Lead Project: 063-03-0053
Parish: JEFFERSON
Routes: LA 18
Description: LA 18 (WEST DRIVE TO US 90)
Type Const: cold planing asphaltic concrete, pavement patching, pavement widening, superpave
asphaltic concrete overlay and related work.
Estimated Construction Cost: $1,493,199.92
 
RankLicenseBidderConstruction Bid
1 06276 BARRIERE CONSTRUCTION CO., LLC $1,587,724.00
 
Item Number Item Description Quantity Unit of Measure - 1 -
BARRIERE CONSTRUCTION CO., LLC

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-F removal of concrete combination curb & gutter 445.0    LNFT 12.00 5,340.00            
203-07 borrow (vehicular measurement) 500      CUYD 30.00 15,000.00            
402-01 traffic maintenance aggregate (vehicular measurement) 383.0    CUYD 85.00 32,555.00            
502-01 superpave asphaltic concrete 5,858.9    TON 100.00 585,890.00            
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
736.6    TON 180.00 132,588.00            
509-01 cold planing asphaltic pavement 28,874      SQYD 2.50 72,185.00            
509-02 contractor retained reclaimed asphaltic pavement - 1,203      CUYD 5.00 - 6,015.00            
510-01-A pavement patching (6" minimum thickness) 100      SQYD 60.00 6,000.00            
510-01-B pavement patching (12" minimum thickness) 1,500      SQYD 75.00 112,500.00            
602-05 full depth patching of jointed concrete pavement 50.0    SQYD 200.00 10,000.00            
702-04-A adjusting manholes 5      EACH 1,200.00 6,000.00            
702-04-B adjusting catch basins 5      EACH 2,500.00 12,500.00            
704-01-C guard rail (double thrie beam)(3'-1 1/2" post spacing) 212.5    LNFT 80.00 17,000.00            
704-03 blocked out guard rail 50.0    LNFT 25.00 1,250.00            
704-11-B guard rail end treatment (tangent) 4      EACH 3,400.00 13,600.00            
707-03 combination concrete curb & gutter 495.0    LNFT 50.00 24,750.00            
707-04 asphaltic curb 100.0    LNFT 50.00 5,000.00            
713-01 temporary signs & barricades lump      LUMP 145,000.00 145,000.00            
713-02-C temporary pavement markings (8" width) 96      LNFT 0.50 48.00            
713-02-E temporary pavement markings (24" width) 557      LNFT 4.00 2,228.00            
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
6.920  MILE 300.00 2,076.00            
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
3.460  MILE 350.00 1,211.00            
713-04-A temporary pavement markings (solid line)(4" width) 6.680  MILE 500.00 3,340.00            
713-05-A temporary pavement legends and symbols (arrow) 16      EACH 55.00 880.00            
713-05-C temporary pavement legends and symbols (only) 2      EACH 60.00 120.00            
713-05-D temporary pavement legends and symbols (rr crossing) 12      EACH 60.00 720.00            
713-05-E temporary pavement legends and symbols (school
crossing)
4      EACH 60.00 240.00            
727-01 mobilization lump      LUMP 150,000.00 150,000.00            
729-19-C dead end road installations (type c) 3      EACH 1,100.00 3,300.00            
731-02 reflectorized raised pavement markers 1,241      EACH 6.00 7,446.00            
732-01-C plastic pavement striping (8" width) 48      LNFT 1.00 48.00            
732-01-E plastic pavement striping (24" width) 243      LNFT 4.00 972.00            
732-02-A plastic pavement striping (solid line) (4" width) 3.340  MILE 3,000.00 10,020.00            
732-03-A plastic pavement striping (broken line)(4" width) 1.730  MILE 900.00 1,557.00            
732-04-A plastic pavement legends & symbols (arrow) 9      EACH 200.00 1,800.00            
732-04-C plastic pavement legends & symbols (only) 1      EACH 250.00 250.00            
732-04-D plastic pavement legends & symbols (rr crossing) 6      EACH 500.00 3,000.00            
732-04-E plastic pavement legends & symbols (school crossing) 2      EACH 500.00 1,000.00            
732-05 removal of existing markings 3.100  MILE 3,000.00 9,300.00            
735-01 mailboxes 5      EACH 6.00 30.00            
735-02 mailbox supports (single) 5      EACH 160.00 800.00            
740-01 construction layout lump      LUMP 65,000.00 65,000.00            
S-001 cleaning drainage culverts (18" to 36") 75      LNFT 25.00 1,875.00            
S-002 cleaning drainage culverts (larger than 36") 144.0    LNFT 30.00 4,320.00            
S-004 surface preparation lump      LUMP 125,000.00 125,000.00            
                       
 CONTRACTOR TOTAL       1,587,724.00            