| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 2 - D & J CONSTRUCTION CO., INC. |
- 3 - GILCHRIST CONSTRUCTION CO. LLC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 502-01 |
superpave asphaltic concrete
|
7,078.7 |
TON |
94.00 |
665,397.80 |
110.00 |
778,657.00 |
111.00 |
785,735.70 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
53.7 |
TON |
290.00 |
15,573.00 |
320.00 |
17,184.00 |
165.00 |
8,860.50 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
61,111   |
SQYD |
1.40 |
85,555.40 |
1.50 |
91,666.50 |
1.25 |
76,388.75 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 742   |
CUYD |
0.10 |
- 74.20 |
0.01 |
- 7.42 |
0.01 |
- 7.42 |
|
|
| 510-01-C |
pavement patching (8" minimum thickness)
|
100   |
SQYD |
117.00 |
11,700.00 |
170.00 |
17,000.00 |
200.00 |
20,000.00 |
|
|
| 510-01-D |
pavement patching (16" minimum thickness)
|
150   |
SQYD |
125.00 |
18,750.00 |
190.00 |
28,500.00 |
300.00 |
45,000.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
10,000.00 |
10,000.00 |
9,000.00 |
9,000.00 |
12,000.00 |
12,000.00 |
|
|
| 713-02-E |
temporary pavement markings (24" width)
|
22   |
LNFT |
1.00 |
22.00 |
8.00 |
176.00 |
1.00 |
22.00 |
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
7.666 |
MILE |
1.00 |
7.67 |
225.00 |
1,724.85 |
150.00 |
1,149.90 |
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
4.888 |
MILE |
1.00 |
4.89 |
200.00 |
977.60 |
300.00 |
1,466.40 |
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
22.564 |
MILE |
1.00 |
22.56 |
1.00 |
22.56 |
480.00 |
10,830.72 |
|
|
| 713-05-D |
temporary pavement legends and symbols (rr crossing)
|
2   |
EACH |
1.00 |
2.00 |
175.00 |
350.00 |
125.00 |
250.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
61,500.00 |
61,500.00 |
35,000.00 |
35,000.00 |
45,000.00 |
45,000.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
506   |
EACH |
5.00 |
2,530.00 |
5.00 |
2,530.00 |
5.00 |
2,530.00 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
22   |
LNFT |
3.00 |
66.00 |
18.00 |
396.00 |
3.00 |
66.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
11.282 |
MILE |
2,500.00 |
28,205.00 |
2,300.00 |
25,948.60 |
2,500.00 |
28,205.00 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
2.444 |
MILE |
625.00 |
1,527.50 |
1,000.00 |
2,444.00 |
600.00 |
1,466.40 |
|
|
| 732-04-D |
plastic pavement legends & symbols (rr crossing)
|
2   |
EACH |
410.00 |
820.00 |
550.00 |
1,100.00 |
450.00 |
900.00 |
|
|
| 735-01 |
mailboxes
|
40   |
EACH |
1.00 |
40.00 |
1.00 |
40.00 |
2.00 |
80.00 |
|
|
| 735-02 |
mailbox supports (single)
|
31   |
EACH |
100.00 |
3,100.00 |
125.00 |
3,875.00 |
100.00 |
3,100.00 |
|
|
| 735-03 |
mailbox supports (double)
|
5   |
EACH |
125.00 |
625.00 |
200.00 |
1,000.00 |
140.00 |
700.00 |
|
|
| 735-04 |
mailbox supports (multiple)
|
1   |
EACH |
225.00 |
225.00 |
350.00 |
350.00 |
240.00 |
240.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
16,000.00 |
16,000.00 |
7,500.00 |
7,500.00 |
11,500.00 |
11,500.00 |
|
|
| S-001 |
saw cutting
|
3,500   |
INFT |
0.80 |
2,800.00 |
0.70 |
2,450.00 |
2.00 |
7,000.00 |
|
|
| S-002 |
sawcuts in asphaltic concrete lifts
|
26,029   |
LNFT |
1.00 |
26,029.00 |
0.95 |
24,727.55 |
0.75 |
19,521.75 |
|
|
| S-003 |
sawing and sealing longitudinal joints in asphaltic
concrete overlay |
18,592   |
LNFT |
1.60 |
29,747.20 |
1.25 |
23,240.00 |
1.50 |
27,888.00 |
|
|
| S-004 |
sawing and sealing transverse joints in asphaltic
concrete overlay |
7,437   |
LNFT |
1.60 |
11,899.20 |
1.25 |
9,296.25 |
1.50 |
11,155.50 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
992,075.02 |
|
1,085,148.49 |
|
1,121,049.20 |
|
|
|