Letting of 9/24/2008 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 001-06-0055
Parish: BIENVILLE
Routes: US 80
Description: RAILROAD OVERPASS TO LA 154
Type Const: grading, cold planing asphaltic concrete, pavement patching, superpave asphaltic
concrete pavement, and related work.
Estimated Construction Cost: $1,878,743.64
 
RankLicenseBidderConstruction Bid
1 08584 MADDEN CONTRACTING CO., INC. $1,646,063.12
 
Item Number Item Description Quantity Unit of Measure - 1 -
MADDEN CONTRACTING CO., INC.

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-D removal of concrete walks & drives 9      SQYD 50.00 450.00            
203-05 excavation and embankment lump      LUMP 1,000.00 1,000.00            
203-07 borrow (vehicular measurement) 6,300      CUYD 13.25 83,475.00            
401-02 aggregate surface course (adjusted vehicular
measurement)
150      CUYD 30.00 4,500.00            
502-01 superpave asphaltic concrete 10,159.2    TON 110.30 1,120,559.76            
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
360.0    TON 90.00 32,400.00            
509-01 cold planing asphaltic pavement 49,659      SQYD 1.05 52,141.95            
509-02 contractor retained reclaimed asphaltic pavement - 1,082      CUYD 0.01 - 10.82            
510-01-A pavement patching (6" minimum thickness) 300      SQYD 58.50 17,550.00            
510-01-B pavement patching (12" minimum thickness) 400      SQYD 90.75 36,300.00            
510-03 pavement joint repair 270.2    TON 205.00 55,391.00            
712-02 sacked concrete revetment 80      SQYD 80.00 6,400.00            
713-01 temporary signs & barricades lump      LUMP 68,500.00 68,500.00            
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
12.243  MILE 300.00 3,672.90            
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
6.990  MILE 1.00 6.99            
713-04-A temporary pavement markings (solid line)(4" width) 35.940  MILE 1.00 35.94            
716-01-A mulch (vegetative) 17.1    TON 600.00 10,260.00            
727-01 mobilization lump      LUMP 68,500.00 68,500.00            
729-16-C object marker assembly (type 3) 2      EACH 100.00 200.00            
731-02 reflectorized raised pavement markers 540      EACH 4.50 2,430.00            
732-01-E plastic pavement striping (24" width) 12      LNFT 3.00 36.00            
732-02-A plastic pavement striping (solid line) (4" width) 11.984  MILE 2,300.00 27,563.20            
732-03-A plastic pavement striping (broken line)(4" width) 2.332  MILE 600.00 1,399.20            
735-01 mailboxes 2      EACH 1.00 2.00            
735-02 mailbox supports (single) 2      EACH 500.00 1,000.00            
739-01 hydro-seeding 9.75   ACRE 1,200.00 11,700.00            
740-01 construction layout lump      LUMP 24,000.00 24,000.00            
805-01-B class a concrete (box culvert headwalls) 8.00   CUYD 1,500.00 12,000.00            
806-01 deformed reinforcing steel 1,000      LB 3.00 3,000.00            
S-001 saw cutting concrete drives 64      LNFT 25.00 1,600.00            
                       
 CONTRACTOR TOTAL       1,646,063.12            