| Lead Project: 814-07-0004 |
| Parish: CLAIBORNE |
| Routes: LA 3244 |
| Description: HOMER BY-PASS EMBANKMENT |
Type Const:
grading, excavation and embankment, drainage structures, portland cement concrete
pavement, and related work. |
| Estimated Construction Cost: $6,941,686.11 |
|
| |
| Rank | License | Bidder | Construction Bid |
| 1 | 39670 |
EUTAW CONSTRUCTION CO. INC. | $5,792,683.20 |
| 2 | 40615 |
SPECIALTY TRACKHOE & DOZER SERV.INC | $6,022,171.08 |
| 3 | 33685 |
SPECIALTY CONTRACTORS | $6,178,716.55 |
| 4 | 28218 |
F. J. BURNELL, INC. | $6,234,986.00 |
| 5 | 36374 |
BEST-YET BUILDERS, LLC | $6,437,517.46 |
| 6 | 12135 |
BLOUNT BROS. CONSTRUCTION, INC. | $6,507,284.75 |
| 7 | 47577 |
T.J. LAMBRECHT CONSTRUCTION, INC. | $6,648,431.92 |
| 8 | 34567 |
JAMES CONSTRUCTION GROUP LLC | $7,099,695.85 |
| 9 | 39462 |
DENTON-JAMES LLC | $7,210,101.75 |
| 10 | 12312 |
GILCHRIST CONSTRUCTION CO. LLC | $8,830,893.01 |
|
| |
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - EUTAW CONSTRUCTION CO. INC. |
- 2 - SPECIALTY TRACKHOE & DOZER SERV.INC |
- 3 - SPECIALTY CONTRACTORS |
- 4 - F. J. BURNELL, INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
65,000.00 |
65,000.00 |
37,000.00 |
37,000.00 |
150,000.00 |
150,000.00 |
75,000.00 |
75,000.00 |
| 203-01 |
general excavation
|
599,811   |
CUYD |
1.55 |
929,707.05 |
1.36 |
815,742.96 |
1.75 |
1,049,669.25 |
2.90 |
1,739,451.90 |
| 203-02 |
drainage excavation
|
4,210   |
CUYD |
5.00 |
21,050.00 |
10.00 |
42,100.00 |
5.00 |
21,050.00 |
7.00 |
29,470.00 |
| 203-03 |
embankment
|
385,766   |
CUYD |
1.50 |
578,649.00 |
2.12 |
817,823.92 |
1.80 |
694,378.80 |
1.10 |
424,342.60 |
| 204-02 |
temporary hay or straw bales
|
500   |
EACH |
9.50 |
4,750.00 |
15.00 |
7,500.00 |
10.00 |
5,000.00 |
10.00 |
5,000.00 |
| 204-03 |
temporary slope drains
|
40   |
LNFT |
20.00 |
800.00 |
25.00 |
1,000.00 |
65.00 |
2,600.00 |
100.00 |
4,000.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
400   |
EACH |
110.00 |
44,000.00 |
115.00 |
46,000.00 |
150.00 |
60,000.00 |
90.00 |
36,000.00 |
| 204-05-B |
temporary sediment check dams (stone)
|
100   |
EACH |
500.00 |
50,000.00 |
750.00 |
75,000.00 |
400.00 |
40,000.00 |
350.00 |
35,000.00 |
| 204-06 |
temporary silt fencing
|
50,000   |
LNFT |
1.40 |
70,000.00 |
1.35 |
67,500.00 |
1.50 |
75,000.00 |
2.00 |
100,000.00 |
| 204-07 |
temporary stone construction entrance
|
6   |
EACH |
3,800.00 |
22,800.00 |
3,000.00 |
18,000.00 |
1,500.00 |
9,000.00 |
2,500.00 |
15,000.00 |
| 510-01-B |
pavement patching (12" minimum thickness)
|
20   |
SQYD |
280.00 |
5,600.00 |
175.00 |
3,500.00 |
250.00 |
5,000.00 |
200.00 |
4,000.00 |
| 701-01-I |
cross drain pipe (24" rcp/pcp)
|
951   |
LNFT |
82.00 |
77,982.00 |
70.00 |
66,570.00 |
60.00 |
57,060.00 |
60.00 |
57,060.00 |
| 701-01-K |
cross drain pipe (30" rcp/pcp)
|
429   |
LNFT |
106.00 |
45,474.00 |
95.00 |
40,755.00 |
85.00 |
36,465.00 |
80.00 |
34,320.00 |
| 701-01-M |
cross drain pipe (36" rcp/pcp)
|
1,112   |
LNFT |
135.00 |
150,120.00 |
120.00 |
133,440.00 |
100.00 |
111,200.00 |
90.00 |
100,080.00 |
| 701-01-N |
cross drain pipe (42" rcp/pcp)
|
692   |
LNFT |
185.00 |
128,020.00 |
140.00 |
96,880.00 |
145.00 |
100,340.00 |
120.00 |
83,040.00 |
| 701-01-O |
cross drain pipe (48" rcp/pcp)
|
1,448   |
LNFT |
223.00 |
322,904.00 |
160.00 |
231,680.00 |
175.00 |
253,400.00 |
150.00 |
217,200.00 |
| 701-01-Q |
cross drain pipe (60" rcp/pcp)
|
1,301   |
LNFT |
322.00 |
418,922.00 |
260.00 |
338,260.00 |
275.00 |
357,775.00 |
250.00 |
325,250.00 |
| 701-01-S |
cross drain pipe (72" rcp/pcp)
|
1,166   |
LNFT |
441.00 |
514,206.00 |
340.00 |
396,440.00 |
380.00 |
443,080.00 |
350.00 |
408,100.00 |
| 701-05-I |
side drain pipe (24")
|
1,068   |
LNFT |
58.00 |
61,944.00 |
60.00 |
64,080.00 |
60.00 |
64,080.00 |
60.00 |
64,080.00 |
| 706-03-A |
incidental concrete paving (4" thick)
|
7,159.3 |
SQYD |
30.00 |
214,779.00 |
45.00 |
322,168.50 |
40.00 |
286,372.00 |
45.00 |
322,168.50 |
| 711-02-D |
riprap (55 lb)
|
2,790   |
CUYD |
110.00 |
306,900.00 |
120.00 |
334,800.00 |
80.00 |
223,200.00 |
80.00 |
223,200.00 |
| 711-04 |
geotextile fabric
|
4,629   |
SQYD |
2.50 |
11,572.50 |
1.75 |
8,100.75 |
2.00 |
9,258.00 |
2.00 |
9,258.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
46,000.00 |
46,000.00 |
10,000.00 |
10,000.00 |
15,000.00 |
15,000.00 |
25,000.00 |
25,000.00 |
| 716-01-A |
mulch (vegetative)
|
186.0 |
TON |
925.00 |
172,050.00 |
950.00 |
176,700.00 |
700.00 |
130,200.00 |
1,000.00 |
186,000.00 |
| 720-01-C |
erosion control system, flexible channel liner (type c)
|
18,101   |
SQYD |
1.80 |
32,581.80 |
1.50 |
27,151.50 |
1.50 |
27,151.50 |
3.00 |
54,303.00 |
| 720-01-D |
erosion control system, flexible channel liner (type d)
|
4,953   |
SQYD |
2.10 |
10,401.30 |
1.50 |
7,429.50 |
1.50 |
7,429.50 |
3.00 |
14,859.00 |
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
25,000.00 |
25,000.00 |
25,000.00 |
25,000.00 |
17,500.00 |
17,500.00 |
30,000.00 |
30,000.00 |
| 726-01 |
bedding material
|
1,562.0 |
CUYD |
110.00 |
171,820.00 |
80.00 |
124,960.00 |
80.00 |
124,960.00 |
90.00 |
140,580.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
300,000.00 |
300,000.00 |
350,000.00 |
350,000.00 |
250,000.00 |
250,000.00 |
350,000.00 |
350,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
48   |
EACH |
60.00 |
2,880.00 |
100.00 |
4,800.00 |
68.00 |
3,264.00 |
80.00 |
3,840.00 |
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
72.00 |
288.00 |
250.00 |
1,000.00 |
70.00 |
280.00 |
80.00 |
320.00 |
| 739-01 |
hydro-seeding
|
186.00 |
ACRE |
950.00 |
176,700.00 |
1,050.00 |
195,300.00 |
700.00 |
130,200.00 |
1,000.00 |
186,000.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
125,000.00 |
125,000.00 |
220,000.00 |
220,000.00 |
300,000.00 |
300,000.00 |
125,000.00 |
125,000.00 |
| 805-01-A |
class a concrete (pipe headwalls)
|
182.74 |
CUYD |
800.00 |
146,192.00 |
1,565.00 |
285,988.10 |
1,350.00 |
246,699.00 |
1,100.00 |
201,014.00 |
| 805-01-B |
class a concrete (box culvert headwalls)
|
46.23 |
CUYD |
685.00 |
31,667.55 |
785.00 |
36,290.55 |
1,500.00 |
69,345.00 |
1,100.00 |
50,853.00 |
| 805-12-Y |
reinforced concrete box culverts (3-10'x7'x 226')
|
678.0 |
LNFT |
725.00 |
491,550.00 |
850.00 |
576,300.00 |
1,150.00 |
779,700.00 |
775.00 |
525,450.00 |
| 806-01 |
deformed reinforcing steel
|
15,373   |
LB |
1.00 |
15,373.00 |
1.10 |
16,910.30 |
1.50 |
23,059.50 |
2.00 |
30,746.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
5,792,683.20 |
|
6,022,171.08 |
|
6,178,716.55 |
|
6,234,986.00 |
|
| |
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - BEST-YET BUILDERS, LLC |
- 6 - BLOUNT BROS. CONSTRUCTION, INC. |
- 7 - T.J. LAMBRECHT CONSTRUCTION, INC. |
- 8 - JAMES CONSTRUCTION GROUP LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
25,000.00 |
25,000.00 |
50,000.00 |
50,000.00 |
10,000.00 |
10,000.00 |
150,000.00 |
150,000.00 |
| 203-01 |
general excavation
|
599,811   |
CUYD |
2.20 |
1,319,584.20 |
2.25 |
1,349,574.75 |
2.29 |
1,373,567.19 |
2.10 |
1,259,603.10 |
| 203-02 |
drainage excavation
|
4,210   |
CUYD |
5.00 |
21,050.00 |
10.00 |
42,100.00 |
7.25 |
30,522.50 |
13.50 |
56,835.00 |
| 203-03 |
embankment
|
385,766   |
CUYD |
1.50 |
578,649.00 |
1.50 |
578,649.00 |
2.39 |
921,980.74 |
2.50 |
964,415.00 |
| 204-02 |
temporary hay or straw bales
|
500   |
EACH |
10.00 |
5,000.00 |
20.00 |
10,000.00 |
13.50 |
6,750.00 |
15.00 |
7,500.00 |
| 204-03 |
temporary slope drains
|
40   |
LNFT |
25.00 |
1,000.00 |
20.00 |
800.00 |
53.00 |
2,120.00 |
120.00 |
4,800.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
400   |
EACH |
100.00 |
40,000.00 |
150.00 |
60,000.00 |
80.00 |
32,000.00 |
130.00 |
52,000.00 |
| 204-05-B |
temporary sediment check dams (stone)
|
100   |
EACH |
500.00 |
50,000.00 |
500.00 |
50,000.00 |
400.00 |
40,000.00 |
630.00 |
63,000.00 |
| 204-06 |
temporary silt fencing
|
50,000   |
LNFT |
1.50 |
75,000.00 |
2.00 |
100,000.00 |
1.45 |
72,500.00 |
4.50 |
225,000.00 |
| 204-07 |
temporary stone construction entrance
|
6   |
EACH |
10.00 |
60.00 |
3,000.00 |
18,000.00 |
4,000.00 |
24,000.00 |
2,000.00 |
12,000.00 |
| 510-01-B |
pavement patching (12" minimum thickness)
|
20   |
SQYD |
100.00 |
2,000.00 |
100.00 |
2,000.00 |
135.00 |
2,700.00 |
175.00 |
3,500.00 |
| 701-01-I |
cross drain pipe (24" rcp/pcp)
|
951   |
LNFT |
53.70 |
51,068.70 |
60.00 |
57,060.00 |
75.00 |
71,325.00 |
77.00 |
73,227.00 |
| 701-01-K |
cross drain pipe (30" rcp/pcp)
|
429   |
LNFT |
75.94 |
32,578.26 |
80.00 |
34,320.00 |
90.00 |
38,610.00 |
95.00 |
40,755.00 |
| 701-01-M |
cross drain pipe (36" rcp/pcp)
|
1,112   |
LNFT |
104.50 |
116,204.00 |
120.00 |
133,440.00 |
105.00 |
116,760.00 |
113.00 |
125,656.00 |
| 701-01-N |
cross drain pipe (42" rcp/pcp)
|
692   |
LNFT |
160.54 |
111,093.68 |
180.00 |
124,560.00 |
145.00 |
100,340.00 |
150.00 |
103,800.00 |
| 701-01-O |
cross drain pipe (48" rcp/pcp)
|
1,448   |
LNFT |
198.14 |
286,906.72 |
220.00 |
318,560.00 |
190.00 |
275,120.00 |
200.00 |
289,600.00 |
| 701-01-Q |
cross drain pipe (60" rcp/pcp)
|
1,301   |
LNFT |
287.40 |
373,907.40 |
300.00 |
390,300.00 |
260.00 |
338,260.00 |
258.00 |
335,658.00 |
| 701-01-S |
cross drain pipe (72" rcp/pcp)
|
1,166   |
LNFT |
423.55 |
493,859.30 |
460.00 |
536,360.00 |
370.00 |
431,420.00 |
390.00 |
454,740.00 |
| 701-05-I |
side drain pipe (24")
|
1,068   |
LNFT |
53.70 |
57,351.60 |
60.00 |
64,080.00 |
90.00 |
96,120.00 |
54.00 |
57,672.00 |
| 706-03-A |
incidental concrete paving (4" thick)
|
7,159.3 |
SQYD |
60.00 |
429,558.00 |
55.00 |
393,761.50 |
40.00 |
286,372.00 |
60.00 |
429,558.00 |
| 711-02-D |
riprap (55 lb)
|
2,790   |
CUYD |
80.00 |
223,200.00 |
100.00 |
279,000.00 |
65.00 |
181,350.00 |
120.00 |
334,800.00 |
| 711-04 |
geotextile fabric
|
4,629   |
SQYD |
2.00 |
9,258.00 |
3.50 |
16,201.50 |
2.25 |
10,415.25 |
3.60 |
16,664.40 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
50,000.00 |
50,000.00 |
30,000.00 |
30,000.00 |
12,000.00 |
12,000.00 |
55,000.00 |
55,000.00 |
| 716-01-A |
mulch (vegetative)
|
186.0 |
TON |
500.00 |
93,000.00 |
1,600.00 |
297,600.00 |
1,000.00 |
186,000.00 |
925.00 |
172,050.00 |
| 720-01-C |
erosion control system, flexible channel liner (type c)
|
18,101   |
SQYD |
1.65 |
29,866.65 |
3.00 |
54,303.00 |
1.65 |
29,866.65 |
1.80 |
32,581.80 |
| 720-01-D |
erosion control system, flexible channel liner (type d)
|
4,953   |
SQYD |
1.65 |
8,172.45 |
3.00 |
14,859.00 |
1.65 |
8,172.45 |
2.10 |
10,401.30 |
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
10,000.00 |
10,000.00 |
25,000.00 |
25,000.00 |
30,000.00 |
30,000.00 |
30,000.00 |
30,000.00 |
| 726-01 |
bedding material
|
1,562.0 |
CUYD |
50.00 |
78,100.00 |
80.00 |
124,960.00 |
82.00 |
128,084.00 |
90.00 |
140,580.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
500,000.00 |
500,000.00 |
200,000.00 |
200,000.00 |
658,000.00 |
658,000.00 |
430,000.00 |
430,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
48   |
EACH |
65.00 |
3,120.00 |
100.00 |
4,800.00 |
61.00 |
2,928.00 |
75.00 |
3,600.00 |
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
100.00 |
400.00 |
120.00 |
480.00 |
79.00 |
316.00 |
85.00 |
340.00 |
| 739-01 |
hydro-seeding
|
186.00 |
ACRE |
1,250.00 |
232,500.00 |
800.00 |
148,800.00 |
1,400.00 |
260,400.00 |
950.00 |
176,700.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
200,000.00 |
200,000.00 |
60,000.00 |
60,000.00 |
130,000.00 |
130,000.00 |
80,000.00 |
80,000.00 |
| 805-01-A |
class a concrete (pipe headwalls)
|
182.74 |
CUYD |
1,000.00 |
182,740.00 |
1,000.00 |
182,740.00 |
880.00 |
160,811.20 |
1,000.00 |
182,740.00 |
| 805-01-B |
class a concrete (box culvert headwalls)
|
46.23 |
CUYD |
1,000.00 |
46,230.00 |
1,000.00 |
46,230.00 |
880.00 |
40,682.40 |
1,000.00 |
46,230.00 |
| 805-12-Y |
reinforced concrete box culverts (3-10'x7'x 226')
|
678.0 |
LNFT |
1,000.00 |
678,000.00 |
1,000.00 |
678,000.00 |
750.00 |
508,500.00 |
950.00 |
644,100.00 |
| 806-01 |
deformed reinforcing steel
|
15,373   |
LB |
1.50 |
23,059.50 |
2.00 |
30,746.00 |
1.98 |
30,438.54 |
2.25 |
34,589.25 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
6,437,517.46 |
|
6,507,284.75 |
|
6,648,431.92 |
|
7,099,695.85 |
|
| |
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 9 - DENTON-JAMES LLC |
- 10 - GILCHRIST CONSTRUCTION CO. LLC |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
600,000.00 |
600,000.00 |
100,000.00 |
100,000.00 |
|
|
|
|
| 203-01 |
general excavation
|
599,811   |
CUYD |
1.75 |
1,049,669.25 |
3.35 |
2,009,366.85 |
|
|
|
|
| 203-02 |
drainage excavation
|
4,210   |
CUYD |
9.00 |
37,890.00 |
4.88 |
20,544.80 |
|
|
|
|
| 203-03 |
embankment
|
385,766   |
CUYD |
2.55 |
983,703.30 |
3.70 |
1,427,334.20 |
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
500   |
EACH |
10.00 |
5,000.00 |
20.00 |
10,000.00 |
|
|
|
|
| 204-03 |
temporary slope drains
|
40   |
LNFT |
25.00 |
1,000.00 |
65.00 |
2,600.00 |
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
400   |
EACH |
110.00 |
44,000.00 |
175.00 |
70,000.00 |
|
|
|
|
| 204-05-B |
temporary sediment check dams (stone)
|
100   |
EACH |
800.00 |
80,000.00 |
500.00 |
50,000.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
50,000   |
LNFT |
1.50 |
75,000.00 |
2.00 |
100,000.00 |
|
|
|
|
| 204-07 |
temporary stone construction entrance
|
6   |
EACH |
2,500.00 |
15,000.00 |
3,500.00 |
21,000.00 |
|
|
|
|
| 510-01-B |
pavement patching (12" minimum thickness)
|
20   |
SQYD |
130.00 |
2,600.00 |
200.00 |
4,000.00 |
|
|
|
|
| 701-01-I |
cross drain pipe (24" rcp/pcp)
|
951   |
LNFT |
70.00 |
66,570.00 |
125.00 |
118,875.00 |
|
|
|
|
| 701-01-K |
cross drain pipe (30" rcp/pcp)
|
429   |
LNFT |
80.00 |
34,320.00 |
150.00 |
64,350.00 |
|
|
|
|
| 701-01-M |
cross drain pipe (36" rcp/pcp)
|
1,112   |
LNFT |
100.00 |
111,200.00 |
180.00 |
200,160.00 |
|
|
|
|
| 701-01-N |
cross drain pipe (42" rcp/pcp)
|
692   |
LNFT |
150.00 |
103,800.00 |
220.00 |
152,240.00 |
|
|
|
|
| 701-01-O |
cross drain pipe (48" rcp/pcp)
|
1,448   |
LNFT |
170.00 |
246,160.00 |
250.00 |
362,000.00 |
|
|
|
|
| 701-01-Q |
cross drain pipe (60" rcp/pcp)
|
1,301   |
LNFT |
260.00 |
338,260.00 |
350.00 |
455,350.00 |
|
|
|
|
| 701-01-S |
cross drain pipe (72" rcp/pcp)
|
1,166   |
LNFT |
350.00 |
408,100.00 |
500.00 |
583,000.00 |
|
|
|
|
| 701-05-I |
side drain pipe (24")
|
1,068   |
LNFT |
68.00 |
72,624.00 |
55.00 |
58,740.00 |
|
|
|
|
| 706-03-A |
incidental concrete paving (4" thick)
|
7,159.3 |
SQYD |
44.00 |
315,009.20 |
40.00 |
286,372.00 |
|
|
|
|
| 711-02-D |
riprap (55 lb)
|
2,790   |
CUYD |
126.00 |
351,540.00 |
140.00 |
390,600.00 |
|
|
|
|
| 711-04 |
geotextile fabric
|
4,629   |
SQYD |
2.00 |
9,258.00 |
2.00 |
9,258.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
100,000.00 |
100,000.00 |
150,000.00 |
150,000.00 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
186.0 |
TON |
925.00 |
172,050.00 |
1,000.00 |
186,000.00 |
|
|
|
|
| 720-01-C |
erosion control system, flexible channel liner (type c)
|
18,101   |
SQYD |
2.00 |
36,202.00 |
1.80 |
32,581.80 |
|
|
|
|
| 720-01-D |
erosion control system, flexible channel liner (type d)
|
4,953   |
SQYD |
2.00 |
9,906.00 |
2.10 |
10,401.30 |
|
|
|
|
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
30,000.00 |
30,000.00 |
90,000.00 |
90,000.00 |
|
|
|
|
| 726-01 |
bedding material
|
1,562.0 |
CUYD |
70.00 |
109,340.00 |
50.00 |
78,100.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
690,000.00 |
690,000.00 |
730,000.00 |
730,000.00 |
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
48   |
EACH |
80.00 |
3,840.00 |
75.00 |
3,600.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
100.00 |
400.00 |
75.00 |
300.00 |
|
|
|
|
| 739-01 |
hydro-seeding
|
186.00 |
ACRE |
950.00 |
176,700.00 |
1,000.00 |
186,000.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
100,000.00 |
100,000.00 |
100,000.00 |
100,000.00 |
|
|
|
|
| 805-01-A |
class a concrete (pipe headwalls)
|
182.74 |
CUYD |
1,200.00 |
219,288.00 |
1,200.00 |
219,288.00 |
|
|
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
46.23 |
CUYD |
1,200.00 |
55,476.00 |
1,200.00 |
55,476.00 |
|
|
|
|
| 805-12-Y |
reinforced concrete box culverts (3-10'x7'x 226')
|
678.0 |
LNFT |
775.00 |
525,450.00 |
700.00 |
474,600.00 |
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
15,373   |
LB |
2.00 |
30,746.00 |
1.22 |
18,755.06 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
7,210,101.75 |
|
8,830,893.01 |
|
|
|
|
|