| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - M & M MAINTENANCE OF LASALLE, LLC |
- 2 - GERACE CONSTRUCTION LLC |
- 3 - C W & W CONTRACTORS, INC. |
- 4 - GLYNN W. LEONARD, INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
7,755.00 |
7,755.00 |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
35,000.00 |
35,000.00 |
| 202-02-A-01 |
removal of bridge(sta. 15+00.40, 20.05' wide x 34.03'
long; timber bridge) |
1   |
EACH |
7,275.00 |
7,275.00 |
8,000.00 |
8,000.00 |
5,000.00 |
5,000.00 |
8,000.00 |
8,000.00 |
| 202-02-A-02 |
removal of bridge(sta. 14+99.82, 17.91' wide x 20.42'
long; timber bridge) |
1   |
EACH |
7,275.00 |
7,275.00 |
5,000.00 |
5,000.00 |
5,000.00 |
5,000.00 |
8,000.00 |
8,000.00 |
| 203-05 |
excavation and embankment
|
lump |
LUMP |
16,020.00 |
16,020.00 |
15,000.00 |
15,000.00 |
10,000.00 |
10,000.00 |
15,000.00 |
15,000.00 |
| 204-02 |
temporary hay or straw bales
|
24   |
EACH |
20.00 |
480.00 |
10.00 |
240.00 |
10.00 |
240.00 |
10.00 |
240.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
8   |
EACH |
250.00 |
2,000.00 |
100.00 |
800.00 |
100.00 |
800.00 |
500.00 |
4,000.00 |
| 204-06 |
temporary silt fencing
|
550   |
LNFT |
2.00 |
1,100.00 |
2.00 |
1,100.00 |
3.00 |
1,650.00 |
6.00 |
3,300.00 |
| 302-01-A |
class ii base course (stone)
|
131.4 |
CUYD |
110.00 |
14,454.00 |
125.00 |
16,425.00 |
100.00 |
13,140.00 |
125.00 |
16,425.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
18   |
CUYD |
110.00 |
1,980.00 |
80.00 |
1,440.00 |
100.00 |
1,800.00 |
125.00 |
2,250.00 |
| 502-01 |
superpave asphaltic concrete
|
101.3 |
TON |
285.00 |
28,870.50 |
265.00 |
26,844.50 |
300.00 |
30,390.00 |
175.00 |
17,727.50 |
| 701-05-I |
side drain pipe (24")
|
40   |
LNFT |
115.00 |
4,600.00 |
85.00 |
3,400.00 |
60.00 |
2,400.00 |
85.00 |
3,400.00 |
| 705-01 |
barbed wire fence
|
75   |
LNFT |
3.00 |
225.00 |
15.00 |
1,125.00 |
25.00 |
1,875.00 |
12.00 |
900.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
15,000.00 |
15,000.00 |
2,500.00 |
2,500.00 |
15,000.00 |
15,000.00 |
15,000.00 |
15,000.00 |
| 716-01-A |
mulch (vegetative)
|
0.7 |
TON |
640.00 |
448.00 |
1,000.00 |
700.00 |
2,500.00 |
1,750.00 |
2,000.00 |
1,400.00 |
| 717-01 |
seeding
|
8   |
LB |
20.00 |
160.00 |
10.00 |
80.00 |
100.00 |
800.00 |
25.00 |
200.00 |
| 718-01 |
fertilizer
|
160   |
LB |
3.00 |
480.00 |
0.45 |
72.00 |
3.00 |
480.00 |
3.00 |
480.00 |
| 726-01 |
bedding material
|
200.6 |
CUYD |
125.00 |
25,075.00 |
80.00 |
16,048.00 |
100.00 |
20,060.00 |
200.00 |
40,120.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
20,000.00 |
20,000.00 |
25,000.00 |
25,000.00 |
40,000.00 |
40,000.00 |
30,000.00 |
30,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
8   |
EACH |
150.00 |
1,200.00 |
85.00 |
680.00 |
100.00 |
800.00 |
100.00 |
800.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
9,000.00 |
9,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
| 805-01-B |
class a concrete (box culvert headwalls)
|
36.69 |
CUYD |
1,225.00 |
44,945.25 |
1,000.00 |
36,690.00 |
1,100.00 |
40,359.00 |
1,250.00 |
45,862.50 |
| 805-12-H |
reinforced concrete box culverts (7'x 4')
|
120.0 |
LNFT |
530.00 |
63,600.00 |
750.00 |
90,000.00 |
800.00 |
96,000.00 |
750.00 |
90,000.00 |
| 805-12-K |
reinforced concrete box culverts (7'x 5')
|
114.0 |
LNFT |
550.00 |
62,700.00 |
825.00 |
94,050.00 |
850.00 |
96,900.00 |
775.00 |
88,350.00 |
| 806-01 |
deformed reinforcing steel
|
2,945   |
LB |
3.00 |
8,835.00 |
2.00 |
5,890.00 |
3.00 |
8,835.00 |
3.25 |
9,571.25 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
343,477.75 |
|
371,084.50 |
|
413,279.00 |
|
446,026.25 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - JEFF MERCER LLC |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
15,000.00 |
15,000.00 |
|
|
|
|
|
|
| 202-02-A-01 |
removal of bridge(sta. 15+00.40, 20.05' wide x 34.03'
long; timber bridge) |
1   |
EACH |
15,000.00 |
15,000.00 |
|
|
|
|
|
|
| 202-02-A-02 |
removal of bridge(sta. 14+99.82, 17.91' wide x 20.42'
long; timber bridge) |
1   |
EACH |
15,000.00 |
15,000.00 |
|
|
|
|
|
|
| 203-05 |
excavation and embankment
|
lump |
LUMP |
30,000.00 |
30,000.00 |
|
|
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
24   |
EACH |
8.00 |
192.00 |
|
|
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
8   |
EACH |
250.00 |
2,000.00 |
|
|
|
|
|
|
| 204-06 |
temporary silt fencing
|
550   |
LNFT |
5.50 |
3,025.00 |
|
|
|
|
|
|
| 302-01-A |
class ii base course (stone)
|
131.4 |
CUYD |
80.00 |
10,512.00 |
|
|
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
18   |
CUYD |
150.00 |
2,700.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
101.3 |
TON |
250.00 |
25,325.00 |
|
|
|
|
|
|
| 701-05-I |
side drain pipe (24")
|
40   |
LNFT |
150.00 |
6,000.00 |
|
|
|
|
|
|
| 705-01 |
barbed wire fence
|
75   |
LNFT |
10.00 |
750.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
10,000.00 |
10,000.00 |
|
|
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
0.7 |
TON |
1,050.00 |
735.00 |
|
|
|
|
|
|
| 717-01 |
seeding
|
8   |
LB |
8.00 |
64.00 |
|
|
|
|
|
|
| 718-01 |
fertilizer
|
160   |
LB |
15.00 |
2,400.00 |
|
|
|
|
|
|
| 726-01 |
bedding material
|
200.6 |
CUYD |
75.00 |
15,045.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
45,000.00 |
45,000.00 |
|
|
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
8   |
EACH |
150.00 |
1,200.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
20,000.00 |
20,000.00 |
|
|
|
|
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
36.69 |
CUYD |
1,500.00 |
55,035.00 |
|
|
|
|
|
|
| 805-12-H |
reinforced concrete box culverts (7'x 4')
|
120.0 |
LNFT |
700.00 |
84,000.00 |
|
|
|
|
|
|
| 805-12-K |
reinforced concrete box culverts (7'x 5')
|
114.0 |
LNFT |
720.00 |
82,080.00 |
|
|
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
2,945   |
LB |
2.50 |
7,362.50 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
448,425.50 |
|
|
|
|
|
|
|