| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
2,359   |
LNFT |
6.50 |
15,333.50 |
|
|
|
|
|
|
| 202-02-I |
removal of asphalt
|
416.0 |
SQYD |
40.00 |
16,640.00 |
|
|
|
|
|
|
| 202-02-J |
removal of pcc pavement
|
258.9 |
SQYD |
25.00 |
6,472.50 |
|
|
|
|
|
|
| 203-07 |
borrow (vehicular measurement)
|
3,150   |
CUYD |
25.00 |
78,750.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
2,247.8 |
TON |
155.00 |
348,409.00 |
|
|
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
984.3 |
TON |
265.00 |
260,839.50 |
|
|
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
21,185   |
SQYD |
4.00 |
84,740.00 |
|
|
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 883   |
CUYD |
1.00 |
- 883.00 |
|
|
|
|
|
|
| 510-01-A |
pavement patching (6" minimum thickness)
|
100   |
SQYD |
100.00 |
10,000.00 |
|
|
|
|
|
|
| 602-02-A |
cleaning and resealing existing longitudinal pavement
joints |
90,953   |
LNFT |
1.75 |
159,167.75 |
|
|
|
|
|
|
| 602-02-B |
cleaning and resealing existing transverse pavement
joints |
42,898   |
LNFT |
2.00 |
85,796.00 |
|
|
|
|
|
|
| 602-03 |
cleaning and sealing cracks
|
300   |
LNFT |
3.50 |
1,050.00 |
|
|
|
|
|
|
| 602-05-M-03 |
full depth patching of jointed concrete pavement
|
1,421.6 |
SQYD |
185.00 |
262,996.00 |
|
|
|
|
|
|
| 704-01-C |
guard rail (double thrie beam)(3'-1 1/2" post spacing)
|
262.5 |
LNFT |
75.00 |
19,687.50 |
|
|
|
|
|
|
| 704-03 |
blocked out guard rail
|
1,606.4 |
LNFT |
20.00 |
32,128.00 |
|
|
|
|
|
|
| 704-06-A |
guard rail anchor sections (trailing end)(single thrie
beam) |
37.5 |
LNFT |
100.00 |
3,750.00 |
|
|
|
|
|
|
| 704-07-A |
guard rail bridge attachments (single thrie beam)
|
100.0 |
LNFT |
80.00 |
8,000.00 |
|
|
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
200.0 |
LNFT |
75.00 |
15,000.00 |
|
|
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
14   |
EACH |
3,200.00 |
44,800.00 |
|
|
|
|
|
|
| 707-01 |
concrete curb
|
80.0 |
LNFT |
80.00 |
6,400.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
210,000.00 |
210,000.00 |
|
|
|
|
|
|
| 713-02-A |
temporary pavement markings (4" width)
|
1,000   |
LNFT |
1.00 |
1,000.00 |
|
|
|
|
|
|
| 717-01 |
seeding
|
162   |
LB |
9.50 |
1,539.00 |
|
|
|
|
|
|
| 718-01 |
fertilizer
|
5,390   |
LB |
0.40 |
2,156.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
210,000.00 |
210,000.00 |
|
|
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
26   |
EACH |
50.00 |
1,300.00 |
|
|
|
|
|
|
| 731-01 |
nonreflectorized raised pavement markers
|
500   |
EACH |
14.00 |
7,000.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
2,800   |
EACH |
5.00 |
14,000.00 |
|
|
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
60   |
LNFT |
0.80 |
48.00 |
|
|
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
2,314   |
LNFT |
3.00 |
6,942.00 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
17.636 |
MILE |
2,500.00 |
44,090.00 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
9.313 |
MILE |
750.00 |
6,984.75 |
|
|
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
2   |
EACH |
200.00 |
400.00 |
|
|
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
2   |
EACH |
200.00 |
400.00 |
|
|
|
|
|
|
| 732-05 |
removal of existing markings
|
26.949 |
MILE |
4,500.00 |
121,270.50 |
|
|
|
|
|
|
| 736-09 |
loop detector
|
470   |
LNFT |
15.00 |
7,050.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
34,000.00 |
34,000.00 |
|
|
|
|
|
|
| S-001 |
rumble strips (ground-in)
|
10.6 |
MILE |
1,200.00 |
12,720.00 |
|
|
|
|
|
|
| S-002 |
dynamic message sign unit
|
2   |
EACH |
20,000.00 |
40,000.00 |
|
|
|
|
|
|
| S-003 |
straightening existing signs
|
10   |
EACH |
10.00 |
100.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | ITEM TOTAL (CONSTRUCTION BID) |
|
|
|
2,180,077.00 |
|
|
|
|
|
|
| | NUMBER OF DAYS BID AT $15,000 PER DAY. |
|
|
|
3,600,000.00 |
|
|
|
|
|
|
| | TOTAL BID |
|
|
|
5,780,077.00 |
|
|
|
|
|
|
|