| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - LOUISIANA BRIDGE, INC. |
- 2 - C W & W CONTRACTORS, INC. |
- 3 - KEY CONSTRUCTORS, INC. |
- 4 - JAMES CONSTRUCTION GROUP LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
25,750.00 |
25,750.00 |
15,000.00 |
15,000.00 |
30,000.00 |
30,000.00 |
35,000.00 |
35,000.00 |
| 202-02-A-01 |
removal of bridge(sta. 14+99.97',22.38' wide x 58.41'
long; timber bridge) |
1   |
EACH |
3,000.00 |
3,000.00 |
5,000.00 |
5,000.00 |
5,000.00 |
5,000.00 |
5,000.00 |
5,000.00 |
| 202-02-A-02 |
removal of bridge(sta. 15+00.26',23.22' wide x 96.22'
long; timber bridge) |
1   |
EACH |
5,100.00 |
5,100.00 |
5,000.00 |
5,000.00 |
5,000.00 |
5,000.00 |
20,000.00 |
20,000.00 |
| 202-02-A-03 |
removal of bridge(sta. 15+00.10',18.53' wide x 39.45'
long; timber bridge) |
1   |
EACH |
5,100.00 |
5,100.00 |
5,000.00 |
5,000.00 |
5,000.00 |
5,000.00 |
15,000.00 |
15,000.00 |
| 203-05 |
excavation & embankment
|
lump |
LUMP |
62,000.00 |
62,000.00 |
65,000.00 |
65,000.00 |
40,000.00 |
40,000.00 |
62,000.00 |
62,000.00 |
| 204-02 |
temporary hay or straw bales
|
12   |
EACH |
1.00 |
12.00 |
10.00 |
120.00 |
20.00 |
240.00 |
15.00 |
180.00 |
| 204-03 |
temporary slope drains
|
80   |
LNFT |
1.00 |
80.00 |
10.00 |
800.00 |
12.00 |
960.00 |
15.00 |
1,200.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
12   |
EACH |
1.00 |
12.00 |
100.00 |
1,200.00 |
20.00 |
240.00 |
230.00 |
2,760.00 |
| 204-06 |
temporary silt fencing
|
1,440   |
LNFT |
1.00 |
1,440.00 |
3.00 |
4,320.00 |
4.00 |
5,760.00 |
4.00 |
5,760.00 |
| 302-01-A |
class ii base course(stone only)
|
466.4 |
CUYD |
90.00 |
41,976.00 |
100.00 |
46,640.00 |
125.00 |
58,300.00 |
150.00 |
69,960.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
30   |
CUYD |
90.00 |
2,700.00 |
100.00 |
3,000.00 |
100.00 |
3,000.00 |
200.00 |
6,000.00 |
| 502-01 |
superpave asphaltic concrete
|
364.3 |
TON |
300.00 |
109,290.00 |
250.00 |
91,075.00 |
300.00 |
109,290.00 |
200.00 |
72,860.00 |
| 701-05-M |
side drain pipe (36")
|
70   |
LNFT |
80.00 |
5,600.00 |
120.00 |
8,400.00 |
150.00 |
10,500.00 |
125.00 |
8,750.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
200.0 |
LNFT |
67.00 |
13,400.00 |
75.00 |
15,000.00 |
62.00 |
12,400.00 |
60.00 |
12,000.00 |
| 704-09 |
guard rail anchor sections (turndown)
|
200.0 |
LNFT |
34.00 |
6,800.00 |
40.00 |
8,000.00 |
32.00 |
6,400.00 |
30.00 |
6,000.00 |
| 705-01 |
barbed wire fence
|
120   |
LNFT |
10.00 |
1,200.00 |
25.00 |
3,000.00 |
10.00 |
1,200.00 |
6.00 |
720.00 |
| 711-01-C |
riprap (30 lb,14" thick)
|
460   |
SQYD |
87.00 |
40,020.00 |
100.00 |
46,000.00 |
85.00 |
39,100.00 |
60.00 |
27,600.00 |
| 711-04 |
geotextile fabric
|
460   |
SQYD |
4.00 |
1,840.00 |
3.00 |
1,380.00 |
3.00 |
1,380.00 |
3.00 |
1,380.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
16,600.00 |
16,600.00 |
25,000.00 |
25,000.00 |
20,000.00 |
20,000.00 |
20,000.00 |
20,000.00 |
| 716-01-A |
mulch (vegetative)
|
1.50 |
TON |
2,400.00 |
3,600.00 |
2,000.00 |
3,000.00 |
1,000.00 |
1,500.00 |
655.00 |
982.50 |
| 717-01 |
seeding
|
17   |
LB |
7.50 |
127.50 |
100.00 |
1,700.00 |
20.00 |
340.00 |
8.00 |
136.00 |
| 718-01 |
fertilizer
|
340   |
LB |
2.00 |
680.00 |
3.00 |
1,020.00 |
1.50 |
510.00 |
0.50 |
170.00 |
| 726-01 |
bedding material
|
159.2 |
CUYD |
102.00 |
16,238.40 |
100.00 |
15,920.00 |
100.00 |
15,920.00 |
125.00 |
19,900.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
93,225.00 |
93,225.00 |
100,000.00 |
100,000.00 |
115,000.00 |
115,000.00 |
110,000.00 |
110,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
4   |
EACH |
82.00 |
328.00 |
100.00 |
400.00 |
80.00 |
320.00 |
75.00 |
300.00 |
| 729-16-C |
object marker assembly (type 3)
|
16   |
EACH |
82.00 |
1,312.00 |
100.00 |
1,600.00 |
80.00 |
1,280.00 |
75.00 |
1,200.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
6,300.00 |
6,300.00 |
20,000.00 |
20,000.00 |
30,000.00 |
30,000.00 |
50,000.00 |
50,000.00 |
| 804-01-B |
precast concrete piles (14")
|
1,392   |
LNFT |
63.00 |
87,696.00 |
115.00 |
160,080.00 |
80.00 |
111,360.00 |
100.00 |
139,200.00 |
| 804-12 |
loading permanent piles
|
2   |
EACH |
1.00 |
2.00 |
1.00 |
2.00 |
10,000.00 |
20,000.00 |
2,500.00 |
5,000.00 |
| 805-01-B |
class a concrete (box culvert headwalls)
|
37.78 |
CUYD |
1,533.00 |
57,916.74 |
1,100.00 |
41,558.00 |
1,500.00 |
56,670.00 |
1,200.00 |
45,336.00 |
| 805-10-A |
bridge superstructure & substructure(28' clear
roadway,90 degree crossing;) |
8   |
SPAN |
37,000.00 |
296,000.00 |
22,000.00 |
176,000.00 |
30,000.00 |
240,000.00 |
38,000.00 |
304,000.00 |
| 805-12-R |
reinforced concrete box culverts (9'x 7')
|
114.0 |
LNFT |
820.00 |
93,480.00 |
1,200.00 |
136,800.00 |
1,100.00 |
125,400.00 |
725.00 |
82,650.00 |
| 806-01 |
deformed reinforcing steel
|
2,727   |
LB |
1.70 |
4,635.90 |
3.00 |
8,181.00 |
2.50 |
6,817.50 |
1.25 |
3,408.75 |
| S-101 |
concrete approach slabs(28'clear roadway;90 degree
crossing; w/out asphalt) |
4   |
EACH |
9,500.00 |
38,000.00 |
10,000.00 |
40,000.00 |
12,000.00 |
48,000.00 |
8,500.00 |
34,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,041,461.54 |
|
1,055,196.00 |
|
1,126,887.50 |
|
1,168,453.25 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - GLYNN W. LEONARD, INC. |
- 6 - CECIL D. GASSIOTT |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
150,000.00 |
150,000.00 |
150,000.00 |
150,000.00 |
|
|
|
|
| 202-02-A-01 |
removal of bridge(sta. 14+99.97',22.38' wide x 58.41'
long; timber bridge) |
1   |
EACH |
10,000.00 |
10,000.00 |
30,000.00 |
30,000.00 |
|
|
|
|
| 202-02-A-02 |
removal of bridge(sta. 15+00.26',23.22' wide x 96.22'
long; timber bridge) |
1   |
EACH |
10,000.00 |
10,000.00 |
30,000.00 |
30,000.00 |
|
|
|
|
| 202-02-A-03 |
removal of bridge(sta. 15+00.10',18.53' wide x 39.45'
long; timber bridge) |
1   |
EACH |
10,000.00 |
10,000.00 |
30,000.00 |
30,000.00 |
|
|
|
|
| 203-05 |
excavation & embankment
|
lump |
LUMP |
45,000.00 |
45,000.00 |
175,000.00 |
175,000.00 |
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
12   |
EACH |
50.00 |
600.00 |
20.00 |
240.00 |
|
|
|
|
| 204-03 |
temporary slope drains
|
80   |
LNFT |
20.00 |
1,600.00 |
15.00 |
1,200.00 |
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
12   |
EACH |
500.00 |
6,000.00 |
500.00 |
6,000.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
1,440   |
LNFT |
6.00 |
8,640.00 |
7.50 |
10,800.00 |
|
|
|
|
| 302-01-A |
class ii base course(stone only)
|
466.4 |
CUYD |
125.00 |
58,300.00 |
125.00 |
58,300.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
30   |
CUYD |
125.00 |
3,750.00 |
125.00 |
3,750.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
364.3 |
TON |
175.00 |
63,752.50 |
175.00 |
63,752.50 |
|
|
|
|
| 701-05-M |
side drain pipe (36")
|
70   |
LNFT |
115.00 |
8,050.00 |
140.00 |
9,800.00 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
200.0 |
LNFT |
60.00 |
12,000.00 |
100.00 |
20,000.00 |
|
|
|
|
| 704-09 |
guard rail anchor sections (turndown)
|
200.0 |
LNFT |
60.00 |
12,000.00 |
50.00 |
10,000.00 |
|
|
|
|
| 705-01 |
barbed wire fence
|
120   |
LNFT |
10.00 |
1,200.00 |
10.00 |
1,200.00 |
|
|
|
|
| 711-01-C |
riprap (30 lb,14" thick)
|
460   |
SQYD |
85.00 |
39,100.00 |
75.00 |
34,500.00 |
|
|
|
|
| 711-04 |
geotextile fabric
|
460   |
SQYD |
2.00 |
920.00 |
3.50 |
1,610.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
21,000.00 |
21,000.00 |
25,000.00 |
25,000.00 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
1.50 |
TON |
800.00 |
1,200.00 |
2,500.00 |
3,750.00 |
|
|
|
|
| 717-01 |
seeding
|
17   |
LB |
25.00 |
425.00 |
125.00 |
2,125.00 |
|
|
|
|
| 718-01 |
fertilizer
|
340   |
LB |
3.00 |
1,020.00 |
7.50 |
2,550.00 |
|
|
|
|
| 726-01 |
bedding material
|
159.2 |
CUYD |
125.00 |
19,900.00 |
125.00 |
19,900.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
55,000.00 |
55,000.00 |
75,000.00 |
75,000.00 |
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
4   |
EACH |
65.00 |
260.00 |
100.00 |
400.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
16   |
EACH |
80.00 |
1,280.00 |
100.00 |
1,600.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
45,000.00 |
45,000.00 |
30,000.00 |
30,000.00 |
|
|
|
|
| 804-01-B |
precast concrete piles (14")
|
1,392   |
LNFT |
63.00 |
87,696.00 |
200.00 |
278,400.00 |
|
|
|
|
| 804-12 |
loading permanent piles
|
2   |
EACH |
500.00 |
1,000.00 |
2,500.00 |
5,000.00 |
|
|
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
37.78 |
CUYD |
1,250.00 |
47,225.00 |
500.00 |
18,890.00 |
|
|
|
|
| 805-10-A |
bridge superstructure & substructure(28' clear
roadway,90 degree crossing;) |
8   |
SPAN |
35,000.00 |
280,000.00 |
35,000.00 |
280,000.00 |
|
|
|
|
| 805-12-R |
reinforced concrete box culverts (9'x 7')
|
114.0 |
LNFT |
1,500.00 |
171,000.00 |
2,000.00 |
228,000.00 |
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
2,727   |
LB |
2.50 |
6,817.50 |
10.00 |
27,270.00 |
|
|
|
|
| S-101 |
concrete approach slabs(28'clear roadway;90 degree
crossing; w/out asphalt) |
4   |
EACH |
9,000.00 |
36,000.00 |
27,500.00 |
110,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,215,736.00 |
|
1,744,037.50 |
|
|
|
|
|