Lead Project: 697-11-0015
Parish: CALCASIEU
Routes: I-10
Description: TOOMEY PIT SCALE MAINLINE SORTING SYSTEM
Type Const: grading, class ii b/c, cold planing acp, asphaltic concrete pvmt, portland cement
concrete pvmt, pavement patching, weigh in motion (mainline sorting system), and related work.
Estimated Construction Cost: $3,967,457.31
 
RankLicenseBidderConstruction Bid
1 46547 INTERSTATE IMPROVEMENT, INC. $4,321,056.20
2 08470 DIAMOND ELECTRICAL CO., INC. $4,979,269.69
 
Item Number Item Description Quantity Unit of Measure - 1 -
INTERSTATE IMPROVEMENT, INC.
- 2 -
DIAMOND ELECTRICAL CO., INC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 25,000.00 25,000.00 40,000.00 40,000.00        
203-05 excavation and embankment lump      LUMP 350,000.00 350,000.00 115,500.00 115,500.00        
203-08 geotextile fabric 90      SQYD 1.50 135.00 4.65 418.50        
204-02 temporary hay or straw bales 40      EACH 15.00 600.00 23.00 920.00        
204-06 temporary silt fencing 1,000      LNFT 2.50 2,500.00 3.50 3,500.00        
302-01-A class ii base course 40.0    CUYD 50.00 2,000.00 175.00 7,000.00        
508-01 asphalt concrete (sma) wearing course 723.4    TON 170.00 122,978.00 242.55 175,460.67        
509-01 cold planing asphaltic pavement 2,672      SQYD 5.00 13,360.00 12.75 34,068.00        
509-02 contractor retained reclaimed asphaltic pavement - 550      CUYD 1.50 - 825.00 0.01 - 5.50        
601-03-D portland cement concrete shoulder (6.5" thick) 666.6    SQYD 175.00 116,655.00 69.00 45,995.40        
602-07 patching continuously reinforced concrete pavement 1,600.0    SQYD 425.00 680,000.00 335.00 536,000.00        
713-01 temporary signs & barricades lump      LUMP 150,000.00 150,000.00 100,200.00 100,200.00        
713-04-A temporary pavement markings (solid line)(4" width) 2.462  MILE 1,000.00 2,462.00 1,386.00 3,412.33        
713-06 temporary reflectorized raised pavement markers 612      EACH 0.35 214.20 5.90 3,610.80        
713-08 temporary precast concrete barrier (department
furnished)
280      EACH 200.00 56,000.00 810.00 226,800.00        
713-10 temporary precast concrete barrier movement 2,240      EACH 5.00 11,200.00 35.00 78,400.00        
725-01 temporary detour roads 7,500.0    SQYD 60.00 450,000.00 185.00 1,387,500.00        
727-01 mobilization lump      LUMP 300,000.00 300,000.00 408,000.00 408,000.00        
729-04 sign (type d) 1,414.0    SQFT 28.00 39,592.00 37.00 52,318.00        
729-08-F mounting (w6 x 12) 14      EACH 1,000.00 14,000.00 1,790.00 25,060.00        
729-08-G mounting (w8 x 18) 16      EACH 1,600.00 25,600.00 2,137.00 34,192.00        
729-13 mounting (bridge fascia mounted) 1      EACH 10,000.00 10,000.00 9,820.00 9,820.00        
731-02 reflectorized raised pavement markers 110      EACH 10.00 1,100.00 5.89 647.90        
732-02-A plastic pavement striping (solid line) (4" width) 3.125  MILE 3,000.00 9,375.00 3,638.25 11,369.53        
732-05 removal of existing markings 0.423  MILE 10,000.00 4,230.00 6,699.00 2,833.68        
740-01 construction layout lump      LUMP 100,000.00 100,000.00 28,000.00 28,000.00        
S-001 mainline sorting system lump      LUMP 1,750,000.00 1,750,000.00 1,567,400.00 1,567,400.00        
S-002 extended maintenance lump      LUMP 17,000.00 17,000.00 20,000.00 20,000.00        
S-003 saw cut 736      LNFT 5.00 3,680.00 17.33 12,754.88        
S-004 rumble strips (ground in) 0.4    MILE 10,500.00 4,200.00 22,233.75 8,893.50        
S-005 dynamic message sign unit 4      EACH 15,000.00 60,000.00 9,800.00 39,200.00        
                       
 CONTRACTOR TOTAL       4,321,056.20   4,979,269.69        