| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - THE MABRY COMPANY, INC. |
- 2 - M & M MAINTENANCE OF LASALLE, LLC |
- 3 - BEN ALLEN, INC. |
- 4 - C W & W CONTRACTORS, INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
5,000.00 |
5,000.00 |
20,000.00 |
20,000.00 |
7,000.00 |
7,000.00 |
5,000.00 |
5,000.00 |
| 202-02-A-01 |
removal of bridges (sta. 15+00.00; 19.59' wide x
30.15' long timber bridge) |
1   |
EACH |
3,500.00 |
3,500.00 |
8,000.00 |
8,000.00 |
3,500.00 |
3,500.00 |
5,000.00 |
5,000.00 |
| 202-02-A-02 |
removal of bridges (sta. 15+00.00; 19.12' wide x
46.13' long timber bridge) |
1   |
EACH |
5,000.00 |
5,000.00 |
8,000.00 |
8,000.00 |
3,500.00 |
3,500.00 |
5,000.00 |
5,000.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
89.8 |
SQYD |
3.00 |
269.40 |
60.00 |
5,388.00 |
10.00 |
898.00 |
20.00 |
1,796.00 |
| 203-05 |
excavation and embankment
|
lump |
LUMP |
10,000.00 |
10,000.00 |
30,000.00 |
30,000.00 |
29,000.00 |
29,000.00 |
30,000.00 |
30,000.00 |
| 204-02 |
temporary hay or straw bales
|
36   |
EACH |
20.00 |
720.00 |
20.00 |
720.00 |
0.00 |
0.00 |
0.10 |
3.60 |
| 204-05-A |
temporary sediment check dams (hay)
|
6   |
EACH |
200.00 |
1,200.00 |
250.00 |
1,500.00 |
0.00 |
0.00 |
0.10 |
0.60 |
| 204-06 |
temporary silt fencing
|
303   |
LNFT |
2.50 |
757.50 |
2.00 |
606.00 |
0.00 |
0.00 |
0.10 |
30.30 |
| 302-01-A |
class ii base course (stone or rpcc)
|
61.7 |
CUYD |
100.00 |
6,170.00 |
110.00 |
6,787.00 |
120.00 |
7,404.00 |
100.00 |
6,170.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
7   |
CUYD |
100.00 |
700.00 |
110.00 |
770.00 |
120.00 |
840.00 |
100.00 |
700.00 |
| 403-01 |
aggregate roadway surfacing (vehicular measurement)
|
52.0 |
CUYD |
100.00 |
5,200.00 |
110.00 |
5,720.00 |
120.00 |
6,240.00 |
100.00 |
5,200.00 |
| 502-01 |
superpave asphaltic concrete
|
48.7 |
TON |
350.00 |
17,045.00 |
225.00 |
10,957.50 |
278.00 |
13,538.60 |
300.00 |
14,610.00 |
| 701-05-G |
side drain pipe (18")
|
60   |
LNFT |
90.00 |
5,400.00 |
85.00 |
5,100.00 |
50.00 |
3,000.00 |
50.00 |
3,000.00 |
| 701-05-K |
side drain pipe (30")
|
56   |
LNFT |
150.00 |
8,400.00 |
110.00 |
6,160.00 |
75.00 |
4,200.00 |
100.00 |
5,600.00 |
| 711-01-C |
riprap (30 lb.)
|
60   |
SQYD |
100.00 |
6,000.00 |
100.00 |
6,000.00 |
100.00 |
6,000.00 |
100.00 |
6,000.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
4,000.00 |
4,000.00 |
15,000.00 |
15,000.00 |
9,000.00 |
9,000.00 |
13,000.00 |
13,000.00 |
| 716-01-A |
mulch (vegetative)
|
0.5 |
TON |
3,000.00 |
1,500.00 |
500.00 |
250.00 |
1,000.00 |
500.00 |
3,000.00 |
1,500.00 |
| 717-01 |
seeding
|
12   |
LB |
25.00 |
300.00 |
20.00 |
240.00 |
50.00 |
600.00 |
50.00 |
600.00 |
| 718-01 |
fertilizer
|
250   |
LB |
2.00 |
500.00 |
3.00 |
750.00 |
3.00 |
750.00 |
3.00 |
750.00 |
| 726-01 |
bedding material
|
283.2 |
CUYD |
125.00 |
35,400.00 |
80.00 |
22,656.00 |
110.00 |
31,152.00 |
100.00 |
28,320.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
90,000.00 |
90,000.00 |
35,000.00 |
35,000.00 |
47,000.00 |
47,000.00 |
100,000.00 |
100,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
8   |
EACH |
100.00 |
800.00 |
125.00 |
1,000.00 |
90.00 |
720.00 |
100.00 |
800.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
3,500.00 |
3,500.00 |
30,000.00 |
30,000.00 |
5,000.00 |
5,000.00 |
13,000.00 |
13,000.00 |
| 805-01-B |
class a concrete (box culvert headwalls)
|
97.47 |
CUYD |
1,200.00 |
116,964.00 |
1,025.00 |
99,906.75 |
1,280.00 |
124,761.60 |
1,400.00 |
136,458.00 |
| 805-12-M |
reinforced concrete box culverts (6'x 6')
|
152.0 |
LNFT |
525.00 |
79,800.00 |
575.00 |
87,400.00 |
675.00 |
102,600.00 |
700.00 |
106,400.00 |
| 805-12-S |
reinforced concrete box culverts (8'x 8')
|
152.0 |
LNFT |
710.00 |
107,920.00 |
750.00 |
114,000.00 |
810.00 |
123,120.00 |
950.00 |
144,400.00 |
| 806-01 |
deformed reinforcing steel
|
7,247   |
LB |
3.00 |
21,741.00 |
2.25 |
16,305.75 |
1.85 |
13,406.95 |
2.00 |
14,494.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
537,786.90 |
|
538,217.00 |
|
543,731.15 |
|
647,832.50 |
|