DBE GOAL FED
Lead Project: 713-42-0136
Parish: RICHLAND
Routes:
Description: MITCHNER ROAD ROAD BRIDGES I & II AND MONROE ROAD BRIDGE
Type Const: c & g, grading, drainage structures, class ii bc, superpave acp, concrete slab
span bridge and related work.
Estimated Construction Cost: $1,002,343.55
 
RankLicenseBidderConstruction Bid
1 14788 LOUISIANA BRIDGE, INC. $1,041,461.54
2 18546 C W & W CONTRACTORS, INC. $1,055,196.00
3 09476 KEY CONSTRUCTORS, INC. $1,126,887.50
4 34567 JAMES CONSTRUCTION GROUP LLC $1,168,453.25
5 27492 GLYNN W. LEONARD, INC. $1,215,736.00
6 12094 CECIL D. GASSIOTT $1,744,037.50
 
Item Number Item Description Quantity Unit of Measure - 1 -
LOUISIANA BRIDGE, INC.
- 2 -
C W & W CONTRACTORS, INC.
- 3 -
KEY CONSTRUCTORS, INC.
- 4 -
JAMES CONSTRUCTION GROUP LLC
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 25,750.00 25,750.00 15,000.00 15,000.00 30,000.00 30,000.00 35,000.00 35,000.00
202-02-A-01 removal of bridge(sta. 14+99.97',22.38' wide x 58.41'
long; timber bridge)
1      EACH 3,000.00 3,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00
202-02-A-02 removal of bridge(sta. 15+00.26',23.22' wide x 96.22'
long; timber bridge)
1      EACH 5,100.00 5,100.00 5,000.00 5,000.00 5,000.00 5,000.00 20,000.00 20,000.00
202-02-A-03 removal of bridge(sta. 15+00.10',18.53' wide x 39.45'
long; timber bridge)
1      EACH 5,100.00 5,100.00 5,000.00 5,000.00 5,000.00 5,000.00 15,000.00 15,000.00
203-05 excavation & embankment lump      LUMP 62,000.00 62,000.00 65,000.00 65,000.00 40,000.00 40,000.00 62,000.00 62,000.00
204-02 temporary hay or straw bales 12      EACH 1.00 12.00 10.00 120.00 20.00 240.00 15.00 180.00
204-03 temporary slope drains 80      LNFT 1.00 80.00 10.00 800.00 12.00 960.00 15.00 1,200.00
204-05-A temporary sediment check dams (hay) 12      EACH 1.00 12.00 100.00 1,200.00 20.00 240.00 230.00 2,760.00
204-06 temporary silt fencing 1,440      LNFT 1.00 1,440.00 3.00 4,320.00 4.00 5,760.00 4.00 5,760.00
302-01-A class ii base course(stone only) 466.4    CUYD 90.00 41,976.00 100.00 46,640.00 125.00 58,300.00 150.00 69,960.00
401-02 aggregate surface course (adjusted vehicular
measurement)
30      CUYD 90.00 2,700.00 100.00 3,000.00 100.00 3,000.00 200.00 6,000.00
502-01 superpave asphaltic concrete 364.3    TON 300.00 109,290.00 250.00 91,075.00 300.00 109,290.00 200.00 72,860.00
701-05-M side drain pipe (36") 70      LNFT 80.00 5,600.00 120.00 8,400.00 150.00 10,500.00 125.00 8,750.00
704-08-B guard rail transitions (double thrie beam) 200.0    LNFT 67.00 13,400.00 75.00 15,000.00 62.00 12,400.00 60.00 12,000.00
704-09 guard rail anchor sections (turndown) 200.0    LNFT 34.00 6,800.00 40.00 8,000.00 32.00 6,400.00 30.00 6,000.00
705-01 barbed wire fence 120      LNFT 10.00 1,200.00 25.00 3,000.00 10.00 1,200.00 6.00 720.00
711-01-C riprap (30 lb,14" thick) 460      SQYD 87.00 40,020.00 100.00 46,000.00 85.00 39,100.00 60.00 27,600.00
711-04 geotextile fabric 460      SQYD 4.00 1,840.00 3.00 1,380.00 3.00 1,380.00 3.00 1,380.00
713-01 temporary signs & barricades lump      LUMP 16,600.00 16,600.00 25,000.00 25,000.00 20,000.00 20,000.00 20,000.00 20,000.00
716-01-A mulch (vegetative) 1.50   TON 2,400.00 3,600.00 2,000.00 3,000.00 1,000.00 1,500.00 655.00 982.50
717-01 seeding 17      LB 7.50 127.50 100.00 1,700.00 20.00 340.00 8.00 136.00
718-01 fertilizer 340      LB 2.00 680.00 3.00 1,020.00 1.50 510.00 0.50 170.00
726-01 bedding material 159.2    CUYD 102.00 16,238.40 100.00 15,920.00 100.00 15,920.00 125.00 19,900.00
727-01 mobilization lump      LUMP 93,225.00 93,225.00 100,000.00 100,000.00 115,000.00 115,000.00 110,000.00 110,000.00
729-16-B object marker assembly (type 2) 4      EACH 82.00 328.00 100.00 400.00 80.00 320.00 75.00 300.00
729-16-C object marker assembly (type 3) 16      EACH 82.00 1,312.00 100.00 1,600.00 80.00 1,280.00 75.00 1,200.00
740-01 construction layout lump      LUMP 6,300.00 6,300.00 20,000.00 20,000.00 30,000.00 30,000.00 50,000.00 50,000.00
804-01-B precast concrete piles (14") 1,392      LNFT 63.00 87,696.00 115.00 160,080.00 80.00 111,360.00 100.00 139,200.00
804-12 loading permanent piles 2      EACH 1.00 2.00 1.00 2.00 10,000.00 20,000.00 2,500.00 5,000.00
805-01-B class a concrete (box culvert headwalls) 37.78   CUYD 1,533.00 57,916.74 1,100.00 41,558.00 1,500.00 56,670.00 1,200.00 45,336.00
805-10-A bridge superstructure & substructure(28' clear
roadway,90 degree crossing;)
8      SPAN 37,000.00 296,000.00 22,000.00 176,000.00 30,000.00 240,000.00 38,000.00 304,000.00
805-12-R reinforced concrete box culverts (9'x 7') 114.0    LNFT 820.00 93,480.00 1,200.00 136,800.00 1,100.00 125,400.00 725.00 82,650.00
806-01 deformed reinforcing steel 2,727      LB 1.70 4,635.90 3.00 8,181.00 2.50 6,817.50 1.25 3,408.75
S-101 concrete approach slabs(28'clear roadway;90 degree
crossing; w/out asphalt)
4      EACH 9,500.00 38,000.00 10,000.00 40,000.00 12,000.00 48,000.00 8,500.00 34,000.00
                       
 CONTRACTOR TOTAL       1,041,461.54   1,055,196.00   1,126,887.50   1,168,453.25
 
Item Number Item Description Quantity Unit of Measure - 5 -
GLYNN W. LEONARD, INC.
- 6 -
CECIL D. GASSIOTT

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 150,000.00 150,000.00 150,000.00 150,000.00        
202-02-A-01 removal of bridge(sta. 14+99.97',22.38' wide x 58.41'
long; timber bridge)
1      EACH 10,000.00 10,000.00 30,000.00 30,000.00        
202-02-A-02 removal of bridge(sta. 15+00.26',23.22' wide x 96.22'
long; timber bridge)
1      EACH 10,000.00 10,000.00 30,000.00 30,000.00        
202-02-A-03 removal of bridge(sta. 15+00.10',18.53' wide x 39.45'
long; timber bridge)
1      EACH 10,000.00 10,000.00 30,000.00 30,000.00        
203-05 excavation & embankment lump      LUMP 45,000.00 45,000.00 175,000.00 175,000.00        
204-02 temporary hay or straw bales 12      EACH 50.00 600.00 20.00 240.00        
204-03 temporary slope drains 80      LNFT 20.00 1,600.00 15.00 1,200.00        
204-05-A temporary sediment check dams (hay) 12      EACH 500.00 6,000.00 500.00 6,000.00        
204-06 temporary silt fencing 1,440      LNFT 6.00 8,640.00 7.50 10,800.00        
302-01-A class ii base course(stone only) 466.4    CUYD 125.00 58,300.00 125.00 58,300.00        
401-02 aggregate surface course (adjusted vehicular
measurement)
30      CUYD 125.00 3,750.00 125.00 3,750.00        
502-01 superpave asphaltic concrete 364.3    TON 175.00 63,752.50 175.00 63,752.50        
701-05-M side drain pipe (36") 70      LNFT 115.00 8,050.00 140.00 9,800.00        
704-08-B guard rail transitions (double thrie beam) 200.0    LNFT 60.00 12,000.00 100.00 20,000.00        
704-09 guard rail anchor sections (turndown) 200.0    LNFT 60.00 12,000.00 50.00 10,000.00        
705-01 barbed wire fence 120      LNFT 10.00 1,200.00 10.00 1,200.00        
711-01-C riprap (30 lb,14" thick) 460      SQYD 85.00 39,100.00 75.00 34,500.00        
711-04 geotextile fabric 460      SQYD 2.00 920.00 3.50 1,610.00        
713-01 temporary signs & barricades lump      LUMP 21,000.00 21,000.00 25,000.00 25,000.00        
716-01-A mulch (vegetative) 1.50   TON 800.00 1,200.00 2,500.00 3,750.00        
717-01 seeding 17      LB 25.00 425.00 125.00 2,125.00        
718-01 fertilizer 340      LB 3.00 1,020.00 7.50 2,550.00        
726-01 bedding material 159.2    CUYD 125.00 19,900.00 125.00 19,900.00        
727-01 mobilization lump      LUMP 55,000.00 55,000.00 75,000.00 75,000.00        
729-16-B object marker assembly (type 2) 4      EACH 65.00 260.00 100.00 400.00        
729-16-C object marker assembly (type 3) 16      EACH 80.00 1,280.00 100.00 1,600.00        
740-01 construction layout lump      LUMP 45,000.00 45,000.00 30,000.00 30,000.00        
804-01-B precast concrete piles (14") 1,392      LNFT 63.00 87,696.00 200.00 278,400.00        
804-12 loading permanent piles 2      EACH 500.00 1,000.00 2,500.00 5,000.00        
805-01-B class a concrete (box culvert headwalls) 37.78   CUYD 1,250.00 47,225.00 500.00 18,890.00        
805-10-A bridge superstructure & substructure(28' clear
roadway,90 degree crossing;)
8      SPAN 35,000.00 280,000.00 35,000.00 280,000.00        
805-12-R reinforced concrete box culverts (9'x 7') 114.0    LNFT 1,500.00 171,000.00 2,000.00 228,000.00        
806-01 deformed reinforcing steel 2,727      LB 2.50 6,817.50 10.00 27,270.00        
S-101 concrete approach slabs(28'clear roadway;90 degree
crossing; w/out asphalt)
4      EACH 9,000.00 36,000.00 27,500.00 110,000.00        
                       
 CONTRACTOR TOTAL       1,215,736.00   1,744,037.50        