| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - RMD HOLDINGS LTD |
- 2 - THE MABRY COMPANY, INC. |
- 3 - FORBY CONTRACTING, INC. |
- 4 - C W & W CONTRACTORS, INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
22,000.00 |
22,000.00 |
3,000.00 |
3,000.00 |
2,500.00 |
2,500.00 |
5,000.00 |
5,000.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
360.00 |
360.00 |
3,000.00 |
3,000.00 |
7,000.00 |
7,000.00 |
10,000.00 |
10,000.00 |
| 202-02-F |
removal of concrete combination curb & gutter
|
85.0 |
LNFT |
20.00 |
1,700.00 |
10.00 |
850.00 |
25.00 |
2,125.00 |
15.00 |
1,275.00 |
| 203-05 |
excavation and embankment
|
lump |
LUMP |
8,000.00 |
8,000.00 |
8,000.00 |
8,000.00 |
10,000.00 |
10,000.00 |
24,000.00 |
24,000.00 |
| 204-02 |
temporary hay or straw bales
|
36   |
EACH |
15.00 |
540.00 |
15.00 |
540.00 |
10.00 |
360.00 |
0.10 |
3.60 |
| 204-06 |
temporary silt fencing
|
2,265   |
LNFT |
2.00 |
4,530.00 |
2.50 |
5,662.50 |
1.50 |
3,397.50 |
0.10 |
226.50 |
| 302-02-A |
class ii base course (4" thick)
|
2,028.0 |
SQYD |
3.60 |
7,300.80 |
25.00 |
50,700.00 |
12.50 |
25,350.00 |
11.00 |
22,308.00 |
| 701-05-G |
side drain pipe (18" rcp)
|
58   |
LNFT |
45.00 |
2,610.00 |
75.00 |
4,350.00 |
90.00 |
5,220.00 |
60.00 |
3,480.00 |
| 701-10-G |
reinforced concrete pipe (extension)(18")
|
26   |
LNFT |
225.00 |
5,850.00 |
75.00 |
1,950.00 |
90.00 |
2,340.00 |
140.00 |
3,640.00 |
| 702-01 |
junction boxes
|
1   |
EACH |
600.00 |
600.00 |
3,000.00 |
3,000.00 |
4,500.00 |
4,500.00 |
4,500.00 |
4,500.00 |
| 702-03-A |
catch basins (cb-01)
|
1   |
EACH |
1,800.00 |
1,800.00 |
2,500.00 |
2,500.00 |
4,500.00 |
4,500.00 |
4,500.00 |
4,500.00 |
| 702-04-A |
adjusting manholes
|
1   |
EACH |
240.00 |
240.00 |
800.00 |
800.00 |
1,000.00 |
1,000.00 |
1,500.00 |
1,500.00 |
| 706-01-A |
concrete walk (4" thick)
|
1,817.0 |
SQYD |
36.00 |
65,412.00 |
45.00 |
81,765.00 |
55.00 |
99,935.00 |
50.00 |
90,850.00 |
| 706-01-C |
concrete walk (6" thick)
|
290.0 |
SQYD |
48.00 |
13,920.00 |
60.00 |
17,400.00 |
75.00 |
21,750.00 |
60.00 |
17,400.00 |
| 706-02-C |
concrete drive (6" thick)
|
79.0 |
SQYD |
77.00 |
6,083.00 |
60.00 |
4,740.00 |
75.00 |
5,925.00 |
65.00 |
5,135.00 |
| 706-04 |
handicapped curb ramps
|
19   |
each |
500.00 |
9,500.00 |
1,000.00 |
19,000.00 |
500.00 |
9,500.00 |
700.00 |
13,300.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
3,300.00 |
3,300.00 |
5,000.00 |
5,000.00 |
10,000.00 |
10,000.00 |
8,000.00 |
8,000.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
18,000.00 |
18,000.00 |
12,500.00 |
12,500.00 |
25,000.00 |
25,000.00 |
20,000.00 |
20,000.00 |
| 732-01-D |
plastic pavement striping (12" width)
|
1,605   |
LNFT |
2.20 |
3,531.00 |
2.75 |
4,413.75 |
2.00 |
3,210.00 |
3.50 |
5,617.50 |
| 739-01 |
hydro-seeding
|
1.00 |
ACRE |
2,200.00 |
2,200.00 |
3,000.00 |
3,000.00 |
1,500.00 |
1,500.00 |
2,300.00 |
2,300.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
4,000.00 |
4,000.00 |
5,000.00 |
5,000.00 |
5,000.00 |
5,000.00 |
4,000.00 |
4,000.00 |
| S-001 |
sign relocation
|
6   |
EACH |
100.00 |
600.00 |
150.00 |
900.00 |
100.00 |
600.00 |
400.00 |
2,400.00 |
| S-002 |
saw cut (per 1" depth)
|
5,694   |
LNFT |
2.50 |
14,235.00 |
1.50 |
8,541.00 |
2.00 |
11,388.00 |
2.00 |
11,388.00 |
| S-003 |
adjust/lower existing 4" water main
|
lump |
LUMP |
1,800.00 |
1,800.00 |
3,000.00 |
3,000.00 |
500.00 |
500.00 |
7,500.00 |
7,500.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
198,111.80 |
|
249,612.25 |
|
262,600.50 |
|
268,323.60 |
|