| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - MADDEN CONTRACTING CO., INC. |
- 2 - GILCHRIST CONSTRUCTION CO. LLC |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks & drives
|
105   |
SQYD |
5.00 |
525.00 |
30.00 |
3,150.00 |
|
|
|
|
| 203-07 |
borrow (vehicular measurement)
|
450   |
CUYD |
14.00 |
6,300.00 |
20.00 |
9,000.00 |
|
|
|
|
| 203-07-A |
borrow (vehicular meas.)(selected soils)
|
100   |
CUYD |
14.00 |
1,400.00 |
25.00 |
2,500.00 |
|
|
|
|
| 308-01-A |
in-place cement treated base course (12" thick)
|
9,233   |
SQYD |
12.00 |
110,796.00 |
16.50 |
152,344.50 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
175   |
CUYD |
100.00 |
17,500.00 |
90.00 |
15,750.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
2,727.5 |
TON |
109.00 |
297,297.50 |
110.00 |
300,025.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
124.3 |
TON |
50.00 |
6,215.00 |
225.00 |
27,967.50 |
|
|
|
|
| 507-01-A |
asphaltic material (crs-2p emulsion)
|
10,641   |
GAL |
3.90 |
41,499.90 |
5.00 |
53,205.00 |
|
|
|
|
| 507-02-B |
aggregate (s2)
|
15,648   |
SQYD |
2.25 |
35,208.00 |
3.00 |
46,944.00 |
|
|
|
|
| 507-02-C |
aggregate (s3)
|
15,648   |
SQYD |
2.10 |
32,860.80 |
2.70 |
42,249.60 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
15,797   |
SQYD |
1.39 |
21,957.83 |
1.75 |
27,644.75 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 274   |
CUYD |
0.01 |
- 2.74 |
0.01 |
- 2.74 |
|
|
|
|
| 510-01-A |
pavement patching (6" minimum thickness)
|
50   |
SQYD |
140.00 |
7,000.00 |
120.00 |
6,000.00 |
|
|
|
|
| 510-01-B |
pavement patching (12" minimum thickness)
|
100   |
SQYD |
140.00 |
14,000.00 |
130.00 |
13,000.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
30,500.00 |
30,500.00 |
17,250.00 |
17,250.00 |
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
2.212 |
MILE |
325.00 |
718.90 |
350.00 |
774.20 |
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
1.048 |
MILE |
1.00 |
1.05 |
350.00 |
366.80 |
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
10.010 |
MILE |
1.00 |
10.01 |
470.00 |
4,704.70 |
|
|
|
|
| 713-06-A |
temporary reflectorized raised pavement markers (tabs)
|
584   |
EACH |
1.90 |
1,109.60 |
1.00 |
584.00 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
4.3 |
TON |
1,000.00 |
4,300.00 |
700.00 |
3,010.00 |
|
|
|
|
| 717-01 |
seeding
|
64   |
LB |
10.00 |
640.00 |
9.00 |
576.00 |
|
|
|
|
| 718-01 |
fertilizer
|
2,148   |
LB |
1.00 |
2,148.00 |
0.75 |
1,611.00 |
|
|
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
2,500.00 |
2,500.00 |
20,700.00 |
20,700.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
30,500.00 |
30,500.00 |
39,000.00 |
39,000.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
146   |
EACH |
4.50 |
657.00 |
5.50 |
803.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
12   |
LNFT |
3.00 |
36.00 |
3.75 |
45.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
4.074 |
MILE |
2,500.00 |
10,185.00 |
3,100.00 |
12,629.40 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.349 |
MILE |
700.00 |
244.30 |
850.00 |
296.65 |
|
|
|
|
| 735-01 |
mailboxes
|
49   |
EACH |
1.00 |
49.00 |
1.50 |
73.50 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
26   |
EACH |
125.00 |
3,250.00 |
120.00 |
3,120.00 |
|
|
|
|
| 735-03 |
mailbox supports (double)
|
12   |
EACH |
175.00 |
2,100.00 |
150.00 |
1,800.00 |
|
|
|
|
| 735-04 |
mailbox supports (multiple)
|
3   |
EACH |
325.00 |
975.00 |
300.00 |
900.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
10,000.00 |
10,000.00 |
9,500.00 |
9,500.00 |
|
|
|
|
| S-001 |
saw cutting
|
1,900   |
INFT |
0.01 |
19.00 |
1.50 |
2,850.00 |
|
|
|
|
| S-002 |
sawcuts in asphaltic concrete lifts
|
11,678   |
LNFT |
1.25 |
14,597.50 |
0.85 |
9,926.30 |
|
|
|
|
| S-003 |
sawing and sealing longitudinal joints in asphaltic
concrete overlay |
11,678   |
LNFT |
1.50 |
17,517.00 |
1.60 |
18,684.80 |
|
|
|
|
| S-004 |
general excavation (vehicular measurement)
|
625   |
CUYD |
0.01 |
6.25 |
11.00 |
6,875.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
724,620.90 |
|
855,857.96 |
|
|
|
|
|