| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - JAMES CONSTRUCTION GROUP LLC |
- 2 - BLOUNT BROS. CONSTRUCTION, INC. |
- 3 - GUINN BROTHERS, LLC. |
- 4 - GILCHRIST CONSTRUCTION CO. LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
LUMP |
40,000.00 |
40,000.00 |
30,000.00 |
30,000.00 |
5,000.00 |
5,000.00 |
75,000.00 |
75,000.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
4,600.00 |
4,600.00 |
30,000.00 |
30,000.00 |
10,000.00 |
10,000.00 |
5,000.00 |
5,000.00 |
| 202-02-A-01 |
removal of bridge(sta 15+00- 31.25 ft. x
114 ft.concrete bridge) |
1   |
EACH |
1.00 |
1.00 |
35,000.00 |
35,000.00 |
15,000.00 |
15,000.00 |
5,000.00 |
5,000.00 |
| 202-02-I |
removal of surfacing
|
1,739.5 |
SQYD |
4.70 |
8,175.65 |
8.00 |
13,916.00 |
5.00 |
8,697.50 |
6.00 |
10,437.00 |
| 203-05 |
excavation and embankment
|
lump |
LUMP |
110,000.00 |
110,000.00 |
60,000.00 |
60,000.00 |
95,000.00 |
95,000.00 |
200,000.00 |
200,000.00 |
| 204-02 |
temporary hay or straw bales
|
31   |
EACH |
21.00 |
651.00 |
20.00 |
620.00 |
10.00 |
310.00 |
16.00 |
496.00 |
| 204-03 |
temporary slope drains
|
400   |
LNFT |
12.00 |
4,800.00 |
20.00 |
8,000.00 |
1.00 |
400.00 |
32.00 |
12,800.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
12   |
EACH |
215.00 |
2,580.00 |
150.00 |
1,800.00 |
100.00 |
1,200.00 |
300.00 |
3,600.00 |
| 204-06 |
temporary silt fencing
|
1,805   |
LNFT |
2.25 |
4,061.25 |
3.00 |
5,415.00 |
3.00 |
5,415.00 |
3.00 |
5,415.00 |
| 302-01 |
class ii base course
|
1,076.7 |
CUYD |
140.00 |
150,738.00 |
80.00 |
86,136.00 |
105.00 |
113,053.50 |
85.00 |
91,519.50 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
173   |
CUYD |
12.00 |
2,076.00 |
60.00 |
10,380.00 |
110.00 |
19,030.00 |
50.00 |
8,650.00 |
| 502-01 |
superpave asphaltic concrete
|
864.4 |
TON |
175.00 |
151,270.00 |
160.00 |
138,304.00 |
200.00 |
172,880.00 |
200.00 |
172,880.00 |
| 701-01-I/K |
cross drain pipe (24" rcp/pcp or 30" cmp)
|
72   |
LNFT |
70.00 |
5,040.00 |
60.00 |
4,320.00 |
175.00 |
12,600.00 |
175.00 |
12,600.00 |
| 701-05-I-01 |
side drain pipe (24") (erosion)
|
54   |
LNFT |
65.00 |
3,510.00 |
60.00 |
3,240.00 |
127.00 |
6,858.00 |
150.00 |
8,100.00 |
| 704-03 |
blocked out guard rail
|
50.0 |
LNFT |
20.00 |
1,000.00 |
35.00 |
1,750.00 |
25.00 |
1,250.00 |
22.00 |
1,100.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
60.00 |
6,000.00 |
80.00 |
8,000.00 |
75.00 |
7,500.00 |
65.00 |
6,500.00 |
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
2,250.00 |
9,000.00 |
3,000.00 |
12,000.00 |
2,500.00 |
10,000.00 |
2,500.00 |
10,000.00 |
| 705-01 |
barbed wire fence
|
1,096   |
LNFT |
8.00 |
8,768.00 |
6.00 |
6,576.00 |
8.00 |
8,768.00 |
9.00 |
9,864.00 |
| 711-01-E |
riprap (130lb., 24" thick)
|
1,476   |
SQYD |
85.00 |
125,460.00 |
100.00 |
147,600.00 |
145.00 |
214,020.00 |
130.00 |
191,880.00 |
| 711-04 |
geotextile fabric
|
1,476   |
SQYD |
3.60 |
5,313.60 |
3.00 |
4,428.00 |
6.00 |
8,856.00 |
2.00 |
2,952.00 |
| 712-04 |
flexible revetment
|
15   |
SQYD |
60.00 |
900.00 |
100.00 |
1,500.00 |
125.00 |
1,875.00 |
130.00 |
1,950.00 |
| 713-01 |
temporary signs and barricades
|
lump |
LUMP |
10,000.00 |
10,000.00 |
35,000.00 |
35,000.00 |
15,000.00 |
15,000.00 |
32,000.00 |
32,000.00 |
| 716-01-A |
mulch (vegetative)
|
1.6 |
TON |
1,200.00 |
1,920.00 |
2,000.00 |
3,200.00 |
2,500.00 |
4,000.00 |
1,400.00 |
2,240.00 |
| 717-01 |
seeding
|
35   |
LB |
20.00 |
700.00 |
10.00 |
350.00 |
15.00 |
525.00 |
22.00 |
770.00 |
| 718-01 |
fertilizer
|
770   |
LB |
1.00 |
770.00 |
1.00 |
770.00 |
1.00 |
770.00 |
1.10 |
847.00 |
| 726-01 |
bedding material
|
7.5 |
CUYD |
80.00 |
600.00 |
80.00 |
600.00 |
150.00 |
1,125.00 |
90.00 |
675.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
230,000.00 |
230,000.00 |
150,000.00 |
150,000.00 |
245,000.00 |
245,000.00 |
250,000.00 |
250,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
2   |
EACH |
70.00 |
140.00 |
100.00 |
200.00 |
100.00 |
200.00 |
85.00 |
170.00 |
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
75.00 |
300.00 |
120.00 |
480.00 |
100.00 |
400.00 |
90.00 |
360.00 |
| 729-19-A |
dead end road installations(type a)
|
2   |
EACH |
1,250.00 |
2,500.00 |
2,500.00 |
5,000.00 |
1,500.00 |
3,000.00 |
1,500.00 |
3,000.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
55,000.00 |
55,000.00 |
60,000.00 |
60,000.00 |
55,000.00 |
55,000.00 |
75,000.00 |
75,000.00 |
| 804-01-D |
precast concrete piles (18")
|
3,159   |
LNFT |
90.00 |
284,310.00 |
120.00 |
379,080.00 |
85.00 |
268,515.00 |
80.00 |
252,720.00 |
| 804-12 |
loading permanent piles
|
1   |
EACH |
10,000.00 |
10,000.00 |
5,000.00 |
5,000.00 |
1.00 |
1.00 |
5,000.00 |
5,000.00 |
| 805-01-F |
class a concrete (bents)
|
171.32 |
CUYD |
1,000.00 |
171,320.00 |
800.00 |
137,056.00 |
1,050.00 |
179,886.00 |
800.00 |
137,056.00 |
| 805-03 |
class aa concrete
|
498.93 |
CUYD |
720.00 |
359,229.60 |
800.00 |
399,144.00 |
800.00 |
399,144.00 |
1,000.00 |
498,930.00 |
| 805-08-B |
precast-prestressed concrete girder (type ii)
|
2,227.5 |
LNFT |
85.00 |
189,337.50 |
100.00 |
222,750.00 |
145.00 |
322,987.50 |
85.00 |
189,337.50 |
| 806-01 |
deformed reinforcing steel
|
174,605   |
LB |
1.35 |
235,716.75 |
2.00 |
349,210.00 |
1.45 |
253,177.25 |
1.25 |
218,256.25 |
| 807-08 |
structural metalwork
|
lump |
LUMP |
18,000.00 |
18,000.00 |
25,000.00 |
25,000.00 |
22,500.00 |
22,500.00 |
16,000.00 |
16,000.00 |
| 810-01 |
concrete railing (barrier)
|
964.00 |
LNFT |
61.00 |
58,804.00 |
150.00 |
144,600.00 |
75.00 |
72,300.00 |
100.00 |
96,400.00 |
| 813-01 |
concrete approach slabs
|
177.78 |
SQYD |
200.00 |
35,556.00 |
200.00 |
35,556.00 |
225.00 |
40,000.50 |
260.00 |
46,222.80 |
| S-101 |
vibration monitoring
|
lump |
LUMP |
9,000.00 |
9,000.00 |
20,000.00 |
20,000.00 |
15,000.00 |
15,000.00 |
2,500.00 |
2,500.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,317,148.35 |
|
2,581,981.00 |
|
2,616,244.25 |
|
2,663,228.05 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - T. L. WALLACE CONSTRUCTION, INC. |
- 6 - AUSTIN BRIDGE & ROAD, LP |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
LUMP |
320,000.00 |
320,000.00 |
100,000.00 |
100,000.00 |
|
|
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
6,500.00 |
6,500.00 |
5,000.00 |
5,000.00 |
|
|
|
|
| 202-02-A-01 |
removal of bridge(sta 15+00- 31.25 ft. x
114 ft.concrete bridge) |
1   |
EACH |
40,000.00 |
40,000.00 |
25,000.00 |
25,000.00 |
|
|
|
|
| 202-02-I |
removal of surfacing
|
1,739.5 |
SQYD |
4.00 |
6,958.00 |
10.00 |
17,395.00 |
|
|
|
|
| 203-05 |
excavation and embankment
|
lump |
LUMP |
100,000.00 |
100,000.00 |
100,000.00 |
100,000.00 |
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
31   |
EACH |
18.75 |
581.25 |
25.00 |
775.00 |
|
|
|
|
| 204-03 |
temporary slope drains
|
400   |
LNFT |
37.50 |
15,000.00 |
35.00 |
14,000.00 |
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
12   |
EACH |
243.75 |
2,925.00 |
300.00 |
3,600.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
1,805   |
LNFT |
2.50 |
4,512.50 |
8.00 |
14,440.00 |
|
|
|
|
| 302-01 |
class ii base course
|
1,076.7 |
CUYD |
137.50 |
148,046.25 |
38.00 |
40,914.60 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
173   |
CUYD |
75.00 |
12,975.00 |
38.00 |
6,574.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
864.4 |
TON |
218.75 |
189,087.50 |
180.00 |
155,592.00 |
|
|
|
|
| 701-01-I/K |
cross drain pipe (24" rcp/pcp or 30" cmp)
|
72   |
LNFT |
87.50 |
6,300.00 |
200.00 |
14,400.00 |
|
|
|
|
| 701-05-I-01 |
side drain pipe (24") (erosion)
|
54   |
LNFT |
81.25 |
4,387.50 |
150.00 |
8,100.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
50.0 |
LNFT |
25.00 |
1,250.00 |
20.00 |
1,000.00 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
75.00 |
7,500.00 |
60.00 |
6,000.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
2,800.00 |
11,200.00 |
2,250.00 |
9,000.00 |
|
|
|
|
| 705-01 |
barbed wire fence
|
1,096   |
LNFT |
10.00 |
10,960.00 |
7.00 |
7,672.00 |
|
|
|
|
| 711-01-E |
riprap (130lb., 24" thick)
|
1,476   |
SQYD |
107.50 |
158,670.00 |
80.00 |
118,080.00 |
|
|
|
|
| 711-04 |
geotextile fabric
|
1,476   |
SQYD |
3.00 |
4,428.00 |
2.50 |
3,690.00 |
|
|
|
|
| 712-04 |
flexible revetment
|
15   |
SQYD |
125.00 |
1,875.00 |
115.00 |
1,725.00 |
|
|
|
|
| 713-01 |
temporary signs and barricades
|
lump |
LUMP |
17,000.00 |
17,000.00 |
14,000.00 |
14,000.00 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
1.6 |
TON |
1,500.00 |
2,400.00 |
400.00 |
640.00 |
|
|
|
|
| 717-01 |
seeding
|
35   |
LB |
25.00 |
875.00 |
7.00 |
245.00 |
|
|
|
|
| 718-01 |
fertilizer
|
770   |
LB |
1.25 |
962.50 |
0.50 |
385.00 |
|
|
|
|
| 726-01 |
bedding material
|
7.5 |
CUYD |
125.00 |
937.50 |
200.00 |
1,500.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
250,000.00 |
250,000.00 |
299,000.00 |
299,000.00 |
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
2   |
EACH |
87.50 |
175.00 |
70.00 |
140.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
94.00 |
376.00 |
75.00 |
300.00 |
|
|
|
|
| 729-19-A |
dead end road installations(type a)
|
2   |
EACH |
1,560.00 |
3,120.00 |
1,250.00 |
2,500.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
60,000.00 |
60,000.00 |
180,000.00 |
180,000.00 |
|
|
|
|
| 804-01-D |
precast concrete piles (18")
|
3,159   |
LNFT |
62.00 |
195,858.00 |
90.00 |
284,310.00 |
|
|
|
|
| 804-12 |
loading permanent piles
|
1   |
EACH |
30,000.00 |
30,000.00 |
22,000.00 |
22,000.00 |
|
|
|
|
| 805-01-F |
class a concrete (bents)
|
171.32 |
CUYD |
800.00 |
137,056.00 |
1,180.00 |
202,157.60 |
|
|
|
|
| 805-03 |
class aa concrete
|
498.93 |
CUYD |
875.00 |
436,563.75 |
900.00 |
449,037.00 |
|
|
|
|
| 805-08-B |
precast-prestressed concrete girder (type ii)
|
2,227.5 |
LNFT |
100.00 |
222,750.00 |
120.00 |
267,300.00 |
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
174,605   |
LB |
1.58 |
275,875.90 |
2.81 |
490,640.05 |
|
|
|
|
| 807-08 |
structural metalwork
|
lump |
LUMP |
21,000.00 |
21,000.00 |
16,000.00 |
16,000.00 |
|
|
|
|
| 810-01 |
concrete railing (barrier)
|
964.00 |
LNFT |
70.00 |
67,480.00 |
65.00 |
62,660.00 |
|
|
|
|
| 813-01 |
concrete approach slabs
|
177.78 |
SQYD |
232.00 |
41,244.96 |
180.00 |
32,000.40 |
|
|
|
|
| S-101 |
vibration monitoring
|
lump |
LUMP |
10,000.00 |
10,000.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,826,830.61 |
|
2,997,772.65 |
|
|
|
|
|