Letting of 7/30/2008 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 856-08-0007
Parish: UNION
Routes: LA 3121
Description: LA 15 - LA 558
Type Const: grading, drainage structures, superpave asphaltic concrete pavement, and related
work.
Estimated Construction Cost: $3,120,192.48
 
RankLicenseBidderConstruction Bid
1 05789 D & J CONSTRUCTION CO., INC. $3,186,496.26
2 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $3,212,532.82
 
Item Number Item Description Quantity Unit of Measure - 1 -
D & J CONSTRUCTION CO., INC.
- 2 -
DIAMOND B CONSTRUCTION CO., L.L.C.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 5,000.00 5,000.00 24,500.00 24,500.00        
202-02-D removal of concrete walks & drives 147      SQYD 16.00 2,352.00 20.00 2,940.00        
203-07 borrow (vehicular measurement) 2,362      CUYD 20.00 47,240.00 18.00 42,516.00        
203-07-A borrow (vehicular meas.)(selected soils) 8,736      CUYD 7.00 61,152.00 18.00 157,248.00        
308-01-A in-place cement treated base course (12" thick) 81,821      SQYD 10.25 838,665.25 10.65 871,393.65        
308-02 removal of existing patches 200      SQYD 12.00 2,400.00 100.00 20,000.00        
401-02 aggregate surface course (adjusted vehicular
measurement)
141      CUYD 80.00 11,280.00 140.00 19,740.00        
402-01 traffic maintenance aggregate (vehicular measurement) 2,101.0    CUYD 15.00 31,515.00 90.00 189,090.00        
502-01 superpave asphaltic concrete 8,609.0    TON 142.00 1,222,478.00 98.00 843,682.00        
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
1,492.4    TON 142.00 211,920.80 150.00 223,860.00        
701-01-U cross drain pipe (84" rcp) 100      LNFT 725.00 72,500.00 1,000.00 100,000.00        
701-02-G/H cross drain pipe arch (42" equiv. rcpa or 48" equiv.
cmpa)
48      LNFT 250.00 12,000.00 350.00 16,800.00        
701-02-I/J cross drain pipe arch (54" equiv. rcpa or 60" equiv.
cmpa)
48      LNFT 325.00 15,600.00 485.00 23,280.00        
701-10-F reinforced concrete pipe (extension)(15") 20      LNFT 130.00 2,600.00 160.00 3,200.00        
701-10-G reinforced concrete pipe (extension)(18") 4      LNFT 130.00 520.00 160.00 640.00        
701-10-I reinforced concrete pipe (extension)(24") 8      LNFT 155.00 1,240.00 200.00 1,600.00        
701-12-G corrugated metal pipe (extension)(18") 6      LNFT 120.00 720.00 130.00 780.00        
701-12-I corrugated metal pipe (extension)(24") 28      LNFT 150.00 4,200.00 160.00 4,480.00        
701-15 concrete collar 13      EACH 800.00 10,400.00 1,000.00 13,000.00        
706-02-C concrete drive (6" thick) 111.0    SQYD 65.00 7,215.00 78.00 8,658.00        
713-01 temporary signs & barricades lump      LUMP 175,000.00 175,000.00 50,000.00 50,000.00        
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
18.191  MILE 250.00 4,547.75 1.00 18.19        
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
1.368  MILE 200.00 273.60 1.00 1.37        
713-04-A temporary pavement markings (solid line)(4" width) 71.109  MILE 1.00 71.11 1.00 71.11        
716-01-A mulch (vegetative) 11.8    TON 1,000.00 11,800.00 500.00 5,900.00        
717-01 seeding 531      LB 6.75 3,584.25 9.00 4,779.00        
718-01 fertilizer 11,800      LB 0.25 2,950.00 0.65 7,670.00        
726-01 bedding material 179.4    CUYD 110.00 19,734.00 125.00 22,425.00        
727-01 mobilization lump      LUMP 225,000.00 225,000.00 275,000.00 275,000.00        
729-16-B object marker assembly (type 2) 19      EACH 100.00 1,900.00 110.00 2,090.00        
731-02 reflectorized raised pavement markers 802      EACH 8.50 6,817.00 6.00 4,812.00        
732-02-A plastic pavement striping (solid line) (4" width) 23.703  MILE 3,500.00 82,960.50 3,200.00 75,849.60        
732-03-A plastic pavement striping (broken line)(4" width) 0.456  MILE 2,000.00 912.00 900.00 410.40        
735-01 mailboxes 41      EACH 25.00 1,025.00 6.50 266.50        
735-02 mailbox supports (single) 28      EACH 125.00 3,500.00 200.00 5,600.00        
735-03 mailbox supports (double) 5      EACH 200.00 1,000.00 250.00 1,250.00        
735-04 mailbox supports (multiple) 1      EACH 350.00 350.00 325.00 325.00        
740-01 construction layout lump      LUMP 35,000.00 35,000.00 75,000.00 75,000.00        
S-001 tree trimming lump      LUMP 35,000.00 35,000.00 100,000.00 100,000.00        
S-002 cleaning existing ditches 1,425      LNFT 9.00 12,825.00 9.00 12,825.00        
S-003 saw cutting concrete drives (6" depth) 104      LNFT 12.00 1,248.00 8.00 832.00        
                       
 CONTRACTOR TOTAL       3,186,496.26   3,212,532.82        