| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC. |
- 2 - PHYLWAY CONSTRUCTION LLC |
- 3 - BOH BROS. CONSTRUCTION CO., LLC. |
- 4 - JAMES CONSTRUCTION GROUP LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
180,000.00 |
180,000.00 |
580,000.00 |
580,000.00 |
200,000.00 |
200,000.00 |
500,000.00 |
500,000.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
78,000.00 |
78,000.00 |
4,000.00 |
4,000.00 |
100,000.00 |
100,000.00 |
50,000.00 |
50,000.00 |
| 202-02-C |
removal of portland cement concrete pavement
|
953   |
SQYD |
13.00 |
12,389.00 |
14.00 |
13,342.00 |
10.00 |
9,530.00 |
25.00 |
23,825.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
5,242.0 |
SQYD |
11.00 |
57,662.00 |
10.00 |
52,420.00 |
10.00 |
52,420.00 |
10.00 |
52,420.00 |
| 202-02-I |
removal of concrete boat ramp (sta 135+50) (partially
submerged) |
1   |
each |
17,000.00 |
17,000.00 |
22,000.00 |
22,000.00 |
7,000.00 |
7,000.00 |
15,000.00 |
15,000.00 |
| 202-02-J |
removal of wooden bulkheads (sta 135+20)
|
1   |
each |
29,000.00 |
29,000.00 |
35,000.00 |
35,000.00 |
20,000.00 |
20,000.00 |
15,000.00 |
15,000.00 |
| 202-02-K |
removal of traffic signal equipment
|
lump |
LUMP |
3,600.00 |
3,600.00 |
4,000.00 |
4,000.00 |
3,500.00 |
3,500.00 |
4,000.00 |
4,000.00 |
| 203-01 |
general excavation
|
13,740   |
CUYD |
8.50 |
116,790.00 |
10.00 |
137,400.00 |
15.00 |
206,100.00 |
15.00 |
206,100.00 |
| 203-02 |
drainage excavation
|
5,244   |
CUYD |
29.00 |
152,076.00 |
23.00 |
120,612.00 |
14.00 |
73,416.00 |
35.00 |
183,540.00 |
| 203-03 |
embankment
|
26,744   |
CUYD |
21.00 |
561,624.00 |
20.00 |
534,880.00 |
22.00 |
588,368.00 |
30.00 |
802,320.00 |
| 203-04 |
nonplastic embankment
|
31,478   |
CUYD |
21.50 |
676,777.00 |
25.00 |
786,950.00 |
30.00 |
944,340.00 |
65.00 |
2,046,070.00 |
| 203-08 |
geotextile fabric
|
39,130   |
SQYD |
2.00 |
78,260.00 |
1.50 |
58,695.00 |
1.75 |
68,477.50 |
2.50 |
97,825.00 |
| 204-02 |
temporary hay or straw bales
|
488   |
EACH |
11.60 |
5,660.80 |
11.00 |
5,368.00 |
9.00 |
4,392.00 |
17.00 |
8,296.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
1   |
EACH |
290.00 |
290.00 |
300.00 |
300.00 |
160.00 |
160.00 |
300.00 |
300.00 |
| 204-06 |
temporary silt fencing
|
10,000   |
LNFT |
1.70 |
17,000.00 |
2.50 |
25,000.00 |
1.50 |
15,000.00 |
3.00 |
30,000.00 |
| 302-02-B-01 |
class ii base course (6" thick) (crushed stone or
recycled pccp) |
42,840.0 |
SQYD |
13.60 |
582,624.00 |
18.00 |
771,120.00 |
22.00 |
942,480.00 |
25.00 |
1,071,000.00 |
| 401-01 |
aggregate surface course (net section)
|
51.8 |
CUYD |
116.00 |
6,008.80 |
90.00 |
4,662.00 |
80.00 |
4,144.00 |
150.00 |
7,770.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
100.0 |
CUYD |
100.00 |
10,000.00 |
75.00 |
7,500.00 |
40.00 |
4,000.00 |
150.00 |
15,000.00 |
| 502-01 |
superpave asphaltic concrete
|
10,442.0 |
TON |
114.00 |
1,190,388.00 |
125.00 |
1,305,250.00 |
112.00 |
1,169,504.00 |
115.00 |
1,200,830.00 |
| 601-01-G |
portland cement concrete pavement (8" thick)
|
463.0 |
SQYD |
69.00 |
31,947.00 |
75.00 |
34,725.00 |
75.00 |
34,725.00 |
140.00 |
64,820.00 |
| 601-01-K |
portland cement concrete pavement (10" thick)
|
2,410.0 |
SQYD |
67.00 |
161,470.00 |
85.00 |
204,850.00 |
95.00 |
228,950.00 |
100.00 |
241,000.00 |
| 602-02-A |
cleaning and resealing existing longitudinal pavement
joints |
250   |
LNFT |
3.50 |
875.00 |
8.00 |
2,000.00 |
10.00 |
2,500.00 |
10.00 |
2,500.00 |
| 602-02-B |
cleaning and resealing existing transverse pavement
joints |
150   |
LNFT |
3.50 |
525.00 |
8.00 |
1,200.00 |
10.00 |
1,500.00 |
10.00 |
1,500.00 |
| 602-03 |
cleaning and sealing random cracks
|
150   |
LNFT |
3.50 |
525.00 |
10.00 |
1,500.00 |
10.00 |
1,500.00 |
25.00 |
3,750.00 |
| 602-04 |
full depth corner patching of jointed concrete
pavement |
50.0 |
SQYD |
299.00 |
14,950.00 |
300.00 |
15,000.00 |
300.00 |
15,000.00 |
500.00 |
25,000.00 |
| 602-05 |
full depth patching of jointed concrete pavement
|
50.0 |
SQYD |
132.00 |
6,600.00 |
300.00 |
15,000.00 |
250.00 |
12,500.00 |
500.00 |
25,000.00 |
| 602-07 |
patching continuously reinforced concrete pavement
|
50.0 |
SQYD |
157.00 |
7,850.00 |
350.00 |
17,500.00 |
300.00 |
15,000.00 |
1,000.00 |
50,000.00 |
| 602-09 |
grinding isolated joints
|
50.0 |
SQYD |
35.00 |
1,750.00 |
35.00 |
1,750.00 |
80.00 |
4,000.00 |
50.00 |
2,500.00 |
| 701-03-E |
storm drain pipe (12" rcp/pcp)
|
10   |
LNFT |
104.00 |
1,040.00 |
68.00 |
680.00 |
55.00 |
550.00 |
100.00 |
1,000.00 |
| 701-03-F |
storm drain pipe (15" rcp/pcp)
|
3,196   |
LNFT |
95.00 |
303,620.00 |
70.00 |
223,720.00 |
95.00 |
303,620.00 |
150.00 |
479,400.00 |
| 701-03-G |
storm drain pipe (18" rcp/pcp)
|
1,344   |
LNFT |
100.00 |
134,400.00 |
75.00 |
100,800.00 |
105.00 |
141,120.00 |
150.00 |
201,600.00 |
| 701-03-I |
storm drain pipe (24" rcp/pcp)
|
1,686   |
LNFT |
105.00 |
177,030.00 |
90.00 |
151,740.00 |
145.00 |
244,470.00 |
200.00 |
337,200.00 |
| 701-03-K |
storm drain pipe (30" rcp/pcp)
|
3,588   |
LNFT |
110.00 |
394,680.00 |
110.00 |
394,680.00 |
150.00 |
538,200.00 |
175.00 |
627,900.00 |
| 701-03-K/M-01 |
storm drain pipe (30" pcp or 36" cmp) (outfall)
|
101   |
LNFT |
110.00 |
11,110.00 |
120.00 |
12,120.00 |
260.00 |
26,260.00 |
250.00 |
25,250.00 |
| 701-03-O |
storm drain pipe (48" rcp)
|
452   |
LNFT |
200.00 |
90,400.00 |
200.00 |
90,400.00 |
280.00 |
126,560.00 |
400.00 |
180,800.00 |
| 701-03-Q-01 |
storm drain pipe (60" cmp) (outfall)
|
26   |
LNFT |
175.00 |
4,550.00 |
240.00 |
6,240.00 |
700.00 |
18,200.00 |
475.00 |
12,350.00 |
| 701-04-F-01 |
storm drain pipe arch (36" equiv. cmp) (outfall)
|
70   |
LNFT |
110.00 |
7,700.00 |
110.00 |
7,700.00 |
270.00 |
18,900.00 |
275.00 |
19,250.00 |
| 701-14 |
cleaning existing pipes
|
600   |
LNFT |
15.00 |
9,000.00 |
10.00 |
6,000.00 |
30.00 |
18,000.00 |
30.00 |
18,000.00 |
| 702-03-A |
catch basins (cb-01)
|
10   |
EACH |
5,500.00 |
55,000.00 |
3,000.00 |
30,000.00 |
4,000.00 |
40,000.00 |
5,000.00 |
50,000.00 |
| 702-03-A-01 |
catch basins (cb-01) (brick)
|
36   |
EACH |
8,500.00 |
306,000.00 |
3,000.00 |
108,000.00 |
3,700.00 |
133,200.00 |
6,500.00 |
234,000.00 |
| 702-03-B |
catch basins (cb-02)
|
2   |
EACH |
5,000.00 |
10,000.00 |
4,700.00 |
9,400.00 |
7,400.00 |
14,800.00 |
7,800.00 |
15,600.00 |
| 702-03-C |
catch basins (cb-06)
|
12   |
EACH |
7,500.00 |
90,000.00 |
5,600.00 |
67,200.00 |
5,800.00 |
69,600.00 |
6,300.00 |
75,600.00 |
| 702-03-C-01 |
catch basins (cb-06) (brick)
|
46   |
EACH |
10,000.00 |
460,000.00 |
5,800.00 |
266,800.00 |
4,300.00 |
197,800.00 |
7,800.00 |
358,800.00 |
| 702-03-D |
catch basins (cb-07)
|
17   |
EACH |
9,500.00 |
161,500.00 |
6,400.00 |
108,800.00 |
8,800.00 |
149,600.00 |
7,000.00 |
119,000.00 |
| 702-03-F |
catch basins (cb-08)
|
2   |
EACH |
11,000.00 |
22,000.00 |
8,000.00 |
16,000.00 |
13,000.00 |
26,000.00 |
8,600.00 |
17,200.00 |
| 702-03-I |
catch basins (paved gutter drain)
|
17   |
EACH |
5,000.00 |
85,000.00 |
2,500.00 |
42,500.00 |
6,300.00 |
107,100.00 |
3,500.00 |
59,500.00 |
| 702-04-A |
adjusting manholes
|
1   |
EACH |
1,700.00 |
1,700.00 |
1,000.00 |
1,000.00 |
1,000.00 |
1,000.00 |
2,000.00 |
2,000.00 |
| 702-04-B |
adjusting catch basins
|
4   |
EACH |
2,000.00 |
8,000.00 |
1,500.00 |
6,000.00 |
1,200.00 |
4,800.00 |
2,000.00 |
8,000.00 |
| 704-03 |
blocked out guard rail
|
150.0 |
LNFT |
23.00 |
3,450.00 |
22.00 |
3,300.00 |
25.00 |
3,750.00 |
20.00 |
3,000.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
69.00 |
6,900.00 |
65.00 |
6,500.00 |
65.00 |
6,500.00 |
60.00 |
6,000.00 |
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
3,200.00 |
12,800.00 |
2,200.00 |
8,800.00 |
3,000.00 |
12,000.00 |
2,000.00 |
8,000.00 |
| 706-02-C |
concrete drive (6" thick)
|
152.0 |
SQYD |
69.00 |
10,488.00 |
90.00 |
13,680.00 |
75.00 |
11,400.00 |
65.00 |
9,880.00 |
| 706-03-A |
incidental concrete paving (4" thick)
|
656.0 |
SQYD |
90.00 |
59,040.00 |
70.00 |
45,920.00 |
60.00 |
39,360.00 |
75.00 |
49,200.00 |
| 707-01 |
concrete curb
|
2,018.0 |
LNFT |
12.60 |
25,426.80 |
10.00 |
20,180.00 |
8.00 |
16,144.00 |
15.00 |
30,270.00 |
| 707-03 |
combination concrete curb & gutter
|
19,851.0 |
LNFT |
19.50 |
387,094.50 |
26.00 |
516,126.00 |
26.00 |
516,126.00 |
38.00 |
754,338.00 |
| 708-01 |
right-of-way monument
|
20   |
EACH |
200.00 |
4,000.00 |
150.00 |
3,000.00 |
300.00 |
6,000.00 |
350.00 |
7,000.00 |
| 711-01-B |
riprap (10 lb, 12" thick)
|
150   |
SQYD |
50.00 |
7,500.00 |
40.00 |
6,000.00 |
135.00 |
20,250.00 |
65.00 |
9,750.00 |
| 712-04 |
flexible revetment
|
827   |
SQYD |
87.00 |
71,949.00 |
100.00 |
82,700.00 |
100.00 |
82,700.00 |
165.00 |
136,455.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
80,000.00 |
80,000.00 |
100,000.00 |
100,000.00 |
255,000.00 |
255,000.00 |
70,000.00 |
70,000.00 |
| 713-02-A |
temporary pavement markings (4" width)
|
20,800   |
LNFT |
0.25 |
5,200.00 |
0.22 |
4,576.00 |
0.25 |
5,200.00 |
0.25 |
5,200.00 |
| 713-07 |
temporary precast concrete barrier (contractor
furnished) |
2   |
EACH |
757.00 |
1,514.00 |
1,500.00 |
3,000.00 |
1,000.00 |
2,000.00 |
3,000.00 |
6,000.00 |
| 717-01 |
seeding
|
500   |
LB |
10.00 |
5,000.00 |
9.00 |
4,500.00 |
4.00 |
2,000.00 |
10.00 |
5,000.00 |
| 718-01 |
fertilizer
|
16,500   |
LB |
0.50 |
8,250.00 |
0.35 |
5,775.00 |
0.45 |
7,425.00 |
0.50 |
8,250.00 |
| 720-01-A |
erosion control system, slope protection (type a)
|
568   |
SQYD |
4.70 |
2,669.60 |
3.00 |
1,704.00 |
2.70 |
1,533.60 |
2.50 |
1,420.00 |
| 722-01 |
project site laboratory
|
1.00 |
EACH |
50,000.00 |
50,000.00 |
25,000.00 |
25,000.00 |
40,000.00 |
40,000.00 |
20,000.00 |
20,000.00 |
| 725-01 |
temporary detour roads
|
450.0 |
SQYD |
116.00 |
52,200.00 |
124.00 |
55,800.00 |
150.00 |
67,500.00 |
175.00 |
78,750.00 |
| 726-01 |
bedding material
|
3,918.4 |
CUYD |
57.00 |
223,348.80 |
70.00 |
274,288.00 |
70.00 |
274,288.00 |
65.00 |
254,696.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
868,000.00 |
868,000.00 |
1,350,000.00 |
1,350,000.00 |
1,600,000.00 |
1,600,000.00 |
1,800,000.00 |
1,800,000.00 |
| 729-01 |
sign (type a)
|
52.5 |
SQFT |
39.00 |
2,047.50 |
60.00 |
3,150.00 |
35.00 |
1,837.50 |
35.00 |
1,837.50 |
| 730-01 |
trenching and backfilling
|
12,000   |
LNFT |
3.75 |
45,000.00 |
6.00 |
72,000.00 |
3.75 |
45,000.00 |
4.00 |
48,000.00 |
| 730-02-A |
conduit with conductors (2"c, 3#4 for service)
|
250   |
LNFT |
11.00 |
2,750.00 |
11.00 |
2,750.00 |
11.00 |
2,750.00 |
10.00 |
2,500.00 |
| 730-02-B |
conduit with conductors (2"c, 3#6, 1#10g)
|
11,470   |
LNFT |
8.25 |
94,627.50 |
9.00 |
103,230.00 |
9.00 |
103,230.00 |
8.00 |
91,760.00 |
| 730-02-C |
conduit with conductors (2"c, 6#4, 2#10g)
|
200   |
LNFT |
19.00 |
3,800.00 |
18.00 |
3,600.00 |
19.00 |
3,800.00 |
18.00 |
3,600.00 |
| 730-02-D |
conduit with conductors (2"c, 3#4, 1#1g for entergy)
|
800   |
LNFT |
15.00 |
12,000.00 |
14.00 |
11,200.00 |
15.00 |
12,000.00 |
14.00 |
11,200.00 |
| 730-05-A |
light pole (30' tall with 12' arm, aluminum)
|
73   |
EACH |
7,000.00 |
511,000.00 |
3,800.00 |
277,400.00 |
7,100.00 |
518,300.00 |
6,600.00 |
481,800.00 |
| 730-07-A |
luminaire (250 w, hps, cobra head)
|
73   |
EACH |
330.00 |
24,090.00 |
400.00 |
29,200.00 |
350.00 |
25,550.00 |
320.00 |
23,360.00 |
| 730-08-A |
electrical service point (pedestal mounted)
|
2   |
EACH |
6,000.00 |
12,000.00 |
9,000.00 |
18,000.00 |
6,000.00 |
12,000.00 |
6,400.00 |
12,800.00 |
| 730-16-A |
underground junction box (8 cubic feet) (for lighting)
|
7   |
EACH |
300.00 |
2,100.00 |
1,500.00 |
10,500.00 |
300.00 |
2,100.00 |
275.00 |
1,925.00 |
| 730-16-C |
underground junction box (for entergy)
|
5   |
EACH |
525.00 |
2,625.00 |
950.00 |
4,750.00 |
525.00 |
2,625.00 |
490.00 |
2,450.00 |
| 730-18 |
service pole
|
2   |
EACH |
1,400.00 |
2,800.00 |
2,600.00 |
5,200.00 |
1,400.00 |
2,800.00 |
1,300.00 |
2,600.00 |
| 731-02 |
reflectorized raised pavement markers
|
500   |
EACH |
5.80 |
2,900.00 |
5.50 |
2,750.00 |
5.10 |
2,550.00 |
5.00 |
2,500.00 |
| 732-01-C-03 |
plastic pavement striping (8" width) hot appl thermo
(40 mil thickness) |
1,000   |
LNFT |
0.95 |
950.00 |
1.00 |
1,000.00 |
0.85 |
850.00 |
1.00 |
1,000.00 |
| 732-01-E |
plastic pavement striping (24" width)
|
155   |
LNFT |
3.65 |
565.75 |
3.50 |
542.50 |
3.25 |
503.75 |
3.50 |
542.50 |
| 732-02-A-03 |
plast pvmt striping (solid line) (4" width) hot appl
thermo (40 mil thickness) |
5.000 |
MILE |
1,550.00 |
7,750.00 |
1,600.00 |
8,000.00 |
1,410.00 |
7,050.00 |
1,500.00 |
7,500.00 |
| 732-03-A-03 |
plastic pvmt striping (broken line) (4" width) hot
appl thermo (40 mil thickness) |
2.500 |
MILE |
650.00 |
1,625.00 |
650.00 |
1,625.00 |
600.00 |
1,500.00 |
600.00 |
1,500.00 |
| 732-04-A-03 |
plastic pvmt legends and symbols (arrow) hot appl
thermo (40 mil thickness) |
10   |
EACH |
210.00 |
2,100.00 |
210.00 |
2,100.00 |
200.00 |
2,000.00 |
200.00 |
2,000.00 |
| 732-04-C-03 |
plastic pvmt legends and symbols (only) hot appl
thermo (40 mil thickness) |
10   |
EACH |
225.00 |
2,250.00 |
230.00 |
2,300.00 |
210.00 |
2,100.00 |
200.00 |
2,000.00 |
| 735-01 |
mailboxes
|
1   |
EACH |
100.00 |
100.00 |
1.00 |
1.00 |
1.00 |
1.00 |
5.00 |
5.00 |
| 735-02 |
mailbox supports (single)
|
1   |
EACH |
50.00 |
50.00 |
110.00 |
110.00 |
100.00 |
100.00 |
100.00 |
100.00 |
| 736-01 |
trenching and backfilling
|
710   |
LNFT |
3.75 |
2,662.50 |
7.00 |
4,970.00 |
3.80 |
2,698.00 |
4.00 |
2,840.00 |
| 736-03-A |
jacked or bored conduit (1/2" p.e.c.)
|
15   |
LNFT |
10.75 |
161.25 |
75.00 |
1,125.00 |
10.00 |
150.00 |
10.00 |
150.00 |
| 736-03-B |
jacked or bored conduit (2" p.e.c.)
|
120   |
LNFT |
20.50 |
2,460.00 |
40.00 |
4,800.00 |
20.00 |
2,400.00 |
20.00 |
2,400.00 |
| 736-03-C |
jacked or bored conduit (3" p.e.c.)
|
300   |
LNFT |
27.50 |
8,250.00 |
44.00 |
13,200.00 |
26.00 |
7,800.00 |
25.00 |
7,500.00 |
| 736-04-B |
signal support (mast arm standard w/ 30' arm)
|
4   |
EACH |
11,000.00 |
44,000.00 |
17,000.00 |
68,000.00 |
10,600.00 |
42,400.00 |
10,000.00 |
40,000.00 |
| 736-04-C |
signal support (mast arm standard w/ 35' arm)
|
1   |
EACH |
11,000.00 |
11,000.00 |
17,000.00 |
17,000.00 |
11,000.00 |
11,000.00 |
10,000.00 |
10,000.00 |
| 736-05-B |
signal heads (3 section, r, y, g) l.e.d.
|
8   |
EACH |
950.00 |
7,600.00 |
1,200.00 |
9,600.00 |
930.00 |
7,440.00 |
850.00 |
6,800.00 |
| 736-05-C |
signal heads (5 section, r, lty, y, ltg, g) l.e.d.
|
1   |
EACH |
1,400.00 |
1,400.00 |
1,300.00 |
1,300.00 |
1,350.00 |
1,350.00 |
1,300.00 |
1,300.00 |
| 736-05-D |
signal heads (5 section, r, y, rty, g, rtg) l.e.d.
|
1   |
EACH |
1,400.00 |
1,400.00 |
1,900.00 |
1,900.00 |
1,350.00 |
1,350.00 |
1,300.00 |
1,300.00 |
| 736-06-A |
signal service (pole mounted for controller only)
|
1   |
EACH |
1,200.00 |
1,200.00 |
1,800.00 |
1,800.00 |
1,200.00 |
1,200.00 |
1,100.00 |
1,100.00 |
| 736-08-A |
signal controller (ts 2 controller, type 2 cabinet)
|
1   |
EACH |
24,000.00 |
24,000.00 |
28,000.00 |
28,000.00 |
24,000.00 |
24,000.00 |
25,000.00 |
25,000.00 |
| 736-09 |
loop detector
|
75   |
LNFT |
10.00 |
750.00 |
40.00 |
3,000.00 |
10.00 |
750.00 |
10.00 |
750.00 |
| 736-10-A |
underground junction box (type "e") (for traffic
signals) |
3   |
EACH |
400.00 |
1,200.00 |
460.00 |
1,380.00 |
430.00 |
1,290.00 |
400.00 |
1,200.00 |
| 736-10-B |
underground junction box (type "f") (for traffic
signals) |
4   |
EACH |
450.00 |
1,800.00 |
460.00 |
1,840.00 |
470.00 |
1,880.00 |
450.00 |
1,800.00 |
| 736-10-C |
underground junction box (type "h") (for traffic
signals) |
1   |
EACH |
1,090.00 |
1,090.00 |
1,500.00 |
1,500.00 |
1,000.00 |
1,000.00 |
950.00 |
950.00 |
| 736-11-A |
conduit (2" p.e.c. schedule 80)
|
692   |
LNFT |
4.50 |
3,114.00 |
8.50 |
5,882.00 |
4.40 |
3,044.80 |
4.00 |
2,768.00 |
| 736-11-B |
conduit (3" p.e.c. schedule 80)
|
20   |
LNFT |
8.50 |
170.00 |
14.00 |
280.00 |
8.00 |
160.00 |
7.50 |
150.00 |
| 736-12-A |
conductor (2c, loop lead-in)
|
770   |
LNFT |
1.75 |
1,347.50 |
1.50 |
1,155.00 |
1.60 |
1,232.00 |
1.50 |
1,155.00 |
| 736-12-B |
conductor (3c, power)
|
145   |
LNFT |
7.00 |
1,015.00 |
7.00 |
1,015.00 |
7.00 |
1,015.00 |
6.50 |
942.50 |
| 736-12-C |
conductor (6c, signal)
|
460   |
LNFT |
2.00 |
920.00 |
4.00 |
1,840.00 |
1.80 |
828.00 |
1.70 |
782.00 |
| 736-12-D |
conductor (10c, signal)
|
605   |
LNFT |
3.00 |
1,815.00 |
4.00 |
2,420.00 |
2.70 |
1,633.50 |
2.50 |
1,512.50 |
| 740-01 |
construction layout
|
lump |
LUMP |
296,000.00 |
296,000.00 |
275,000.00 |
275,000.00 |
650,000.00 |
650,000.00 |
250,000.00 |
250,000.00 |
| 741-01-A |
water main (8" ductile iron)
|
40   |
LNFT |
160.00 |
6,400.00 |
85.00 |
3,400.00 |
80.00 |
3,200.00 |
50.00 |
2,000.00 |
| 741-01-B |
water main (12" ductile iron)
|
260   |
LNFT |
180.00 |
46,800.00 |
100.00 |
26,000.00 |
150.00 |
39,000.00 |
11.00 |
2,860.00 |
| 741-01-C |
water main (12" pe)
|
300   |
LNFT |
100.00 |
30,000.00 |
66.00 |
19,800.00 |
90.00 |
27,000.00 |
10.00 |
3,000.00 |
| 741-02-A |
gate valve (6")
|
2   |
EACH |
536.00 |
1,072.00 |
1,400.00 |
2,800.00 |
1,500.00 |
3,000.00 |
1,000.00 |
2,000.00 |
| 741-02-B |
gate valve (12")
|
2   |
EACH |
4,700.00 |
9,400.00 |
2,600.00 |
5,200.00 |
4,300.00 |
8,600.00 |
2,000.00 |
4,000.00 |
| 741-04 |
fire hydrant
|
2   |
EACH |
2,800.00 |
5,600.00 |
4,100.00 |
8,200.00 |
4,300.00 |
8,600.00 |
3,000.00 |
6,000.00 |
| 741-11 |
adjusting water valve and meter box
|
3   |
EACH |
800.00 |
2,400.00 |
600.00 |
1,800.00 |
900.00 |
2,700.00 |
350.00 |
1,050.00 |
| 741-12 |
removing water valve including box
|
2   |
EACH |
1,200.00 |
2,400.00 |
500.00 |
1,000.00 |
400.00 |
800.00 |
250.00 |
500.00 |
| 741-13 |
removing fire hydrant
|
2   |
EACH |
1,200.00 |
2,400.00 |
600.00 |
1,200.00 |
800.00 |
1,600.00 |
500.00 |
1,000.00 |
| 741-15-A |
casing (16" steel, 1/2" thick)
|
100.0 |
LNFT |
140.00 |
14,000.00 |
100.00 |
10,000.00 |
350.00 |
35,000.00 |
125.00 |
12,500.00 |
| 804-01-C |
precast concrete piles (16")
|
3,744   |
LNFT |
75.00 |
280,800.00 |
75.00 |
280,800.00 |
59.00 |
220,896.00 |
100.00 |
374,400.00 |
| 804-01-F |
precast concrete piles (24")
|
2,340   |
LNFT |
215.00 |
503,100.00 |
230.00 |
538,200.00 |
160.00 |
374,400.00 |
250.00 |
585,000.00 |
| 804-05 |
precast concrete test piles
|
1   |
EACH |
30,000.00 |
30,000.00 |
30,000.00 |
30,000.00 |
28,000.00 |
28,000.00 |
100,000.00 |
100,000.00 |
| 804-09 |
loading test piles
|
1   |
EACH |
40,000.00 |
40,000.00 |
40,000.00 |
40,000.00 |
19,000.00 |
19,000.00 |
5,000.00 |
5,000.00 |
| 804-10 |
reloading test piles
|
1   |
EACH |
1,750.00 |
1,750.00 |
2,000.00 |
2,000.00 |
500.00 |
500.00 |
3,000.00 |
3,000.00 |
| 804-11 |
redriving test piles
|
1   |
EACH |
1,750.00 |
1,750.00 |
2,000.00 |
2,000.00 |
750.00 |
750.00 |
2,500.00 |
2,500.00 |
| 804-17 |
dynamic monitoring
|
1   |
EACH |
4,065.00 |
4,065.00 |
5,000.00 |
5,000.00 |
5,300.00 |
5,300.00 |
2,000.00 |
2,000.00 |
| 805-01-F |
class a concrete (bents)
|
252.00 |
CUYD |
1,220.00 |
307,440.00 |
1,400.00 |
352,800.00 |
2,500.00 |
630,000.00 |
1,000.00 |
252,000.00 |
| 805-03 |
class aa concrete
|
524.00 |
CUYD |
1,100.00 |
576,400.00 |
1,150.00 |
602,600.00 |
1,600.00 |
838,400.00 |
850.00 |
445,400.00 |
| 805-08-B |
precast-prestressed concrete girders (type ii)
|
400.0 |
LNFT |
145.00 |
58,000.00 |
150.00 |
60,000.00 |
230.00 |
92,000.00 |
200.00 |
80,000.00 |
| 805-08-C |
precast-prestressed concrete girders (type iii)
|
2,100.0 |
LNFT |
180.00 |
378,000.00 |
190.00 |
399,000.00 |
270.00 |
567,000.00 |
220.00 |
462,000.00 |
| 805-11 |
strip seal joints
|
697.50 |
LNFT |
150.00 |
104,625.00 |
140.00 |
97,650.00 |
200.00 |
139,500.00 |
150.00 |
104,625.00 |
| 806-01 |
deformed reinforcing steel
|
147,104   |
LB |
1.50 |
220,656.00 |
1.60 |
235,366.40 |
1.50 |
220,656.00 |
2.00 |
294,208.00 |
| 807-08 |
structural metalwork
|
lump |
LUMP |
5,800.00 |
5,800.00 |
9,000.00 |
9,000.00 |
60,000.00 |
60,000.00 |
15,000.00 |
15,000.00 |
| 810-01 |
concrete railing (barrier)
|
1,144.00 |
LNFT |
99.00 |
113,256.00 |
110.00 |
125,840.00 |
115.00 |
131,560.00 |
100.00 |
114,400.00 |
| 813-01 |
concrete approach slabs
|
304.80 |
SQYD |
261.00 |
79,552.80 |
160.00 |
48,768.00 |
250.00 |
76,200.00 |
250.00 |
76,200.00 |
| 813-02 |
concrete approach slabs (pile supported)
|
1,647.70 |
SQYD |
377.00 |
621,182.90 |
400.00 |
659,080.00 |
513.00 |
845,270.10 |
600.00 |
988,620.00 |
| S-001-A |
tree trimming
|
lump |
LUMP |
3,500.00 |
3,500.00 |
20,000.00 |
20,000.00 |
2,700.00 |
2,700.00 |
5,000.00 |
5,000.00 |
| S-001-B |
root pruning
|
lump |
LUMP |
5,800.00 |
5,800.00 |
15,000.00 |
15,000.00 |
2,700.00 |
2,700.00 |
5,000.00 |
5,000.00 |
| S-002 |
5" c casing for street light conduit street crossing
|
410   |
LNFT |
87.00 |
35,670.00 |
80.00 |
32,800.00 |
80.00 |
32,800.00 |
80.00 |
32,800.00 |
| S-003 |
catch basin conversion
|
2   |
EACH |
4,700.00 |
9,400.00 |
2,600.00 |
5,200.00 |
6,000.00 |
12,000.00 |
1,200.00 |
2,400.00 |
| S-004 |
longitudinal butt joint
|
1,835   |
LNFT |
5.60 |
10,276.00 |
8.00 |
14,680.00 |
6.00 |
11,010.00 |
5.00 |
9,175.00 |
| S-005-A |
video detection camera device and connection
|
2   |
EACH |
7,600.00 |
15,200.00 |
8,000.00 |
16,000.00 |
7,000.00 |
14,000.00 |
7,000.00 |
14,000.00 |
| S-005-B |
video detection system
|
1   |
EACH |
4,600.00 |
4,600.00 |
6,000.00 |
6,000.00 |
4,300.00 |
4,300.00 |
4,000.00 |
4,000.00 |
| S-006 |
traffic signal installation of harvey blvd. at wall
blvd. |
lump |
LUMP |
270,000.00 |
270,000.00 |
260,000.00 |
260,000.00 |
250,000.00 |
250,000.00 |
250,000.00 |
250,000.00 |
| S-007 |
exploratory excavation
|
4   |
EACH |
1,800.00 |
7,200.00 |
1,400.00 |
5,600.00 |
1,300.00 |
5,200.00 |
1,500.00 |
6,000.00 |
| S-008-A |
waterline offset (8")
|
1   |
EACH |
7,200.00 |
7,200.00 |
7,500.00 |
7,500.00 |
16,000.00 |
16,000.00 |
1,000.00 |
1,000.00 |
| S-008-B |
waterline offset (12")
|
1   |
EACH |
11,000.00 |
11,000.00 |
9,500.00 |
9,500.00 |
29,000.00 |
29,000.00 |
1,000.00 |
1,000.00 |
| S-008-C |
waterline long body transition couplings (8")
|
2   |
EACH |
760.00 |
1,520.00 |
900.00 |
1,800.00 |
1,200.00 |
2,400.00 |
3,000.00 |
6,000.00 |
| S-008-D |
waterline long body transition couplings (12")
|
4   |
EACH |
1,100.00 |
4,400.00 |
1,500.00 |
6,000.00 |
1,700.00 |
6,800.00 |
3,000.00 |
12,000.00 |
| S-009-A |
sewer force main offset (10")
|
2   |
EACH |
9,900.00 |
19,800.00 |
5,200.00 |
10,400.00 |
36,000.00 |
72,000.00 |
1,000.00 |
2,000.00 |
| S-009-B |
sewer force main (10" pvc c-900)
|
80   |
LNFT |
100.00 |
8,000.00 |
80.00 |
6,400.00 |
70.00 |
5,600.00 |
100.00 |
8,000.00 |
| S-009-C |
sewer force main long body transition couplings (10")
|
2   |
EACH |
1,000.00 |
2,000.00 |
1,170.00 |
2,340.00 |
1,500.00 |
3,000.00 |
5,000.00 |
10,000.00 |
| S-009-D |
cleaning and videotaping
|
535   |
LNFT |
12.00 |
6,420.00 |
10.00 |
5,350.00 |
30.00 |
16,050.00 |
15.00 |
8,025.00 |
| S-010 |
dynamic analysis
|
1   |
EACH |
4,000.00 |
4,000.00 |
4,500.00 |
4,500.00 |
340.00 |
340.00 |
1,500.00 |
1,500.00 |
| S-011 |
saw cutting existing concrete (2" depth)
|
125   |
LNFT |
9.00 |
1,125.00 |
4.00 |
500.00 |
3.50 |
437.50 |
10.00 |
1,250.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
13,239,649.00 |
|
13,946,142.90 |
|
16,256,001.25 |
|
18,230,818.00 |
|