| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - SPECIALTY TRACKHOE & DOZER SERV.INC |
- 2 - BENTON & BROWN, LLC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
5,000.00 |
5,000.00 |
1,500.00 |
1,500.00 |
|
|
|
|
| 202-02-E |
removal of concrete curbs
|
30.0 |
LNFT |
36.00 |
1,080.00 |
25.00 |
750.00 |
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
1,088.1 |
SQYD |
11.00 |
11,969.10 |
26.00 |
28,290.60 |
|
|
|
|
| 202-02-I |
removal of existing safety end treatment
|
1   |
EACH |
500.00 |
500.00 |
900.00 |
900.00 |
|
|
|
|
| 203-05 |
excavation and embankment
|
lump |
LUMP |
52,000.00 |
52,000.00 |
35,000.00 |
35,000.00 |
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
40   |
each |
20.00 |
800.00 |
16.00 |
640.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
1,000.7 |
TON |
135.00 |
135,094.50 |
145.00 |
145,101.50 |
|
|
|
|
| 701-03-E |
storm drain pipe (12" rcp/pcp)
|
21   |
LNFT |
55.00 |
1,155.00 |
95.00 |
1,995.00 |
|
|
|
|
| 701-03-G |
storm drain pipe (18" rcp/pcp)
|
24   |
LNFT |
60.00 |
1,440.00 |
110.00 |
2,640.00 |
|
|
|
|
| 701-03-I |
storm drain pipe (24" rcp/pcp)
|
6   |
LNFT |
155.00 |
930.00 |
175.00 |
1,050.00 |
|
|
|
|
| 701-15 |
concrete collar
|
2   |
EACH |
1,000.00 |
2,000.00 |
1,000.00 |
2,000.00 |
|
|
|
|
| 702-03-A |
catch basins (cb-01)
|
2   |
EACH |
3,500.00 |
7,000.00 |
2,900.00 |
5,800.00 |
|
|
|
|
| 703-01 |
shoulder underdrain systems
|
265   |
LNFT |
16.00 |
4,240.00 |
27.00 |
7,155.00 |
|
|
|
|
| 703-02 |
shoulder outlet underdrains
|
1   |
EACH |
1,000.00 |
1,000.00 |
750.00 |
750.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
15,000.00 |
15,000.00 |
21,000.00 |
21,000.00 |
|
|
|
|
| 717-01 |
seeding
|
15   |
LB |
20.00 |
300.00 |
10.00 |
150.00 |
|
|
|
|
| 718-01 |
fertilizer
|
500   |
LB |
1.65 |
825.00 |
1.00 |
500.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
25,000.00 |
25,000.00 |
21,000.00 |
21,000.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
60   |
EACH |
5.50 |
330.00 |
5.60 |
336.00 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
354.000 |
LNFT |
1.10 |
389.40 |
1.05 |
371.70 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
0.307 |
MILE |
2,860.00 |
878.02 |
3,220.00 |
988.54 |
|
|
|
|
| 732-03-C |
plastic pavement striping (broken line)(8" width)
|
0.219 |
MILE |
4,400.00 |
963.60 |
1,900.00 |
416.10 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
5   |
EACH |
155.00 |
775.00 |
200.00 |
1,000.00 |
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
5   |
EACH |
155.00 |
775.00 |
230.00 |
1,150.00 |
|
|
|
|
| 732-05 |
removal of existing markings
|
0.290 |
MILE |
5,800.00 |
1,682.00 |
6,500.00 |
1,885.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
8,000.00 |
8,000.00 |
7,000.00 |
7,000.00 |
|
|
|
|
| S-001 |
relay safety end treatment
|
1   |
EACH |
1,100.00 |
1,100.00 |
550.00 |
550.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
280,226.62 |
|
289,919.44 |
|
|
|
|
|