| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - GILCHRIST CONSTRUCTION CO. LLC |
- 2 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 3 - W. E. MCDONALD & SON, LLC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
7,500.00 |
7,500.00 |
4,000.00 |
4,000.00 |
5,000.00 |
5,000.00 |
|
|
| 202-02-D |
removal of concrete walks & drives
|
9   |
SQYD |
85.00 |
765.00 |
100.00 |
900.00 |
500.00 |
4,500.00 |
|
|
| 203-07 |
borrow (vehicular measurement)
|
500   |
CUYD |
21.00 |
10,500.00 |
23.00 |
11,500.00 |
15.00 |
7,500.00 |
|
|
| 203-07-A |
borrow (vehicular meas.)(selected soils)
|
100   |
CUYD |
21.00 |
2,100.00 |
42.00 |
4,200.00 |
15.00 |
1,500.00 |
|
|
| 304-05 |
lime treatment (type e)
|
108.39 |
TON |
300.00 |
32,517.00 |
600.00 |
65,034.00 |
450.00 |
48,775.50 |
|
|
| 308-01-A |
in-place cement treated base course (12" thick)
|
34,754   |
SQYD |
7.50 |
260,655.00 |
7.50 |
260,655.00 |
8.20 |
284,982.80 |
|
|
| 308-02 |
removal of existing patches
|
325   |
SQYD |
10.00 |
3,250.00 |
20.00 |
6,500.00 |
20.00 |
6,500.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
800   |
CUYD |
50.00 |
40,000.00 |
27.00 |
21,600.00 |
45.00 |
36,000.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
3,606.1 |
TON |
90.00 |
324,549.00 |
85.00 |
306,518.50 |
85.00 |
306,518.50 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
174.7 |
TON |
200.00 |
34,940.00 |
200.00 |
34,940.00 |
200.00 |
34,940.00 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
32,751   |
SQYD |
1.55 |
50,764.05 |
1.85 |
60,589.35 |
1.85 |
60,589.35 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 1,292   |
CUYD |
0.01 |
- 12.92 |
0.10 |
- 129.20 |
0.01 |
- 12.92 |
|
|
| 701-02-F |
cross drain pipe arch (36" equiv. rcpa)
|
56   |
LNFT |
350.00 |
19,600.00 |
210.00 |
11,760.00 |
200.00 |
11,200.00 |
|
|
| 711-04 |
geotextile fabric
|
24   |
SQYD |
2.50 |
60.00 |
3.25 |
78.00 |
3.00 |
72.00 |
|
|
| 712-04 |
flexible revetment
|
15   |
SQYD |
80.00 |
1,200.00 |
85.00 |
1,275.00 |
80.00 |
1,200.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
4,600.00 |
4,600.00 |
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
5.526 |
MILE |
1.00 |
5.53 |
135.00 |
746.01 |
400.00 |
2,210.40 |
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
1.616 |
MILE |
1.00 |
1.62 |
310.00 |
500.96 |
295.00 |
476.72 |
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
20.290 |
MILE |
1.00 |
20.29 |
500.00 |
10,145.00 |
475.00 |
9,637.75 |
|
|
| 716-01-A |
mulch (vegetative)
|
3.0 |
TON |
500.00 |
1,500.00 |
550.00 |
1,650.00 |
500.00 |
1,500.00 |
|
|
| 717-01 |
seeding
|
45   |
LB |
10.00 |
450.00 |
11.00 |
495.00 |
10.00 |
450.00 |
|
|
| 718-01 |
fertilizer
|
1,504   |
LB |
0.60 |
902.40 |
0.60 |
902.40 |
0.59 |
887.36 |
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
7,500.00 |
7,500.00 |
4,500.00 |
4,500.00 |
5,000.00 |
5,000.00 |
|
|
| 726-01 |
bedding material
|
14.4 |
CUYD |
85.00 |
1,224.00 |
100.00 |
1,440.00 |
90.00 |
1,296.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
45,000.00 |
45,000.00 |
73,000.00 |
73,000.00 |
95,000.00 |
95,000.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
2   |
EACH |
75.00 |
150.00 |
80.00 |
160.00 |
500.00 |
1,000.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
365   |
EACH |
5.00 |
1,825.00 |
5.50 |
2,007.50 |
5.10 |
1,861.50 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
4.547 |
MILE |
2,000.00 |
9,094.00 |
2,200.00 |
10,003.40 |
2,150.00 |
9,776.05 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.808 |
MILE |
500.00 |
404.00 |
700.00 |
565.60 |
610.00 |
492.88 |
|
|
| 735-01 |
mailboxes
|
18   |
EACH |
5.00 |
90.00 |
1.00 |
18.00 |
1.00 |
18.00 |
|
|
| 735-02 |
mailbox supports (single)
|
15   |
EACH |
100.00 |
1,500.00 |
110.00 |
1,650.00 |
125.00 |
1,875.00 |
|
|
| 735-03 |
mailbox supports (double)
|
3   |
EACH |
140.00 |
420.00 |
150.00 |
450.00 |
175.00 |
525.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
11,000.00 |
11,000.00 |
10,000.00 |
10,000.00 |
5,000.00 |
5,000.00 |
|
|
| S-001 |
saw cutting
|
300   |
INFT |
6.00 |
1,800.00 |
4.25 |
1,275.00 |
5.00 |
1,500.00 |
|
|
| S-002 |
sack concrete headwall
|
5.0 |
CUYD |
100.00 |
500.00 |
500.00 |
2,500.00 |
450.00 |
2,250.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
881,773.97 |
|
921,429.52 |
|
954,621.89 |
|
|
|