| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BENTON & BROWN, LLC. |
- 2 - MADDEN CONTRACTING CO., INC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
416   |
LNFT |
5.00 |
2,080.00 |
6.00 |
2,496.00 |
|
|
|
|
| 202-02-I |
removal of culvert pipe
|
16   |
EACH |
100.00 |
1,600.00 |
1.00 |
16.00 |
|
|
|
|
| 203-07 |
borrow (vehicular measurement)
|
500   |
CUYD |
20.00 |
10,000.00 |
15.00 |
7,500.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
75   |
CUYD |
55.00 |
4,125.00 |
97.50 |
7,312.50 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
9,867.0 |
TON |
105.00 |
1,036,035.00 |
110.50 |
1,090,303.50 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
50.0 |
TON |
150.00 |
7,500.00 |
288.00 |
14,400.00 |
|
|
|
|
| 507-01-A |
asphaltic material (crs-2p emulsion)
|
23,492   |
GAL |
4.40 |
103,364.80 |
3.98 |
93,498.16 |
|
|
|
|
| 507-02-B |
aggregate (s2)
|
57,297   |
SQYD |
1.55 |
88,810.35 |
1.36 |
77,923.92 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
88,802   |
SQYD |
1.70 |
150,963.40 |
1.50 |
133,203.00 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 2,776   |
CUYD |
1.00 |
- 2,776.00 |
1.00 |
- 2,776.00 |
|
|
|
|
| 510-01-A |
pavement patching (6" minimum thickness)
|
750   |
SQYD |
40.00 |
30,000.00 |
47.65 |
35,737.50 |
|
|
|
|
| 510-01-B |
pavement patching (12" minimum thickness)
|
1,000   |
SQYD |
100.00 |
100,000.00 |
94.00 |
94,000.00 |
|
|
|
|
| 510-03 |
pavement joint repair
|
20.0 |
TON |
600.00 |
12,000.00 |
805.00 |
16,100.00 |
|
|
|
|
| 701-01-M |
cross drain pipe (36" rcp/pcp)
|
96   |
LNFT |
240.00 |
23,040.00 |
275.00 |
26,400.00 |
|
|
|
|
| 701-10-G |
reinforced concrete pipe (extension)(18")
|
14   |
LNFT |
150.00 |
2,100.00 |
180.00 |
2,520.00 |
|
|
|
|
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
36   |
LNFT |
200.00 |
7,200.00 |
200.00 |
7,200.00 |
|
|
|
|
| 701-15 |
concrete collar
|
7   |
EACH |
950.00 |
6,650.00 |
300.00 |
2,100.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
150.0 |
LNFT |
33.00 |
4,950.00 |
21.50 |
3,225.00 |
|
|
|
|
| 704-07-A |
guard rail bridge attachments (single thrie beam)
|
50.0 |
LNFT |
55.00 |
2,750.00 |
46.00 |
2,300.00 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
82.00 |
8,200.00 |
59.00 |
5,900.00 |
|
|
|
|
| 704-11-B |
guard rail end treatment (tangent)
|
4   |
EACH |
2,750.00 |
11,000.00 |
2,250.00 |
9,000.00 |
|
|
|
|
| 712-04 |
flexible revetment
|
125   |
SQYD |
70.00 |
8,750.00 |
80.00 |
10,000.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
49,000.00 |
49,000.00 |
70,500.00 |
70,500.00 |
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
13.340 |
MILE |
350.00 |
4,669.00 |
400.00 |
5,336.00 |
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
8.022 |
MILE |
1.00 |
8.02 |
1.00 |
8.02 |
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
41.355 |
MILE |
1.00 |
41.36 |
1.00 |
41.36 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
1.0 |
TON |
2,200.00 |
2,200.00 |
1,500.00 |
1,500.00 |
|
|
|
|
| 726-01 |
bedding material
|
25.0 |
CUYD |
60.00 |
1,500.00 |
90.00 |
2,250.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
49,000.00 |
49,000.00 |
70,500.00 |
70,500.00 |
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
5   |
EACH |
70.00 |
350.00 |
70.00 |
350.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
110.00 |
440.00 |
75.00 |
300.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
881   |
EACH |
5.60 |
4,933.60 |
4.50 |
3,964.50 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
20.678 |
MILE |
2,850.00 |
58,932.30 |
2,300.00 |
47,559.40 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
4.011 |
MILE |
750.00 |
3,008.25 |
600.00 |
2,406.60 |
|
|
|
|
| 735-01 |
mailboxes
|
57   |
EACH |
1.00 |
57.00 |
1.00 |
57.00 |
|
|
|
|
| 735-01-A |
mailboxes (large)
|
5   |
EACH |
30.00 |
150.00 |
25.00 |
125.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
56   |
EACH |
135.00 |
7,560.00 |
125.00 |
7,000.00 |
|
|
|
|
| 735-03 |
mailbox supports (double)
|
3   |
EACH |
195.00 |
585.00 |
175.00 |
525.00 |
|
|
|
|
| 739-01 |
hydro-seeding
|
1.00 |
ACRE |
2,200.00 |
2,200.00 |
1,500.00 |
1,500.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
15,000.00 |
15,000.00 |
24,000.00 |
24,000.00 |
|
|
|
|
| S-001 |
traffic maintenance superpave asphaltic concrete
|
20   |
TON |
100.00 |
2,000.00 |
215.00 |
4,300.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,819,977.08 |
|
1,880,582.46 |
|
|
|
|
|