| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - AUSTIN BRIDGE & ROAD, LP |
- 2 - JAMES CONSTRUCTION GROUP LLC |
- 3 - GILCHRIST CONSTRUCTION CO. LLC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
300,000.00 |
300,000.00 |
400,000.00 |
400,000.00 |
1,950,000.00 |
1,950,000.00 |
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
220,000.00 |
220,000.00 |
190,000.00 |
190,000.00 |
350,000.00 |
350,000.00 |
|
|
| 202-02-A-01 |
removal of bridges (sta. 188+79.54; 39'x215' concrete
deck & prestressed girders) |
2   |
EACH |
100,000.00 |
200,000.00 |
400,000.00 |
800,000.00 |
215,000.00 |
430,000.00 |
|
|
| 202-02-A-02 |
removal of bridges (sta. 227+22.70; 39.5'x264'
concrete deck & bents with steel girders) |
2   |
EACH |
100,000.00 |
200,000.00 |
300,000.00 |
600,000.00 |
135,000.00 |
270,000.00 |
|
|
| 202-02-A-03 |
removal of bridge deck (sta. 258+13.74)(includes
railing) |
2,470   |
SQFT |
15.00 |
37,050.00 |
50.00 |
123,500.00 |
54.00 |
133,380.00 |
|
|
| 202-02-A-04 |
removal of bridge deck (sta. 335+93.86)(includes
railing) |
3,990   |
SQFT |
16.00 |
63,840.00 |
50.00 |
199,500.00 |
54.00 |
215,460.00 |
|
|
| 202-02-A-05 |
removal of prestressed girders(sta. 336+88.86)
|
283.5 |
LNFT |
25.00 |
7,087.50 |
35.00 |
9,922.50 |
120.00 |
34,020.00 |
|
|
| 202-02-A-06 |
demolition of existing substructure(sta. 258+13.74)
|
4   |
each |
10,000.00 |
40,000.00 |
12,000.00 |
48,000.00 |
30,000.00 |
120,000.00 |
|
|
| 202-02-A-07 |
demolition of existing substructure(sta. 335+93.86)
|
4   |
each |
12,000.00 |
48,000.00 |
12,000.00 |
48,000.00 |
30,000.00 |
120,000.00 |
|
|
| 202-02-A-08 |
demolition of existing concrete rails(sta. 179+03)
|
4   |
each |
10,000.00 |
40,000.00 |
4,500.00 |
18,000.00 |
3,500.00 |
14,000.00 |
|
|
| 202-02-A-10 |
removal of existing approach slabs
|
2,075   |
SQYD |
28.00 |
58,100.00 |
50.00 |
103,750.00 |
90.00 |
186,750.00 |
|
|
| 202-02-A-11 |
removal of existing revetment (concrete and/or
flexible) |
9,357   |
SQYD |
12.00 |
112,284.00 |
20.00 |
187,140.00 |
5.50 |
51,463.50 |
|
|
| 202-02-C |
removal of portland cement concrete pavement (variable
thickness) |
125,511   |
SQYD |
6.00 |
753,066.00 |
7.00 |
878,577.00 |
5.50 |
690,310.50 |
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
58,292.9 |
SQYD |
8.00 |
466,343.20 |
5.00 |
291,464.50 |
5.00 |
291,464.50 |
|
|
| 202-02-H |
removal of guard rail
|
10,639   |
LNFT |
5.00 |
53,195.00 |
4.00 |
42,556.00 |
6.00 |
63,834.00 |
|
|
| 202-02-I |
removal of overhead sign (bridge fascia mounted)
|
8   |
EACH |
1,884.61 |
15,076.88 |
3,550.00 |
28,400.00 |
4,000.00 |
32,000.00 |
|
|
| 202-02-J |
removal of overhead sign (truss ground mounted)
|
4   |
EACH |
6,910.25 |
27,641.00 |
15,000.00 |
60,000.00 |
6,500.00 |
26,000.00 |
|
|
| 202-02-K |
removal of overhead sign (cantilever truss ground
mounted) |
4   |
EACH |
4,397.43 |
17,589.72 |
15,000.00 |
60,000.00 |
5,300.00 |
21,200.00 |
|
|
| 202-02-L |
removal of sign (w-section post)
|
15   |
EACH |
219.87 |
3,298.05 |
820.00 |
12,300.00 |
1,000.00 |
15,000.00 |
|
|
| 202-02-M |
removal of sign(circular post)
|
35   |
EACH |
219.87 |
7,695.45 |
650.00 |
22,750.00 |
775.00 |
27,125.00 |
|
|
| 202-02-N |
removal of headwalls
|
19   |
EACH |
1,500.00 |
28,500.00 |
3,000.00 |
57,000.00 |
1,200.00 |
22,800.00 |
|
|
| 202-02-O |
removal of concrete barriers
|
770   |
EACH |
100.00 |
77,000.00 |
65.00 |
50,050.00 |
155.00 |
119,350.00 |
|
|
| 202-02-P |
removal of fence
|
5,500   |
LNFT |
5.00 |
27,500.00 |
5.00 |
27,500.00 |
5.00 |
27,500.00 |
|
|
| 202-03-A |
relocation of existing sign faces
|
75   |
EACH |
565.38 |
42,403.50 |
100.00 |
7,500.00 |
250.00 |
18,750.00 |
|
|
| 203-01 |
general excavation
|
118,987   |
CUYD |
14.00 |
1,665,818.00 |
15.00 |
1,784,805.00 |
8.00 |
951,896.00 |
|
|
| 203-02 |
drainage excavation
|
71   |
CUYD |
16.95 |
1,203.45 |
150.00 |
10,650.00 |
35.00 |
2,485.00 |
|
|
| 203-03 |
embankment
|
113,311   |
CUYD |
16.00 |
1,812,976.00 |
20.00 |
2,266,220.00 |
23.00 |
2,606,153.00 |
|
|
| 203-04 |
nonplastic embankment
|
392   |
CUYD |
170.00 |
66,640.00 |
125.00 |
49,000.00 |
150.00 |
58,800.00 |
|
|
| 204-02 |
temporary hay or straw bales
|
150   |
EACH |
11.94 |
1,791.00 |
30.00 |
4,500.00 |
20.00 |
3,000.00 |
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
38   |
EACH |
119.36 |
4,535.68 |
130.00 |
4,940.00 |
200.00 |
7,600.00 |
|
|
| 204-06 |
temporary silt fencing
|
19,972   |
LNFT |
3.00 |
59,916.00 |
3.00 |
59,916.00 |
2.00 |
39,944.00 |
|
|
| 302-02-E |
class ii base course (10" thick)
|
282,484.9 |
SQYD |
24.00 |
6,779,637.60 |
18.00 |
5,084,728.20 |
22.50 |
6,355,910.25 |
|
|
| 304-05 |
lime treatment (type e)
|
1,971.81 |
TON |
600.00 |
1,183,086.00 |
280.00 |
552,106.80 |
265.00 |
522,529.65 |
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
1,962.0 |
CUYD |
110.00 |
215,820.00 |
70.00 |
137,340.00 |
40.00 |
78,480.00 |
|
|
| 701-01-I |
cross drain pipe (24" rcp/pcp)
|
153   |
LNFT |
83.78 |
12,818.34 |
98.00 |
14,994.00 |
165.00 |
25,245.00 |
|
|
| 701-01-K |
cross drain pipe (30" rcp/pcp)
|
456   |
LNFT |
87.02 |
39,681.12 |
120.00 |
54,720.00 |
140.00 |
63,840.00 |
|
|
| 701-01-M |
cross drain pipe (36" rcp/pcp)
|
16   |
LNFT |
209.05 |
3,344.80 |
190.00 |
3,040.00 |
250.00 |
4,000.00 |
|
|
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
42   |
LNFT |
94.46 |
3,967.32 |
100.00 |
4,200.00 |
190.00 |
7,980.00 |
|
|
| 701-10-O |
reinforced concrete pipe (extension)(48")
|
20   |
LNFT |
210.22 |
4,204.40 |
325.00 |
6,500.00 |
280.00 |
5,600.00 |
|
|
| 701-15 |
concrete collar
|
5   |
EACH |
444.79 |
2,223.95 |
1,000.00 |
5,000.00 |
950.00 |
4,750.00 |
|
|
| 702-03-A |
catch basins (cb-01)
|
19   |
EACH |
2,965.20 |
56,338.80 |
5,000.00 |
95,000.00 |
3,000.00 |
57,000.00 |
|
|
| 702-03-B |
catch basins (cb-02)
|
10   |
EACH |
5,125.30 |
51,253.00 |
8,350.00 |
83,500.00 |
4,800.00 |
48,000.00 |
|
|
| 702-07-B |
cross drain safety end (type 2)
|
1   |
EACH |
8,412.89 |
8,412.89 |
8,000.00 |
8,000.00 |
5,600.00 |
5,600.00 |
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
31.3 |
LNFT |
50.26 |
1,573.14 |
55.00 |
1,721.50 |
63.00 |
1,971.90 |
|
|
| 704-01-C |
guard rail (double thrie beam)(3'-1 1/2" post spacing)
|
526.9 |
LNFT |
69.10 |
36,408.79 |
58.00 |
30,560.20 |
68.00 |
35,829.20 |
|
|
| 704-03 |
blocked out guard rail
|
2,482.8 |
LNFT |
28.90 |
71,752.92 |
22.00 |
54,621.60 |
25.00 |
62,070.00 |
|
|
| 704-06-A |
guard rail anchor sections (trailing end)(single thrie
beam) |
100.0 |
LNFT |
94.23 |
9,423.00 |
87.00 |
8,700.00 |
100.00 |
10,000.00 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
387.5 |
LNFT |
75.38 |
29,209.75 |
68.00 |
26,350.00 |
80.00 |
31,000.00 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
30   |
EACH |
2,826.92 |
84,807.60 |
2,220.00 |
66,600.00 |
2,500.00 |
75,000.00 |
|
|
| 705-06-C |
chain link fence (6-foot height)
|
100   |
LNFT |
125.64 |
12,564.00 |
30.00 |
3,000.00 |
35.00 |
3,500.00 |
|
|
| 712-01-A |
concrete cast-in-place revetment (4" thick)
|
3,283   |
SQYD |
50.92 |
167,170.36 |
90.00 |
295,470.00 |
69.00 |
226,527.00 |
|
|
| 712-04 |
flexible revetment
|
13,054   |
SQYD |
87.95 |
1,148,099.30 |
65.00 |
848,510.00 |
48.00 |
626,592.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
150,000.00 |
150,000.00 |
950,000.00 |
950,000.00 |
3,000,000.00 |
3,000,000.00 |
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
12.248 |
MILE |
441.00 |
5,401.37 |
2,535.00 |
31,048.68 |
420.00 |
5,144.16 |
|
|
| 713-03-B-01 |
temporary pavement markings (broken line)(4" width)
(10' length) (type 1 removable) |
9.576 |
MILE |
2,985.23 |
28,586.56 |
3,250.00 |
31,122.00 |
3,200.00 |
30,643.20 |
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
39.058 |
MILE |
746.31 |
29,149.38 |
1,015.00 |
39,643.87 |
700.00 |
27,340.60 |
|
|
| 713-04-A-01 |
temporary pavement markings (solid line)(4" width)
(type 1 removable) |
9.576 |
MILE |
11,940.90 |
114,346.06 |
9,150.00 |
87,620.40 |
13,000.00 |
124,488.00 |
|
|
| 713-04-C |
temporary pavement markings (solid line)(8" width)
|
2.840 |
MILE |
2,091.92 |
5,941.05 |
2,285.00 |
6,489.40 |
1,900.00 |
5,396.00 |
|
|
| 713-06 |
temporary reflectorized raised pavement markers
|
5,402   |
EACH |
6.51 |
35,167.02 |
5.00 |
27,010.00 |
6.00 |
32,412.00 |
|
|
| 713-07 |
temporary precast concrete barrier (contractor
furnished) |
2,724   |
EACH |
900.00 |
2,451,600.00 |
690.00 |
1,879,560.00 |
1,250.00 |
3,405,000.00 |
|
|
| 713-10 |
temporary precast concrete barrier movement
|
2,545   |
EACH |
200.00 |
509,000.00 |
100.00 |
254,500.00 |
25.00 |
63,625.00 |
|
|
| 716-01-A |
mulch (vegetative)
|
50.2 |
TON |
525.14 |
26,362.03 |
425.00 |
21,335.00 |
500.00 |
25,100.00 |
|
|
| 716-01-B |
mulch (fiber)
|
16.7 |
TON |
1,094.04 |
18,270.47 |
950.00 |
15,865.00 |
1,100.00 |
18,370.00 |
|
|
| 717-01 |
seeding
|
1,262   |
LB |
9.30 |
11,736.60 |
8.50 |
10,727.00 |
10.00 |
12,620.00 |
|
|
| 718-01 |
fertilizer
|
42,070   |
LB |
0.39 |
16,407.30 |
0.30 |
12,621.00 |
0.75 |
31,552.50 |
|
|
| 720-01-A |
erosion control system, slope protection (type a)
|
16,626   |
SQYD |
1.29 |
21,447.54 |
1.15 |
19,119.90 |
1.75 |
29,095.50 |
|
|
| 720-01-B |
erosion control system, slope protection (type b)
|
1,627   |
SQYD |
1.29 |
2,098.83 |
1.15 |
1,871.05 |
1.75 |
2,847.25 |
|
|
| 720-01-C |
erosion control system, flexible channel liner (type c)
|
6,184   |
SQYD |
1.75 |
10,822.00 |
1.15 |
7,111.60 |
2.20 |
13,604.80 |
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
50,000.00 |
50,000.00 |
35,000.00 |
35,000.00 |
285,000.00 |
285,000.00 |
|
|
| 725-01 |
temporary detour roads
|
48,785.8 |
SQYD |
70.00 |
3,415,006.00 |
98.00 |
4,781,008.40 |
150.00 |
7,317,870.00 |
|
|
| 726-01 |
bedding material
|
226.6 |
CUYD |
103.51 |
23,455.37 |
92.00 |
20,847.20 |
130.00 |
29,458.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
5,577,803.23 |
5,577,803.23 |
10,000,000.00 |
10,000,000.00 |
10,000,000.00 |
10,000,000.00 |
|
|
| 728-01-A |
jacked or bored pipe (24")
|
1,354   |
LNFT |
625.00 |
846,250.00 |
515.00 |
697,310.00 |
550.00 |
744,700.00 |
|
|
| 729-01 |
sign (type a)
|
777.8 |
SQFT |
27.35 |
21,272.83 |
18.00 |
14,000.40 |
24.00 |
18,667.20 |
|
|
| 729-04 |
sign (type d)
|
555.5 |
SQFT |
28.44 |
15,798.42 |
22.00 |
12,221.00 |
28.00 |
15,554.00 |
|
|
| 729-05 |
sign (type e)
|
337.0 |
SQFT |
32.82 |
11,060.34 |
22.50 |
7,582.50 |
28.00 |
9,436.00 |
|
|
| 729-06 |
sign (overhead mounted)
|
5,642.0 |
SQFT |
32.82 |
185,170.44 |
24.00 |
135,408.00 |
28.00 |
157,976.00 |
|
|
| 729-08-B |
mounting (3-1/2" post)
|
37   |
EACH |
929.93 |
34,407.41 |
675.00 |
24,975.00 |
830.00 |
30,710.00 |
|
|
| 729-08-C |
mounting (5" post)
|
1   |
EACH |
1,148.74 |
1,148.74 |
870.00 |
870.00 |
1,000.00 |
1,000.00 |
|
|
| 729-08-F |
mounting (w6x12 post)
|
16   |
EACH |
1,312.85 |
21,005.60 |
1,350.00 |
21,600.00 |
1,600.00 |
25,600.00 |
|
|
| 729-08-H |
mounting (w8x24 post)
|
4   |
EACH |
1,969.27 |
7,877.08 |
1,735.00 |
6,940.00 |
2,100.00 |
8,400.00 |
|
|
| 729-09 |
mounting (overhead truss)(ground mounted)
|
9   |
EACH |
83,146.86 |
748,321.74 |
58,000.00 |
522,000.00 |
65,000.00 |
585,000.00 |
|
|
| 729-11 |
mounting (overhead cantilever)(ground mounted)
|
8   |
EACH |
38,291.32 |
306,330.56 |
27,500.00 |
220,000.00 |
32,000.00 |
256,000.00 |
|
|
| 729-13 |
mounting (bridge fascia mounted)
|
9   |
EACH |
7,111.24 |
64,001.16 |
6,275.00 |
56,475.00 |
7,500.00 |
67,500.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
12   |
EACH |
164.11 |
1,969.32 |
85.00 |
1,020.00 |
100.00 |
1,200.00 |
|
|
| 729-17 |
milepost assembly (ground mounted)
|
6   |
EACH |
164.11 |
984.66 |
180.00 |
1,080.00 |
220.00 |
1,320.00 |
|
|
| 729-20-A |
footings for overhead mountings (cantelever)
|
6   |
EACH |
30,633.06 |
183,798.36 |
35,000.00 |
210,000.00 |
14,000.00 |
84,000.00 |
|
|
| 729-20-B |
footings for overhead mountings (truss)
|
18   |
EACH |
30,633.05 |
551,394.90 |
36,000.00 |
648,000.00 |
20,000.00 |
360,000.00 |
|
|
| 730-01 |
trenching and backfilling
|
21,700   |
LNFT |
3.83 |
83,111.00 |
4.00 |
86,800.00 |
4.15 |
90,055.00 |
|
|
| 730-02-A |
conduit with conductors (2 #6 awg xhhw-2 & 1#8 bare
ground in 1 1/2" sch 40 pvc) |
11,900   |
LNFT |
6.07 |
72,233.00 |
7.00 |
83,300.00 |
7.20 |
85,680.00 |
|
|
| 730-02-B |
conduit with conductors (2 #4 & 2 #6 awg xhhw-2,
1#8 bare ground in 2" sch 40 pvc) |
1,900   |
LNFT |
11.74 |
22,306.00 |
12.00 |
22,800.00 |
13.00 |
24,700.00 |
|
|
| 730-02-C |
conduit with conductors (2 #4 awg xhhw-2 & 1#8 bare
ground in 2" sch 40 pvc) |
9,700   |
LNFT |
8.22 |
79,734.00 |
9.00 |
87,300.00 |
9.75 |
94,575.00 |
|
|
| 730-02-D |
conduit with conductors (2 #6 awg xhhw-2,
1#8 insulated ground in 1" aluminum) |
590   |
LNFT |
15.27 |
9,009.30 |
28.50 |
16,815.00 |
29.50 |
17,405.00 |
|
|
| 730-02-E |
conduit with conductors (2 #6, 2 #4 awg xhhw-2,
1#8 insulated ground in 1 1/2" aluminum) |
140   |
LNFT |
36.97 |
5,175.80 |
36.25 |
5,075.00 |
38.00 |
5,320.00 |
|
|
| 730-02-F |
conduit with conductors (2 #10 awg xhhw-2 &
1#10 insulated ground in 3/4" aluminum) |
1,400   |
LNFT |
13.57 |
18,998.00 |
23.00 |
32,200.00 |
24.00 |
33,600.00 |
|
|
| 730-04 |
jacking or bored casing (4" sch 80 pvc)
|
1,100   |
LNFT |
27.84 |
30,624.00 |
17.25 |
18,975.00 |
19.00 |
20,900.00 |
|
|
| 730-05-A |
light pole (40'mh, twin 15' arms, pedestal mounted)
|
28   |
EACH |
4,841.12 |
135,551.36 |
4,000.00 |
112,000.00 |
4,200.00 |
117,600.00 |
|
|
| 730-05-B |
light pole (40'mh, twin 15' arms, ground mounted)
|
2   |
EACH |
4,430.86 |
8,861.72 |
4,500.00 |
9,000.00 |
5,300.00 |
10,600.00 |
|
|
| 730-05-C |
light pole (40'mh, single 6'arm, ground mounted)
|
9   |
EACH |
4,037.00 |
36,333.00 |
3,800.00 |
34,200.00 |
4,400.00 |
39,600.00 |
|
|
| 730-05-D |
light pole (40'mh, single 12'arm, ground mounted)
|
2   |
EACH |
4,135.47 |
8,270.94 |
4,000.00 |
8,000.00 |
4,500.00 |
9,000.00 |
|
|
| 730-05-E |
light pole (40'mh, single 12'arm, structure mounted)
|
2   |
EACH |
3,446.22 |
6,892.44 |
2,400.00 |
4,800.00 |
2,700.00 |
5,400.00 |
|
|
| 730-06-A |
high mast pole (120' mh, 6 roadway luminaires,
pedestal mount) |
4   |
EACH |
64,276.90 |
257,107.60 |
46,000.00 |
184,000.00 |
50,000.00 |
200,000.00 |
|
|
| 730-06-B |
high mast pole (130' mh, 6 roadway luminaires,
pedestal mount) |
4   |
EACH |
71,838.89 |
287,355.56 |
58,300.00 |
233,200.00 |
64,000.00 |
256,000.00 |
|
|
| 730-07-A |
luminaire (1000 w hps roadway)
|
48   |
EACH |
918.99 |
44,111.52 |
700.00 |
33,600.00 |
800.00 |
38,400.00 |
|
|
| 730-07-B |
luminaire (250 w hps roadway, cobra head)
|
73   |
EACH |
443.09 |
32,345.57 |
250.00 |
18,250.00 |
290.00 |
21,170.00 |
|
|
| 730-07-C |
luminaire (150 w hps underpass)
|
24   |
EACH |
758.17 |
18,196.08 |
865.00 |
20,760.00 |
980.00 |
23,520.00 |
|
|
| 730-08 |
electrical service point w/ pedestal mounted
controller |
4   |
EACH |
7,959.13 |
31,836.52 |
12,000.00 |
48,000.00 |
13,500.00 |
54,000.00 |
|
|
| 730-12-A |
removal and storage of high mast light poles
|
4   |
EACH |
4,376.15 |
17,504.60 |
4,025.00 |
16,100.00 |
4,500.00 |
18,000.00 |
|
|
| 730-12-B |
removal and storage of low mast light poles
|
76   |
EACH |
218.81 |
16,629.56 |
550.00 |
41,800.00 |
580.00 |
44,080.00 |
|
|
| 730-14-A |
removal and disposal of luminaires (1000 watt)
|
24   |
EACH |
164.11 |
3,938.64 |
80.00 |
1,920.00 |
88.00 |
2,112.00 |
|
|
| 730-14-B |
removal and disposal of luminaires (250 watt)
|
126   |
EACH |
136.75 |
17,230.50 |
80.00 |
10,080.00 |
88.00 |
11,088.00 |
|
|
| 730-14-C |
removal and disposal of luminaires (250 watt underpass)
|
12   |
EACH |
196.93 |
2,363.16 |
255.00 |
3,060.00 |
275.00 |
3,300.00 |
|
|
| 730-16 |
underground junction box (inside dimension
12"x12"x10"d) |
23   |
EACH |
382.91 |
8,806.93 |
735.00 |
16,905.00 |
840.00 |
19,320.00 |
|
|
| 730-17-A |
structure mounted junction box (4"x8"x8")
|
24   |
EACH |
519.67 |
12,472.08 |
715.00 |
17,160.00 |
820.00 |
19,680.00 |
|
|
| 731-01 |
nonreflectorized raised pavement markers
|
7,079   |
EACH |
13.59 |
96,203.61 |
5.00 |
35,395.00 |
16.00 |
113,264.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
6,786   |
EACH |
5.67 |
38,476.62 |
5.00 |
33,930.00 |
6.50 |
44,109.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
19.741 |
MILE |
2,727.44 |
53,842.39 |
2,550.00 |
50,339.55 |
3,000.00 |
59,223.00 |
|
|
| 732-02-C |
plastic pavement striping (solid line) (8" width)
|
1.744 |
MILE |
4,159.09 |
7,253.45 |
8,600.00 |
14,998.40 |
4,500.00 |
7,848.00 |
|
|
| 732-02-E |
plastic pavement striping (solid line) (24" width)
|
1.350 |
MILE |
18,560.35 |
25,056.47 |
16,250.00 |
21,937.50 |
20,000.00 |
27,000.00 |
|
|
| 733-01 |
concrete roadway barrier (type f)
|
30,043.3 |
LNFT |
255.00 |
7,661,041.50 |
260.00 |
7,811,258.00 |
275.00 |
8,261,907.50 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
800,000.00 |
800,000.00 |
750,000.00 |
750,000.00 |
700,000.00 |
700,000.00 |
|
|
| 802-02 |
structural excavation for intermediate bents
|
54.0 |
CUYD |
152.85 |
8,253.90 |
140.00 |
7,560.00 |
30.00 |
1,620.00 |
|
|
| 803-03-A |
steel sheet pile wall (pz-27)
|
13,935   |
SQFT |
30.63 |
426,829.05 |
65.00 |
905,775.00 |
40.00 |
557,400.00 |
|
|
| 803-03-B |
steel sheet pile wall (pz-35)
|
12,540   |
SQFT |
41.17 |
516,271.80 |
80.00 |
1,003,200.00 |
48.00 |
601,920.00 |
|
|
| 803-03-C |
steel sheet pile wall (pz-40)
|
22,230   |
SQFT |
47.51 |
1,056,147.30 |
85.00 |
1,889,550.00 |
52.00 |
1,155,960.00 |
|
|
| 803-03-D |
steel sheet pile wall (ps-27.5)
|
2,050   |
SQFT |
54.23 |
111,171.50 |
90.00 |
184,500.00 |
49.00 |
100,450.00 |
|
|
| 804-01-B |
precast concrete piles (14")
|
230   |
LNFT |
51.12 |
11,757.60 |
112.50 |
25,875.00 |
63.00 |
14,490.00 |
|
|
| 804-01-C |
precast concrete piles (16")
|
15,360   |
LNFT |
70.47 |
1,082,419.20 |
75.00 |
1,152,000.00 |
65.00 |
998,400.00 |
|
|
| 804-01-G |
precast concrete piles (30")
|
5,938   |
LNFT |
137.85 |
818,553.30 |
169.00 |
1,003,522.00 |
205.00 |
1,217,290.00 |
|
|
| 804-05 |
precast concrete test piles
|
6   |
EACH |
11,177.32 |
67,063.92 |
25,225.00 |
151,350.00 |
75,000.00 |
450,000.00 |
|
|
| 804-09 |
loading test piles
|
6   |
EACH |
30,941.53 |
185,649.18 |
40,000.00 |
240,000.00 |
50,000.00 |
300,000.00 |
|
|
| 804-10 |
reloading test piles
|
6   |
EACH |
12,230.31 |
73,381.86 |
3,100.00 |
18,600.00 |
1,000.00 |
6,000.00 |
|
|
| 804-11 |
redriving test piles
|
3   |
EACH |
2,248.48 |
6,745.44 |
2,100.00 |
6,300.00 |
1,000.00 |
3,000.00 |
|
|
| 804-17 |
dynamic monitoring
|
148   |
EACH |
873.60 |
129,292.80 |
2,320.00 |
343,360.00 |
600.00 |
88,800.00 |
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
13.56 |
CUYD |
909.60 |
12,334.18 |
1,500.00 |
20,340.00 |
1,800.00 |
24,408.00 |
|
|
| 805-01-D |
class a concrete (footings)
|
496.54 |
CUYD |
471.35 |
234,044.13 |
550.00 |
273,097.00 |
450.00 |
223,443.00 |
|
|
| 805-01-F |
class a concrete (bents)
|
2,843.97 |
CUYD |
550.00 |
1,564,183.50 |
2,000.00 |
5,687,940.00 |
818.00 |
2,326,367.46 |
|
|
| 805-03 |
class aa concrete
|
3,652.66 |
CUYD |
650.00 |
2,374,229.00 |
1,785.00 |
6,519,998.10 |
960.00 |
3,506,553.60 |
|
|
| 805-08-C |
precast-prestressed concrete girders (type iii)
|
7,599.2 |
LNFT |
105.52 |
801,867.58 |
160.00 |
1,215,872.00 |
112.00 |
851,110.40 |
|
|
| 805-08-D |
precast-prestressed concrete girders (type iv)
|
2,551.5 |
LNFT |
213.57 |
544,923.86 |
125.00 |
318,937.50 |
160.00 |
408,240.00 |
|
|
| 805-08-I |
precast-prestressed concrete girders (type iv modified)
|
6,899.0 |
LNFT |
193.93 |
1,337,923.07 |
285.00 |
1,966,215.00 |
200.00 |
1,379,800.00 |
|
|
| 805-11 |
strip seal joints
|
2,064.60 |
LNFT |
186.41 |
384,862.09 |
178.00 |
367,498.80 |
150.00 |
309,690.00 |
|
|
| 805-12-G |
reinforced concrete box culverts (6'x 4')
|
68.0 |
LNFT |
808.00 |
54,944.00 |
1,000.00 |
68,000.00 |
1,000.00 |
68,000.00 |
|
|
| 806-01 |
deformed reinforcing steel
|
1,487,147   |
LB |
1.45 |
2,156,363.15 |
1.25 |
1,858,933.75 |
1.38 |
2,052,262.86 |
|
|
| 807-08 |
structural metalwork
|
lump |
LUMP |
36,085.04 |
36,085.04 |
50,000.00 |
50,000.00 |
60,000.00 |
60,000.00 |
|
|
| 810-01-A |
concrete railing (barrier)
|
2,870.12 |
LNFT |
67.04 |
192,412.84 |
60.00 |
172,207.20 |
80.00 |
229,609.60 |
|
|
| 810-01-B |
concrete railing (median barrier)
|
3,463.70 |
LNFT |
110.00 |
381,007.00 |
250.00 |
865,925.00 |
125.00 |
432,962.50 |
|
|
| 813-01 |
concrete approach slabs
|
10,806.85 |
SQYD |
211.92 |
2,290,187.65 |
220.00 |
2,377,507.00 |
290.00 |
3,133,986.50 |
|
|
| 814-01-C |
drilled shaft (30")
|
1,500.0 |
LNFT |
256.19 |
384,285.00 |
225.00 |
337,500.00 |
270.00 |
405,000.00 |
|
|
| 814-01-E |
drilled shaft (48")
|
2,656.5 |
LNFT |
513.93 |
1,365,255.05 |
450.00 |
1,195,425.00 |
490.00 |
1,301,685.00 |
|
|
| 814-02-C |
trial shaft (30")
|
75.0 |
LNFT |
304.33 |
22,824.75 |
410.00 |
30,750.00 |
200.00 |
15,000.00 |
|
|
| 814-02-E |
trial shaft (48")
|
223.5 |
LNFT |
549.13 |
122,730.56 |
1,450.00 |
324,075.00 |
585.00 |
130,747.50 |
|
|
| 814-04-C |
crosshole sonic logging (30")
|
20   |
EACH |
5,779.48 |
115,589.60 |
5,000.00 |
100,000.00 |
4,400.00 |
88,000.00 |
|
|
| 814-04-E |
crosshole sonic logging (48")
|
32   |
EACH |
7,035.89 |
225,148.48 |
5,700.00 |
182,400.00 |
5,000.00 |
160,000.00 |
|
|
| S-001 |
impact attenuator (construction zone)
|
20   |
EACH |
23,356.63 |
467,132.60 |
15,000.00 |
300,000.00 |
17,500.00 |
350,000.00 |
|
|
| S-002 |
impact attenuator (kinetic)
|
1   |
EACH |
28,438.80 |
28,438.80 |
20,000.00 |
20,000.00 |
25,000.00 |
25,000.00 |
|
|
| S-003 |
noise barrier(10' height)(structure mounted)
|
842.5 |
LNFT |
496.06 |
417,930.55 |
410.00 |
345,425.00 |
455.00 |
383,337.50 |
|
|
| S-004 |
noise barrier (16' height)(ground mounted)
|
5,580.0 |
LNFT |
547.06 |
3,052,594.80 |
375.00 |
2,092,500.00 |
420.00 |
2,343,600.00 |
|
|
| S-005 |
dynamic message sign unit
|
4   |
EACH |
39,030.33 |
156,121.32 |
16,500.00 |
66,000.00 |
25,000.00 |
100,000.00 |
|
|
| S-102 |
hydro-demolition and resurfacing of bridge deck
|
25,650   |
SQFT |
16.00 |
410,400.00 |
20.00 |
513,000.00 |
17.50 |
448,875.00 |
|
|
| S-103 |
underpass circuit breaker disconnect
|
6   |
EACH |
2,010.25 |
12,061.50 |
2,000.00 |
12,000.00 |
2,200.00 |
13,200.00 |
|
|
| S-104 |
modular break-away cable system (low mast)
|
13   |
EACH |
1,633.33 |
21,233.29 |
1,300.00 |
16,900.00 |
1,400.00 |
18,200.00 |
|
|
| S-105 |
marker tape(underground)
|
21,700   |
LNFT |
0.88 |
19,096.00 |
0.50 |
10,850.00 |
0.42 |
9,114.00 |
|
|
| S-106 |
deck drainage system
|
16   |
EACH |
2,500.00 |
40,000.00 |
19,000.00 |
304,000.00 |
6,000.00 |
96,000.00 |
|
|
| S-107 |
sheet pile whalers
|
330   |
LNFT |
220.72 |
72,837.60 |
240.00 |
79,200.00 |
260.00 |
85,800.00 |
|
|
| S-108 |
sheet pile anchors
|
54   |
EACH |
18,939.10 |
1,022,711.40 |
19,600.00 |
1,058,400.00 |
14,000.00 |
756,000.00 |
|
|
| S-109 |
furnishing latex modified cement concrete (very early
strength) (1-1/2" depth) |
119.00 |
CUYD |
2,000.00 |
238,000.00 |
205.00 |
24,395.00 |
1.00 |
119.00 |
|
|
| S-110 |
placing and finishing latex modified cement concrete
(very early strength) (1-1/2" depth) |
2,850   |
SQYD |
110.00 |
313,500.00 |
12.00 |
34,200.00 |
1.00 |
2,850.00 |
|
|
| S-111 |
test drilled shaft (30" diameter)
|
1   |
EACH |
47,809.87 |
47,809.87 |
90,000.00 |
90,000.00 |
125,000.00 |
125,000.00 |
|
|
| S-112 |
test drilled shaft (48" diameter)
|
3   |
EACH |
60,824.64 |
182,473.92 |
78,000.00 |
234,000.00 |
150,000.00 |
450,000.00 |
|
|
| S-113 |
load test drilled shaft (30" diameter)
|
1   |
EACH |
87,163.33 |
87,163.33 |
70,000.00 |
70,000.00 |
90,000.00 |
90,000.00 |
|
|
| S-114 |
load test drilled shaft (48" diameter)
|
3   |
EACH |
98,565.23 |
295,695.69 |
65,000.00 |
195,000.00 |
100,000.00 |
300,000.00 |
|
|
| S-201 |
cctv camera site - removal of equipment
|
3   |
EACH |
4,430.85 |
13,292.55 |
4,800.00 |
14,400.00 |
5,000.00 |
15,000.00 |
|
|
| S-202 |
cctv camera site - new
|
3   |
EACH |
3,391.52 |
10,174.56 |
40,000.00 |
120,000.00 |
41,000.00 |
123,000.00 |
|
|
| S-203 |
cctv camera site - relocation
|
1   |
EACH |
35,009.21 |
35,009.21 |
37,000.00 |
37,000.00 |
40,000.00 |
40,000.00 |
|
|
| S-204 |
dynamic message sign cabinet relocation
|
1   |
EACH |
21,880.75 |
21,880.75 |
70,000.00 |
70,000.00 |
75,000.00 |
75,000.00 |
|
|
| S-205 |
rvd site - removal of equipment
|
4   |
EACH |
3,282.12 |
13,128.48 |
2,500.00 |
10,000.00 |
2,500.00 |
10,000.00 |
|
|
| S-206 |
rvd site - relocation
|
4   |
EACH |
27,350.94 |
109,403.76 |
11,000.00 |
44,000.00 |
12,000.00 |
48,000.00 |
|
|
| S-207 |
96 strand optical fiber cable
|
30,370   |
LNFT |
4.38 |
133,020.60 |
3.50 |
106,295.00 |
4.10 |
124,517.00 |
|
|
| S-208 |
optical fiber drop cable
|
900   |
LNFT |
6.56 |
5,904.00 |
4.75 |
4,275.00 |
5.40 |
4,860.00 |
|
|
| S-209 |
optical fiber patch cord
|
30   |
EACH |
136.75 |
4,102.50 |
46.00 |
1,380.00 |
51.00 |
1,530.00 |
|
|
| S-210 |
backbone construction - trench
|
18,600   |
LNFT |
24.62 |
457,932.00 |
27.00 |
502,200.00 |
28.00 |
520,800.00 |
|
|
| S-211 |
backbone construction - bore
|
2,000   |
LNFT |
88.62 |
177,240.00 |
87.00 |
174,000.00 |
98.00 |
196,000.00 |
|
|
| S-212 |
device build out - trench
|
900   |
LNFT |
17.50 |
15,750.00 |
23.00 |
20,700.00 |
26.00 |
23,400.00 |
|
|
| S-213 |
device build out - bore
|
900   |
LNFT |
49.23 |
44,307.00 |
75.00 |
67,500.00 |
83.00 |
74,700.00 |
|
|
| S-214 |
splice closure
|
9   |
EACH |
1,575.41 |
14,178.69 |
2,600.00 |
23,400.00 |
2,800.00 |
25,200.00 |
|
|
| S-215 |
underground handhole / pullbox
|
27   |
EACH |
2,461.58 |
66,462.66 |
3,400.00 |
91,800.00 |
3,800.00 |
102,600.00 |
|
|
| S-216 |
electrical power conductors
|
61,800   |
LNFT |
3.45 |
213,210.00 |
2.75 |
169,950.00 |
3.10 |
191,580.00 |
|
|
| S-217 |
65' pole - foundation - two lowering devices
|
4   |
EACH |
67,939.74 |
271,758.96 |
90,000.00 |
360,000.00 |
100,000.00 |
400,000.00 |
|
|
| S-218 |
lowering tool, electric hoise assembly, and clutch
adapter |
1   |
EACH |
6,017.20 |
6,017.20 |
3,750.00 |
3,750.00 |
4,200.00 |
4,200.00 |
|
|
| S-219 |
removal of 65' bendable cctv camera poles
|
3   |
EACH |
4,923.17 |
14,769.51 |
2,350.00 |
7,050.00 |
2,700.00 |
8,100.00 |
|
|
| S-220 |
removal of 40' rvd poles
|
4   |
EACH |
382.92 |
1,531.68 |
1,575.00 |
6,300.00 |
1,800.00 |
7,200.00 |
|
|
| S-221 |
communications system integration
|
lump |
LUMP |
207,867.15 |
207,867.15 |
135,000.00 |
135,000.00 |
145,000.00 |
145,000.00 |
|
|
| S-222 |
cctv camera assembly
|
2   |
EACH |
5,907.81 |
11,815.62 |
3,225.00 |
6,450.00 |
3,600.00 |
7,200.00 |
|
|
| S-223 |
standalone digital video/data encoder
|
2   |
EACH |
3,347.76 |
6,695.52 |
2,700.00 |
5,400.00 |
3,000.00 |
6,000.00 |
|
|
| S-224 |
local ethernet switch
|
2   |
EACH |
4,037.00 |
8,074.00 |
1,650.00 |
3,300.00 |
1,800.00 |
3,600.00 |
|
|
| S-225 |
cctv camera lowering device
|
2   |
EACH |
7,754.00 |
15,508.00 |
6,100.00 |
12,200.00 |
6,800.00 |
13,600.00 |
|
|
| S-226 |
power surge supressor
|
2   |
EACH |
246.16 |
492.32 |
125.00 |
250.00 |
130.00 |
260.00 |
|
|
| S-227 |
video surge supressor
|
2   |
EACH |
246.16 |
492.32 |
110.00 |
220.00 |
120.00 |
240.00 |
|
|
| S-228 |
data surge supressor
|
2   |
EACH |
246.16 |
492.32 |
150.00 |
300.00 |
150.00 |
300.00 |
|
|
| S-229 |
gigabit ethernet aggregation switch
|
1   |
EACH |
38,291.32 |
38,291.32 |
32,000.00 |
32,000.00 |
35,000.00 |
35,000.00 |
|
|
| S-230 |
removal of 48 count fiber optic and #20 power
conductor |
lump |
LUMP |
12,034.42 |
12,034.42 |
12,000.00 |
12,000.00 |
13,000.00 |
13,000.00 |
|
|
| S-231 |
removal of pull boxes
|
30   |
EACH |
250.00 |
7,500.00 |
300.00 |
9,000.00 |
320.00 |
9,600.00 |
|
|
| | SUBTOTAL GENERAL |
|
|
|
69,750,887.95 |
|
84,906,747.50 |
|
84,885,576.13 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A |
alternate pavement types
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A1 |
portland cement concrete pavement
|
|
|
|
|
|
|
|
|
|
|
| 601-01-Q |
portland cement concrete pavement (13" thick)
|
230,456.4 |
SQYD |
58.00 |
13,366,471.20 |
70.00 |
16,131,948.00 |
74.25 |
17,111,387.70 |
|
|
| 601-03-Q |
portland cement concrete shoulder (13" thick)
|
46,223.1 |
SQYD |
58.00 |
2,680,939.80 |
70.00 |
3,235,617.00 |
80.00 |
3,697,848.00 |
|
|
| 706-03-A |
incidental concrete paving (4" thick)
|
5,931.9 |
SQYD |
50.00 |
296,595.00 |
35.00 |
207,616.50 |
52.00 |
308,458.80 |
|
|
| 707-01 |
concrete curb (barrier)
|
603.0 |
LNFT |
45.00 |
27,135.00 |
20.00 |
12,060.00 |
20.00 |
12,060.00 |
|
|
| 732-03-A-01 |
plastic pvmt striping (broken line)(4"width)preformed
marking tape (type v) |
16.544 |
MILE |
3,909.00 |
64,670.50 |
4,265.00 |
70,560.16 |
4,300.00 |
71,139.20 |
|
|
| 732-03-C-01 |
plastic pvmt striping (broken line)(8"width)preformed
marking tape (type v) |
1.696 |
MILE |
7,842.61 |
13,301.07 |
10,120.00 |
17,163.52 |
8,500.00 |
14,416.00 |
|
|
| | SUBTOTAL ALT A1 |
|
|
|
16,449,112.57 |
|
19,674,965.18 |
|
21,215,309.70 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A2 |
superpave asphaltic concrete pavement
|
|
|
|
|
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
167,391.3 |
TON |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
| 508-01 |
asphalt concrete (sma) wearing course
|
30,764.0 |
TON |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
| 706-03-A |
incidental concrete paving (4" thick)
|
4,433.9 |
SQYD |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
| 707-03 |
combination concrete curb & gutter
|
603.0 |
LNFT |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
16.544 |
MILE |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
| 732-03-C |
plastic pavement striping (broken line)(8" width)
|
1.696 |
MILE |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | ITEM TOTAL (CONSTRUCTION BID) |
|
|
|
86,200,000.52 |
|
104,581,712.68 |
|
106,100,885.83 |
|
|
| | NUMBER OF DAYS BID AT $15,000 PER DAY. |
|
|
|
14,250,000.00 |
|
13,650,000.00 |
|
13,500,000.00 |
|
|
| | LIFE CYCLE COST |
|
|
|
9,348,000.00 |
|
9,348,000.00 |
|
9,348,000.00 |
|
|
| | TOTAL BID |
|
|
|
109,798,000.52 |
|
127,579,712.68 |
|
128,948,885.83 |
|
|
|