Lead Project: 004-06-0032
Parish: ST MARY
Routes: LA 182
Description: JCT LA 322 - C.S.L.M. 0.764
Type Const: cold planing asphaltic concrete, pavement patching, superpave asphaltic concrete
overlay and related work.
Estimated Construction Cost: $728,252.60
 
RankLicenseBidderConstruction Bid
1 04089 H & S CONSTRUCTION CO., INC. $777,960.43
2 06276 BARRIERE CONSTRUCTION CO., LLC $822,697.20
 
Item Number Item Description Quantity Unit of Measure - 1 -
H & S CONSTRUCTION CO., INC.
- 2 -
BARRIERE CONSTRUCTION CO., LLC

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
502-01 superpave asphaltic concrete 3,138.9    TON 125.00 392,362.50 115.00 360,973.50        
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
335.0    TON 175.00 58,625.00 115.00 38,525.00        
509-01 cold planing asphaltic pavement 31,575      SQYD 4.00 126,300.00 3.10 97,882.50        
509-02 contractor retained reclaimed asphaltic pavement - 1,870      CUYD 0.01 - 18.70 1.00 - 1,870.00        
510-01-B pavement patching (12" minimum thickness) 750      SQYD 175.00 131,250.00 100.00 75,000.00        
702-04-A adjusting manholes 11      EACH 140.00 1,540.00 2,000.00 22,000.00        
702-04-B adjusting catch basins 5      EACH 450.00 2,250.00 2,000.00 10,000.00        
702-04-D adjusting water valves 6      EACH 85.00 510.00 1,000.00 6,000.00        
702-04-E adjusting gas valves 3      EACH 85.00 255.00 1,000.00 3,000.00        
713-01 temporary signs & barricades lump      LUMP 12,000.00 12,000.00 81,000.00 81,000.00        
713-02-C temporary pavement markings (8" width) 506      LNFT 0.36 182.16 0.10 50.60        
713-02-E temporary pavement markings (24" width) 244      LNFT 1.09 265.96 0.10 24.40        
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
2.556  MILE 304.00 777.02 100.00 255.60        
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
0.494  MILE 334.00 165.00 100.00 49.40        
713-04-A temporary pavement markings (solid line)(4" width) 3.817  MILE 516.00 1,969.57 100.00 381.70        
713-05-A temporary pavement legends and symbols (arrow) 14      EACH 61.00 854.00 50.00 700.00        
727-01 mobilization lump      LUMP 25,000.00 25,000.00 81,000.00 81,000.00        
731-02 reflectorized raised pavement markers 393      EACH 6.20 2,436.60 5.50 2,161.50        
732-01-C plastic pavement striping (8" width) 506      LNFT 0.79 399.74 0.70 354.20        
732-01-E plastic pavement striping (24" width) 244      LNFT 5.00 1,220.00 4.00 976.00        
732-02-A plastic pavement striping (solid line) (4" width) 3.817  MILE 3,293.00 12,569.38 2,800.00 10,687.60        
732-03-A plastic pavement striping (broken line)(4" width) 0.494  MILE 966.00 477.20 800.00 395.20        
732-04-A plastic pavement legends & symbols (arrow) 14      EACH 255.00 3,570.00 225.00 3,150.00        
740-01 construction layout lump      LUMP 3,000.00 3,000.00 30,000.00 30,000.00        
                       
 CONTRACTOR TOTAL       777,960.43   822,697.20        