Letting of 7/30/2008 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 052-05-0048
Parish: AVOYELLES
Routes: LA 114
Description: BAYOU DESGLAISES CHANNEL BRIDGE
Type Const: grading, drainage structures, class ii base course, superpave ashphaltic concrete
pavement, portland cement concrete pavement, precast girder span bridge & related work
Estimated Construction Cost: $1,894,410.95
Maximum Number of Days Allowed for Construction: 140
Calculated Daily User Cost: $1,000.00
 
RankLicenseBidderConstruction Bid Bidder's Proposed
Contract Time
Total Bid
1 12312 GILCHRIST CONSTRUCTION CO. LLC $1,842,900.75 140 $1,982,900.75
2 34567 JAMES CONSTRUCTION GROUP LLC $1,873,737.40 140 $2,013,737.40
3 00060 F. MILLER CONSTRUCTION LLC $2,363,290.65 140 $2,503,290.65
 35436 GULF STATES CONSTRUCTORS, L.L.C. IRREGULAR 140 IRREGULAR
 
Item Number Item Description Quantity Unit of Measure - 1 -
GILCHRIST CONSTRUCTION CO. LLC
- 2 -
JAMES CONSTRUCTION GROUP LLC
- 3 -
F. MILLER CONSTRUCTION LLC

GULF STATES CONSTRUCTORS, L.L.C.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 50,000.00 50,000.00 95,000.00 95,000.00 25,000.00 25,000.00 45,000.00 45,000.00
202-01 removal of structures & obstructions lump      LUMP 40,000.00 40,000.00 17,000.00 17,000.00 10,000.00 10,000.00 25,000.00 25,000.00
202-02-A-01 removal of bridges (station 116+49.46, 24.0' x 179.0',
comb i-beam & timber trestle)
1      EACH 100,000.00 100,000.00 35,000.00 35,000.00 100,000.00 100,000.00 42,960.00 42,960.00
202-02-D removal of concrete walks & drives 134      SQYD 15.00 2,010.00 6.25 837.50 13.00 1,742.00 25.00 3,350.00
202-02-G removal of surfacing & stabilized base 886.7    SQYD 5.50 4,876.85 8.00 7,093.60 7.00 6,206.90 5.00 4,433.50
202-02-H removal of guard rail 198      LNFT 20.00 3,960.00 9.50 1,881.00 10.00 1,980.00 12.50 2,475.00
203-05 excavation and embankment lump      LUMP 50,000.00 50,000.00 18,000.00 18,000.00 80,000.00 80,000.00 7,950.00 7,950.00
204-02 temporary hay or straw bales 8      EACH 15.00 120.00 25.00 200.00 21.00 168.00 25.00 200.00
204-05-A temporary sediment check dams (hay) 5      EACH 275.00 1,375.00 170.00 850.00 160.00 800.00 187.50 937.50
204-06 temporary silt fencing 635      LNFT 2.50 1,587.50 3.50 2,222.50 2.60 1,651.00 3.75 2,381.25
302-02-D-01 class ii base course (8 1/2" thick) (crushed stone or
recycled pccp)
942.4    SQYD 28.00 26,387.20 40.00 37,696.00 27.00 25,444.80 21.25 20,026.00
304-05 lime treatment (type e) 2.21   TON 1,200.00 2,652.00 350.00 773.50 1,200.00 2,652.00 375.00 828.75
402-01 traffic maintenance aggregate (vehicular measurement) 500.0    CUYD 35.00 17,500.00 24.00 12,000.00 100.00 50,000.00 100.00 50,000.00
502-01 superpave asphaltic concrete 197.8    TON 150.00 29,670.00 325.00 64,285.00 350.00 69,230.00 281.25 55,631.25
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
33.6    TON 300.00 10,080.00 400.00 13,440.00 410.00 13,776.00 281.25 9,450.00
701-03-G storm drain pipe (18" rcp/pcp) 145      LNFT 75.00 10,875.00 60.00 8,700.00 35.00 5,075.00 100.00 14,500.00
701-03-G-01 storm drain pipe (18" rcp/pcp)(outfall) 91      LNFT 75.00 6,825.00 60.00 5,460.00 55.00 5,005.00 100.00 9,100.00
702-03-A catch basins (cb-01) 2      EACH 3,000.00 6,000.00 1,300.00 2,600.00 3,500.00 7,000.00 3,125.00 6,250.00
704-03 blocked out guard rail 25.0    LNFT 35.00 875.00 30.00 750.00 35.00 875.00 62.50 1,562.50
704-08-B guard rail transitions (double thrie beam) 50.0    LNFT 66.00 3,300.00 65.00 3,250.00 70.00 3,500.00 81.25 4,062.50
704-11-A guard rail end treatment (flared) 2      EACH 2,300.00 4,600.00 2,100.00 4,200.00 2,200.00 4,400.00 3,125.00 6,250.00
706-01-A concrete walk (4" thick) 154.9    SQYD 60.00 9,294.00 53.00 8,209.70 60.00 9,294.00 62.50 9,681.25
706-02-C concrete drive (6" thick) 143.3    SQYD 70.00 10,031.00 69.00 9,887.70 70.00 10,031.00 75.00 10,747.50
708-01 right-of-way monument 12      EACH 250.00 3,000.00 180.00 2,160.00 500.00 6,000.00 175.00 2,100.00
708-02 right-of-way monument witness post 12      EACH 250.00 3,000.00 55.00 660.00 300.00 3,600.00 175.00 2,100.00
711-01-D riprap (55 lb, 24" thick) 2,488      SQYD 90.00 223,920.00 60.00 149,280.00 90.00 223,920.00 68.75 171,050.00
711-04 geotextile fabric 2,488      SQYD 2.50 6,220.00 4.00 9,952.00 3.00 7,464.00 5.00 12,440.00
713-01 temporary signs & barricades lump      LUMP 32,000.00 32,000.00 12,000.00 12,000.00 25,000.00 25,000.00 15,000.00 15,000.00
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
0.205  MILE 800.00 164.00 1,500.00 307.50 2,000.00 410.00 1,750.00 358.75
713-04-A temporary pavement markings (solid line)(4" width) 0.818  MILE 1,800.00 1,472.40 1,400.00 1,145.20 1,700.00 1,390.60 3,750.00 3,067.50
720-01-A erosion control system, slope protection (type a) 780      SQYD 2.25 1,755.00 1.80 1,404.00 2.30 1,794.00 2.25 1,755.00
722-01 project site laboratory 1      EACH 25,000.00 25,000.00 7,000.00 7,000.00 10,000.00 10,000.00 31,250.00 31,250.00
726-01 bedding material 86.7    CUYD 60.00 5,202.00 100.00 8,670.00 200.00 17,340.00 100.00 8,670.00
727-01 mobilization lump      LUMP 175,000.00 175,000.00 185,000.00 185,000.00 230,000.00 230,000.00 370,500.00 370,500.00
729-16-C object marker assembly (type 3) 4      EACH 80.00 320.00 75.00 300.00 80.00 320.00 93.75 375.00
731-01 nonreflectorized raised pavement markers 30      EACH 21.00 630.00 18.00 540.00 2,500.00 75,000.00 22.50 675.00
731-02 reflectorized raised pavement markers 48      EACH 12.00 576.00 9.00 432.00 11.00 528.00 11.25 540.00
732-02-A plastic pavement striping (solid line) (4" width) 0.409  MILE 6,000.00 2,454.00 5,250.00 2,147.25 6,000.00 2,454.00 7,875.00 3,220.88
739-01 hydro-seeding 1.00   ACRE 1,600.00 1,600.00 1,300.00 1,300.00 1,500.00 1,500.00 1,625.00 1,625.00
740-01 construction layout lump      LUMP 40,000.00 40,000.00 35,000.00 35,000.00 20,000.00 20,000.00 62,500.00 62,500.00
804-01-B precast concrete piles (14") 2,040      LNFT 55.00 112,200.00 75.00 153,000.00 42.00 85,680.00 113.75 232,050.00
804-01-G precast concrete piles (30") 680      LNFT 140.00 95,200.00 240.00 163,200.00 460.00 312,800.00 373.75 254,150.00
804-12 loading permanent piles 1      EACH 5,000.00 5,000.00 10,000.00 10,000.00 100.00 100.00 6,250.00 6,250.00
805-01-F class a concrete (bents) 106.10   CUYD 980.00 103,978.00 1,270.00 134,747.00 1,350.00 143,235.00 1,500.00 159,150.00
805-03 class aa concrete 216.31   CUYD 1,000.00 216,310.00 810.00 175,211.10 1,310.00 283,366.10 1,500.00 324,465.00
805-08-C precast-prestressed concrete girders (type iii) 1,050.0    LNFT 100.00 105,000.00 125.00 131,250.00 135.00 141,750.00 171.25 179,812.50
805-11 strip seal joints 78.50   LNFT 120.00 9,420.00 190.00 14,915.00 220.00 17,270.00 250.00 19,625.00
806-01 deformed reinforcing steel 73,928      LB 1.25 92,410.00 1.45 107,195.60 1.60 118,284.80 2.19 161,902.32
807-08 structural metalwork lump      LUMP 2,500.00 2,500.00 6,000.00 6,000.00 2,200.00 2,200.00 2,500.00 2,500.00
810-01 concrete railing (barrier) 420.00   LNFT 65.00 27,300.00 51.00 21,420.00 130.00 54,600.00 87.50 36,750.00
810-02 steel railing 229.08   LNFT 175.00 40,089.00 285.00 65,287.80 160.00 36,652.80 218.75 50,111.25
813-01 concrete approach slabs 342.93   SQYD 260.00 89,161.80 265.00 90,876.45 205.00 70,300.65 225.00 77,159.25
S-101 impact attenuator (kinetic) 2      EACH 15,000.00 30,000.00 17,000.00 34,000.00 18,250.00 36,500.00 18,750.00 37,500.00
                       
 ITEM TOTAL (CONSTRUCTION BID)       1,842,900.75   1,873,737.40   2,363,290.65   IRREGULAR
 NUMBER OF DAYS BID AT $1,000 PER DAY.       140,000.00   140,000.00   140,000.00   140,000.00
 TOTAL BID       1,982,900.75   2,013,737.40   2,503,290.65   IRREGULAR