Letting of 7/30/2008 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 207-09-0011
Parish: ST LANDRY
Routes: LA 35
Description: DRAINAGE CANAL BRIDGES ON LA 35
Type Const: grading, drainage structures, cold planing acp, class ii base course, lime trmt,
superpave acp and related work.
Estimated Construction Cost: $1,492,462.10
 
RankLicenseBidderConstruction Bid
1 04089 H & S CONSTRUCTION CO., INC. $1,242,149.00
2 09090 GUINN BROTHERS, LLC. $1,430,288.45
3 12312 GILCHRIST CONSTRUCTION CO. LLC $1,595,120.30
4 00060 F. MILLER CONSTRUCTION LLC $1,806,615.10
 35436 GULF STATES CONSTRUCTORS, L.L.C. IRREGULAR
 
Item Number Item Description Quantity Unit of Measure - 1 -
H & S CONSTRUCTION CO., INC.
- 2 -
GUINN BROTHERS, LLC.
- 3 -
GILCHRIST CONSTRUCTION CO. LLC
- 4 -
F. MILLER CONSTRUCTION LLC
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 25,000.00 25,000.00 37,000.00 37,000.00 45,000.00 45,000.00 100,000.00 100,000.00
202-01 removal of structures & obstructions lump      LUMP 4,500.00 4,500.00 5,000.00 5,000.00 5,000.00 5,000.00 25,000.00 25,000.00
202-02-A-01 removal of bridges (sta.115+99, 24'x 39.3'croesote
timber, site 1)
1      EACH 9,000.00 9,000.00 8,000.00 8,000.00 10,000.00 10,000.00 21,000.00 21,000.00
202-02-A-02 removal of bridges (sta.114+14, 20.6'x 39.5'croesote
timber, site 2)
1      EACH 9,000.00 9,000.00 8,000.00 8,000.00 10,000.00 10,000.00 19,100.00 19,100.00
202-02-G removal of surfacing & stabilized base 792.9    SQYD 13.50 10,704.15 8.00 6,343.20 7.00 5,550.30 19.00 15,065.10
202-02-H removal of guard rail 613      LNFT 3.00 1,839.00 5.00 3,065.00 15.00 9,195.00 6.00 3,678.00
203-01 general excavation 3,461      CUYD 8.00 27,688.00 10.00 34,610.00 8.50 29,418.50 12.00 41,532.00
203-02 drainage excavation 12,117      CUYD 11.00 133,287.00 8.00 96,936.00 10.00 121,170.00 12.00 145,404.00
203-03 embankment 3,388      CUYD 8.50 28,798.00 16.00 54,208.00 10.00 33,880.00 30.00 101,640.00
204-05-A temporary sediment check dams (hay) 12      EACH 135.00 1,620.00 100.00 1,200.00 300.00 3,600.00 130.00 1,560.00
204-06 temporary silt fencing 98      LNFT 4.50 441.00 10.00 980.00 5.00 490.00 4.10 401.80
302-02-C-01 class ii base course (8" thick) (crushed stone or
recycled pccp)
1,421.7    SQYD 40.00 56,868.00 40.00 56,868.00 33.00 46,916.10 26.00 36,964.20
304-01 lime 20.12   TON 198.00 3,983.76 300.00 6,036.00 250.00 5,030.00 260.00 5,231.20
304-04-D lime treatment (type d) (12" thick) 1,420      SQYD 7.00 9,940.00 10.00 14,200.00 8.00 11,360.00 2.62 3,720.40
401-01 aggregate surface course (net section) 257.0    CUYD 65.00 16,705.00 85.00 21,845.00 100.00 25,700.00 106.00 27,242.00
502-01 superpave asphaltic concrete 599.2    TON 130.00 77,896.00 250.00 149,800.00 160.00 95,872.00 320.00 191,744.00
509-01 cold planing asphaltic pavement 1,199      SQYD 14.50 17,385.50 17.00 20,383.00 10.00 11,990.00 4.60 5,515.40
510-02 pavement widening 455.6    SQYD 110.00 50,116.00 85.00 38,726.00 150.00 68,340.00 215.00 97,954.00
701-05-G side drain pipe (18") 34      LNFT 55.00 1,870.00 90.00 3,060.00 125.00 4,250.00 99.00 3,366.00
701-05-I side drain pipe (24") 64      LNFT 65.00 4,160.00 95.00 6,080.00 135.00 8,640.00 103.00 6,592.00
701-05-K side drain pipe (30") 100      LNFT 82.00 8,200.00 115.00 11,500.00 155.00 15,500.00 116.00 11,600.00
705-01 barbed wire fence 1,004      LNFT 8.80 8,835.20 8.00 8,032.00 10.00 10,040.00 8.75 8,785.00
708-01 right-of-way monument 21      EACH 210.00 4,410.00 125.00 2,625.00 300.00 6,300.00 475.00 9,975.00
708-02 right-of-way monument witness post 21      EACH 220.00 4,620.00 125.00 2,625.00 300.00 6,300.00 300.00 6,300.00
713-01 temporary signs & barricades lump      LUMP 28,000.00 28,000.00 15,000.00 15,000.00 20,000.00 20,000.00 16,000.00 16,000.00
716-01-B mulch (fiber) 1.9    TON 1,210.00 2,299.00 4,000.00 7,600.00 1,300.00 2,470.00 600.00 1,140.00
717-01 seeding 57      LB 13.50 769.50 15.00 855.00 14.00 798.00 9.50 541.50
718-01 fertilizer 1,900      LB 1.10 2,090.00 1.00 1,900.00 1.20 2,280.00 0.60 1,140.00
722-01 project site laboratory 1      EACH 3,250.00 3,250.00 15,000.00 15,000.00 30,000.00 30,000.00 1,000.00 1,000.00
726-01 bedding material 104.3    CUYD 162.00 16,896.60 100.00 10,430.00 100.00 10,430.00 150.00 15,645.00
727-01 mobilization lump      LUMP 50,000.00 50,000.00 125,000.00 125,000.00 150,000.00 150,000.00 180,000.00 180,000.00
729-16-B object marker assembly (type 2) 8      EACH 75.00 600.00 125.00 1,000.00 90.00 720.00 65.00 520.00
731-02 reflectorized raised pavement markers 26      EACH 5.61 145.86 25.00 650.00 11.00 286.00 120.00 3,120.00
732-02-A plastic pavement striping (solid line) (4" width) 0.356  MILE 5,830.00 2,075.48 7,500.00 2,670.00 5,500.00 1,958.00 6,500.00 2,314.00
732-03-A plastic pavement striping (broken line)(4" width) 0.178  MILE 1,650.00 293.70 3,000.00 534.00 1,600.00 284.80 1,800.00 320.40
740-01 construction layout lump      LUMP 6,500.00 6,500.00 10,000.00 10,000.00 24,000.00 24,000.00 5,700.00 5,700.00
805-01-B class a concrete (box culvert headwalls) 102.80   CUYD 1,650.00 169,620.00 1,500.00 154,200.00 2,000.00 205,600.00 900.00 92,520.00
805-12-S-01 reinforced concrete box culverts (8'x 8') precast 237.6    LNFT 650.00 154,440.00 750.00 178,200.00 1,000.00 237,600.00 920.00 218,592.00
805-12-U-01 reinforced concrete box culverts (10'x 8') precast 291.0    LNFT 925.00 269,175.00 1,000.00 291,000.00 1,050.00 305,550.00 1,240.00 360,840.00
806-01 deformed reinforcing steel 8,501      LB 2.25 19,127.25 2.25 19,127.25 1.60 13,601.60 2.10 17,852.10
                       
 CONTRACTOR TOTAL       1,242,149.00   1,430,288.45   1,595,120.30   1,806,615.10
 
Item Number Item Description Quantity Unit of Measure
GULF STATES CONSTRUCTORS, L.L.C.

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 37,500.00 37,500.00            
202-01 removal of structures & obstructions lump      LUMP 18,750.00 18,750.00            
202-02-A-01 removal of bridges (sta.115+99, 24'x 39.3'croesote
timber, site 1)
1      EACH 9,360.00 9,360.00            
202-02-A-02 removal of bridges (sta.114+14, 20.6'x 39.5'croesote
timber, site 2)
1      EACH 8,400.00 8,400.00            
202-02-G removal of surfacing & stabilized base 792.9    SQYD 5.00 3,964.50            
202-02-H removal of guard rail 613      LNFT 3.75 2,298.75            
203-01 general excavation 3,461      CUYD 5.00 17,305.00            
203-02 drainage excavation 12,117      CUYD 12.50 151,462.50            
203-03 embankment 3,388      CUYD 18.75 63,525.00            
204-05-A temporary sediment check dams (hay) 12      EACH 150.00 1,800.00            
204-06 temporary silt fencing 98      LNFT 5.63 551.74            
302-02-C-01 class ii base course (8" thick) (crushed stone or
recycled pccp)
1,421.7    SQYD 25.00 35,542.50            
304-01 lime 20.12   TON 425.00 8,551.00            
304-04-D lime treatment (type d) (12" thick) 1,420      SQYD 6.25 8,875.00            
401-01 aggregate surface course (net section) 257.0    CUYD 100.00 25,700.00            
502-01 superpave asphaltic concrete 599.2    TON 275.00 164,780.00            
509-01 cold planing asphaltic pavement 1,199      SQYD 11.25 13,488.75            
510-02 pavement widening 455.6    SQYD 93.75 42,712.50            
701-05-G side drain pipe (18") 34      LNFT 75.00 2,550.00            
701-05-I side drain pipe (24") 64      LNFT 106.25 6,800.00            
701-05-K side drain pipe (30") 100      LNFT 125.00 12,500.00            
705-01 barbed wire fence 1,004      LNFT 10.00 10,040.00            
708-01 right-of-way monument 21      EACH 375.00 7,875.00            
708-02 right-of-way monument witness post 21      EACH 156.25 3,281.25            
713-01 temporary signs & barricades lump      LUMP 17,000.00 17,000.00            
716-01-B mulch (fiber) 1.9    TON 1,375.00 2,612.50            
717-01 seeding 57      LB 15.00 855.00            
718-01 fertilizer 1,900      LB 1.25 2,375.00            
722-01 project site laboratory 1      EACH 25,000.00 25,000.00            
726-01 bedding material 104.3    CUYD 100.00 10,430.00            
727-01 mobilization lump      LUMP 289,175.00 289,175.00            
729-16-B object marker assembly (type 2) 8      EACH 100.00 800.00            
731-02 reflectorized raised pavement markers 26      EACH 125.00 3,250.00            
732-02-A plastic pavement striping (solid line) (4" width) 0.356  MILE 12,500.00 4,450.00            
732-03-A plastic pavement striping (broken line)(4" width) 0.178  MILE 1,250.00 222.50            
740-01 construction layout lump      LUMP 18,750.00 18,750.00            
805-01-B class a concrete (box culvert headwalls) 102.80   CUYD 1,250.00 128,500.00            
805-12-S-01 reinforced concrete box culverts (8'x 8') precast 237.6    LNFT 562.50 133,650.00            
805-12-U-01 reinforced concrete box culverts (10'x 8') precast 291.0    LNFT 837.50 243,712.50            
806-01 deformed reinforcing steel 8,501      LB 1.38 11,731.38            
                       
 CONTRACTOR TOTAL       IRREGULAR            

Error processing SSI file