| DBE GOAL FED |
| Lead Project: 001-06-0055 |
| Parish: BIENVILLE |
| Routes: US 80 |
| Description: RAILROAD OVERPASS TO LA 154 |
Type Const:
grading, cold planing asphaltic concrete, pavement patching, superpave asphaltic
concrete pavement, and related work. |
| Estimated Construction Cost: $1,878,743.64 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - MADDEN CONTRACTING CO., INC. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks & drives
|
9   |
SQYD |
50.00 |
450.00 |
|
|
|
|
|
|
| 203-05 |
excavation and embankment
|
lump |
LUMP |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 203-07 |
borrow (vehicular measurement)
|
6,300   |
CUYD |
13.25 |
83,475.00 |
|
|
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
150   |
CUYD |
30.00 |
4,500.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
10,159.2 |
TON |
110.30 |
1,120,559.76 |
|
|
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
360.0 |
TON |
90.00 |
32,400.00 |
|
|
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
49,659   |
SQYD |
1.05 |
52,141.95 |
|
|
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 1,082   |
CUYD |
0.01 |
- 10.82 |
|
|
|
|
|
|
| 510-01-A |
pavement patching (6" minimum thickness)
|
300   |
SQYD |
58.50 |
17,550.00 |
|
|
|
|
|
|
| 510-01-B |
pavement patching (12" minimum thickness)
|
400   |
SQYD |
90.75 |
36,300.00 |
|
|
|
|
|
|
| 510-03 |
pavement joint repair
|
270.2 |
TON |
205.00 |
55,391.00 |
|
|
|
|
|
|
| 712-02 |
sacked concrete revetment
|
80   |
SQYD |
80.00 |
6,400.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
68,500.00 |
68,500.00 |
|
|
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
12.243 |
MILE |
300.00 |
3,672.90 |
|
|
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
6.990 |
MILE |
1.00 |
6.99 |
|
|
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
35.940 |
MILE |
1.00 |
35.94 |
|
|
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
17.1 |
TON |
600.00 |
10,260.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
68,500.00 |
68,500.00 |
|
|
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
2   |
EACH |
100.00 |
200.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
540   |
EACH |
4.50 |
2,430.00 |
|
|
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
12   |
LNFT |
3.00 |
36.00 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
11.984 |
MILE |
2,300.00 |
27,563.20 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
2.332 |
MILE |
600.00 |
1,399.20 |
|
|
|
|
|
|
| 735-01 |
mailboxes
|
2   |
EACH |
1.00 |
2.00 |
|
|
|
|
|
|
| 735-02 |
mailbox supports (single)
|
2   |
EACH |
500.00 |
1,000.00 |
|
|
|
|
|
|
| 739-01 |
hydro-seeding
|
9.75 |
ACRE |
1,200.00 |
11,700.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
24,000.00 |
24,000.00 |
|
|
|
|
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
8.00 |
CUYD |
1,500.00 |
12,000.00 |
|
|
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
1,000   |
LB |
3.00 |
3,000.00 |
|
|
|
|
|
|
| S-001 |
saw cutting concrete drives
|
64   |
LNFT |
25.00 |
1,600.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,646,063.12 |
|
|
|
|
|
|
|