DBE GOAL FED
Lead Project: 742-26-0044
Parish: JEFFERSON, PLAQUEMINES
Routes:
Description: HARVEY BLVD EXTENSION, WALL BLVD TO ENGINEERS ROAD(LA 3017)
Type Const: clearing and grubbing, grading, drainage structures, class ii bc, pccp, pavement
patching, precast-prestressed concrete girder span bridge, water lines, and related work.
Estimated Construction Cost: $15,685,541.00
 
RankLicenseBidderConstruction Bid
1 06276 BARRIERE CONSTRUCTION CO., LLC. $13,239,649.00
2 27634 PHYLWAY CONSTRUCTION LLC $13,946,142.90
3 02179 BOH BROS. CONSTRUCTION CO., LLC. $16,256,001.25
4 34567 JAMES CONSTRUCTION GROUP LLC $18,230,818.00
 
Item Number Item Description Quantity Unit of Measure - 1 -
BARRIERE CONSTRUCTION CO., LLC.
- 2 -
PHYLWAY CONSTRUCTION LLC
- 3 -
BOH BROS. CONSTRUCTION CO., LLC.
- 4 -
JAMES CONSTRUCTION GROUP LLC
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 180,000.00 180,000.00 580,000.00 580,000.00 200,000.00 200,000.00 500,000.00 500,000.00
202-01 removal of structures & obstructions lump      LUMP 78,000.00 78,000.00 4,000.00 4,000.00 100,000.00 100,000.00 50,000.00 50,000.00
202-02-C removal of portland cement concrete pavement 953      SQYD 13.00 12,389.00 14.00 13,342.00 10.00 9,530.00 25.00 23,825.00
202-02-G removal of surfacing & stabilized base 5,242.0    SQYD 11.00 57,662.00 10.00 52,420.00 10.00 52,420.00 10.00 52,420.00
202-02-I removal of concrete boat ramp (sta 135+50) (partially
submerged)
1      each 17,000.00 17,000.00 22,000.00 22,000.00 7,000.00 7,000.00 15,000.00 15,000.00
202-02-J removal of wooden bulkheads (sta 135+20) 1      each 29,000.00 29,000.00 35,000.00 35,000.00 20,000.00 20,000.00 15,000.00 15,000.00
202-02-K removal of traffic signal equipment lump      LUMP 3,600.00 3,600.00 4,000.00 4,000.00 3,500.00 3,500.00 4,000.00 4,000.00
203-01 general excavation 13,740      CUYD 8.50 116,790.00 10.00 137,400.00 15.00 206,100.00 15.00 206,100.00
203-02 drainage excavation 5,244      CUYD 29.00 152,076.00 23.00 120,612.00 14.00 73,416.00 35.00 183,540.00
203-03 embankment 26,744      CUYD 21.00 561,624.00 20.00 534,880.00 22.00 588,368.00 30.00 802,320.00
203-04 nonplastic embankment 31,478      CUYD 21.50 676,777.00 25.00 786,950.00 30.00 944,340.00 65.00 2,046,070.00
203-08 geotextile fabric 39,130      SQYD 2.00 78,260.00 1.50 58,695.00 1.75 68,477.50 2.50 97,825.00
204-02 temporary hay or straw bales 488      EACH 11.60 5,660.80 11.00 5,368.00 9.00 4,392.00 17.00 8,296.00
204-05-A temporary sediment check dams (hay) 1      EACH 290.00 290.00 300.00 300.00 160.00 160.00 300.00 300.00
204-06 temporary silt fencing 10,000      LNFT 1.70 17,000.00 2.50 25,000.00 1.50 15,000.00 3.00 30,000.00
302-02-B-01 class ii base course (6" thick) (crushed stone or
recycled pccp)
42,840.0    SQYD 13.60 582,624.00 18.00 771,120.00 22.00 942,480.00 25.00 1,071,000.00
401-01 aggregate surface course (net section) 51.8    CUYD 116.00 6,008.80 90.00 4,662.00 80.00 4,144.00 150.00 7,770.00
402-01 traffic maintenance aggregate (vehicular measurement) 100.0    CUYD 100.00 10,000.00 75.00 7,500.00 40.00 4,000.00 150.00 15,000.00
502-01 superpave asphaltic concrete 10,442.0    TON 114.00 1,190,388.00 125.00 1,305,250.00 112.00 1,169,504.00 115.00 1,200,830.00
601-01-G portland cement concrete pavement (8" thick) 463.0    SQYD 69.00 31,947.00 75.00 34,725.00 75.00 34,725.00 140.00 64,820.00
601-01-K portland cement concrete pavement (10" thick) 2,410.0    SQYD 67.00 161,470.00 85.00 204,850.00 95.00 228,950.00 100.00 241,000.00
602-02-A cleaning and resealing existing longitudinal pavement
joints
250      LNFT 3.50 875.00 8.00 2,000.00 10.00 2,500.00 10.00 2,500.00
602-02-B cleaning and resealing existing transverse pavement
joints
150      LNFT 3.50 525.00 8.00 1,200.00 10.00 1,500.00 10.00 1,500.00
602-03 cleaning and sealing random cracks 150      LNFT 3.50 525.00 10.00 1,500.00 10.00 1,500.00 25.00 3,750.00
602-04 full depth corner patching of jointed concrete
pavement
50.0    SQYD 299.00 14,950.00 300.00 15,000.00 300.00 15,000.00 500.00 25,000.00
602-05 full depth patching of jointed concrete pavement 50.0    SQYD 132.00 6,600.00 300.00 15,000.00 250.00 12,500.00 500.00 25,000.00
602-07 patching continuously reinforced concrete pavement 50.0    SQYD 157.00 7,850.00 350.00 17,500.00 300.00 15,000.00 1,000.00 50,000.00
602-09 grinding isolated joints 50.0    SQYD 35.00 1,750.00 35.00 1,750.00 80.00 4,000.00 50.00 2,500.00
701-03-E storm drain pipe (12" rcp/pcp) 10      LNFT 104.00 1,040.00 68.00 680.00 55.00 550.00 100.00 1,000.00
701-03-F storm drain pipe (15" rcp/pcp) 3,196      LNFT 95.00 303,620.00 70.00 223,720.00 95.00 303,620.00 150.00 479,400.00
701-03-G storm drain pipe (18" rcp/pcp) 1,344      LNFT 100.00 134,400.00 75.00 100,800.00 105.00 141,120.00 150.00 201,600.00
701-03-I storm drain pipe (24" rcp/pcp) 1,686      LNFT 105.00 177,030.00 90.00 151,740.00 145.00 244,470.00 200.00 337,200.00
701-03-K storm drain pipe (30" rcp/pcp) 3,588      LNFT 110.00 394,680.00 110.00 394,680.00 150.00 538,200.00 175.00 627,900.00
701-03-K/M-01 storm drain pipe (30" pcp or 36" cmp) (outfall) 101      LNFT 110.00 11,110.00 120.00 12,120.00 260.00 26,260.00 250.00 25,250.00
701-03-O storm drain pipe (48" rcp) 452      LNFT 200.00 90,400.00 200.00 90,400.00 280.00 126,560.00 400.00 180,800.00
701-03-Q-01 storm drain pipe (60" cmp) (outfall) 26      LNFT 175.00 4,550.00 240.00 6,240.00 700.00 18,200.00 475.00 12,350.00
701-04-F-01 storm drain pipe arch (36" equiv. cmp) (outfall) 70      LNFT 110.00 7,700.00 110.00 7,700.00 270.00 18,900.00 275.00 19,250.00
701-14 cleaning existing pipes 600      LNFT 15.00 9,000.00 10.00 6,000.00 30.00 18,000.00 30.00 18,000.00
702-03-A catch basins (cb-01) 10      EACH 5,500.00 55,000.00 3,000.00 30,000.00 4,000.00 40,000.00 5,000.00 50,000.00
702-03-A-01 catch basins (cb-01) (brick) 36      EACH 8,500.00 306,000.00 3,000.00 108,000.00 3,700.00 133,200.00 6,500.00 234,000.00
702-03-B catch basins (cb-02) 2      EACH 5,000.00 10,000.00 4,700.00 9,400.00 7,400.00 14,800.00 7,800.00 15,600.00
702-03-C catch basins (cb-06) 12      EACH 7,500.00 90,000.00 5,600.00 67,200.00 5,800.00 69,600.00 6,300.00 75,600.00
702-03-C-01 catch basins (cb-06) (brick) 46      EACH 10,000.00 460,000.00 5,800.00 266,800.00 4,300.00 197,800.00 7,800.00 358,800.00
702-03-D catch basins (cb-07) 17      EACH 9,500.00 161,500.00 6,400.00 108,800.00 8,800.00 149,600.00 7,000.00 119,000.00
702-03-F catch basins (cb-08) 2      EACH 11,000.00 22,000.00 8,000.00 16,000.00 13,000.00 26,000.00 8,600.00 17,200.00
702-03-I catch basins (paved gutter drain) 17      EACH 5,000.00 85,000.00 2,500.00 42,500.00 6,300.00 107,100.00 3,500.00 59,500.00
702-04-A adjusting manholes 1      EACH 1,700.00 1,700.00 1,000.00 1,000.00 1,000.00 1,000.00 2,000.00 2,000.00
702-04-B adjusting catch basins 4      EACH 2,000.00 8,000.00 1,500.00 6,000.00 1,200.00 4,800.00 2,000.00 8,000.00
704-03 blocked out guard rail 150.0    LNFT 23.00 3,450.00 22.00 3,300.00 25.00 3,750.00 20.00 3,000.00
704-08-B guard rail transitions (double thrie beam) 100.0    LNFT 69.00 6,900.00 65.00 6,500.00 65.00 6,500.00 60.00 6,000.00
704-11-A guard rail end treatment (flared) 4      EACH 3,200.00 12,800.00 2,200.00 8,800.00 3,000.00 12,000.00 2,000.00 8,000.00
706-02-C concrete drive (6" thick) 152.0    SQYD 69.00 10,488.00 90.00 13,680.00 75.00 11,400.00 65.00 9,880.00
706-03-A incidental concrete paving (4" thick) 656.0    SQYD 90.00 59,040.00 70.00 45,920.00 60.00 39,360.00 75.00 49,200.00
707-01 concrete curb 2,018.0    LNFT 12.60 25,426.80 10.00 20,180.00 8.00 16,144.00 15.00 30,270.00
707-03 combination concrete curb & gutter 19,851.0    LNFT 19.50 387,094.50 26.00 516,126.00 26.00 516,126.00 38.00 754,338.00
708-01 right-of-way monument 20      EACH 200.00 4,000.00 150.00 3,000.00 300.00 6,000.00 350.00 7,000.00
711-01-B riprap (10 lb, 12" thick) 150      SQYD 50.00 7,500.00 40.00 6,000.00 135.00 20,250.00 65.00 9,750.00
712-04 flexible revetment 827      SQYD 87.00 71,949.00 100.00 82,700.00 100.00 82,700.00 165.00 136,455.00
713-01 temporary signs & barricades lump      LUMP 80,000.00 80,000.00 100,000.00 100,000.00 255,000.00 255,000.00 70,000.00 70,000.00
713-02-A temporary pavement markings (4" width) 20,800      LNFT 0.25 5,200.00 0.22 4,576.00 0.25 5,200.00 0.25 5,200.00
713-07 temporary precast concrete barrier (contractor
furnished)
2      EACH 757.00 1,514.00 1,500.00 3,000.00 1,000.00 2,000.00 3,000.00 6,000.00
717-01 seeding 500      LB 10.00 5,000.00 9.00 4,500.00 4.00 2,000.00 10.00 5,000.00
718-01 fertilizer 16,500      LB 0.50 8,250.00 0.35 5,775.00 0.45 7,425.00 0.50 8,250.00
720-01-A erosion control system, slope protection (type a) 568      SQYD 4.70 2,669.60 3.00 1,704.00 2.70 1,533.60 2.50 1,420.00
722-01 project site laboratory 1.00   EACH 50,000.00 50,000.00 25,000.00 25,000.00 40,000.00 40,000.00 20,000.00 20,000.00
725-01 temporary detour roads 450.0    SQYD 116.00 52,200.00 124.00 55,800.00 150.00 67,500.00 175.00 78,750.00
726-01 bedding material 3,918.4    CUYD 57.00 223,348.80 70.00 274,288.00 70.00 274,288.00 65.00 254,696.00
727-01 mobilization lump      LUMP 868,000.00 868,000.00 1,350,000.00 1,350,000.00 1,600,000.00 1,600,000.00 1,800,000.00 1,800,000.00
729-01 sign (type a) 52.5    SQFT 39.00 2,047.50 60.00 3,150.00 35.00 1,837.50 35.00 1,837.50
730-01 trenching and backfilling 12,000      LNFT 3.75 45,000.00 6.00 72,000.00 3.75 45,000.00 4.00 48,000.00
730-02-A conduit with conductors (2"c, 3#4 for service) 250      LNFT 11.00 2,750.00 11.00 2,750.00 11.00 2,750.00 10.00 2,500.00
730-02-B conduit with conductors (2"c, 3#6, 1#10g) 11,470      LNFT 8.25 94,627.50 9.00 103,230.00 9.00 103,230.00 8.00 91,760.00
730-02-C conduit with conductors (2"c, 6#4, 2#10g) 200      LNFT 19.00 3,800.00 18.00 3,600.00 19.00 3,800.00 18.00 3,600.00
730-02-D conduit with conductors (2"c, 3#4, 1#1g for entergy) 800      LNFT 15.00 12,000.00 14.00 11,200.00 15.00 12,000.00 14.00 11,200.00
730-05-A light pole (30' tall with 12' arm, aluminum) 73      EACH 7,000.00 511,000.00 3,800.00 277,400.00 7,100.00 518,300.00 6,600.00 481,800.00
730-07-A luminaire (250 w, hps, cobra head) 73      EACH 330.00 24,090.00 400.00 29,200.00 350.00 25,550.00 320.00 23,360.00
730-08-A electrical service point (pedestal mounted) 2      EACH 6,000.00 12,000.00 9,000.00 18,000.00 6,000.00 12,000.00 6,400.00 12,800.00
730-16-A underground junction box (8 cubic feet) (for lighting) 7      EACH 300.00 2,100.00 1,500.00 10,500.00 300.00 2,100.00 275.00 1,925.00
730-16-C underground junction box (for entergy) 5      EACH 525.00 2,625.00 950.00 4,750.00 525.00 2,625.00 490.00 2,450.00
730-18 service pole 2      EACH 1,400.00 2,800.00 2,600.00 5,200.00 1,400.00 2,800.00 1,300.00 2,600.00
731-02 reflectorized raised pavement markers 500      EACH 5.80 2,900.00 5.50 2,750.00 5.10 2,550.00 5.00 2,500.00
732-01-C-03 plastic pavement striping (8" width) hot appl thermo
(40 mil thickness)
1,000      LNFT 0.95 950.00 1.00 1,000.00 0.85 850.00 1.00 1,000.00
732-01-E plastic pavement striping (24" width) 155      LNFT 3.65 565.75 3.50 542.50 3.25 503.75 3.50 542.50
732-02-A-03 plast pvmt striping (solid line) (4" width) hot appl
thermo (40 mil thickness)
5.000  MILE 1,550.00 7,750.00 1,600.00 8,000.00 1,410.00 7,050.00 1,500.00 7,500.00
732-03-A-03 plastic pvmt striping (broken line) (4" width) hot
appl thermo (40 mil thickness)
2.500  MILE 650.00 1,625.00 650.00 1,625.00 600.00 1,500.00 600.00 1,500.00
732-04-A-03 plastic pvmt legends and symbols (arrow) hot appl
thermo (40 mil thickness)
10      EACH 210.00 2,100.00 210.00 2,100.00 200.00 2,000.00 200.00 2,000.00
732-04-C-03 plastic pvmt legends and symbols (only) hot appl
thermo (40 mil thickness)
10      EACH 225.00 2,250.00 230.00 2,300.00 210.00 2,100.00 200.00 2,000.00
735-01 mailboxes 1      EACH 100.00 100.00 1.00 1.00 1.00 1.00 5.00 5.00
735-02 mailbox supports (single) 1      EACH 50.00 50.00 110.00 110.00 100.00 100.00 100.00 100.00
736-01 trenching and backfilling 710      LNFT 3.75 2,662.50 7.00 4,970.00 3.80 2,698.00 4.00 2,840.00
736-03-A jacked or bored conduit (1/2" p.e.c.) 15      LNFT 10.75 161.25 75.00 1,125.00 10.00 150.00 10.00 150.00
736-03-B jacked or bored conduit (2" p.e.c.) 120      LNFT 20.50 2,460.00 40.00 4,800.00 20.00 2,400.00 20.00 2,400.00
736-03-C jacked or bored conduit (3" p.e.c.) 300      LNFT 27.50 8,250.00 44.00 13,200.00 26.00 7,800.00 25.00 7,500.00
736-04-B signal support (mast arm standard w/ 30' arm) 4      EACH 11,000.00 44,000.00 17,000.00 68,000.00 10,600.00 42,400.00 10,000.00 40,000.00
736-04-C signal support (mast arm standard w/ 35' arm) 1      EACH 11,000.00 11,000.00 17,000.00 17,000.00 11,000.00 11,000.00 10,000.00 10,000.00
736-05-B signal heads (3 section, r, y, g) l.e.d. 8      EACH 950.00 7,600.00 1,200.00 9,600.00 930.00 7,440.00 850.00 6,800.00
736-05-C signal heads (5 section, r, lty, y, ltg, g) l.e.d. 1      EACH 1,400.00 1,400.00 1,300.00 1,300.00 1,350.00 1,350.00 1,300.00 1,300.00
736-05-D signal heads (5 section, r, y, rty, g, rtg) l.e.d. 1      EACH 1,400.00 1,400.00 1,900.00 1,900.00 1,350.00 1,350.00 1,300.00 1,300.00
736-06-A signal service (pole mounted for controller only) 1      EACH 1,200.00 1,200.00 1,800.00 1,800.00 1,200.00 1,200.00 1,100.00 1,100.00
736-08-A signal controller (ts 2 controller, type 2 cabinet) 1      EACH 24,000.00 24,000.00 28,000.00 28,000.00 24,000.00 24,000.00 25,000.00 25,000.00
736-09 loop detector 75      LNFT 10.00 750.00 40.00 3,000.00 10.00 750.00 10.00 750.00
736-10-A underground junction box (type "e") (for traffic
signals)
3      EACH 400.00 1,200.00 460.00 1,380.00 430.00 1,290.00 400.00 1,200.00
736-10-B underground junction box (type "f") (for traffic
signals)
4      EACH 450.00 1,800.00 460.00 1,840.00 470.00 1,880.00 450.00 1,800.00
736-10-C underground junction box (type "h") (for traffic
signals)
1      EACH 1,090.00 1,090.00 1,500.00 1,500.00 1,000.00 1,000.00 950.00 950.00
736-11-A conduit (2" p.e.c. schedule 80) 692      LNFT 4.50 3,114.00 8.50 5,882.00 4.40 3,044.80 4.00 2,768.00
736-11-B conduit (3" p.e.c. schedule 80) 20      LNFT 8.50 170.00 14.00 280.00 8.00 160.00 7.50 150.00
736-12-A conductor (2c, loop lead-in) 770      LNFT 1.75 1,347.50 1.50 1,155.00 1.60 1,232.00 1.50 1,155.00
736-12-B conductor (3c, power) 145      LNFT 7.00 1,015.00 7.00 1,015.00 7.00 1,015.00 6.50 942.50
736-12-C conductor (6c, signal) 460      LNFT 2.00 920.00 4.00 1,840.00 1.80 828.00 1.70 782.00
736-12-D conductor (10c, signal) 605      LNFT 3.00 1,815.00 4.00 2,420.00 2.70 1,633.50 2.50 1,512.50
740-01 construction layout lump      LUMP 296,000.00 296,000.00 275,000.00 275,000.00 650,000.00 650,000.00 250,000.00 250,000.00
741-01-A water main (8" ductile iron) 40      LNFT 160.00 6,400.00 85.00 3,400.00 80.00 3,200.00 50.00 2,000.00
741-01-B water main (12" ductile iron) 260      LNFT 180.00 46,800.00 100.00 26,000.00 150.00 39,000.00 11.00 2,860.00
741-01-C water main (12" pe) 300      LNFT 100.00 30,000.00 66.00 19,800.00 90.00 27,000.00 10.00 3,000.00
741-02-A gate valve (6") 2      EACH 536.00 1,072.00 1,400.00 2,800.00 1,500.00 3,000.00 1,000.00 2,000.00
741-02-B gate valve (12") 2      EACH 4,700.00 9,400.00 2,600.00 5,200.00 4,300.00 8,600.00 2,000.00 4,000.00
741-04 fire hydrant 2      EACH 2,800.00 5,600.00 4,100.00 8,200.00 4,300.00 8,600.00 3,000.00 6,000.00
741-11 adjusting water valve and meter box 3      EACH 800.00 2,400.00 600.00 1,800.00 900.00 2,700.00 350.00 1,050.00
741-12 removing water valve including box 2      EACH 1,200.00 2,400.00 500.00 1,000.00 400.00 800.00 250.00 500.00
741-13 removing fire hydrant 2      EACH 1,200.00 2,400.00 600.00 1,200.00 800.00 1,600.00 500.00 1,000.00
741-15-A casing (16" steel, 1/2" thick) 100.0    LNFT 140.00 14,000.00 100.00 10,000.00 350.00 35,000.00 125.00 12,500.00
804-01-C precast concrete piles (16") 3,744      LNFT 75.00 280,800.00 75.00 280,800.00 59.00 220,896.00 100.00 374,400.00
804-01-F precast concrete piles (24") 2,340      LNFT 215.00 503,100.00 230.00 538,200.00 160.00 374,400.00 250.00 585,000.00
804-05 precast concrete test piles 1      EACH 30,000.00 30,000.00 30,000.00 30,000.00 28,000.00 28,000.00 100,000.00 100,000.00
804-09 loading test piles 1      EACH 40,000.00 40,000.00 40,000.00 40,000.00 19,000.00 19,000.00 5,000.00 5,000.00
804-10 reloading test piles 1      EACH 1,750.00 1,750.00 2,000.00 2,000.00 500.00 500.00 3,000.00 3,000.00
804-11 redriving test piles 1      EACH 1,750.00 1,750.00 2,000.00 2,000.00 750.00 750.00 2,500.00 2,500.00
804-17 dynamic monitoring 1      EACH 4,065.00 4,065.00 5,000.00 5,000.00 5,300.00 5,300.00 2,000.00 2,000.00
805-01-F class a concrete (bents) 252.00   CUYD 1,220.00 307,440.00 1,400.00 352,800.00 2,500.00 630,000.00 1,000.00 252,000.00
805-03 class aa concrete 524.00   CUYD 1,100.00 576,400.00 1,150.00 602,600.00 1,600.00 838,400.00 850.00 445,400.00
805-08-B precast-prestressed concrete girders (type ii) 400.0    LNFT 145.00 58,000.00 150.00 60,000.00 230.00 92,000.00 200.00 80,000.00
805-08-C precast-prestressed concrete girders (type iii) 2,100.0    LNFT 180.00 378,000.00 190.00 399,000.00 270.00 567,000.00 220.00 462,000.00
805-11 strip seal joints 697.50   LNFT 150.00 104,625.00 140.00 97,650.00 200.00 139,500.00 150.00 104,625.00
806-01 deformed reinforcing steel 147,104      LB 1.50 220,656.00 1.60 235,366.40 1.50 220,656.00 2.00 294,208.00
807-08 structural metalwork lump      LUMP 5,800.00 5,800.00 9,000.00 9,000.00 60,000.00 60,000.00 15,000.00 15,000.00
810-01 concrete railing (barrier) 1,144.00   LNFT 99.00 113,256.00 110.00 125,840.00 115.00 131,560.00 100.00 114,400.00
813-01 concrete approach slabs 304.80   SQYD 261.00 79,552.80 160.00 48,768.00 250.00 76,200.00 250.00 76,200.00
813-02 concrete approach slabs (pile supported) 1,647.70   SQYD 377.00 621,182.90 400.00 659,080.00 513.00 845,270.10 600.00 988,620.00
S-001-A tree trimming lump      LUMP 3,500.00 3,500.00 20,000.00 20,000.00 2,700.00 2,700.00 5,000.00 5,000.00
S-001-B root pruning lump      LUMP 5,800.00 5,800.00 15,000.00 15,000.00 2,700.00 2,700.00 5,000.00 5,000.00
S-002 5" c casing for street light conduit street crossing 410      LNFT 87.00 35,670.00 80.00 32,800.00 80.00 32,800.00 80.00 32,800.00
S-003 catch basin conversion 2      EACH 4,700.00 9,400.00 2,600.00 5,200.00 6,000.00 12,000.00 1,200.00 2,400.00
S-004 longitudinal butt joint 1,835      LNFT 5.60 10,276.00 8.00 14,680.00 6.00 11,010.00 5.00 9,175.00
S-005-A video detection camera device and connection 2      EACH 7,600.00 15,200.00 8,000.00 16,000.00 7,000.00 14,000.00 7,000.00 14,000.00
S-005-B video detection system 1      EACH 4,600.00 4,600.00 6,000.00 6,000.00 4,300.00 4,300.00 4,000.00 4,000.00
S-006 traffic signal installation of harvey blvd. at wall
blvd.
lump      LUMP 270,000.00 270,000.00 260,000.00 260,000.00 250,000.00 250,000.00 250,000.00 250,000.00
S-007 exploratory excavation 4      EACH 1,800.00 7,200.00 1,400.00 5,600.00 1,300.00 5,200.00 1,500.00 6,000.00
S-008-A waterline offset (8") 1      EACH 7,200.00 7,200.00 7,500.00 7,500.00 16,000.00 16,000.00 1,000.00 1,000.00
S-008-B waterline offset (12") 1      EACH 11,000.00 11,000.00 9,500.00 9,500.00 29,000.00 29,000.00 1,000.00 1,000.00
S-008-C waterline long body transition couplings (8") 2      EACH 760.00 1,520.00 900.00 1,800.00 1,200.00 2,400.00 3,000.00 6,000.00
S-008-D waterline long body transition couplings (12") 4      EACH 1,100.00 4,400.00 1,500.00 6,000.00 1,700.00 6,800.00 3,000.00 12,000.00
S-009-A sewer force main offset (10") 2      EACH 9,900.00 19,800.00 5,200.00 10,400.00 36,000.00 72,000.00 1,000.00 2,000.00
S-009-B sewer force main (10" pvc c-900) 80      LNFT 100.00 8,000.00 80.00 6,400.00 70.00 5,600.00 100.00 8,000.00
S-009-C sewer force main long body transition couplings (10") 2      EACH 1,000.00 2,000.00 1,170.00 2,340.00 1,500.00 3,000.00 5,000.00 10,000.00
S-009-D cleaning and videotaping 535      LNFT 12.00 6,420.00 10.00 5,350.00 30.00 16,050.00 15.00 8,025.00
S-010 dynamic analysis 1      EACH 4,000.00 4,000.00 4,500.00 4,500.00 340.00 340.00 1,500.00 1,500.00
S-011 saw cutting existing concrete (2" depth) 125      LNFT 9.00 1,125.00 4.00 500.00 3.50 437.50 10.00 1,250.00
                       
 CONTRACTOR TOTAL       13,239,649.00   13,946,142.90   16,256,001.25   18,230,818.00