Letting of 8/27/2008 LA DOTD Headquarters


REBID
go back
Go Back
 
Lead Project: 450-12-0030
Parish: ST JAMES, ST JOHN
Routes: I-10
Description: GRAMERCY TO ST. CHARLES PARISH LINE
Type Const: interstate signing and related work.
Estimated Construction Cost: $1,106,952.40
 
RankLicenseBidderConstruction Bid
1 34068 ALPHA SERVICE AND PRODUCTS, INC. $1,057,397.20
2 00164 TRAFFIC SOLUTIONS, INC. $1,276,538.00
3 23811 HIGHWAY TECHNOLOGIES INC $1,280,147.50
 
Item Number Item Description Quantity Unit of Measure - 1 -
ALPHA SERVICE AND PRODUCTS, INC.
- 2 -
TRAFFIC SOLUTIONS, INC.
- 3 -
HIGHWAY TECHNOLOGIES INC

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-J removal of sign and support(s) 181      EACH 350.00 63,350.00 955.00 172,855.00 1,000.00 181,000.00    
202-02-K removal of sign face(s) 120      EACH 110.00 13,200.00 350.00 42,000.00 121.00 14,520.00    
202-02-L removal of sign footing 2      EACH 1,000.00 2,000.00 3,000.00 6,000.00 11,385.00 22,770.00    
706-03-C incidental concrete paving (6" thick) 100.8    SQYD 80.00 8,064.00 100.00 10,080.00 101.00 10,180.80    
713-01 temporary signs & barricades lump      LUMP 50,000.00 50,000.00 70,000.00 70,000.00 117,675.00 117,675.00    
727-01 mobilization lump      LUMP 100,000.00 100,000.00 100,000.00 100,000.00 119,853.50 119,853.50    
729-01 sign (type a) 1,701.6    SQFT 24.00 40,838.40 25.00 42,540.00 23.00 39,136.80    
729-02 sign (type b) 113.2    SQFT 34.00 3,848.80 25.00 2,830.00 22.00 2,490.40    
729-04 sign (type d) 6,102.0    SQFT 28.00 170,856.00 26.00 158,652.00 23.00 140,346.00    
729-05 sign (type e) 300.0    SQFT 35.00 10,500.00 32.00 9,600.00 26.00 7,800.00    
729-06 sign (overhead mounted) 1,328.0    SQFT 30.00 39,840.00 32.00 42,496.00 33.00 43,824.00    
729-08-A mounting (2 1/2" post) 10      EACH 780.00 7,800.00 950.00 9,500.00 693.00 6,930.00    
729-08-B mounting (3 1/2" post) 42      EACH 900.00 37,800.00 975.00 40,950.00 771.00 32,382.00    
729-08-B-01 mounting (3 1/2" post structure mounted) 6      EACH 1,050.00 6,300.00 950.00 5,700.00 3,643.00 21,858.00    
729-08-C mounting (5" post) 35      EACH 1,200.00 42,000.00 1,200.00 42,000.00 1,064.00 37,240.00    
729-08-C-01 mounting (5" post structure mounted) 16      EACH 1,200.00 19,200.00 1,100.00 17,600.00 3,450.00 55,200.00    
729-08-E mounting (s3 x 5.7) 4      EACH 950.00 3,800.00 1,100.00 4,400.00 786.00 3,144.00    
729-08-F mounting (w6 x 12) 64      EACH 970.00 62,080.00 1,500.00 96,000.00 1,146.00 73,344.00    
729-08-F-01 mounting (w6 x 12 structure mounted) 2      EACH 875.00 1,750.00 1,200.00 2,400.00 1,393.00 2,786.00    
729-08-G mounting (w8 x 18) 20      EACH 1,500.00 30,000.00 1,950.00 39,000.00 1,394.00 27,880.00    
729-08-H mounting (w8 x 24) 26      EACH 2,000.00 52,000.00 2,200.00 57,200.00 2,211.00 57,486.00    
729-08-I mounting (w10 x 33) 20      EACH 2,380.00 47,600.00 2,800.00 56,000.00 2,828.00 56,560.00    
729-17 milepost assembly (ground mounted) 20      EACH 150.00 3,000.00 200.00 4,000.00 157.00 3,140.00    
729-18-A milepost assembly (structure mounted)(1' x 4') 14      EACH 200.00 2,800.00 150.00 2,100.00 218.00 3,052.00    
729-18-B milepost assembly (structure mounted)(0.5' x 2') 106      EACH 190.00 20,140.00 140.00 14,840.00 207.00 21,942.00    
729-19 dead end road installations (type c without guardrail) 1      EACH 1,150.00 1,150.00 1,000.00 1,000.00 800.00 800.00    
729-21 u-channel post 7      EACH 120.00 840.00 85.00 595.00 96.00 672.00    
740-01 construction layout lump      LUMP 30,000.00 30,000.00 50,000.00 50,000.00 37,285.00 37,285.00    
S-001 remove and remount logo panel 90      ea 75.00 6,750.00 90.00 8,100.00 50.00 4,500.00    
S-002 dynamic message sign unit 2      ea 12,000.00 24,000.00 7,500.00 15,000.00 2,000.00 4,000.00    
S-003 removal of call box post (ground mounted) 15      ea 250.00 3,750.00 300.00 4,500.00 50.00 750.00    
S-004 removal of call box post (structure mounted) 23      ea 180.00 4,140.00 200.00 4,600.00 75.00 1,725.00    
S-005 sign support bracket 8      ea 7,000.00 56,000.00 6,000.00 48,000.00 5,600.00 44,800.00    
S-007 type ii mounting bracket & supports 5      ea 14,000.00 70,000.00 15,000.00 75,000.00 14,500.00 72,500.00    
S-008 sign support bracket (structure mounted) 4      ea 4,200.00 16,800.00 4,000.00 16,000.00 1,500.00 6,000.00    
S-009 type iii mounting bracket & supports 1      ea 5,200.00 5,200.00 5,000.00 5,000.00 4,575.00 4,575.00    
                       
 CONTRACTOR TOTAL       1,057,397.20   1,276,538.00   1,280,147.50    