Error processing SSI file
Error processing SSI file
Bid Tabs Error processing SSI file
Bid Tabulations Error processing SSI file
February 06, 2014 Error processing SSI file

Letting of 7/30/2008 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 001-06-0052
Parish: BIENVILLE
Routes: US 80
Description: ARCADIA SIDEWALK PROGRAM, PHASE I
Type Const: concrete sidewalks and related work
Estimated Construction Cost: $206,434.00
 
RankLicenseBidderConstruction Bid
1 43371 RMD HOLDINGS LTD $198,111.80
2 32563 THE MABRY COMPANY, INC. $249,612.25
3 21982 FORBY CONTRACTING, INC. $262,600.50
4 18546 C W & W CONTRACTORS, INC. $268,323.60
 
Item Number Item Description Quantity Unit of Measure - 1 -
RMD HOLDINGS LTD
- 2 -
THE MABRY COMPANY, INC.
- 3 -
FORBY CONTRACTING, INC.
- 4 -
C W & W CONTRACTORS, INC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 22,000.00 22,000.00 3,000.00 3,000.00 2,500.00 2,500.00 5,000.00 5,000.00
202-01 removal of structures & obstructions lump      LUMP 360.00 360.00 3,000.00 3,000.00 7,000.00 7,000.00 10,000.00 10,000.00
202-02-F removal of concrete combination curb & gutter 85.0    LNFT 20.00 1,700.00 10.00 850.00 25.00 2,125.00 15.00 1,275.00
203-05 excavation and embankment lump      LUMP 8,000.00 8,000.00 8,000.00 8,000.00 10,000.00 10,000.00 24,000.00 24,000.00
204-02 temporary hay or straw bales 36      EACH 15.00 540.00 15.00 540.00 10.00 360.00 0.10 3.60
204-06 temporary silt fencing 2,265      LNFT 2.00 4,530.00 2.50 5,662.50 1.50 3,397.50 0.10 226.50
302-02-A class ii base course (4" thick) 2,028.0    SQYD 3.60 7,300.80 25.00 50,700.00 12.50 25,350.00 11.00 22,308.00
701-05-G side drain pipe (18" rcp) 58      LNFT 45.00 2,610.00 75.00 4,350.00 90.00 5,220.00 60.00 3,480.00
701-10-G reinforced concrete pipe (extension)(18") 26      LNFT 225.00 5,850.00 75.00 1,950.00 90.00 2,340.00 140.00 3,640.00
702-01 junction boxes 1      EACH 600.00 600.00 3,000.00 3,000.00 4,500.00 4,500.00 4,500.00 4,500.00
702-03-A catch basins (cb-01) 1      EACH 1,800.00 1,800.00 2,500.00 2,500.00 4,500.00 4,500.00 4,500.00 4,500.00
702-04-A adjusting manholes 1      EACH 240.00 240.00 800.00 800.00 1,000.00 1,000.00 1,500.00 1,500.00
706-01-A concrete walk (4" thick) 1,817.0    SQYD 36.00 65,412.00 45.00 81,765.00 55.00 99,935.00 50.00 90,850.00
706-01-C concrete walk (6" thick) 290.0    SQYD 48.00 13,920.00 60.00 17,400.00 75.00 21,750.00 60.00 17,400.00
706-02-C concrete drive (6" thick) 79.0    SQYD 77.00 6,083.00 60.00 4,740.00 75.00 5,925.00 65.00 5,135.00
706-04 handicapped curb ramps 19      each 500.00 9,500.00 1,000.00 19,000.00 500.00 9,500.00 700.00 13,300.00
713-01 temporary signs & barricades lump      LUMP 3,300.00 3,300.00 5,000.00 5,000.00 10,000.00 10,000.00 8,000.00 8,000.00
727-01 mobilization lump      LUMP 18,000.00 18,000.00 12,500.00 12,500.00 25,000.00 25,000.00 20,000.00 20,000.00
732-01-D plastic pavement striping (12" width) 1,605      LNFT 2.20 3,531.00 2.75 4,413.75 2.00 3,210.00 3.50 5,617.50
739-01 hydro-seeding 1.00   ACRE 2,200.00 2,200.00 3,000.00 3,000.00 1,500.00 1,500.00 2,300.00 2,300.00
740-01 construction layout lump      LUMP 4,000.00 4,000.00 5,000.00 5,000.00 5,000.00 5,000.00 4,000.00 4,000.00
S-001 sign relocation 6      EACH 100.00 600.00 150.00 900.00 100.00 600.00 400.00 2,400.00
S-002 saw cut (per 1" depth) 5,694      LNFT 2.50 14,235.00 1.50 8,541.00 2.00 11,388.00 2.00 11,388.00
S-003 adjust/lower existing 4" water main lump      LUMP 1,800.00 1,800.00 3,000.00 3,000.00 500.00 500.00 7,500.00 7,500.00
                       
 CONTRACTOR TOTAL       198,111.80   249,612.25   262,600.50   268,323.60

Error processing SSI file