| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 2 - PRAIRIE CONTRACTORS INC. |
- 3 - GILCHRIST CONSTRUCTION CO. LLC |
- 4 - D & J CONSTRUCTION CO., INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
673   |
LNFT |
10.00 |
6,730.00 |
20.00 |
13,460.00 |
15.00 |
10,095.00 |
9.00 |
6,057.00 |
| 203-07 |
borrow (vehicular measurement)
|
25   |
CUYD |
125.00 |
3,125.00 |
50.00 |
1,250.00 |
35.00 |
875.00 |
100.00 |
2,500.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
3,778   |
CUYD |
35.00 |
132,230.00 |
30.00 |
113,340.00 |
59.00 |
222,902.00 |
40.00 |
151,120.00 |
| 502-01 |
superpave asphaltic concrete
|
15,680.2 |
TON |
84.50 |
1,324,976.90 |
131.00 |
2,054,106.20 |
101.00 |
1,583,700.20 |
112.00 |
1,756,182.40 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
2,844.5 |
TON |
130.00 |
369,785.00 |
50.00 |
142,225.00 |
155.00 |
440,897.50 |
120.00 |
341,340.00 |
| 509-01 |
cold planing asphaltic pavement
|
976   |
SQYD |
13.00 |
12,688.00 |
13.00 |
12,688.00 |
11.00 |
10,736.00 |
12.00 |
11,712.00 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 54   |
CUYD |
0.10 |
- 5.40 |
0.01 |
- 0.54 |
0.01 |
- 0.54 |
0.10 |
- 5.40 |
| 510-01-B |
pavement patching (12" minimum thickness)
|
1,500   |
SQYD |
100.00 |
150,000.00 |
100.00 |
150,000.00 |
120.00 |
180,000.00 |
150.00 |
225,000.00 |
| 510-02 |
pavement widening
|
618.6 |
SQYD |
80.00 |
49,488.00 |
102.00 |
63,097.20 |
115.00 |
71,139.00 |
125.00 |
77,325.00 |
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
684.0 |
LNFT |
35.00 |
23,940.00 |
35.00 |
23,940.00 |
35.00 |
23,940.00 |
40.00 |
27,360.00 |
| 704-03 |
blocked out guard rail
|
50.0 |
LNFT |
25.00 |
1,250.00 |
25.00 |
1,250.00 |
25.00 |
1,250.00 |
21.00 |
1,050.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
60.00 |
6,000.00 |
60.00 |
6,000.00 |
60.00 |
6,000.00 |
66.00 |
6,600.00 |
| 704-11-B |
guard rail end treatment (tangent)
|
4   |
EACH |
2,600.00 |
10,400.00 |
2,500.00 |
10,000.00 |
2,600.00 |
10,400.00 |
2,800.00 |
11,200.00 |
| 707-04 |
asphaltic curb
|
40.0 |
LNFT |
50.00 |
2,000.00 |
100.00 |
4,000.00 |
30.00 |
1,200.00 |
60.00 |
2,400.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
11,000.00 |
11,000.00 |
22,500.00 |
22,500.00 |
17,500.00 |
17,500.00 |
27,000.00 |
27,000.00 |
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
6.397 |
MILE |
1.00 |
6.40 |
5,550.00 |
35,503.35 |
150.00 |
959.55 |
800.00 |
5,117.60 |
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
3.625 |
MILE |
1.00 |
3.63 |
2,650.00 |
9,606.25 |
300.00 |
1,087.50 |
200.00 |
725.00 |
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
20.552 |
MILE |
1.00 |
20.55 |
600.00 |
12,331.20 |
450.00 |
9,248.40 |
250.00 |
5,138.00 |
| 716-01-A |
mulch (vegetative)
|
1.0 |
TON |
525.00 |
525.00 |
600.00 |
600.00 |
550.00 |
550.00 |
700.00 |
700.00 |
| 717-01 |
seeding
|
15   |
LB |
11.00 |
165.00 |
12.00 |
180.00 |
11.00 |
165.00 |
10.00 |
150.00 |
| 718-01 |
fertilizer
|
500   |
LB |
0.90 |
450.00 |
1.00 |
500.00 |
1.00 |
500.00 |
1.00 |
500.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
128,500.00 |
128,500.00 |
42,500.00 |
42,500.00 |
60,000.00 |
60,000.00 |
147,000.00 |
147,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
76.00 |
304.00 |
100.00 |
400.00 |
80.00 |
320.00 |
100.00 |
400.00 |
| 731-02 |
reflectorized raised pavement markers
|
844   |
EACH |
5.50 |
4,642.00 |
5.00 |
4,220.00 |
5.00 |
4,220.00 |
6.00 |
5,064.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
20.552 |
MILE |
2,700.00 |
55,490.40 |
2,500.00 |
51,380.00 |
2,750.00 |
56,518.00 |
2,200.00 |
45,214.40 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
3.625 |
MILE |
625.00 |
2,265.63 |
1,000.00 |
3,625.00 |
650.00 |
2,356.25 |
900.00 |
3,262.50 |
| 735-01 |
mailboxes
|
107   |
EACH |
1.00 |
107.00 |
2.00 |
214.00 |
2.00 |
214.00 |
1.00 |
107.00 |
| 735-02 |
mailbox supports (single)
|
89   |
EACH |
100.00 |
8,900.00 |
100.00 |
8,900.00 |
100.00 |
8,900.00 |
125.00 |
11,125.00 |
| 735-03 |
mailbox supports (double)
|
18   |
EACH |
125.00 |
2,250.00 |
150.00 |
2,700.00 |
125.00 |
2,250.00 |
200.00 |
3,600.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
14,000.00 |
14,000.00 |
100.00 |
100.00 |
15,000.00 |
15,000.00 |
15,000.00 |
15,000.00 |
| S-001 |
saw cutting
|
35,000   |
INFT |
0.25 |
8,750.00 |
0.10 |
3,500.00 |
1.50 |
52,500.00 |
0.30 |
10,500.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,329,987.11 |
|
2,794,115.66 |
|
2,795,422.86 |
|
2,900,444.50 |
|