| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DIAMOND ELECTRICAL CO., INC. |
- 2 - JACK B. HARPER CONTRACTOR, INC. |
- 3 - COASTAL BRIDGE CO., L.L.C. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
17,600.00 |
17,600.00 |
7,200.00 |
7,200.00 |
45,000.00 |
45,000.00 |
|
|
| 203-05 |
excavation and embankment
|
lump |
LUMP |
48,510.00 |
48,510.00 |
8,700.00 |
8,700.00 |
10,000.00 |
10,000.00 |
|
|
| 502-03 |
superpave asphaltic concrete (4" thick)
|
1,976   |
SQYD |
68.00 |
134,368.00 |
66.00 |
130,416.00 |
55.00 |
108,680.00 |
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
150.0 |
LNFT |
45.00 |
6,750.00 |
50.60 |
7,590.00 |
75.00 |
11,250.00 |
|
|
| 704-03 |
blocked out guard rail
|
1,000.0 |
LNFT |
23.10 |
23,100.00 |
20.90 |
20,900.00 |
35.00 |
35,000.00 |
|
|
| 704-06-A |
guard rail anchor sections (trailing end)(single thrie
beam) |
25.0 |
LNFT |
92.40 |
2,310.00 |
99.00 |
2,475.00 |
140.00 |
3,500.00 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
2   |
EACH |
3,089.65 |
6,179.30 |
2,530.00 |
5,060.00 |
2,500.00 |
5,000.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
13,000.00 |
13,000.00 |
13,800.00 |
13,800.00 |
55,000.00 |
55,000.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
42,850.00 |
42,850.00 |
38,400.00 |
38,400.00 |
65,000.00 |
65,000.00 |
|
|
| 730-01 |
trenching and backfilling
|
5,180   |
LNFT |
2.75 |
14,245.00 |
3.85 |
19,943.00 |
3.00 |
15,540.00 |
|
|
| 730-02-A |
conduit with conductors (2" schedule 40 pvc; 3#1/0)
|
80   |
LNFT |
34.40 |
2,752.00 |
19.80 |
1,584.00 |
28.00 |
2,240.00 |
|
|
| 730-02-B |
conduit with conductors (2" rigid galvanized steel;
3#1/0) |
20   |
LNFT |
43.20 |
864.00 |
37.50 |
750.00 |
38.00 |
760.00 |
|
|
| 730-02-C |
conduit with conductors (2" rigid galvanized steel;
3#1/0, 1#6 green ground) |
25   |
LNFT |
65.35 |
1,633.75 |
38.72 |
968.00 |
35.00 |
875.00 |
|
|
| 730-02-D |
conduit with conductors (2" schedule 40 pvc; 3#1/0,
1#6 green ground) |
60   |
LNFT |
33.65 |
2,019.00 |
21.00 |
1,260.00 |
20.00 |
1,200.00 |
|
|
| 730-02-E |
conduit with conductors (2" rigid galvanized steel;
3#2, 1#6 green ground) |
25   |
LNFT |
52.70 |
1,317.50 |
30.32 |
758.00 |
32.00 |
800.00 |
|
|
| 730-02-F |
conduit with conductors (2" schedule 40 pvc; 3#2,
1#6 green ground) |
60   |
LNFT |
14.20 |
852.00 |
18.40 |
1,104.00 |
18.00 |
1,080.00 |
|
|
| 730-02-G |
conduit with conductors (2" rigid galvanized steel;
2#2, 2#6, 2#8, 1#2 bare ground) |
20   |
LNFT |
47.40 |
948.00 |
35.50 |
710.00 |
35.00 |
700.00 |
|
|
| 730-02-H |
conduit with conductors (2" schedule 40 pvc; 2#2, 2#6,
2#8, 1#2 bare ground) |
525   |
LNFT |
15.40 |
8,085.00 |
16.00 |
8,400.00 |
17.00 |
8,925.00 |
|
|
| 730-02-I |
conduit with conductors (1 1/2" schedule 40 pvc; 2#2,
2#6, 1#2 bare ground) |
1,775   |
LNFT |
13.80 |
24,495.00 |
12.76 |
22,649.00 |
12.00 |
21,300.00 |
|
|
| 730-02-J |
conduit with conductors (1" schedule 40 pvc; 2#6,
1#6 bare ground) |
3,200   |
LNFT |
5.80 |
18,560.00 |
5.42 |
17,344.00 |
6.00 |
19,200.00 |
|
|
| 730-04 |
jacked or bored casing (6" diameter schedule 80 pvc)
|
120   |
LNFT |
48.80 |
5,856.00 |
27.30 |
3,276.00 |
60.00 |
7,200.00 |
|
|
| 730-05-A |
light pole (50 foot, aluminum, breakaway base, concr.
mowing apron w/juncti on box; two (2) internal lowering devices) |
8   |
EACH |
13,485.00 |
107,880.00 |
12,360.00 |
98,880.00 |
18,600.00 |
148,800.00 |
|
|
| 730-06-A |
high mast pole (130 foot, steel, 8 luminaire ring,
internal lowering device) |
4   |
EACH |
48,105.00 |
192,420.00 |
65,700.00 |
262,800.00 |
69,000.00 |
276,000.00 |
|
|
| 730-07-A |
luminaire (400 watt hps, trunion, type iv, long &
narrow, non-cutoff distribution, protected starter, with lamp) |
16   |
EACH |
680.00 |
10,880.00 |
1,452.00 |
23,232.00 |
2,000.00 |
32,000.00 |
|
|
| 730-07-B |
luminaire (1000 watt hps, type ii, medium, cutoff
distribution with lamp) |
32   |
EACH |
865.00 |
27,680.00 |
864.00 |
27,648.00 |
1,200.00 |
38,400.00 |
|
|
| 730-08 |
electrical service point (on structure)
|
2   |
EACH |
12,430.00 |
24,860.00 |
12,660.00 |
25,320.00 |
15,000.00 |
30,000.00 |
|
|
| 730-12-A |
removal and storage of light poles (40 foot, ground
mounted, 1-6 foot truss arm, steel) |
39   |
EACH |
120.00 |
4,680.00 |
222.00 |
8,658.00 |
150.00 |
5,850.00 |
|
|
| 730-14-A |
removal and disposal of luminaires (400 watt hps)
|
39   |
EACH |
70.00 |
2,730.00 |
114.00 |
4,446.00 |
35.00 |
1,365.00 |
|
|
| 730-16-A |
underground junction box (12"x12")
|
8   |
EACH |
165.00 |
1,320.00 |
324.00 |
2,592.00 |
400.00 |
3,200.00 |
|
|
| 730-16-B |
underground junction box (11"x18")
|
10   |
EACH |
650.00 |
6,500.00 |
516.00 |
5,160.00 |
600.00 |
6,000.00 |
|
|
| 730-16-C |
underground junction box (13"x24")
|
4   |
EACH |
930.00 |
3,720.00 |
576.00 |
2,304.00 |
900.00 |
3,600.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
2,800.00 |
2,800.00 |
5,400.00 |
5,400.00 |
1,000.00 |
1,000.00 |
|
|
| S-001 |
modular breakaway cable system (low mast)
|
8   |
EACH |
1,200.00 |
9,600.00 |
1,404.00 |
11,232.00 |
1,900.00 |
15,200.00 |
|
|
| S-002 |
concrete marker (underground duct)
|
4   |
EACH |
150.00 |
600.00 |
132.00 |
528.00 |
150.00 |
600.00 |
|
|
| S-003 |
marker tape (underground)
|
5,180   |
LNFT |
0.43 |
2,227.40 |
0.80 |
4,144.00 |
0.50 |
2,590.00 |
|
|
| S-004 |
safety switch (secondary power controller)
|
2   |
EACH |
5,000.00 |
10,000.00 |
1,476.00 |
2,952.00 |
5,700.00 |
11,400.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
784,191.95 |
|
798,583.00 |
|
994,255.00 |
|
|
|