Letting of 7/30/2008 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 450-38-0022
Parish: ST CHARLES
Routes: I-310
Description: S. END MISS. RIVER BR. - US 90
Type Const: cold planing asphaltic concrete, pavement patching, superpave asphaltic concrete
pavement, and related work.
Estimated Construction Cost: $1,938,898.85
Maximum Number of Days Allowed for Construction: 240
Calculated Daily User Cost: $15,000.00
 
RankLicenseBidderConstruction Bid Bidder's Proposed
Contract Time
Total Bid
1 06276 BARRIERE CONSTRUCTION CO., LLC $2,180,077.00 240 $5,780,077.00
 
Item Number Item Description Quantity Unit of Measure - 1 -
BARRIERE CONSTRUCTION CO., LLC

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-H removal of guard rail 2,359      LNFT 6.50 15,333.50            
202-02-I removal of asphalt 416.0    SQYD 40.00 16,640.00            
202-02-J removal of pcc pavement 258.9    SQYD 25.00 6,472.50            
203-07 borrow (vehicular measurement) 3,150      CUYD 25.00 78,750.00            
502-01 superpave asphaltic concrete 2,247.8    TON 155.00 348,409.00            
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
984.3    TON 265.00 260,839.50            
509-01 cold planing asphaltic pavement 21,185      SQYD 4.00 84,740.00            
509-02 contractor retained reclaimed asphaltic pavement - 883      CUYD 1.00 - 883.00            
510-01-A pavement patching (6" minimum thickness) 100      SQYD 100.00 10,000.00            
602-02-A cleaning and resealing existing longitudinal pavement
joints
90,953      LNFT 1.75 159,167.75            
602-02-B cleaning and resealing existing transverse pavement
joints
42,898      LNFT 2.00 85,796.00            
602-03 cleaning and sealing cracks 300      LNFT 3.50 1,050.00            
602-05-M-03 full depth patching of jointed concrete pavement 1,421.6    SQYD 185.00 262,996.00            
704-01-C guard rail (double thrie beam)(3'-1 1/2" post spacing) 262.5    LNFT 75.00 19,687.50            
704-03 blocked out guard rail 1,606.4    LNFT 20.00 32,128.00            
704-06-A guard rail anchor sections (trailing end)(single thrie
beam)
37.5    LNFT 100.00 3,750.00            
704-07-A guard rail bridge attachments (single thrie beam) 100.0    LNFT 80.00 8,000.00            
704-08-B guard rail transitions (double thrie beam) 200.0    LNFT 75.00 15,000.00            
704-11-A guard rail end treatment (flared) 14      EACH 3,200.00 44,800.00            
707-01 concrete curb 80.0    LNFT 80.00 6,400.00            
713-01 temporary signs & barricades lump      LUMP 210,000.00 210,000.00            
713-02-A temporary pavement markings (4" width) 1,000      LNFT 1.00 1,000.00            
717-01 seeding 162      LB 9.50 1,539.00            
718-01 fertilizer 5,390      LB 0.40 2,156.00            
727-01 mobilization lump      LUMP 210,000.00 210,000.00            
729-16-C object marker assembly (type 3) 26      EACH 50.00 1,300.00            
731-01 nonreflectorized raised pavement markers 500      EACH 14.00 7,000.00            
731-02 reflectorized raised pavement markers 2,800      EACH 5.00 14,000.00            
732-01-C plastic pavement striping (8" width) 60      LNFT 0.80 48.00            
732-01-E plastic pavement striping (24" width) 2,314      LNFT 3.00 6,942.00            
732-02-A plastic pavement striping (solid line) (4" width) 17.636  MILE 2,500.00 44,090.00            
732-03-A plastic pavement striping (broken line)(4" width) 9.313  MILE 750.00 6,984.75            
732-04-A plastic pavement legends & symbols (arrow) 2      EACH 200.00 400.00            
732-04-C plastic pavement legends & symbols (only) 2      EACH 200.00 400.00            
732-05 removal of existing markings 26.949  MILE 4,500.00 121,270.50            
736-09 loop detector 470      LNFT 15.00 7,050.00            
740-01 construction layout lump      LUMP 34,000.00 34,000.00            
S-001 rumble strips (ground-in) 10.6    MILE 1,200.00 12,720.00            
S-002 dynamic message sign unit 2      EACH 20,000.00 40,000.00            
S-003 straightening existing signs 10      EACH 10.00 100.00            
                       
 ITEM TOTAL (CONSTRUCTION BID)       2,180,077.00            
 NUMBER OF DAYS BID AT $15,000 PER DAY.       3,600,000.00            
 TOTAL BID       5,780,077.00            