Letting of 6/25/2008 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 386-03-0006
Parish: ACADIA, ST LANDRY
Routes: LA 367
Description: LA 367 ST. LANDRY PARISH LINE TO JCT. US 190
Type Const: grading, cold planing asphaltic concrete, pavement patching. in-place cement stabilized
base course, superpave asphaltic concrete pavement and related work.
Estimated Construction Cost: $3,012,676.12
 
RankLicenseBidderConstruction Bid
1 12312 GILCHRIST CONSTRUCTION CO. LLC $2,895,213.91
2 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $2,918,361.48
3 08815 W. E. MCDONALD & SON, LLC. $2,943,379.68
4 34356 PRAIRIE CONTRACTORS INC. $3,011,178.40
5 04089 H & S CONSTRUCTION CO., INC. $3,626,339.02
 
Item Number Item Description Quantity Unit of Measure - 1 -
GILCHRIST CONSTRUCTION CO. LLC
- 2 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 3 -
W. E. MCDONALD & SON, LLC.
- 4 -
PRAIRIE CONTRACTORS INC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-D removal of concrete walks & drives 95      SQYD 20.00 1,900.00 50.00 4,750.00 25.00 2,375.00 50.00 4,750.00
203-07 borrow (vehicular measurement) 710      CUYD 19.50 13,845.00 26.00 18,460.00 18.00 12,780.00 20.00 14,200.00
203-07-A borrow (vehicular meas.)(selected soils) 653      CUYD 18.00 11,754.00 22.00 14,366.00 18.00 11,754.00 20.00 13,060.00
204-05-A temporary sediment check dams (hay) 39      EACH 250.00 9,750.00 180.00 7,020.00 1.00 39.00 300.00 11,700.00
303-01-B in-place cement stabilized base course (8 1/2" thick) 75,041      SQYD 7.00 525,287.00 5.35 401,469.35 6.45 484,014.45 6.00 450,246.00
303-02 removal of existing patches 1,596      SQYD 4.00 6,384.00 20.00 31,920.00 5.00 7,980.00 1.00 1,596.00
401-02 aggregate surface course (adjusted vehicular
measurement)
2,911      CUYD 40.00 116,440.00 23.00 66,953.00 19.00 55,309.00 19.00 55,309.00
402-01 traffic maintenance aggregate (vehicular measurement) 100.0    CUYD 85.00 8,500.00 43.00 4,300.00 50.00 5,000.00 150.00 15,000.00
502-01 superpave asphaltic concrete 14,150.5    TON 90.00 1,273,545.00 96.00 1,358,448.00 98.00 1,386,749.00 106.25 1,503,490.63
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
1,094.2    TON 125.00 136,775.00 160.00 175,072.00 150.00 164,130.00 150.00 164,130.00
507-01 asphaltic material (type e) 49,986      GAL 3.75 187,447.50 3.50 174,951.00 3.25 162,454.50 3.50 174,951.00
507-02-B aggregate (s2) 73,509      SQYD 1.35 99,237.15 1.30 95,561.70 1.21 88,945.89 1.25 91,886.25
507-02-C aggregate (s3) 73,509      SQYD 1.20 88,210.80 1.15 84,535.35 1.05 77,184.45 1.10 80,859.90
509-01 cold planing asphaltic pavement 66,970      SQYD 1.28 85,721.60 1.35 90,409.50 2.00 133,940.00 0.25 16,742.50
509-02 contractor retained reclaimed asphaltic pavement - 3,278      CUYD 0.10 - 327.80 0.10 - 327.80 0.01 - 32.78 0.01 - 32.78
510-01-B pavement patching (12" minimum thickness) 54      SQYD 200.00 10,800.00 200.00 10,800.00 175.00 9,450.00 150.00 8,100.00
706-02-A concrete drive (4" thick) 39.1    SQYD 80.00 3,128.00 96.00 3,753.60 260.00 10,166.00 105.00 4,105.50
713-01 temporary signs & barricades lump      LUMP 15,000.00 15,000.00 15,000.00 15,000.00 5,990.00 5,990.00 60,000.00 60,000.00
713-02-E temporary pavement markings (24" width) 24      LNFT 1.00 24.00 0.65 15.60 0.90 21.60 0.01 0.24
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
10.228  MILE 350.00 3,579.80 130.00 1,329.64 400.00 4,091.20 400.00 4,091.20
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
7.100  MILE 10.00 71.00 320.00 2,272.00 325.00 2,307.50 1.00 7.10
713-04-A temporary pavement markings (solid line)(4" width) 26.841  MILE 10.00 268.41 640.00 17,178.24 585.00 15,701.99 1.00 26.84
713-06 temporary reflectorized raised pavement markers 677      EACH 5.50 3,723.50 5.00 3,385.00 0.01 6.77 0.01 6.77
713-06-A temporary reflectorized raised pavement markers (tabs) 1,425      EACH 1.10 1,567.50 1.65 2,351.25 0.01 14.25 1.50 2,137.50
722-02 project site laboratory (equipped) 1      EACH 20,000.00 20,000.00 9,500.00 9,500.00 5,000.00 5,000.00 6,000.00 6,000.00
727-01 mobilization lump      LUMP 125,000.00 125,000.00 160,000.00 160,000.00 150,000.00 150,000.00 190,000.00 190,000.00
729-16-B object marker assembly (type 2) 4      EACH 60.00 240.00 55.00 220.00 150.00 600.00 60.00 240.00
731-02 reflectorized raised pavement markers 677      EACH 5.50 3,723.50 5.00 3,385.00 4.90 3,317.30 5.00 3,385.00
732-01-E plastic pavement striping (24" width) 12      LNFT 4.40 52.80 3.25 39.00 3.95 47.40 3.00 36.00
732-02-A plastic pavement striping (solid line) (4" width) 13.421  MILE 2,800.00 37,578.80 2,600.00 34,894.60 2,410.00 32,344.61 3,000.00 40,263.00
732-03-A plastic pavement striping (broken line)(4" width) 3.550  MILE 800.00 2,840.00 750.00 2,662.50 680.00 2,414.00 700.00 2,485.00
735-01 mailboxes 38      EACH 1.20 45.60 1.00 38.00 1.00 38.00 1.00 38.00
735-02 mailbox supports (single) 57      EACH 115.00 6,555.00 115.00 6,555.00 125.00 7,125.00 125.00 7,125.00
735-03 mailbox supports (double) 1      EACH 150.00 150.00 135.00 135.00 175.00 175.00 200.00 200.00
735-04 mailbox supports (multiple) 1      EACH 250.00 250.00 250.00 250.00 325.00 325.00 300.00 300.00
740-01 construction layout lump      LUMP 12,000.00 12,000.00 14,000.00 14,000.00 10,000.00 10,000.00 100.00 100.00
S-001 cement treatment (10" thick) 14,848.5    SQYD 5.50 81,666.75 6.70 99,484.95 5.97 88,645.55 5.50 81,666.75
S-002 full depth sawcutting of existing portland cement
concrete drives
992      INFT 2.50 2,480.00 3.25 3,224.00 3.00 2,976.00 3.00 2,976.00
                       
 CONTRACTOR TOTAL       2,895,213.91   2,918,361.48   2,943,379.68   3,011,178.40
 
Item Number Item Description Quantity Unit of Measure - 5 -
H & S CONSTRUCTION CO., INC.

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-D removal of concrete walks & drives 95      SQYD 28.00 2,660.00            
203-07 borrow (vehicular measurement) 710      CUYD 20.00 14,200.00            
203-07-A borrow (vehicular meas.)(selected soils) 653      CUYD 20.00 13,060.00            
204-05-A temporary sediment check dams (hay) 39      EACH 250.00 9,750.00            
303-01-B in-place cement stabilized base course (8 1/2" thick) 75,041      SQYD 7.25 544,047.25            
303-02 removal of existing patches 1,596      SQYD 25.00 39,900.00            
401-02 aggregate surface course (adjusted vehicular
measurement)
2,911      CUYD 60.00 174,660.00            
402-01 traffic maintenance aggregate (vehicular measurement) 100.0    CUYD 75.00 7,500.00            
502-01 superpave asphaltic concrete 14,150.5    TON 105.00 1,485,802.50            
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
1,094.2    TON 135.00 147,717.00            
507-01 asphaltic material (type e) 49,986      GAL 3.60 179,949.60            
507-02-B aggregate (s2) 73,509      SQYD 2.25 165,395.25            
507-02-C aggregate (s3) 73,509      SQYD 1.75 128,640.75            
509-01 cold planing asphaltic pavement 66,970      SQYD 2.50 167,425.00            
509-02 contractor retained reclaimed asphaltic pavement - 3,278      CUYD 0.01 - 32.78            
510-01-B pavement patching (12" minimum thickness) 54      SQYD 140.00 7,560.00            
706-02-A concrete drive (4" thick) 39.1    SQYD 190.00 7,429.00            
713-01 temporary signs & barricades lump      LUMP 75,000.00 75,000.00            
713-02-E temporary pavement markings (24" width) 24      LNFT 1.10 26.40            
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
10.228  MILE 540.00 5,523.12            
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
7.100  MILE 390.00 2,769.00            
713-04-A temporary pavement markings (solid line)(4" width) 26.841  MILE 700.00 18,788.70            
713-06 temporary reflectorized raised pavement markers 677      EACH 5.90 3,994.30            
713-06-A temporary reflectorized raised pavement markers (tabs) 1,425      EACH 1.95 2,778.75            
722-02 project site laboratory (equipped) 1      EACH 8,500.00 8,500.00            
727-01 mobilization lump      LUMP 275,000.00 275,000.00            
729-16-B object marker assembly (type 2) 4      EACH 60.00 240.00            
731-02 reflectorized raised pavement markers 677      EACH 5.90 3,994.30            
732-01-E plastic pavement striping (24" width) 12      LNFT 4.75 57.00            
732-02-A plastic pavement striping (solid line) (4" width) 13.421  MILE 2,875.00 38,585.38            
732-03-A plastic pavement striping (broken line)(4" width) 3.550  MILE 810.00 2,875.50            
735-01 mailboxes 38      EACH 1.25 47.50            
735-02 mailbox supports (single) 57      EACH 120.00 6,840.00            
735-03 mailbox supports (double) 1      EACH 155.00 155.00            
735-04 mailbox supports (multiple) 1      EACH 270.00 270.00            
740-01 construction layout lump      LUMP 9,500.00 9,500.00            
S-001 cement treatment (10" thick) 14,848.5    SQYD 5.00 74,242.50            
S-002 full depth sawcutting of existing portland cement
concrete drives
992      INFT 1.50 1,488.00            
                       
 CONTRACTOR TOTAL       3,626,339.02            