| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - D & J CONSTRUCTION CO., INC. |
- 2 - DIAMOND B CONSTRUCTION CO., L.L.C. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
5,000.00 |
5,000.00 |
24,500.00 |
24,500.00 |
|
|
|
|
| 202-02-D |
removal of concrete walks & drives
|
147   |
SQYD |
16.00 |
2,352.00 |
20.00 |
2,940.00 |
|
|
|
|
| 203-07 |
borrow (vehicular measurement)
|
2,362   |
CUYD |
20.00 |
47,240.00 |
18.00 |
42,516.00 |
|
|
|
|
| 203-07-A |
borrow (vehicular meas.)(selected soils)
|
8,736   |
CUYD |
7.00 |
61,152.00 |
18.00 |
157,248.00 |
|
|
|
|
| 308-01-A |
in-place cement treated base course (12" thick)
|
81,821   |
SQYD |
10.25 |
838,665.25 |
10.65 |
871,393.65 |
|
|
|
|
| 308-02 |
removal of existing patches
|
200   |
SQYD |
12.00 |
2,400.00 |
100.00 |
20,000.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
141   |
CUYD |
80.00 |
11,280.00 |
140.00 |
19,740.00 |
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
2,101.0 |
CUYD |
15.00 |
31,515.00 |
90.00 |
189,090.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
8,609.0 |
TON |
142.00 |
1,222,478.00 |
98.00 |
843,682.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
1,492.4 |
TON |
142.00 |
211,920.80 |
150.00 |
223,860.00 |
|
|
|
|
| 701-01-U |
cross drain pipe (84" rcp)
|
100   |
LNFT |
725.00 |
72,500.00 |
1,000.00 |
100,000.00 |
|
|
|
|
| 701-02-G/H |
cross drain pipe arch (42" equiv. rcpa or 48" equiv.
cmpa) |
48   |
LNFT |
250.00 |
12,000.00 |
350.00 |
16,800.00 |
|
|
|
|
| 701-02-I/J |
cross drain pipe arch (54" equiv. rcpa or 60" equiv.
cmpa) |
48   |
LNFT |
325.00 |
15,600.00 |
485.00 |
23,280.00 |
|
|
|
|
| 701-10-F |
reinforced concrete pipe (extension)(15")
|
20   |
LNFT |
130.00 |
2,600.00 |
160.00 |
3,200.00 |
|
|
|
|
| 701-10-G |
reinforced concrete pipe (extension)(18")
|
4   |
LNFT |
130.00 |
520.00 |
160.00 |
640.00 |
|
|
|
|
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
8   |
LNFT |
155.00 |
1,240.00 |
200.00 |
1,600.00 |
|
|
|
|
| 701-12-G |
corrugated metal pipe (extension)(18")
|
6   |
LNFT |
120.00 |
720.00 |
130.00 |
780.00 |
|
|
|
|
| 701-12-I |
corrugated metal pipe (extension)(24")
|
28   |
LNFT |
150.00 |
4,200.00 |
160.00 |
4,480.00 |
|
|
|
|
| 701-15 |
concrete collar
|
13   |
EACH |
800.00 |
10,400.00 |
1,000.00 |
13,000.00 |
|
|
|
|
| 706-02-C |
concrete drive (6" thick)
|
111.0 |
SQYD |
65.00 |
7,215.00 |
78.00 |
8,658.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
175,000.00 |
175,000.00 |
50,000.00 |
50,000.00 |
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
18.191 |
MILE |
250.00 |
4,547.75 |
1.00 |
18.19 |
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
1.368 |
MILE |
200.00 |
273.60 |
1.00 |
1.37 |
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
71.109 |
MILE |
1.00 |
71.11 |
1.00 |
71.11 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
11.8 |
TON |
1,000.00 |
11,800.00 |
500.00 |
5,900.00 |
|
|
|
|
| 717-01 |
seeding
|
531   |
LB |
6.75 |
3,584.25 |
9.00 |
4,779.00 |
|
|
|
|
| 718-01 |
fertilizer
|
11,800   |
LB |
0.25 |
2,950.00 |
0.65 |
7,670.00 |
|
|
|
|
| 726-01 |
bedding material
|
179.4 |
CUYD |
110.00 |
19,734.00 |
125.00 |
22,425.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
225,000.00 |
225,000.00 |
275,000.00 |
275,000.00 |
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
19   |
EACH |
100.00 |
1,900.00 |
110.00 |
2,090.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
802   |
EACH |
8.50 |
6,817.00 |
6.00 |
4,812.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
23.703 |
MILE |
3,500.00 |
82,960.50 |
3,200.00 |
75,849.60 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.456 |
MILE |
2,000.00 |
912.00 |
900.00 |
410.40 |
|
|
|
|
| 735-01 |
mailboxes
|
41   |
EACH |
25.00 |
1,025.00 |
6.50 |
266.50 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
28   |
EACH |
125.00 |
3,500.00 |
200.00 |
5,600.00 |
|
|
|
|
| 735-03 |
mailbox supports (double)
|
5   |
EACH |
200.00 |
1,000.00 |
250.00 |
1,250.00 |
|
|
|
|
| 735-04 |
mailbox supports (multiple)
|
1   |
EACH |
350.00 |
350.00 |
325.00 |
325.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
35,000.00 |
35,000.00 |
75,000.00 |
75,000.00 |
|
|
|
|
| S-001 |
tree trimming
|
lump |
LUMP |
35,000.00 |
35,000.00 |
100,000.00 |
100,000.00 |
|
|
|
|
| S-002 |
cleaning existing ditches
|
1,425   |
LNFT |
9.00 |
12,825.00 |
9.00 |
12,825.00 |
|
|
|
|
| S-003 |
saw cutting concrete drives (6" depth)
|
104   |
LNFT |
12.00 |
1,248.00 |
8.00 |
832.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
3,186,496.26 |
|
3,212,532.82 |
|
|
|
|
|