| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - JOHN BAILEY, INC. |
- 2 - GILCHRIST CONSTRUCTION CO. LLC |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
85,000.00 |
85,000.00 |
5,000.00 |
5,000.00 |
|
|
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
50,000.00 |
50,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 202-02-D |
removal of concrete walks & drives
|
664   |
SQYD |
20.00 |
13,280.00 |
15.00 |
9,960.00 |
|
|
|
|
| 202-02-F |
removal of concrete combination curb & gutter
|
306.0 |
LNFT |
10.00 |
3,060.00 |
16.00 |
4,896.00 |
|
|
|
|
| 202-02-I |
removal of traffic signal equipment
|
lump |
LUMP |
5,952.00 |
5,952.00 |
7,500.00 |
7,500.00 |
|
|
|
|
| 202-02-K |
removal of existing headwall (sta 57+38)
|
1   |
EACH |
1,500.00 |
1,500.00 |
2,500.00 |
2,500.00 |
|
|
|
|
| 202-02-L |
removal of soil cement base course by spading (sta
115+11 - 119+15, lt) |
446.7 |
LNFT |
15.00 |
6,700.50 |
2.80 |
1,250.76 |
|
|
|
|
| 203-01 |
general excavation
|
559   |
CUYD |
18.00 |
10,062.00 |
18.00 |
10,062.00 |
|
|
|
|
| 203-03 |
embankment
|
392   |
CUYD |
20.00 |
7,840.00 |
18.00 |
7,056.00 |
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
24   |
EACH |
25.00 |
600.00 |
15.00 |
360.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
244   |
LNFT |
4.00 |
976.00 |
2.00 |
488.00 |
|
|
|
|
| 302-02-C |
class ii base course (8" thick)
|
928.4 |
SQYD |
28.00 |
25,995.20 |
22.00 |
20,424.80 |
|
|
|
|
| 302-02-G-01 |
class ii base course (4.5" thick) (crushed stone or
recycled pccp) |
221.9 |
SQYD |
20.00 |
4,438.00 |
18.00 |
3,994.20 |
|
|
|
|
| 304-01 |
lime
|
33.00 |
TON |
185.00 |
6,105.00 |
200.00 |
6,600.00 |
|
|
|
|
| 304-04-D |
lime treatment (type d) (12" thick)
|
464   |
SQYD |
10.00 |
4,640.00 |
20.00 |
9,280.00 |
|
|
|
|
| 305-01-D |
subgrade layer (12" thick)
|
464   |
SQYD |
30.00 |
13,920.00 |
32.00 |
14,848.00 |
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
150.0 |
CUYD |
45.00 |
6,750.00 |
67.00 |
10,050.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
712.2 |
TON |
136.00 |
96,859.20 |
230.00 |
163,806.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
64.3 |
TON |
204.00 |
13,117.20 |
400.00 |
25,720.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
317   |
SQYD |
31.20 |
9,890.40 |
20.00 |
6,340.00 |
|
|
|
|
| 510-01-B |
pavement patching (12" minimum thickness)
|
147   |
SQYD |
158.00 |
23,226.00 |
150.00 |
22,050.00 |
|
|
|
|
| 701-03-F |
storm drain pipe (15" rcp/pcp)
|
56   |
LNFT |
86.40 |
4,838.40 |
160.00 |
8,960.00 |
|
|
|
|
| 701-03-G |
storm drain pipe (18" rcp/pcp)
|
357   |
LNFT |
94.00 |
33,558.00 |
75.00 |
26,775.00 |
|
|
|
|
| 701-03-I |
storm drain pipe (24" rcp/pcp)
|
60   |
LNFT |
109.00 |
6,540.00 |
165.00 |
9,900.00 |
|
|
|
|
| 701-03-K |
storm drain pipe (30" rcp/pcp)
|
178   |
LNFT |
130.00 |
23,140.00 |
130.00 |
23,140.00 |
|
|
|
|
| 701-03-M |
storm drain pipe (36" rcp/pcp)
|
418   |
LNFT |
156.00 |
65,208.00 |
140.00 |
58,520.00 |
|
|
|
|
| 701-15 |
concrete collar
|
1   |
EACH |
980.00 |
980.00 |
1,200.00 |
1,200.00 |
|
|
|
|
| 702-02-B |
manholes (r-cb-11)
|
2   |
EACH |
5,400.00 |
10,800.00 |
6,000.00 |
12,000.00 |
|
|
|
|
| 702-03-A |
catch basins (cb-01)
|
10   |
EACH |
3,360.00 |
33,600.00 |
4,000.00 |
40,000.00 |
|
|
|
|
| 702-03-C |
catch basins (cb-06)
|
12   |
EACH |
4,800.00 |
57,600.00 |
6,000.00 |
72,000.00 |
|
|
|
|
| 702-03-H |
catch basins (cb-05)
|
1   |
EACH |
1,250.00 |
1,250.00 |
1,600.00 |
1,600.00 |
|
|
|
|
| 702-04-B |
adjusting catch basins
|
2   |
EACH |
3,000.00 |
6,000.00 |
1,600.00 |
3,200.00 |
|
|
|
|
| 702-08-A |
side drain safety end (type 1)
|
2   |
EACH |
1,800.00 |
3,600.00 |
3,000.00 |
6,000.00 |
|
|
|
|
| 706-01-A |
concrete walk (4" thick)
|
113.3 |
SQYD |
70.00 |
7,931.00 |
90.00 |
10,197.00 |
|
|
|
|
| 706-02-C |
concrete drive (6" thick)
|
454.4 |
SQYD |
78.00 |
35,443.20 |
100.00 |
45,440.00 |
|
|
|
|
| 707-03 |
combination concrete curb & gutter
|
1,699.0 |
LNFT |
42.00 |
71,358.00 |
50.00 |
84,950.00 |
|
|
|
|
| 708-01 |
right of way monument
|
6   |
EACH |
300.00 |
1,800.00 |
350.00 |
2,100.00 |
|
|
|
|
| 708-02 |
right of way monument witness post
|
6   |
EACH |
300.00 |
1,800.00 |
350.00 |
2,100.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
75,000.00 |
75,000.00 |
80,000.00 |
80,000.00 |
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
0.450 |
MILE |
3,720.00 |
1,674.00 |
500.00 |
225.00 |
|
|
|
|
| 726-01 |
bedding material
|
288.3 |
CUYD |
95.00 |
27,388.50 |
75.00 |
21,622.50 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
85,000.00 |
85,000.00 |
115,000.00 |
115,000.00 |
|
|
|
|
| 729-01 |
sign (type a)
|
20.0 |
SQFT |
40.00 |
800.00 |
60.00 |
1,200.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
2   |
EACH |
150.00 |
300.00 |
90.00 |
180.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
292   |
EACH |
6.12 |
1,787.04 |
6.25 |
1,825.00 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
500   |
LNFT |
1.02 |
510.00 |
1.00 |
500.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
34   |
LNFT |
4.74 |
161.16 |
4.95 |
168.30 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
0.340 |
MILE |
3,252.00 |
1,105.68 |
3,300.00 |
1,122.00 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
6   |
EACH |
234.00 |
1,404.00 |
240.00 |
1,440.00 |
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
3   |
EACH |
234.00 |
702.00 |
240.00 |
720.00 |
|
|
|
|
| 732-05 |
removal of existing markings
|
0.390 |
MILE |
7,080.00 |
2,761.20 |
7,300.00 |
2,847.00 |
|
|
|
|
| 736-01 |
trenching and backfilling
|
275   |
LNFT |
7.00 |
1,925.00 |
8.50 |
2,337.50 |
|
|
|
|
| 736-04-B |
signal support (30' strain pole)
|
1   |
EACH |
11,064.00 |
11,064.00 |
15,000.00 |
15,000.00 |
|
|
|
|
| 736-05-A |
signal heads (retrofitted with led's)
|
8   |
EACH |
975.00 |
7,800.00 |
1,300.00 |
10,400.00 |
|
|
|
|
| 736-05-B |
signal heads, 3 section (r,y,g)(l.e.d.)
|
1   |
EACH |
1,400.00 |
1,400.00 |
1,900.00 |
1,900.00 |
|
|
|
|
| 736-05-C |
signal heads, 5 section (r,y,rty,g,rtg)(l.e.d.)
|
1   |
EACH |
1,980.00 |
1,980.00 |
2,600.00 |
2,600.00 |
|
|
|
|
| 736-09 |
loop detector
|
105   |
LNFT |
18.00 |
1,890.00 |
24.00 |
2,520.00 |
|
|
|
|
| 736-10 |
underground junction box type "e"
|
3   |
EACH |
792.00 |
2,376.00 |
1,000.00 |
3,000.00 |
|
|
|
|
| 736-11 |
conduit (2" p.e.c. schedule 80)
|
275   |
LNFT |
5.00 |
1,375.00 |
6.50 |
1,787.50 |
|
|
|
|
| 736-12-A |
conductor (6c, signal, #14 awg)
|
20   |
LNFT |
2.70 |
54.00 |
3.60 |
72.00 |
|
|
|
|
| 736-12-B |
conductor (10c, signal, #14 awg)
|
615   |
LNFT |
3.40 |
2,091.00 |
4.50 |
2,767.50 |
|
|
|
|
| 736-12-C |
conductor (2c, loop lead in, #14 awg)
|
410   |
LNFT |
2.40 |
984.00 |
3.25 |
1,332.50 |
|
|
|
|
| 739-01 |
hydro-seeding
|
1.00 |
ACRE |
3,000.00 |
3,000.00 |
2,000.00 |
2,000.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
8,500.00 |
8,500.00 |
11,000.00 |
11,000.00 |
|
|
|
|
| S-002 |
sawcut hard surfacing
|
832   |
INFT |
1.50 |
1,248.00 |
3.00 |
2,496.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
999,638.68 |
|
1,036,330.56 |
|
|
|
|
|