Letting of 7/30/2008 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 065-04-0041
Parish: TERREBONNE
Routes: LA 24
Description: JOHNSON RIDGE SIDEWALK
Type Const: concrete sidewalks and related work
Estimated Construction Cost: $294,708.90
 
RankLicenseBidderConstruction Bid
1 43371 RMD HOLDINGS LTD $246,340.00
2 21982 FORBY CONTRACTING, INC. $307,870.00
3 12198 BYRON E. TALBOT CONTRACTOR, INC. $339,242.00
4 38610 THREE C'S PROPERTIES INC $359,452.30
5 47020 T.N.T. CONSTRUCTION GROUP LLC $466,390.00
 35436 GULF STATES CONSTRUCTORS, L.L.C. IRREGULAR
 
Item Number Item Description Quantity Unit of Measure - 1 -
RMD HOLDINGS LTD
- 2 -
FORBY CONTRACTING, INC.
- 3 -
BYRON E. TALBOT CONTRACTOR, INC.
- 4 -
THREE C'S PROPERTIES INC
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 26,000.00 26,000.00 5,000.00 5,000.00 22,000.00 22,000.00 6,100.00 6,100.00
202-01 removal of structures & obstructions lump      LUMP 360.00 360.00 5,000.00 5,000.00 6,000.00 6,000.00 6,700.00 6,700.00
202-03-A relocation of signs 19      EACH 120.00 2,280.00 50.00 950.00 200.00 3,800.00 53.00 1,007.00
202-03-B relocation of school caution light(sta. 109+80) 1      EACH 560.00 560.00 2,500.00 2,500.00 2,750.00 2,750.00 2,650.00 2,650.00
401-02-A aggregate surface course (adjusted vehicular
measurement)(limestone)
150      CUYD 22.00 3,300.00 60.00 9,000.00 88.00 13,200.00 65.00 9,750.00
701-10-F reinforced concrete pipe (extension)(15") 8      LNFT 255.00 2,040.00 120.00 960.00 88.00 704.00 205.00 1,640.00
701-10-G reinforced concrete pipe (extension)(18") 8      LNFT 264.00 2,112.00 150.00 1,200.00 93.00 744.00 209.00 1,672.00
706-01-C concrete walk (6" thick) 2,760.0    SQYD 55.00 151,800.00 65.00 179,400.00 72.50 200,100.00 68.00 187,680.00
706-04 handicapped curb ramps 17      EACH 475.00 8,075.00 600.00 10,200.00 700.00 11,900.00 2,000.00 34,000.00
712-02 sacked concrete revetment 104      SQYD 42.00 4,368.00 200.00 20,800.00 75.00 7,800.00 205.00 21,320.00
713-01 temporary signs & barricades lump      LUMP 3,000.00 3,000.00 10,000.00 10,000.00 20,000.00 20,000.00 10,500.00 10,500.00
726-01 bedding material 20.0    CUYD 32.00 640.00 60.00 1,200.00 110.00 2,200.00 68.00 1,360.00
727-01 mobilization lump      LUMP 20,000.00 20,000.00 25,000.00 25,000.00 30,000.00 30,000.00 6,300.00 6,300.00
732-01-D plastic pavement striping (12" width) 620      LNFT 4.75 2,945.00 4.00 2,480.00 5.50 3,410.00 21.20 13,144.00
735-01 mailboxes 3      EACH 100.00 300.00 70.00 210.00 45.00 135.00 1.10 3.30
735-02 mailbox supports (single) 3      EACH 100.00 300.00 30.00 90.00 65.00 195.00 170.00 510.00
740-01 construction layout lump      LUMP 4,000.00 4,000.00 2,500.00 2,500.00 3,200.00 3,200.00 38,000.00 38,000.00
S-001 handrail 200      LNFT 69.00 13,800.00 150.00 30,000.00 50.00 10,000.00 75.00 15,000.00
S-002 sawcutting 184      LNFT 2.50 460.00 7.50 1,380.00 6.00 1,104.00 11.50 2,116.00
                       
 CONTRACTOR TOTAL       246,340.00   307,870.00   339,242.00   359,452.30
 
Item Number Item Description Quantity Unit of Measure - 5 -
T.N.T. CONSTRUCTION GROUP LLC

GULF STATES CONSTRUCTORS, L.L.C.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 105,100.00 105,100.00 18,000.00 18,000.00        
202-01 removal of structures & obstructions lump      LUMP 6,500.00 6,500.00 12,000.00 12,000.00        
202-03-A relocation of signs 19      EACH 150.00 2,850.00 60.00 1,140.00        
202-03-B relocation of school caution light(sta. 109+80) 1      EACH 2,875.00 2,875.00 3,240.00 3,240.00        
401-02-A aggregate surface course (adjusted vehicular
measurement)(limestone)
150      CUYD 45.00 6,750.00 96.00 14,400.00        
701-10-F reinforced concrete pipe (extension)(15") 8      LNFT 545.00 4,360.00 114.00 912.00        
701-10-G reinforced concrete pipe (extension)(18") 8      LNFT 550.00 4,400.00 144.00 1,152.00        
706-01-C concrete walk (6" thick) 2,760.0    SQYD 81.25 224,250.00 84.00 231,840.00        
706-04 handicapped curb ramps 17      EACH 850.00 14,450.00 3,600.00 61,200.00        
712-02 sacked concrete revetment 104      SQYD 86.25 8,970.00 60.00 6,240.00        
713-01 temporary signs & barricades lump      LUMP 17,400.00 17,400.00 9,600.00 9,600.00        
726-01 bedding material 20.0    CUYD 137.00 2,740.00 96.00 1,920.00        
727-01 mobilization lump      LUMP 30,725.00 30,725.00 72,000.00 72,000.00        
732-01-D plastic pavement striping (12" width) 620      LNFT 4.60 2,852.00 25.20 15,624.00        
735-01 mailboxes 3      EACH 50.00 150.00 192.00 576.00        
735-02 mailbox supports (single) 3      EACH 150.00 450.00 120.00 360.00        
740-01 construction layout lump      LUMP 4,000.00 4,000.00 7,200.00 7,200.00        
S-001 handrail 200      LNFT 136.00 27,200.00 138.00 27,600.00        
S-002 sawcutting 184      LNFT 2.00 368.00 12.00 2,208.00        
                       
 CONTRACTOR TOTAL       466,390.00   IRREGULAR        