| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - MADDEN CONTRACTING CO., INC. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-I |
removal of culvert pipe
|
11   |
LNFT |
100.00 |
1,100.00 |
|
|
|
|
|
|
| 202-02-J |
removal of concrete box culvert headwalls
|
3   |
EACH |
1,000.00 |
3,000.00 |
|
|
|
|
|
|
| 203-07 |
borrow (vehicular measurement)
|
6,000   |
CUYD |
14.75 |
88,500.00 |
|
|
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
300   |
CUYD |
30.00 |
9,000.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
13,678.7 |
TON |
103.00 |
1,408,906.10 |
|
|
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
500.0 |
TON |
50.00 |
25,000.00 |
|
|
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
62,614   |
SQYD |
1.64 |
102,686.96 |
|
|
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 1,957   |
CUYD |
1.00 |
- 1,957.00 |
|
|
|
|
|
|
| 510-01-A |
pavement patching (6" minimum thickness)
|
650   |
SQYD |
52.25 |
33,962.50 |
|
|
|
|
|
|
| 701-08 |
relaying pipe
|
60   |
LNFT |
150.00 |
9,000.00 |
|
|
|
|
|
|
| 701-10-G |
reinforced concrete pipe (extension)(18")
|
4   |
LNFT |
150.00 |
600.00 |
|
|
|
|
|
|
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
20   |
LNFT |
190.00 |
3,800.00 |
|
|
|
|
|
|
| 701-10-K |
reinforced concrete pipe (extension)(30")
|
16   |
LNFT |
210.00 |
3,360.00 |
|
|
|
|
|
|
| 701-15 |
concrete collar
|
5   |
EACH |
1,250.00 |
6,250.00 |
|
|
|
|
|
|
| 712-02 |
sacked concrete revetment
|
59   |
SQYD |
80.00 |
4,720.00 |
|
|
|
|
|
|
| 712-03 |
stone revetment
|
398   |
SQYD |
80.00 |
31,840.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
78,500.00 |
78,500.00 |
|
|
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
9.702 |
MILE |
325.00 |
3,153.15 |
|
|
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
8.280 |
MILE |
1.00 |
8.28 |
|
|
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
35.714 |
MILE |
1.00 |
35.71 |
|
|
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
20.6 |
TON |
600.00 |
12,360.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
78,500.00 |
78,500.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
640   |
EACH |
4.50 |
2,880.00 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
17.857 |
MILE |
2,500.00 |
44,642.50 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
2.760 |
MILE |
700.00 |
1,932.00 |
|
|
|
|
|
|
| 735-01 |
mailboxes
|
46   |
EACH |
1.00 |
46.00 |
|
|
|
|
|
|
| 735-02 |
mailbox supports (single)
|
34   |
EACH |
125.00 |
4,250.00 |
|
|
|
|
|
|
| 735-03 |
mailbox supports (double)
|
6   |
EACH |
175.00 |
1,050.00 |
|
|
|
|
|
|
| 739-01 |
hydro-seeding
|
12.00 |
ACRE |
1,200.00 |
14,400.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
20,000.00 |
20,000.00 |
|
|
|
|
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
25.10 |
CUYD |
1,000.00 |
25,100.00 |
|
|
|
|
|
|
| 805-12-F |
reinforced concrete box culverts (5'x 4')
|
5.0 |
LNFT |
900.00 |
4,500.00 |
|
|
|
|
|
|
| 805-12-I |
reinforced concrete box culverts (5'x 5')
|
64.0 |
LNFT |
1,000.00 |
64,000.00 |
|
|
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
1,935   |
LB |
2.50 |
4,837.50 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,089,963.70 |
|
|
|
|
|
|
|