Letting of 6/25/2008 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 835-10-0015
Parish: NATCHITOCHES
Routes: LA 490
Description: JCT. LA 1 - JCT. LA 3279
Type Const: grading, drain struct, cold planing acp, lime trmt, in-place cement treated bc,
superpave acp and related work.
Estimated Construction Cost: $906,097.35
 
RankLicenseBidderConstruction Bid
1 12312 GILCHRIST CONSTRUCTION CO. LLC $881,773.97
2 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $921,429.52
3 08815 W. E. MCDONALD & SON, LLC. $954,621.89
 
Item Number Item Description Quantity Unit of Measure - 1 -
GILCHRIST CONSTRUCTION CO. LLC
- 2 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 3 -
W. E. MCDONALD & SON, LLC.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 7,500.00 7,500.00 4,000.00 4,000.00 5,000.00 5,000.00    
202-02-D removal of concrete walks & drives 9      SQYD 85.00 765.00 100.00 900.00 500.00 4,500.00    
203-07 borrow (vehicular measurement) 500      CUYD 21.00 10,500.00 23.00 11,500.00 15.00 7,500.00    
203-07-A borrow (vehicular meas.)(selected soils) 100      CUYD 21.00 2,100.00 42.00 4,200.00 15.00 1,500.00    
304-05 lime treatment (type e) 108.39   TON 300.00 32,517.00 600.00 65,034.00 450.00 48,775.50    
308-01-A in-place cement treated base course (12" thick) 34,754      SQYD 7.50 260,655.00 7.50 260,655.00 8.20 284,982.80    
308-02 removal of existing patches 325      SQYD 10.00 3,250.00 20.00 6,500.00 20.00 6,500.00    
401-02 aggregate surface course (adjusted vehicular
measurement)
800      CUYD 50.00 40,000.00 27.00 21,600.00 45.00 36,000.00    
502-01 superpave asphaltic concrete 3,606.1    TON 90.00 324,549.00 85.00 306,518.50 85.00 306,518.50    
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
174.7    TON 200.00 34,940.00 200.00 34,940.00 200.00 34,940.00    
509-01 cold planing asphaltic pavement 32,751      SQYD 1.55 50,764.05 1.85 60,589.35 1.85 60,589.35    
509-02 contractor retained reclaimed asphaltic pavement - 1,292      CUYD 0.01 - 12.92 0.10 - 129.20 0.01 - 12.92    
701-02-F cross drain pipe arch (36" equiv. rcpa) 56      LNFT 350.00 19,600.00 210.00 11,760.00 200.00 11,200.00    
711-04 geotextile fabric 24      SQYD 2.50 60.00 3.25 78.00 3.00 72.00    
712-04 flexible revetment 15      SQYD 80.00 1,200.00 85.00 1,275.00 80.00 1,200.00    
713-01 temporary signs & barricades lump      LUMP 10,000.00 10,000.00 10,000.00 10,000.00 4,600.00 4,600.00    
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
5.526  MILE 1.00 5.53 135.00 746.01 400.00 2,210.40    
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
1.616  MILE 1.00 1.62 310.00 500.96 295.00 476.72    
713-04-A temporary pavement markings (solid line)(4" width) 20.290  MILE 1.00 20.29 500.00 10,145.00 475.00 9,637.75    
716-01-A mulch (vegetative) 3.0    TON 500.00 1,500.00 550.00 1,650.00 500.00 1,500.00    
717-01 seeding 45      LB 10.00 450.00 11.00 495.00 10.00 450.00    
718-01 fertilizer 1,504      LB 0.60 902.40 0.60 902.40 0.59 887.36    
722-01 project site laboratory 1      EACH 7,500.00 7,500.00 4,500.00 4,500.00 5,000.00 5,000.00    
726-01 bedding material 14.4    CUYD 85.00 1,224.00 100.00 1,440.00 90.00 1,296.00    
727-01 mobilization lump      LUMP 45,000.00 45,000.00 73,000.00 73,000.00 95,000.00 95,000.00    
729-16-C object marker assembly (type 3) 2      EACH 75.00 150.00 80.00 160.00 500.00 1,000.00    
731-02 reflectorized raised pavement markers 365      EACH 5.00 1,825.00 5.50 2,007.50 5.10 1,861.50    
732-02-A plastic pavement striping (solid line) (4" width) 4.547  MILE 2,000.00 9,094.00 2,200.00 10,003.40 2,150.00 9,776.05    
732-03-A plastic pavement striping (broken line)(4" width) 0.808  MILE 500.00 404.00 700.00 565.60 610.00 492.88    
735-01 mailboxes 18      EACH 5.00 90.00 1.00 18.00 1.00 18.00    
735-02 mailbox supports (single) 15      EACH 100.00 1,500.00 110.00 1,650.00 125.00 1,875.00    
735-03 mailbox supports (double) 3      EACH 140.00 420.00 150.00 450.00 175.00 525.00    
740-01 construction layout lump      LUMP 11,000.00 11,000.00 10,000.00 10,000.00 5,000.00 5,000.00    
S-001 saw cutting 300      INFT 6.00 1,800.00 4.25 1,275.00 5.00 1,500.00    
S-002 sack concrete headwall 5.0    CUYD 100.00 500.00 500.00 2,500.00 450.00 2,250.00    
                       
 CONTRACTOR TOTAL       881,773.97   921,429.52   954,621.89    