Letting of 8/27/2008 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 450-10-0108
Parish: E BATON ROUGE
Routes: I-10
Description: INTERSTATE 12 - LA 3246 (SIEGEN LANE)
Type Const: grading, drainage structures, class ii bc, limetrmt, superpave asphaltic concrete
pvmt, portland cement concrete pvmt, precast concrete girder bridges, and related work.
Estimated Construction Cost: $79,839,506.10
Maximum Number of Days Allowed for Construction: 950
Calculated Daily User Cost: $15,000.00
 
RankLicenseBidderConstruction Bid Bidder's Proposed
Contract Time
Life Cycle
Cost
Total Bid
1 42076 AUSTIN BRIDGE & ROAD, LP $86,200,000.52 950 $9,348,000.00 $109,798,000.52
2 34567 JAMES CONSTRUCTION GROUP LLC $104,581,712.68 910 $9,348,000.00 $127,579,712.68
3 12312 GILCHRIST CONSTRUCTION CO. LLC $106,100,885.83 900 $9,348,000.00 $128,948,885.83
 
Item Number Item Description Quantity Unit of Measure - 1 -
AUSTIN BRIDGE & ROAD, LP
- 2 -
JAMES CONSTRUCTION GROUP LLC
- 3 -
GILCHRIST CONSTRUCTION CO. LLC

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 300,000.00 300,000.00 400,000.00 400,000.00 1,950,000.00 1,950,000.00    
202-01 removal of structures & obstructions lump      LUMP 220,000.00 220,000.00 190,000.00 190,000.00 350,000.00 350,000.00    
202-02-A-01 removal of bridges (sta. 188+79.54; 39'x215' concrete
deck & prestressed girders)
2      EACH 100,000.00 200,000.00 400,000.00 800,000.00 215,000.00 430,000.00    
202-02-A-02 removal of bridges (sta. 227+22.70; 39.5'x264'
concrete deck & bents with steel girders)
2      EACH 100,000.00 200,000.00 300,000.00 600,000.00 135,000.00 270,000.00    
202-02-A-03 removal of bridge deck (sta. 258+13.74)(includes
railing)
2,470      SQFT 15.00 37,050.00 50.00 123,500.00 54.00 133,380.00    
202-02-A-04 removal of bridge deck (sta. 335+93.86)(includes
railing)
3,990      SQFT 16.00 63,840.00 50.00 199,500.00 54.00 215,460.00    
202-02-A-05 removal of prestressed girders(sta. 336+88.86) 283.5    LNFT 25.00 7,087.50 35.00 9,922.50 120.00 34,020.00    
202-02-A-06 demolition of existing substructure(sta. 258+13.74) 4      each 10,000.00 40,000.00 12,000.00 48,000.00 30,000.00 120,000.00    
202-02-A-07 demolition of existing substructure(sta. 335+93.86) 4      each 12,000.00 48,000.00 12,000.00 48,000.00 30,000.00 120,000.00    
202-02-A-08 demolition of existing concrete rails(sta. 179+03) 4      each 10,000.00 40,000.00 4,500.00 18,000.00 3,500.00 14,000.00    
202-02-A-10 removal of existing approach slabs 2,075      SQYD 28.00 58,100.00 50.00 103,750.00 90.00 186,750.00    
202-02-A-11 removal of existing revetment (concrete and/or
flexible)
9,357      SQYD 12.00 112,284.00 20.00 187,140.00 5.50 51,463.50    
202-02-C removal of portland cement concrete pavement (variable
thickness)
125,511      SQYD 6.00 753,066.00 7.00 878,577.00 5.50 690,310.50    
202-02-G removal of surfacing & stabilized base 58,292.9    SQYD 8.00 466,343.20 5.00 291,464.50 5.00 291,464.50    
202-02-H removal of guard rail 10,639      LNFT 5.00 53,195.00 4.00 42,556.00 6.00 63,834.00    
202-02-I removal of overhead sign (bridge fascia mounted) 8      EACH 1,884.61 15,076.88 3,550.00 28,400.00 4,000.00 32,000.00    
202-02-J removal of overhead sign (truss ground mounted) 4      EACH 6,910.25 27,641.00 15,000.00 60,000.00 6,500.00 26,000.00    
202-02-K removal of overhead sign (cantilever truss ground
mounted)
4      EACH 4,397.43 17,589.72 15,000.00 60,000.00 5,300.00 21,200.00    
202-02-L removal of sign (w-section post) 15      EACH 219.87 3,298.05 820.00 12,300.00 1,000.00 15,000.00    
202-02-M removal of sign(circular post) 35      EACH 219.87 7,695.45 650.00 22,750.00 775.00 27,125.00    
202-02-N removal of headwalls 19      EACH 1,500.00 28,500.00 3,000.00 57,000.00 1,200.00 22,800.00    
202-02-O removal of concrete barriers 770      EACH 100.00 77,000.00 65.00 50,050.00 155.00 119,350.00    
202-02-P removal of fence 5,500      LNFT 5.00 27,500.00 5.00 27,500.00 5.00 27,500.00    
202-03-A relocation of existing sign faces 75      EACH 565.38 42,403.50 100.00 7,500.00 250.00 18,750.00    
203-01 general excavation 118,987      CUYD 14.00 1,665,818.00 15.00 1,784,805.00 8.00 951,896.00    
203-02 drainage excavation 71      CUYD 16.95 1,203.45 150.00 10,650.00 35.00 2,485.00    
203-03 embankment 113,311      CUYD 16.00 1,812,976.00 20.00 2,266,220.00 23.00 2,606,153.00    
203-04 nonplastic embankment 392      CUYD 170.00 66,640.00 125.00 49,000.00 150.00 58,800.00    
204-02 temporary hay or straw bales 150      EACH 11.94 1,791.00 30.00 4,500.00 20.00 3,000.00    
204-05-A temporary sediment check dams (hay) 38      EACH 119.36 4,535.68 130.00 4,940.00 200.00 7,600.00    
204-06 temporary silt fencing 19,972      LNFT 3.00 59,916.00 3.00 59,916.00 2.00 39,944.00    
302-02-E class ii base course (10" thick) 282,484.9    SQYD 24.00 6,779,637.60 18.00 5,084,728.20 22.50 6,355,910.25    
304-05 lime treatment (type e) 1,971.81   TON 600.00 1,183,086.00 280.00 552,106.80 265.00 522,529.65    
402-01 traffic maintenance aggregate (vehicular measurement) 1,962.0    CUYD 110.00 215,820.00 70.00 137,340.00 40.00 78,480.00    
701-01-I cross drain pipe (24" rcp/pcp) 153      LNFT 83.78 12,818.34 98.00 14,994.00 165.00 25,245.00    
701-01-K cross drain pipe (30" rcp/pcp) 456      LNFT 87.02 39,681.12 120.00 54,720.00 140.00 63,840.00    
701-01-M cross drain pipe (36" rcp/pcp) 16      LNFT 209.05 3,344.80 190.00 3,040.00 250.00 4,000.00    
701-10-I reinforced concrete pipe (extension)(24") 42      LNFT 94.46 3,967.32 100.00 4,200.00 190.00 7,980.00    
701-10-O reinforced concrete pipe (extension)(48") 20      LNFT 210.22 4,204.40 325.00 6,500.00 280.00 5,600.00    
701-15 concrete collar 5      EACH 444.79 2,223.95 1,000.00 5,000.00 950.00 4,750.00    
702-03-A catch basins (cb-01) 19      EACH 2,965.20 56,338.80 5,000.00 95,000.00 3,000.00 57,000.00    
702-03-B catch basins (cb-02) 10      EACH 5,125.30 51,253.00 8,350.00 83,500.00 4,800.00 48,000.00    
702-07-B cross drain safety end (type 2) 1      EACH 8,412.89 8,412.89 8,000.00 8,000.00 5,600.00 5,600.00    
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 31.3    LNFT 50.26 1,573.14 55.00 1,721.50 63.00 1,971.90    
704-01-C guard rail (double thrie beam)(3'-1 1/2" post spacing) 526.9    LNFT 69.10 36,408.79 58.00 30,560.20 68.00 35,829.20    
704-03 blocked out guard rail 2,482.8    LNFT 28.90 71,752.92 22.00 54,621.60 25.00 62,070.00    
704-06-A guard rail anchor sections (trailing end)(single thrie
beam)
100.0    LNFT 94.23 9,423.00 87.00 8,700.00 100.00 10,000.00    
704-08-B guard rail transitions (double thrie beam) 387.5    LNFT 75.38 29,209.75 68.00 26,350.00 80.00 31,000.00    
704-11-A guard rail end treatment (flared) 30      EACH 2,826.92 84,807.60 2,220.00 66,600.00 2,500.00 75,000.00    
705-06-C chain link fence (6-foot height) 100      LNFT 125.64 12,564.00 30.00 3,000.00 35.00 3,500.00    
712-01-A concrete cast-in-place revetment (4" thick) 3,283      SQYD 50.92 167,170.36 90.00 295,470.00 69.00 226,527.00    
712-04 flexible revetment 13,054      SQYD 87.95 1,148,099.30 65.00 848,510.00 48.00 626,592.00    
713-01 temporary signs & barricades lump      LUMP 150,000.00 150,000.00 950,000.00 950,000.00 3,000,000.00 3,000,000.00    
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
12.248  MILE 441.00 5,401.37 2,535.00 31,048.68 420.00 5,144.16    
713-03-B-01 temporary pavement markings (broken line)(4" width)
(10' length) (type 1 removable)
9.576  MILE 2,985.23 28,586.56 3,250.00 31,122.00 3,200.00 30,643.20    
713-04-A temporary pavement markings (solid line)(4" width) 39.058  MILE 746.31 29,149.38 1,015.00 39,643.87 700.00 27,340.60    
713-04-A-01 temporary pavement markings (solid line)(4" width)
(type 1 removable)
9.576  MILE 11,940.90 114,346.06 9,150.00 87,620.40 13,000.00 124,488.00    
713-04-C temporary pavement markings (solid line)(8" width) 2.840  MILE 2,091.92 5,941.05 2,285.00 6,489.40 1,900.00 5,396.00    
713-06 temporary reflectorized raised pavement markers 5,402      EACH 6.51 35,167.02 5.00 27,010.00 6.00 32,412.00    
713-07 temporary precast concrete barrier (contractor
furnished)
2,724      EACH 900.00 2,451,600.00 690.00 1,879,560.00 1,250.00 3,405,000.00    
713-10 temporary precast concrete barrier movement 2,545      EACH 200.00 509,000.00 100.00 254,500.00 25.00 63,625.00    
716-01-A mulch (vegetative) 50.2    TON 525.14 26,362.03 425.00 21,335.00 500.00 25,100.00    
716-01-B mulch (fiber) 16.7    TON 1,094.04 18,270.47 950.00 15,865.00 1,100.00 18,370.00    
717-01 seeding 1,262      LB 9.30 11,736.60 8.50 10,727.00 10.00 12,620.00    
718-01 fertilizer 42,070      LB 0.39 16,407.30 0.30 12,621.00 0.75 31,552.50    
720-01-A erosion control system, slope protection (type a) 16,626      SQYD 1.29 21,447.54 1.15 19,119.90 1.75 29,095.50    
720-01-B erosion control system, slope protection (type b) 1,627      SQYD 1.29 2,098.83 1.15 1,871.05 1.75 2,847.25    
720-01-C erosion control system, flexible channel liner (type c) 6,184      SQYD 1.75 10,822.00 1.15 7,111.60 2.20 13,604.80    
722-01 project site laboratory 1      EACH 50,000.00 50,000.00 35,000.00 35,000.00 285,000.00 285,000.00    
725-01 temporary detour roads 48,785.8    SQYD 70.00 3,415,006.00 98.00 4,781,008.40 150.00 7,317,870.00    
726-01 bedding material 226.6    CUYD 103.51 23,455.37 92.00 20,847.20 130.00 29,458.00    
727-01 mobilization lump      LUMP 5,577,803.23 5,577,803.23 10,000,000.00 10,000,000.00 10,000,000.00 10,000,000.00    
728-01-A jacked or bored pipe (24") 1,354      LNFT 625.00 846,250.00 515.00 697,310.00 550.00 744,700.00    
729-01 sign (type a) 777.8    SQFT 27.35 21,272.83 18.00 14,000.40 24.00 18,667.20    
729-04 sign (type d) 555.5    SQFT 28.44 15,798.42 22.00 12,221.00 28.00 15,554.00    
729-05 sign (type e) 337.0    SQFT 32.82 11,060.34 22.50 7,582.50 28.00 9,436.00    
729-06 sign (overhead mounted) 5,642.0    SQFT 32.82 185,170.44 24.00 135,408.00 28.00 157,976.00    
729-08-B mounting (3-1/2" post) 37      EACH 929.93 34,407.41 675.00 24,975.00 830.00 30,710.00    
729-08-C mounting (5" post) 1      EACH 1,148.74 1,148.74 870.00 870.00 1,000.00 1,000.00    
729-08-F mounting (w6x12 post) 16      EACH 1,312.85 21,005.60 1,350.00 21,600.00 1,600.00 25,600.00    
729-08-H mounting (w8x24 post) 4      EACH 1,969.27 7,877.08 1,735.00 6,940.00 2,100.00 8,400.00    
729-09 mounting (overhead truss)(ground mounted) 9      EACH 83,146.86 748,321.74 58,000.00 522,000.00 65,000.00 585,000.00    
729-11 mounting (overhead cantilever)(ground mounted) 8      EACH 38,291.32 306,330.56 27,500.00 220,000.00 32,000.00 256,000.00    
729-13 mounting (bridge fascia mounted) 9      EACH 7,111.24 64,001.16 6,275.00 56,475.00 7,500.00 67,500.00    
729-16-C object marker assembly (type 3) 12      EACH 164.11 1,969.32 85.00 1,020.00 100.00 1,200.00    
729-17 milepost assembly (ground mounted) 6      EACH 164.11 984.66 180.00 1,080.00 220.00 1,320.00    
729-20-A footings for overhead mountings (cantelever) 6      EACH 30,633.06 183,798.36 35,000.00 210,000.00 14,000.00 84,000.00    
729-20-B footings for overhead mountings (truss) 18      EACH 30,633.05 551,394.90 36,000.00 648,000.00 20,000.00 360,000.00    
730-01 trenching and backfilling 21,700      LNFT 3.83 83,111.00 4.00 86,800.00 4.15 90,055.00    
730-02-A conduit with conductors (2 #6 awg xhhw-2 & 1#8 bare
ground in 1 1/2" sch 40 pvc)
11,900      LNFT 6.07 72,233.00 7.00 83,300.00 7.20 85,680.00    
730-02-B conduit with conductors (2 #4 & 2 #6 awg xhhw-2,
1#8 bare ground in 2" sch 40 pvc)
1,900      LNFT 11.74 22,306.00 12.00 22,800.00 13.00 24,700.00    
730-02-C conduit with conductors (2 #4 awg xhhw-2 & 1#8 bare
ground in 2" sch 40 pvc)
9,700      LNFT 8.22 79,734.00 9.00 87,300.00 9.75 94,575.00    
730-02-D conduit with conductors (2 #6 awg xhhw-2,
1#8 insulated ground in 1" aluminum)
590      LNFT 15.27 9,009.30 28.50 16,815.00 29.50 17,405.00    
730-02-E conduit with conductors (2 #6, 2 #4 awg xhhw-2,
1#8 insulated ground in 1 1/2" aluminum)
140      LNFT 36.97 5,175.80 36.25 5,075.00 38.00 5,320.00    
730-02-F conduit with conductors (2 #10 awg xhhw-2 &
1#10 insulated ground in 3/4" aluminum)
1,400      LNFT 13.57 18,998.00 23.00 32,200.00 24.00 33,600.00    
730-04 jacking or bored casing (4" sch 80 pvc) 1,100      LNFT 27.84 30,624.00 17.25 18,975.00 19.00 20,900.00    
730-05-A light pole (40'mh, twin 15' arms, pedestal mounted) 28      EACH 4,841.12 135,551.36 4,000.00 112,000.00 4,200.00 117,600.00    
730-05-B light pole (40'mh, twin 15' arms, ground mounted) 2      EACH 4,430.86 8,861.72 4,500.00 9,000.00 5,300.00 10,600.00    
730-05-C light pole (40'mh, single 6'arm, ground mounted) 9      EACH 4,037.00 36,333.00 3,800.00 34,200.00 4,400.00 39,600.00    
730-05-D light pole (40'mh, single 12'arm, ground mounted) 2      EACH 4,135.47 8,270.94 4,000.00 8,000.00 4,500.00 9,000.00    
730-05-E light pole (40'mh, single 12'arm, structure mounted) 2      EACH 3,446.22 6,892.44 2,400.00 4,800.00 2,700.00 5,400.00    
730-06-A high mast pole (120' mh, 6 roadway luminaires,
pedestal mount)
4      EACH 64,276.90 257,107.60 46,000.00 184,000.00 50,000.00 200,000.00    
730-06-B high mast pole (130' mh, 6 roadway luminaires,
pedestal mount)
4      EACH 71,838.89 287,355.56 58,300.00 233,200.00 64,000.00 256,000.00    
730-07-A luminaire (1000 w hps roadway) 48      EACH 918.99 44,111.52 700.00 33,600.00 800.00 38,400.00    
730-07-B luminaire (250 w hps roadway, cobra head) 73      EACH 443.09 32,345.57 250.00 18,250.00 290.00 21,170.00    
730-07-C luminaire (150 w hps underpass) 24      EACH 758.17 18,196.08 865.00 20,760.00 980.00 23,520.00    
730-08 electrical service point w/ pedestal mounted
controller
4      EACH 7,959.13 31,836.52 12,000.00 48,000.00 13,500.00 54,000.00    
730-12-A removal and storage of high mast light poles 4      EACH 4,376.15 17,504.60 4,025.00 16,100.00 4,500.00 18,000.00    
730-12-B removal and storage of low mast light poles 76      EACH 218.81 16,629.56 550.00 41,800.00 580.00 44,080.00    
730-14-A removal and disposal of luminaires (1000 watt) 24      EACH 164.11 3,938.64 80.00 1,920.00 88.00 2,112.00    
730-14-B removal and disposal of luminaires (250 watt) 126      EACH 136.75 17,230.50 80.00 10,080.00 88.00 11,088.00    
730-14-C removal and disposal of luminaires (250 watt underpass) 12      EACH 196.93 2,363.16 255.00 3,060.00 275.00 3,300.00    
730-16 underground junction box (inside dimension
12"x12"x10"d)
23      EACH 382.91 8,806.93 735.00 16,905.00 840.00 19,320.00    
730-17-A structure mounted junction box (4"x8"x8") 24      EACH 519.67 12,472.08 715.00 17,160.00 820.00 19,680.00    
731-01 nonreflectorized raised pavement markers 7,079      EACH 13.59 96,203.61 5.00 35,395.00 16.00 113,264.00    
731-02 reflectorized raised pavement markers 6,786      EACH 5.67 38,476.62 5.00 33,930.00 6.50 44,109.00    
732-02-A plastic pavement striping (solid line) (4" width) 19.741  MILE 2,727.44 53,842.39 2,550.00 50,339.55 3,000.00 59,223.00    
732-02-C plastic pavement striping (solid line) (8" width) 1.744  MILE 4,159.09 7,253.45 8,600.00 14,998.40 4,500.00 7,848.00    
732-02-E plastic pavement striping (solid line) (24" width) 1.350  MILE 18,560.35 25,056.47 16,250.00 21,937.50 20,000.00 27,000.00    
733-01 concrete roadway barrier (type f) 30,043.3    LNFT 255.00 7,661,041.50 260.00 7,811,258.00 275.00 8,261,907.50    
740-01 construction layout lump      LUMP 800,000.00 800,000.00 750,000.00 750,000.00 700,000.00 700,000.00    
802-02 structural excavation for intermediate bents 54.0    CUYD 152.85 8,253.90 140.00 7,560.00 30.00 1,620.00    
803-03-A steel sheet pile wall (pz-27) 13,935      SQFT 30.63 426,829.05 65.00 905,775.00 40.00 557,400.00    
803-03-B steel sheet pile wall (pz-35) 12,540      SQFT 41.17 516,271.80 80.00 1,003,200.00 48.00 601,920.00    
803-03-C steel sheet pile wall (pz-40) 22,230      SQFT 47.51 1,056,147.30 85.00 1,889,550.00 52.00 1,155,960.00    
803-03-D steel sheet pile wall (ps-27.5) 2,050      SQFT 54.23 111,171.50 90.00 184,500.00 49.00 100,450.00    
804-01-B precast concrete piles (14") 230      LNFT 51.12 11,757.60 112.50 25,875.00 63.00 14,490.00    
804-01-C precast concrete piles (16") 15,360      LNFT 70.47 1,082,419.20 75.00 1,152,000.00 65.00 998,400.00    
804-01-G precast concrete piles (30") 5,938      LNFT 137.85 818,553.30 169.00 1,003,522.00 205.00 1,217,290.00    
804-05 precast concrete test piles 6      EACH 11,177.32 67,063.92 25,225.00 151,350.00 75,000.00 450,000.00    
804-09 loading test piles 6      EACH 30,941.53 185,649.18 40,000.00 240,000.00 50,000.00 300,000.00    
804-10 reloading test piles 6      EACH 12,230.31 73,381.86 3,100.00 18,600.00 1,000.00 6,000.00    
804-11 redriving test piles 3      EACH 2,248.48 6,745.44 2,100.00 6,300.00 1,000.00 3,000.00    
804-17 dynamic monitoring 148      EACH 873.60 129,292.80 2,320.00 343,360.00 600.00 88,800.00    
805-01-B class a concrete (box culvert headwalls) 13.56   CUYD 909.60 12,334.18 1,500.00 20,340.00 1,800.00 24,408.00    
805-01-D class a concrete (footings) 496.54   CUYD 471.35 234,044.13 550.00 273,097.00 450.00 223,443.00    
805-01-F class a concrete (bents) 2,843.97   CUYD 550.00 1,564,183.50 2,000.00 5,687,940.00 818.00 2,326,367.46    
805-03 class aa concrete 3,652.66   CUYD 650.00 2,374,229.00 1,785.00 6,519,998.10 960.00 3,506,553.60    
805-08-C precast-prestressed concrete girders (type iii) 7,599.2    LNFT 105.52 801,867.58 160.00 1,215,872.00 112.00 851,110.40    
805-08-D precast-prestressed concrete girders (type iv) 2,551.5    LNFT 213.57 544,923.86 125.00 318,937.50 160.00 408,240.00    
805-08-I precast-prestressed concrete girders (type iv modified) 6,899.0    LNFT 193.93 1,337,923.07 285.00 1,966,215.00 200.00 1,379,800.00    
805-11 strip seal joints 2,064.60   LNFT 186.41 384,862.09 178.00 367,498.80 150.00 309,690.00    
805-12-G reinforced concrete box culverts (6'x 4') 68.0    LNFT 808.00 54,944.00 1,000.00 68,000.00 1,000.00 68,000.00    
806-01 deformed reinforcing steel 1,487,147      LB 1.45 2,156,363.15 1.25 1,858,933.75 1.38 2,052,262.86    
807-08 structural metalwork lump      LUMP 36,085.04 36,085.04 50,000.00 50,000.00 60,000.00 60,000.00    
810-01-A concrete railing (barrier) 2,870.12   LNFT 67.04 192,412.84 60.00 172,207.20 80.00 229,609.60    
810-01-B concrete railing (median barrier) 3,463.70   LNFT 110.00 381,007.00 250.00 865,925.00 125.00 432,962.50    
813-01 concrete approach slabs 10,806.85   SQYD 211.92 2,290,187.65 220.00 2,377,507.00 290.00 3,133,986.50    
814-01-C drilled shaft (30") 1,500.0    LNFT 256.19 384,285.00 225.00 337,500.00 270.00 405,000.00    
814-01-E drilled shaft (48") 2,656.5    LNFT 513.93 1,365,255.05 450.00 1,195,425.00 490.00 1,301,685.00    
814-02-C trial shaft (30") 75.0    LNFT 304.33 22,824.75 410.00 30,750.00 200.00 15,000.00    
814-02-E trial shaft (48") 223.5    LNFT 549.13 122,730.56 1,450.00 324,075.00 585.00 130,747.50    
814-04-C crosshole sonic logging (30") 20      EACH 5,779.48 115,589.60 5,000.00 100,000.00 4,400.00 88,000.00    
814-04-E crosshole sonic logging (48") 32      EACH 7,035.89 225,148.48 5,700.00 182,400.00 5,000.00 160,000.00    
S-001 impact attenuator (construction zone) 20      EACH 23,356.63 467,132.60 15,000.00 300,000.00 17,500.00 350,000.00    
S-002 impact attenuator (kinetic) 1      EACH 28,438.80 28,438.80 20,000.00 20,000.00 25,000.00 25,000.00    
S-003 noise barrier(10' height)(structure mounted) 842.5    LNFT 496.06 417,930.55 410.00 345,425.00 455.00 383,337.50    
S-004 noise barrier (16' height)(ground mounted) 5,580.0    LNFT 547.06 3,052,594.80 375.00 2,092,500.00 420.00 2,343,600.00    
S-005 dynamic message sign unit 4      EACH 39,030.33 156,121.32 16,500.00 66,000.00 25,000.00 100,000.00    
S-102 hydro-demolition and resurfacing of bridge deck 25,650      SQFT 16.00 410,400.00 20.00 513,000.00 17.50 448,875.00    
S-103 underpass circuit breaker disconnect 6      EACH 2,010.25 12,061.50 2,000.00 12,000.00 2,200.00 13,200.00    
S-104 modular break-away cable system (low mast) 13      EACH 1,633.33 21,233.29 1,300.00 16,900.00 1,400.00 18,200.00    
S-105 marker tape(underground) 21,700      LNFT 0.88 19,096.00 0.50 10,850.00 0.42 9,114.00    
S-106 deck drainage system 16      EACH 2,500.00 40,000.00 19,000.00 304,000.00 6,000.00 96,000.00    
S-107 sheet pile whalers 330      LNFT 220.72 72,837.60 240.00 79,200.00 260.00 85,800.00    
S-108 sheet pile anchors 54      EACH 18,939.10 1,022,711.40 19,600.00 1,058,400.00 14,000.00 756,000.00    
S-109 furnishing latex modified cement concrete (very early
strength) (1-1/2" depth)
119.00   CUYD 2,000.00 238,000.00 205.00 24,395.00 1.00 119.00    
S-110 placing and finishing latex modified cement concrete
(very early strength) (1-1/2" depth)
2,850      SQYD 110.00 313,500.00 12.00 34,200.00 1.00 2,850.00    
S-111 test drilled shaft (30" diameter) 1      EACH 47,809.87 47,809.87 90,000.00 90,000.00 125,000.00 125,000.00    
S-112 test drilled shaft (48" diameter) 3      EACH 60,824.64 182,473.92 78,000.00 234,000.00 150,000.00 450,000.00    
S-113 load test drilled shaft (30" diameter) 1      EACH 87,163.33 87,163.33 70,000.00 70,000.00 90,000.00 90,000.00    
S-114 load test drilled shaft (48" diameter) 3      EACH 98,565.23 295,695.69 65,000.00 195,000.00 100,000.00 300,000.00    
S-201 cctv camera site - removal of equipment 3      EACH 4,430.85 13,292.55 4,800.00 14,400.00 5,000.00 15,000.00    
S-202 cctv camera site - new 3      EACH 3,391.52 10,174.56 40,000.00 120,000.00 41,000.00 123,000.00    
S-203 cctv camera site - relocation 1      EACH 35,009.21 35,009.21 37,000.00 37,000.00 40,000.00 40,000.00    
S-204 dynamic message sign cabinet relocation 1      EACH 21,880.75 21,880.75 70,000.00 70,000.00 75,000.00 75,000.00    
S-205 rvd site - removal of equipment 4      EACH 3,282.12 13,128.48 2,500.00 10,000.00 2,500.00 10,000.00    
S-206 rvd site - relocation 4      EACH 27,350.94 109,403.76 11,000.00 44,000.00 12,000.00 48,000.00    
S-207 96 strand optical fiber cable 30,370      LNFT 4.38 133,020.60 3.50 106,295.00 4.10 124,517.00    
S-208 optical fiber drop cable 900      LNFT 6.56 5,904.00 4.75 4,275.00 5.40 4,860.00    
S-209 optical fiber patch cord 30      EACH 136.75 4,102.50 46.00 1,380.00 51.00 1,530.00    
S-210 backbone construction - trench 18,600      LNFT 24.62 457,932.00 27.00 502,200.00 28.00 520,800.00    
S-211 backbone construction - bore 2,000      LNFT 88.62 177,240.00 87.00 174,000.00 98.00 196,000.00    
S-212 device build out - trench 900      LNFT 17.50 15,750.00 23.00 20,700.00 26.00 23,400.00    
S-213 device build out - bore 900      LNFT 49.23 44,307.00 75.00 67,500.00 83.00 74,700.00    
S-214 splice closure 9      EACH 1,575.41 14,178.69 2,600.00 23,400.00 2,800.00 25,200.00    
S-215 underground handhole / pullbox 27      EACH 2,461.58 66,462.66 3,400.00 91,800.00 3,800.00 102,600.00    
S-216 electrical power conductors 61,800      LNFT 3.45 213,210.00 2.75 169,950.00 3.10 191,580.00    
S-217 65' pole - foundation - two lowering devices 4      EACH 67,939.74 271,758.96 90,000.00 360,000.00 100,000.00 400,000.00    
S-218 lowering tool, electric hoise assembly, and clutch
adapter
1      EACH 6,017.20 6,017.20 3,750.00 3,750.00 4,200.00 4,200.00    
S-219 removal of 65' bendable cctv camera poles 3      EACH 4,923.17 14,769.51 2,350.00 7,050.00 2,700.00 8,100.00    
S-220 removal of 40' rvd poles 4      EACH 382.92 1,531.68 1,575.00 6,300.00 1,800.00 7,200.00    
S-221 communications system integration lump      LUMP 207,867.15 207,867.15 135,000.00 135,000.00 145,000.00 145,000.00    
S-222 cctv camera assembly 2      EACH 5,907.81 11,815.62 3,225.00 6,450.00 3,600.00 7,200.00    
S-223 standalone digital video/data encoder 2      EACH 3,347.76 6,695.52 2,700.00 5,400.00 3,000.00 6,000.00    
S-224 local ethernet switch 2      EACH 4,037.00 8,074.00 1,650.00 3,300.00 1,800.00 3,600.00    
S-225 cctv camera lowering device 2      EACH 7,754.00 15,508.00 6,100.00 12,200.00 6,800.00 13,600.00    
S-226 power surge supressor 2      EACH 246.16 492.32 125.00 250.00 130.00 260.00    
S-227 video surge supressor 2      EACH 246.16 492.32 110.00 220.00 120.00 240.00    
S-228 data surge supressor 2      EACH 246.16 492.32 150.00 300.00 150.00 300.00    
S-229 gigabit ethernet aggregation switch 1      EACH 38,291.32 38,291.32 32,000.00 32,000.00 35,000.00 35,000.00    
S-230 removal of 48 count fiber optic and #20 power
conductor
lump      LUMP 12,034.42 12,034.42 12,000.00 12,000.00 13,000.00 13,000.00    
S-231 removal of pull boxes 30      EACH 250.00 7,500.00 300.00 9,000.00 320.00 9,600.00    
 SUBTOTAL GENERAL       69,750,887.95   84,906,747.50   84,885,576.13    
                       
ALTERNATE A alternate pavement types                    
                       
ALTERNATE A1 portland cement concrete pavement                    
601-01-Q portland cement concrete pavement (13" thick) 230,456.4    SQYD 58.00 13,366,471.20 70.00 16,131,948.00 74.25 17,111,387.70    
601-03-Q portland cement concrete shoulder (13" thick) 46,223.1    SQYD 58.00 2,680,939.80 70.00 3,235,617.00 80.00 3,697,848.00    
706-03-A incidental concrete paving (4" thick) 5,931.9    SQYD 50.00 296,595.00 35.00 207,616.50 52.00 308,458.80    
707-01 concrete curb (barrier) 603.0    LNFT 45.00 27,135.00 20.00 12,060.00 20.00 12,060.00    
732-03-A-01 plastic pvmt striping (broken line)(4"width)preformed
marking tape (type v)
16.544  MILE 3,909.00 64,670.50 4,265.00 70,560.16 4,300.00 71,139.20    
732-03-C-01 plastic pvmt striping (broken line)(8"width)preformed
marking tape (type v)
1.696  MILE 7,842.61 13,301.07 10,120.00 17,163.52 8,500.00 14,416.00    
 SUBTOTAL ALT A1       16,449,112.57   19,674,965.18   21,215,309.70    
                       
ALTERNATE A2 superpave asphaltic concrete pavement                    
502-01 superpave asphaltic concrete 167,391.3    TON 0.00 0.00 0.00 0.00 0.00 0.00    
508-01 asphalt concrete (sma) wearing course 30,764.0    TON 0.00 0.00 0.00 0.00 0.00 0.00    
706-03-A incidental concrete paving (4" thick) 4,433.9    SQYD 0.00 0.00 0.00 0.00 0.00 0.00    
707-03 combination concrete curb & gutter 603.0    LNFT 0.00 0.00 0.00 0.00 0.00 0.00    
732-03-A plastic pavement striping (broken line)(4" width) 16.544  MILE 0.00 0.00 0.00 0.00 0.00 0.00    
732-03-C plastic pavement striping (broken line)(8" width) 1.696  MILE 0.00 0.00 0.00 0.00 0.00 0.00    
                       
 ITEM TOTAL (CONSTRUCTION BID)       86,200,000.52   104,581,712.68   106,100,885.83    
 NUMBER OF DAYS BID AT $15,000 PER DAY.       14,250,000.00   13,650,000.00   13,500,000.00    
 LIFE CYCLE COST       9,348,000.00   9,348,000.00   9,348,000.00    
 TOTAL BID       109,798,000.52   127,579,712.68   128,948,885.83    