| 201-01 |
clearing & grubbing
|
lump |
LUMP |
50,000.00 |
50,000.00 |
95,000.00 |
95,000.00 |
25,000.00 |
25,000.00 |
45,000.00 |
45,000.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
40,000.00 |
40,000.00 |
17,000.00 |
17,000.00 |
10,000.00 |
10,000.00 |
25,000.00 |
25,000.00 |
| 202-02-A-01 |
removal of bridges (station 116+49.46, 24.0' x 179.0',
comb i-beam & timber trestle) |
1   |
EACH |
100,000.00 |
100,000.00 |
35,000.00 |
35,000.00 |
100,000.00 |
100,000.00 |
42,960.00 |
42,960.00 |
| 202-02-D |
removal of concrete walks & drives
|
134   |
SQYD |
15.00 |
2,010.00 |
6.25 |
837.50 |
13.00 |
1,742.00 |
25.00 |
3,350.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
886.7 |
SQYD |
5.50 |
4,876.85 |
8.00 |
7,093.60 |
7.00 |
6,206.90 |
5.00 |
4,433.50 |
| 202-02-H |
removal of guard rail
|
198   |
LNFT |
20.00 |
3,960.00 |
9.50 |
1,881.00 |
10.00 |
1,980.00 |
12.50 |
2,475.00 |
| 203-05 |
excavation and embankment
|
lump |
LUMP |
50,000.00 |
50,000.00 |
18,000.00 |
18,000.00 |
80,000.00 |
80,000.00 |
7,950.00 |
7,950.00 |
| 204-02 |
temporary hay or straw bales
|
8   |
EACH |
15.00 |
120.00 |
25.00 |
200.00 |
21.00 |
168.00 |
25.00 |
200.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
5   |
EACH |
275.00 |
1,375.00 |
170.00 |
850.00 |
160.00 |
800.00 |
187.50 |
937.50 |
| 204-06 |
temporary silt fencing
|
635   |
LNFT |
2.50 |
1,587.50 |
3.50 |
2,222.50 |
2.60 |
1,651.00 |
3.75 |
2,381.25 |
| 302-02-D-01 |
class ii base course (8 1/2" thick) (crushed stone or
recycled pccp) |
942.4 |
SQYD |
28.00 |
26,387.20 |
40.00 |
37,696.00 |
27.00 |
25,444.80 |
21.25 |
20,026.00 |
| 304-05 |
lime treatment (type e)
|
2.21 |
TON |
1,200.00 |
2,652.00 |
350.00 |
773.50 |
1,200.00 |
2,652.00 |
375.00 |
828.75 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
500.0 |
CUYD |
35.00 |
17,500.00 |
24.00 |
12,000.00 |
100.00 |
50,000.00 |
100.00 |
50,000.00 |
| 502-01 |
superpave asphaltic concrete
|
197.8 |
TON |
150.00 |
29,670.00 |
325.00 |
64,285.00 |
350.00 |
69,230.00 |
281.25 |
55,631.25 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
33.6 |
TON |
300.00 |
10,080.00 |
400.00 |
13,440.00 |
410.00 |
13,776.00 |
281.25 |
9,450.00 |
| 701-03-G |
storm drain pipe (18" rcp/pcp)
|
145   |
LNFT |
75.00 |
10,875.00 |
60.00 |
8,700.00 |
35.00 |
5,075.00 |
100.00 |
14,500.00 |
| 701-03-G-01 |
storm drain pipe (18" rcp/pcp)(outfall)
|
91   |
LNFT |
75.00 |
6,825.00 |
60.00 |
5,460.00 |
55.00 |
5,005.00 |
100.00 |
9,100.00 |
| 702-03-A |
catch basins (cb-01)
|
2   |
EACH |
3,000.00 |
6,000.00 |
1,300.00 |
2,600.00 |
3,500.00 |
7,000.00 |
3,125.00 |
6,250.00 |
| 704-03 |
blocked out guard rail
|
25.0 |
LNFT |
35.00 |
875.00 |
30.00 |
750.00 |
35.00 |
875.00 |
62.50 |
1,562.50 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
50.0 |
LNFT |
66.00 |
3,300.00 |
65.00 |
3,250.00 |
70.00 |
3,500.00 |
81.25 |
4,062.50 |
| 704-11-A |
guard rail end treatment (flared)
|
2   |
EACH |
2,300.00 |
4,600.00 |
2,100.00 |
4,200.00 |
2,200.00 |
4,400.00 |
3,125.00 |
6,250.00 |
| 706-01-A |
concrete walk (4" thick)
|
154.9 |
SQYD |
60.00 |
9,294.00 |
53.00 |
8,209.70 |
60.00 |
9,294.00 |
62.50 |
9,681.25 |
| 706-02-C |
concrete drive (6" thick)
|
143.3 |
SQYD |
70.00 |
10,031.00 |
69.00 |
9,887.70 |
70.00 |
10,031.00 |
75.00 |
10,747.50 |
| 708-01 |
right-of-way monument
|
12   |
EACH |
250.00 |
3,000.00 |
180.00 |
2,160.00 |
500.00 |
6,000.00 |
175.00 |
2,100.00 |
| 708-02 |
right-of-way monument witness post
|
12   |
EACH |
250.00 |
3,000.00 |
55.00 |
660.00 |
300.00 |
3,600.00 |
175.00 |
2,100.00 |
| 711-01-D |
riprap (55 lb, 24" thick)
|
2,488   |
SQYD |
90.00 |
223,920.00 |
60.00 |
149,280.00 |
90.00 |
223,920.00 |
68.75 |
171,050.00 |
| 711-04 |
geotextile fabric
|
2,488   |
SQYD |
2.50 |
6,220.00 |
4.00 |
9,952.00 |
3.00 |
7,464.00 |
5.00 |
12,440.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
32,000.00 |
32,000.00 |
12,000.00 |
12,000.00 |
25,000.00 |
25,000.00 |
15,000.00 |
15,000.00 |
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
0.205 |
MILE |
800.00 |
164.00 |
1,500.00 |
307.50 |
2,000.00 |
410.00 |
1,750.00 |
358.75 |
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
0.818 |
MILE |
1,800.00 |
1,472.40 |
1,400.00 |
1,145.20 |
1,700.00 |
1,390.60 |
3,750.00 |
3,067.50 |
| 720-01-A |
erosion control system, slope protection (type a)
|
780   |
SQYD |
2.25 |
1,755.00 |
1.80 |
1,404.00 |
2.30 |
1,794.00 |
2.25 |
1,755.00 |
| 722-01 |
project site laboratory
|
1   |
EACH |
25,000.00 |
25,000.00 |
7,000.00 |
7,000.00 |
10,000.00 |
10,000.00 |
31,250.00 |
31,250.00 |
| 726-01 |
bedding material
|
86.7 |
CUYD |
60.00 |
5,202.00 |
100.00 |
8,670.00 |
200.00 |
17,340.00 |
100.00 |
8,670.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
175,000.00 |
175,000.00 |
185,000.00 |
185,000.00 |
230,000.00 |
230,000.00 |
370,500.00 |
370,500.00 |
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
80.00 |
320.00 |
75.00 |
300.00 |
80.00 |
320.00 |
93.75 |
375.00 |
| 731-01 |
nonreflectorized raised pavement markers
|
30   |
EACH |
21.00 |
630.00 |
18.00 |
540.00 |
2,500.00 |
75,000.00 |
22.50 |
675.00 |
| 731-02 |
reflectorized raised pavement markers
|
48   |
EACH |
12.00 |
576.00 |
9.00 |
432.00 |
11.00 |
528.00 |
11.25 |
540.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
0.409 |
MILE |
6,000.00 |
2,454.00 |
5,250.00 |
2,147.25 |
6,000.00 |
2,454.00 |
7,875.00 |
3,220.88 |
| 739-01 |
hydro-seeding
|
1.00 |
ACRE |
1,600.00 |
1,600.00 |
1,300.00 |
1,300.00 |
1,500.00 |
1,500.00 |
1,625.00 |
1,625.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
40,000.00 |
40,000.00 |
35,000.00 |
35,000.00 |
20,000.00 |
20,000.00 |
62,500.00 |
62,500.00 |
| 804-01-B |
precast concrete piles (14")
|
2,040   |
LNFT |
55.00 |
112,200.00 |
75.00 |
153,000.00 |
42.00 |
85,680.00 |
113.75 |
232,050.00 |
| 804-01-G |
precast concrete piles (30")
|
680   |
LNFT |
140.00 |
95,200.00 |
240.00 |
163,200.00 |
460.00 |
312,800.00 |
373.75 |
254,150.00 |
| 804-12 |
loading permanent piles
|
1   |
EACH |
5,000.00 |
5,000.00 |
10,000.00 |
10,000.00 |
100.00 |
100.00 |
6,250.00 |
6,250.00 |
| 805-01-F |
class a concrete (bents)
|
106.10 |
CUYD |
980.00 |
103,978.00 |
1,270.00 |
134,747.00 |
1,350.00 |
143,235.00 |
1,500.00 |
159,150.00 |
| 805-03 |
class aa concrete
|
216.31 |
CUYD |
1,000.00 |
216,310.00 |
810.00 |
175,211.10 |
1,310.00 |
283,366.10 |
1,500.00 |
324,465.00 |
| 805-08-C |
precast-prestressed concrete girders (type iii)
|
1,050.0 |
LNFT |
100.00 |
105,000.00 |
125.00 |
131,250.00 |
135.00 |
141,750.00 |
171.25 |
179,812.50 |
| 805-11 |
strip seal joints
|
78.50 |
LNFT |
120.00 |
9,420.00 |
190.00 |
14,915.00 |
220.00 |
17,270.00 |
250.00 |
19,625.00 |
| 806-01 |
deformed reinforcing steel
|
73,928   |
LB |
1.25 |
92,410.00 |
1.45 |
107,195.60 |
1.60 |
118,284.80 |
2.19 |
161,902.32 |
| 807-08 |
structural metalwork
|
lump |
LUMP |
2,500.00 |
2,500.00 |
6,000.00 |
6,000.00 |
2,200.00 |
2,200.00 |
2,500.00 |
2,500.00 |
| 810-01 |
concrete railing (barrier)
|
420.00 |
LNFT |
65.00 |
27,300.00 |
51.00 |
21,420.00 |
130.00 |
54,600.00 |
87.50 |
36,750.00 |
| 810-02 |
steel railing
|
229.08 |
LNFT |
175.00 |
40,089.00 |
285.00 |
65,287.80 |
160.00 |
36,652.80 |
218.75 |
50,111.25 |
| 813-01 |
concrete approach slabs
|
342.93 |
SQYD |
260.00 |
89,161.80 |
265.00 |
90,876.45 |
205.00 |
70,300.65 |
225.00 |
77,159.25 |
| S-101 |
impact attenuator (kinetic)
|
2   |
EACH |
15,000.00 |
30,000.00 |
17,000.00 |
34,000.00 |
18,250.00 |
36,500.00 |
18,750.00 |
37,500.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | ITEM TOTAL (CONSTRUCTION BID) |
|
|
|
1,842,900.75 |
|
1,873,737.40 |
|
2,363,290.65 |
|
IRREGULAR |
| | NUMBER OF DAYS BID AT $1,000 PER DAY. |
|
|
|
140,000.00 |
|
140,000.00 |
|
140,000.00 |
|
140,000.00 |
| | TOTAL BID |
|
|
|
1,982,900.75 |
|
2,013,737.40 |
|
2,503,290.65 |
|
IRREGULAR |
|