| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC |
- 2 - FLEMING CONSTRUCTION CO., INC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 203-07 |
borrow (vehicular measurement)
|
200   |
CUYD |
45.00 |
9,000.00 |
40.00 |
8,000.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
300   |
CUYD |
75.00 |
22,500.00 |
85.00 |
25,500.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
2,946.5 |
TON |
104.00 |
306,436.00 |
200.00 |
589,300.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
429.1 |
TON |
180.00 |
77,238.00 |
250.00 |
107,275.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
15,934   |
SQYD |
2.70 |
43,021.80 |
15.00 |
239,010.00 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 522   |
CUYD |
1.00 |
- 522.00 |
0.00 |
0.00 |
|
|
|
|
| 510-01-B |
pavement patching (12" minimum thickness)
|
1,200   |
SQYD |
155.00 |
186,000.00 |
225.00 |
270,000.00 |
|
|
|
|
| 702-04-A |
adjusting manholes
|
6   |
EACH |
270.00 |
1,620.00 |
1,500.00 |
9,000.00 |
|
|
|
|
| 702-04-B |
adjusting catch basins
|
5   |
EACH |
3,700.00 |
18,500.00 |
3,000.00 |
15,000.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
87,000.00 |
87,000.00 |
50,000.00 |
50,000.00 |
|
|
|
|
| 713-02-E |
temporary pavement markings (24" width)
|
100   |
LNFT |
1.12 |
112.00 |
2.00 |
200.00 |
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
2.300 |
MILE |
106.00 |
243.80 |
500.00 |
1,150.00 |
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
1.800 |
MILE |
200.00 |
360.00 |
300.00 |
540.00 |
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
6.080 |
MILE |
300.00 |
1,824.00 |
500.00 |
3,040.00 |
|
|
|
|
| 713-05-D |
temporary pavement legends and symbols (rr crossing)
|
8   |
EACH |
130.00 |
1,040.00 |
150.00 |
1,200.00 |
|
|
|
|
| 717-01 |
seeding
|
17   |
LB |
38.00 |
646.00 |
20.00 |
340.00 |
|
|
|
|
| 718-01 |
fertilizer
|
560   |
LB |
3.00 |
1,680.00 |
1.00 |
560.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
87,000.00 |
87,000.00 |
200,000.00 |
200,000.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
96.00 |
384.00 |
150.00 |
600.00 |
|
|
|
|
| 729-19-C |
dead end road installations(type c)
|
1   |
EACH |
575.00 |
575.00 |
1,000.00 |
1,000.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
162   |
EACH |
6.25 |
1,012.50 |
10.00 |
1,620.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
50   |
LNFT |
4.20 |
210.00 |
8.00 |
400.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
3.040 |
MILE |
3,400.00 |
10,336.00 |
3,000.00 |
9,120.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.900 |
MILE |
925.00 |
832.50 |
1,500.00 |
1,350.00 |
|
|
|
|
| 732-04-D |
plastic pavement legends & symbols (rr crossing)
|
4   |
EACH |
510.00 |
2,040.00 |
1,000.00 |
4,000.00 |
|
|
|
|
| 735-01 |
mailboxes
|
106   |
EACH |
1.30 |
137.80 |
25.00 |
2,650.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
106   |
EACH |
110.00 |
11,660.00 |
150.00 |
15,900.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
38,000.00 |
38,000.00 |
50,000.00 |
50,000.00 |
|
|
|
|
| 741-11 |
adjusting water valve and meter box
|
7   |
EACH |
1,200.00 |
8,400.00 |
1,000.00 |
7,000.00 |
|
|
|
|
| S-001 |
sawcutting of pavement
|
16,202   |
LNFT |
0.50 |
8,101.00 |
15.00 |
243,030.00 |
|
|
|
|
| S-002 |
straightening signs
|
lump |
LUMP |
765.00 |
765.00 |
15,000.00 |
15,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
926,153.40 |
|
1,871,785.00 |
|
|
|
|
|