Letting of 7/30/2008 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 814-07-0004
Parish: CLAIBORNE
Routes: LA 3244
Description: HOMER BY-PASS EMBANKMENT
Type Const: grading, excavation and embankment, drainage structures, portland cement concrete
pavement, and related work.
Estimated Construction Cost: $6,941,686.11
 
RankLicenseBidderConstruction Bid
1 39670 EUTAW CONSTRUCTION CO. INC. $5,792,683.20
2 40615 SPECIALTY TRACKHOE & DOZER SERV.INC $6,022,171.08
3 33685 SPECIALTY CONTRACTORS $6,178,716.55
4 28218 F. J. BURNELL, INC. $6,234,986.00
5 36374 BEST-YET BUILDERS, LLC $6,437,517.46
6 12135 BLOUNT BROS. CONSTRUCTION, INC. $6,507,284.75
7 47577 T.J. LAMBRECHT CONSTRUCTION, INC. $6,648,431.92
8 34567 JAMES CONSTRUCTION GROUP LLC $7,099,695.85
9 39462 DENTON-JAMES LLC $7,210,101.75
10 12312 GILCHRIST CONSTRUCTION CO. LLC $8,830,893.01
 
Item Number Item Description Quantity Unit of Measure - 1 -
EUTAW CONSTRUCTION CO. INC.
- 2 -
SPECIALTY TRACKHOE & DOZER SERV.INC
- 3 -
SPECIALTY CONTRACTORS
- 4 -
F. J. BURNELL, INC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 65,000.00 65,000.00 37,000.00 37,000.00 150,000.00 150,000.00 75,000.00 75,000.00
203-01 general excavation 599,811      CUYD 1.55 929,707.05 1.36 815,742.96 1.75 1,049,669.25 2.90 1,739,451.90
203-02 drainage excavation 4,210      CUYD 5.00 21,050.00 10.00 42,100.00 5.00 21,050.00 7.00 29,470.00
203-03 embankment 385,766      CUYD 1.50 578,649.00 2.12 817,823.92 1.80 694,378.80 1.10 424,342.60
204-02 temporary hay or straw bales 500      EACH 9.50 4,750.00 15.00 7,500.00 10.00 5,000.00 10.00 5,000.00
204-03 temporary slope drains 40      LNFT 20.00 800.00 25.00 1,000.00 65.00 2,600.00 100.00 4,000.00
204-05-A temporary sediment check dams (hay) 400      EACH 110.00 44,000.00 115.00 46,000.00 150.00 60,000.00 90.00 36,000.00
204-05-B temporary sediment check dams (stone) 100      EACH 500.00 50,000.00 750.00 75,000.00 400.00 40,000.00 350.00 35,000.00
204-06 temporary silt fencing 50,000      LNFT 1.40 70,000.00 1.35 67,500.00 1.50 75,000.00 2.00 100,000.00
204-07 temporary stone construction entrance 6      EACH 3,800.00 22,800.00 3,000.00 18,000.00 1,500.00 9,000.00 2,500.00 15,000.00
510-01-B pavement patching (12" minimum thickness) 20      SQYD 280.00 5,600.00 175.00 3,500.00 250.00 5,000.00 200.00 4,000.00
701-01-I cross drain pipe (24" rcp/pcp) 951      LNFT 82.00 77,982.00 70.00 66,570.00 60.00 57,060.00 60.00 57,060.00
701-01-K cross drain pipe (30" rcp/pcp) 429      LNFT 106.00 45,474.00 95.00 40,755.00 85.00 36,465.00 80.00 34,320.00
701-01-M cross drain pipe (36" rcp/pcp) 1,112      LNFT 135.00 150,120.00 120.00 133,440.00 100.00 111,200.00 90.00 100,080.00
701-01-N cross drain pipe (42" rcp/pcp) 692      LNFT 185.00 128,020.00 140.00 96,880.00 145.00 100,340.00 120.00 83,040.00
701-01-O cross drain pipe (48" rcp/pcp) 1,448      LNFT 223.00 322,904.00 160.00 231,680.00 175.00 253,400.00 150.00 217,200.00
701-01-Q cross drain pipe (60" rcp/pcp) 1,301      LNFT 322.00 418,922.00 260.00 338,260.00 275.00 357,775.00 250.00 325,250.00
701-01-S cross drain pipe (72" rcp/pcp) 1,166      LNFT 441.00 514,206.00 340.00 396,440.00 380.00 443,080.00 350.00 408,100.00
701-05-I side drain pipe (24") 1,068      LNFT 58.00 61,944.00 60.00 64,080.00 60.00 64,080.00 60.00 64,080.00
706-03-A incidental concrete paving (4" thick) 7,159.3    SQYD 30.00 214,779.00 45.00 322,168.50 40.00 286,372.00 45.00 322,168.50
711-02-D riprap (55 lb) 2,790      CUYD 110.00 306,900.00 120.00 334,800.00 80.00 223,200.00 80.00 223,200.00
711-04 geotextile fabric 4,629      SQYD 2.50 11,572.50 1.75 8,100.75 2.00 9,258.00 2.00 9,258.00
713-01 temporary signs & barricades lump      LUMP 46,000.00 46,000.00 10,000.00 10,000.00 15,000.00 15,000.00 25,000.00 25,000.00
716-01-A mulch (vegetative) 186.0    TON 925.00 172,050.00 950.00 176,700.00 700.00 130,200.00 1,000.00 186,000.00
720-01-C erosion control system, flexible channel liner (type c) 18,101      SQYD 1.80 32,581.80 1.50 27,151.50 1.50 27,151.50 3.00 54,303.00
720-01-D erosion control system, flexible channel liner (type d) 4,953      SQYD 2.10 10,401.30 1.50 7,429.50 1.50 7,429.50 3.00 14,859.00
722-02 project site laboratory (equipped) 1      EACH 25,000.00 25,000.00 25,000.00 25,000.00 17,500.00 17,500.00 30,000.00 30,000.00
726-01 bedding material 1,562.0    CUYD 110.00 171,820.00 80.00 124,960.00 80.00 124,960.00 90.00 140,580.00
727-01 mobilization lump      LUMP 300,000.00 300,000.00 350,000.00 350,000.00 250,000.00 250,000.00 350,000.00 350,000.00
729-16-B object marker assembly (type 2) 48      EACH 60.00 2,880.00 100.00 4,800.00 68.00 3,264.00 80.00 3,840.00
729-16-C object marker assembly (type 3) 4      EACH 72.00 288.00 250.00 1,000.00 70.00 280.00 80.00 320.00
739-01 hydro-seeding 186.00   ACRE 950.00 176,700.00 1,050.00 195,300.00 700.00 130,200.00 1,000.00 186,000.00
740-01 construction layout lump      LUMP 125,000.00 125,000.00 220,000.00 220,000.00 300,000.00 300,000.00 125,000.00 125,000.00
805-01-A class a concrete (pipe headwalls) 182.74   CUYD 800.00 146,192.00 1,565.00 285,988.10 1,350.00 246,699.00 1,100.00 201,014.00
805-01-B class a concrete (box culvert headwalls) 46.23   CUYD 685.00 31,667.55 785.00 36,290.55 1,500.00 69,345.00 1,100.00 50,853.00
805-12-Y reinforced concrete box culverts (3-10'x7'x 226') 678.0    LNFT 725.00 491,550.00 850.00 576,300.00 1,150.00 779,700.00 775.00 525,450.00
806-01 deformed reinforcing steel 15,373      LB 1.00 15,373.00 1.10 16,910.30 1.50 23,059.50 2.00 30,746.00
                       
 CONTRACTOR TOTAL       5,792,683.20   6,022,171.08   6,178,716.55   6,234,986.00
 
Item Number Item Description Quantity Unit of Measure - 5 -
BEST-YET BUILDERS, LLC
- 6 -
BLOUNT BROS. CONSTRUCTION, INC.
- 7 -
T.J. LAMBRECHT CONSTRUCTION, INC.
- 8 -
JAMES CONSTRUCTION GROUP LLC
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 25,000.00 25,000.00 50,000.00 50,000.00 10,000.00 10,000.00 150,000.00 150,000.00
203-01 general excavation 599,811      CUYD 2.20 1,319,584.20 2.25 1,349,574.75 2.29 1,373,567.19 2.10 1,259,603.10
203-02 drainage excavation 4,210      CUYD 5.00 21,050.00 10.00 42,100.00 7.25 30,522.50 13.50 56,835.00
203-03 embankment 385,766      CUYD 1.50 578,649.00 1.50 578,649.00 2.39 921,980.74 2.50 964,415.00
204-02 temporary hay or straw bales 500      EACH 10.00 5,000.00 20.00 10,000.00 13.50 6,750.00 15.00 7,500.00
204-03 temporary slope drains 40      LNFT 25.00 1,000.00 20.00 800.00 53.00 2,120.00 120.00 4,800.00
204-05-A temporary sediment check dams (hay) 400      EACH 100.00 40,000.00 150.00 60,000.00 80.00 32,000.00 130.00 52,000.00
204-05-B temporary sediment check dams (stone) 100      EACH 500.00 50,000.00 500.00 50,000.00 400.00 40,000.00 630.00 63,000.00
204-06 temporary silt fencing 50,000      LNFT 1.50 75,000.00 2.00 100,000.00 1.45 72,500.00 4.50 225,000.00
204-07 temporary stone construction entrance 6      EACH 10.00 60.00 3,000.00 18,000.00 4,000.00 24,000.00 2,000.00 12,000.00
510-01-B pavement patching (12" minimum thickness) 20      SQYD 100.00 2,000.00 100.00 2,000.00 135.00 2,700.00 175.00 3,500.00
701-01-I cross drain pipe (24" rcp/pcp) 951      LNFT 53.70 51,068.70 60.00 57,060.00 75.00 71,325.00 77.00 73,227.00
701-01-K cross drain pipe (30" rcp/pcp) 429      LNFT 75.94 32,578.26 80.00 34,320.00 90.00 38,610.00 95.00 40,755.00
701-01-M cross drain pipe (36" rcp/pcp) 1,112      LNFT 104.50 116,204.00 120.00 133,440.00 105.00 116,760.00 113.00 125,656.00
701-01-N cross drain pipe (42" rcp/pcp) 692      LNFT 160.54 111,093.68 180.00 124,560.00 145.00 100,340.00 150.00 103,800.00
701-01-O cross drain pipe (48" rcp/pcp) 1,448      LNFT 198.14 286,906.72 220.00 318,560.00 190.00 275,120.00 200.00 289,600.00
701-01-Q cross drain pipe (60" rcp/pcp) 1,301      LNFT 287.40 373,907.40 300.00 390,300.00 260.00 338,260.00 258.00 335,658.00
701-01-S cross drain pipe (72" rcp/pcp) 1,166      LNFT 423.55 493,859.30 460.00 536,360.00 370.00 431,420.00 390.00 454,740.00
701-05-I side drain pipe (24") 1,068      LNFT 53.70 57,351.60 60.00 64,080.00 90.00 96,120.00 54.00 57,672.00
706-03-A incidental concrete paving (4" thick) 7,159.3    SQYD 60.00 429,558.00 55.00 393,761.50 40.00 286,372.00 60.00 429,558.00
711-02-D riprap (55 lb) 2,790      CUYD 80.00 223,200.00 100.00 279,000.00 65.00 181,350.00 120.00 334,800.00
711-04 geotextile fabric 4,629      SQYD 2.00 9,258.00 3.50 16,201.50 2.25 10,415.25 3.60 16,664.40
713-01 temporary signs & barricades lump      LUMP 50,000.00 50,000.00 30,000.00 30,000.00 12,000.00 12,000.00 55,000.00 55,000.00
716-01-A mulch (vegetative) 186.0    TON 500.00 93,000.00 1,600.00 297,600.00 1,000.00 186,000.00 925.00 172,050.00
720-01-C erosion control system, flexible channel liner (type c) 18,101      SQYD 1.65 29,866.65 3.00 54,303.00 1.65 29,866.65 1.80 32,581.80
720-01-D erosion control system, flexible channel liner (type d) 4,953      SQYD 1.65 8,172.45 3.00 14,859.00 1.65 8,172.45 2.10 10,401.30
722-02 project site laboratory (equipped) 1      EACH 10,000.00 10,000.00 25,000.00 25,000.00 30,000.00 30,000.00 30,000.00 30,000.00
726-01 bedding material 1,562.0    CUYD 50.00 78,100.00 80.00 124,960.00 82.00 128,084.00 90.00 140,580.00
727-01 mobilization lump      LUMP 500,000.00 500,000.00 200,000.00 200,000.00 658,000.00 658,000.00 430,000.00 430,000.00
729-16-B object marker assembly (type 2) 48      EACH 65.00 3,120.00 100.00 4,800.00 61.00 2,928.00 75.00 3,600.00
729-16-C object marker assembly (type 3) 4      EACH 100.00 400.00 120.00 480.00 79.00 316.00 85.00 340.00
739-01 hydro-seeding 186.00   ACRE 1,250.00 232,500.00 800.00 148,800.00 1,400.00 260,400.00 950.00 176,700.00
740-01 construction layout lump      LUMP 200,000.00 200,000.00 60,000.00 60,000.00 130,000.00 130,000.00 80,000.00 80,000.00
805-01-A class a concrete (pipe headwalls) 182.74   CUYD 1,000.00 182,740.00 1,000.00 182,740.00 880.00 160,811.20 1,000.00 182,740.00
805-01-B class a concrete (box culvert headwalls) 46.23   CUYD 1,000.00 46,230.00 1,000.00 46,230.00 880.00 40,682.40 1,000.00 46,230.00
805-12-Y reinforced concrete box culverts (3-10'x7'x 226') 678.0    LNFT 1,000.00 678,000.00 1,000.00 678,000.00 750.00 508,500.00 950.00 644,100.00
806-01 deformed reinforcing steel 15,373      LB 1.50 23,059.50 2.00 30,746.00 1.98 30,438.54 2.25 34,589.25
                       
 CONTRACTOR TOTAL       6,437,517.46   6,507,284.75   6,648,431.92   7,099,695.85
 
Item Number Item Description Quantity Unit of Measure - 9 -
DENTON-JAMES LLC
- 10 -
GILCHRIST CONSTRUCTION CO. LLC

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 600,000.00 600,000.00 100,000.00 100,000.00        
203-01 general excavation 599,811      CUYD 1.75 1,049,669.25 3.35 2,009,366.85        
203-02 drainage excavation 4,210      CUYD 9.00 37,890.00 4.88 20,544.80        
203-03 embankment 385,766      CUYD 2.55 983,703.30 3.70 1,427,334.20        
204-02 temporary hay or straw bales 500      EACH 10.00 5,000.00 20.00 10,000.00        
204-03 temporary slope drains 40      LNFT 25.00 1,000.00 65.00 2,600.00        
204-05-A temporary sediment check dams (hay) 400      EACH 110.00 44,000.00 175.00 70,000.00        
204-05-B temporary sediment check dams (stone) 100      EACH 800.00 80,000.00 500.00 50,000.00        
204-06 temporary silt fencing 50,000      LNFT 1.50 75,000.00 2.00 100,000.00        
204-07 temporary stone construction entrance 6      EACH 2,500.00 15,000.00 3,500.00 21,000.00        
510-01-B pavement patching (12" minimum thickness) 20      SQYD 130.00 2,600.00 200.00 4,000.00        
701-01-I cross drain pipe (24" rcp/pcp) 951      LNFT 70.00 66,570.00 125.00 118,875.00        
701-01-K cross drain pipe (30" rcp/pcp) 429      LNFT 80.00 34,320.00 150.00 64,350.00        
701-01-M cross drain pipe (36" rcp/pcp) 1,112      LNFT 100.00 111,200.00 180.00 200,160.00        
701-01-N cross drain pipe (42" rcp/pcp) 692      LNFT 150.00 103,800.00 220.00 152,240.00        
701-01-O cross drain pipe (48" rcp/pcp) 1,448      LNFT 170.00 246,160.00 250.00 362,000.00        
701-01-Q cross drain pipe (60" rcp/pcp) 1,301      LNFT 260.00 338,260.00 350.00 455,350.00        
701-01-S cross drain pipe (72" rcp/pcp) 1,166      LNFT 350.00 408,100.00 500.00 583,000.00        
701-05-I side drain pipe (24") 1,068      LNFT 68.00 72,624.00 55.00 58,740.00        
706-03-A incidental concrete paving (4" thick) 7,159.3    SQYD 44.00 315,009.20 40.00 286,372.00        
711-02-D riprap (55 lb) 2,790      CUYD 126.00 351,540.00 140.00 390,600.00        
711-04 geotextile fabric 4,629      SQYD 2.00 9,258.00 2.00 9,258.00        
713-01 temporary signs & barricades lump      LUMP 100,000.00 100,000.00 150,000.00 150,000.00        
716-01-A mulch (vegetative) 186.0    TON 925.00 172,050.00 1,000.00 186,000.00        
720-01-C erosion control system, flexible channel liner (type c) 18,101      SQYD 2.00 36,202.00 1.80 32,581.80        
720-01-D erosion control system, flexible channel liner (type d) 4,953      SQYD 2.00 9,906.00 2.10 10,401.30        
722-02 project site laboratory (equipped) 1      EACH 30,000.00 30,000.00 90,000.00 90,000.00        
726-01 bedding material 1,562.0    CUYD 70.00 109,340.00 50.00 78,100.00        
727-01 mobilization lump      LUMP 690,000.00 690,000.00 730,000.00 730,000.00        
729-16-B object marker assembly (type 2) 48      EACH 80.00 3,840.00 75.00 3,600.00        
729-16-C object marker assembly (type 3) 4      EACH 100.00 400.00 75.00 300.00        
739-01 hydro-seeding 186.00   ACRE 950.00 176,700.00 1,000.00 186,000.00        
740-01 construction layout lump      LUMP 100,000.00 100,000.00 100,000.00 100,000.00        
805-01-A class a concrete (pipe headwalls) 182.74   CUYD 1,200.00 219,288.00 1,200.00 219,288.00        
805-01-B class a concrete (box culvert headwalls) 46.23   CUYD 1,200.00 55,476.00 1,200.00 55,476.00        
805-12-Y reinforced concrete box culverts (3-10'x7'x 226') 678.0    LNFT 775.00 525,450.00 700.00 474,600.00        
806-01 deformed reinforcing steel 15,373      LB 2.00 30,746.00 1.22 18,755.06        
                       
 CONTRACTOR TOTAL       7,210,101.75   8,830,893.01        