Lead Project: 380-02-0010
Parish: ST LANDRY
Routes: LA 363, LA 103
Description: PARISH WIDE ASPHALTIC SURFACE TREATMENT (CM)
Type Const: asphaltic surface treatment
Estimated Construction Cost: $611,073.00
 
RankLicenseBidderConstruction Bid
1 35378 P.R. PARKER COMPANY INC $503,235.48
2 14422 T. L. WALLACE CONSTRUCTION, INC. $575,700.45
3 01552 W. R. CORE, LLC. $634,669.05
 
Item Number Item Description Quantity Unit of Measure - 1 -
P.R. PARKER COMPANY INC
- 2 -
T. L. WALLACE CONSTRUCTION, INC.
- 3 -
W. R. CORE, LLC.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
507-01 asphaltic material 77,571      GAL 3.38 262,189.98 4.05 314,162.55 3.90 302,526.90    
507-02-B aggregate (s2) 114,075      SQYD 0.65 74,148.75 0.98 111,793.50 1.25 142,593.75    
507-02-C aggregate (s3) 114,075      SQYD 0.52 59,319.00 0.75 85,556.25 1.10 125,482.50    
713-01 temporary signs & barricades lump      LUMP 15,400.00 15,400.00 5,300.00 5,300.00 5,500.00 5,500.00    
713-06-A temporary reflectorized raised pavement markers (tabs) 2,237      EACH 1.80 4,026.60 1.00 2,237.00 1.75 3,914.75    
727-01 mobilization lump      LUMP 50,300.00 50,300.00 17,000.00 17,000.00 15,000.00 15,000.00    
731-02 reflectorized raised pavement markers 1,125      EACH 4.75 5,343.75 4.75 5,343.75 4.75 5,343.75    
732-01-C-03 plastic pavement striping (8" width) hot appl thermo
(40 mil thickness)
45      LNFT 1.00 45.00 1.00 45.00 1.00 45.00    
732-02-A-03 plast pvmt striping(solid line)(4" width)hot appl
thermo (40mil thickness)
23.410  MILE 1,200.00 28,092.00 1,200.00 28,092.00 1,200.00 28,092.00    
732-03-A-03 plastic pvmt striping(broken line)(4" width) hot appl
thermo (40 mil thick)
6.284  MILE 600.00 3,770.40 600.00 3,770.40 600.00 3,770.40    
732-04-D-03 plastic pvmt legends & symbols (rr crossing)hot appl
thermo (40 mil thick)
1      EACH 400.00 400.00 400.00 400.00 400.00 400.00    
740-01 construction layout lump      LUMP 200.00 200.00 2,000.00 2,000.00 2,000.00 2,000.00    
                       
 CONTRACTOR TOTAL       503,235.48   575,700.45   634,669.05    