Letting of 7/30/2008 LA DOTD Headquarters


REBID
go back
Go Back
DBE GOAL FED
Lead Project: 744-17-0015
Parish: E BATON ROUGE
Routes:
Description: BICYCLE/PEDESTRIAN PATH IMPROVEMENTS - DALRYMPLE DRIVE
Type Const: grading, drainage structures, class ii base course, superpave asphaltic concrete
bike path and related work.
Estimated Construction Cost: $414,317.27
 
RankLicenseBidderConstruction Bid
1 43238 ON GRADE CONSTRUCTION $420,868.44
 35436 GULF STATES CONSTRUCTORS, L.L.C. IRREGULAR
 
Item Number Item Description Quantity Unit of Measure - 1 -
ON GRADE CONSTRUCTION

GULF STATES CONSTRUCTORS, L.L.C.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 8,000.00 8,000.00 12,000.00 12,000.00        
202-01 removal of structures & obstructions lump      LUMP 5,000.00 5,000.00 10,800.00 10,800.00        
202-02-I removal of existing path 2,116      SQYD 4.50 9,522.00 9.60 20,313.60        
202-02-K removal of existing rail 663      SQYD 3.75 2,486.25 10.80 7,160.40        
203-05 excavation and embankment lump      LUMP 12,500.00 12,500.00 30,000.00 30,000.00        
203-08 geotextile fabric 132      SQYD 2.25 297.00 3.60 475.20        
204-06 temporary silt fencing 5,513      LNFT 1.65 9,096.45 1.80 9,923.40        
302-02-A-01 class ii base course (6" thick)(stone) 4,188.2    SQYD 30.00 125,646.00 31.20 130,671.84        
502-03 superpave asphaltic concrete (2" thick) 3,865      SQYD 26.00 100,490.00 40.80 157,692.00        
704-01-A guard rail (single thrie beam)(3'-1 1/2" post spacing) 56.3    LNFT 65.00 3,659.50 72.00 4,053.60        
704-06-A guard rail anchor sections (trailing end)(single thrie
beam)
6.3    LNFT 26.45 166.64 108.00 680.40        
704-11-B guard rail end treatment (tangent) 1      EACH 2,600.00 2,600.00 3,000.00 3,000.00        
706-01-A concrete walk (4" thick) 420.2    SQYD 28.00 11,765.60 66.00 27,733.20        
711-02-D riprap (55 lb) 1      CUYD 425.00 425.00 78.00 78.00        
713-01 temporary signs & barricades lump      LUMP 10,000.00 10,000.00 3,600.00 3,600.00        
727-01 mobilization lump      LUMP 40,000.00 40,000.00 93,966.00 93,966.00        
729-01 sign (type a) 64.8    SQFT 18.00 1,166.40 24.00 1,555.20        
729-16-C object marker assembly (type 3) 2      EACH 92.00 184.00 90.00 180.00        
729-21 u-channel post 19      EACH 80.50 1,529.50 96.00 1,824.00        
732-02-B plastic pavement striping (solid line) (6" width)
(white)
0.664  MILE 6,000.00 3,984.00 9,120.00 6,055.68        
732-02-C plastic pavement striping (solid line) (8" width)
(white)
0.064  MILE 9,315.00 596.16 9,720.00 622.08        
732-02-D plastic pavement striping (solid line) (12" width)
(white)
0.004  MILE 28,485.00 113.94 30,000.00 120.00        
732-04-A plastic pavement legends & symbols (arrow) 12      EACH 205.00 2,460.00 210.00 2,520.00        
732-04-F plastic pavement legends & symbols (bicycle) 16      EACH 288.00 4,608.00 300.00 4,800.00        
732-04-G plastic pavement legends & symbols (pedestrian) 6      EACH 288.00 1,728.00 300.00 1,800.00        
732-04-H plastic pavement legends & symbols ("xing") 6      EACH 288.00 1,728.00 300.00 1,800.00        
732-04-I plastic pavement legends & symbols ("road") 3      EACH 288.00 864.00 300.00 900.00        
732-04-K plastic pavement legends & symbols ("stop") 4      EACH 288.00 1,152.00 300.00 1,200.00        
739-01 hydro-seeding 2.00   ACRE 1,500.00 3,000.00 1,560.00 3,120.00        
740-01 construction layout lump      LUMP 8,500.00 8,500.00 28,800.00 28,800.00        
S-001 railing type 1 (at golf course) 663      LNFT 25.00 16,575.00 66.00 43,758.00        
S-003 trench drain 54      LNFT 225.00 12,150.00 204.00 11,016.00        
S-004 adjust gas valve 3      EACH 250.00 750.00 660.00 1,980.00        
S-005 stone 25      CUYD 125.00 3,125.00 108.00 2,700.00        
S-006 extend existing box culvert and headwall lump      LUMP 15,000.00 15,000.00 66,000.00 66,000.00        
                       
 CONTRACTOR TOTAL       420,868.44   IRREGULAR        