| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - GILCHRIST CONSTRUCTION CO. LLC |
- 2 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 3 - W. E. MCDONALD & SON, LLC. |
- 4 - PRAIRIE CONTRACTORS INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks & drives
|
95   |
SQYD |
20.00 |
1,900.00 |
50.00 |
4,750.00 |
25.00 |
2,375.00 |
50.00 |
4,750.00 |
| 203-07 |
borrow (vehicular measurement)
|
710   |
CUYD |
19.50 |
13,845.00 |
26.00 |
18,460.00 |
18.00 |
12,780.00 |
20.00 |
14,200.00 |
| 203-07-A |
borrow (vehicular meas.)(selected soils)
|
653   |
CUYD |
18.00 |
11,754.00 |
22.00 |
14,366.00 |
18.00 |
11,754.00 |
20.00 |
13,060.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
39   |
EACH |
250.00 |
9,750.00 |
180.00 |
7,020.00 |
1.00 |
39.00 |
300.00 |
11,700.00 |
| 303-01-B |
in-place cement stabilized base course (8 1/2" thick)
|
75,041   |
SQYD |
7.00 |
525,287.00 |
5.35 |
401,469.35 |
6.45 |
484,014.45 |
6.00 |
450,246.00 |
| 303-02 |
removal of existing patches
|
1,596   |
SQYD |
4.00 |
6,384.00 |
20.00 |
31,920.00 |
5.00 |
7,980.00 |
1.00 |
1,596.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
2,911   |
CUYD |
40.00 |
116,440.00 |
23.00 |
66,953.00 |
19.00 |
55,309.00 |
19.00 |
55,309.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
100.0 |
CUYD |
85.00 |
8,500.00 |
43.00 |
4,300.00 |
50.00 |
5,000.00 |
150.00 |
15,000.00 |
| 502-01 |
superpave asphaltic concrete
|
14,150.5 |
TON |
90.00 |
1,273,545.00 |
96.00 |
1,358,448.00 |
98.00 |
1,386,749.00 |
106.25 |
1,503,490.63 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
1,094.2 |
TON |
125.00 |
136,775.00 |
160.00 |
175,072.00 |
150.00 |
164,130.00 |
150.00 |
164,130.00 |
| 507-01 |
asphaltic material (type e)
|
49,986   |
GAL |
3.75 |
187,447.50 |
3.50 |
174,951.00 |
3.25 |
162,454.50 |
3.50 |
174,951.00 |
| 507-02-B |
aggregate (s2)
|
73,509   |
SQYD |
1.35 |
99,237.15 |
1.30 |
95,561.70 |
1.21 |
88,945.89 |
1.25 |
91,886.25 |
| 507-02-C |
aggregate (s3)
|
73,509   |
SQYD |
1.20 |
88,210.80 |
1.15 |
84,535.35 |
1.05 |
77,184.45 |
1.10 |
80,859.90 |
| 509-01 |
cold planing asphaltic pavement
|
66,970   |
SQYD |
1.28 |
85,721.60 |
1.35 |
90,409.50 |
2.00 |
133,940.00 |
0.25 |
16,742.50 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 3,278   |
CUYD |
0.10 |
- 327.80 |
0.10 |
- 327.80 |
0.01 |
- 32.78 |
0.01 |
- 32.78 |
| 510-01-B |
pavement patching (12" minimum thickness)
|
54   |
SQYD |
200.00 |
10,800.00 |
200.00 |
10,800.00 |
175.00 |
9,450.00 |
150.00 |
8,100.00 |
| 706-02-A |
concrete drive (4" thick)
|
39.1 |
SQYD |
80.00 |
3,128.00 |
96.00 |
3,753.60 |
260.00 |
10,166.00 |
105.00 |
4,105.50 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
15,000.00 |
15,000.00 |
15,000.00 |
15,000.00 |
5,990.00 |
5,990.00 |
60,000.00 |
60,000.00 |
| 713-02-E |
temporary pavement markings (24" width)
|
24   |
LNFT |
1.00 |
24.00 |
0.65 |
15.60 |
0.90 |
21.60 |
0.01 |
0.24 |
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
10.228 |
MILE |
350.00 |
3,579.80 |
130.00 |
1,329.64 |
400.00 |
4,091.20 |
400.00 |
4,091.20 |
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
7.100 |
MILE |
10.00 |
71.00 |
320.00 |
2,272.00 |
325.00 |
2,307.50 |
1.00 |
7.10 |
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
26.841 |
MILE |
10.00 |
268.41 |
640.00 |
17,178.24 |
585.00 |
15,701.99 |
1.00 |
26.84 |
| 713-06 |
temporary reflectorized raised pavement markers
|
677   |
EACH |
5.50 |
3,723.50 |
5.00 |
3,385.00 |
0.01 |
6.77 |
0.01 |
6.77 |
| 713-06-A |
temporary reflectorized raised pavement markers (tabs)
|
1,425   |
EACH |
1.10 |
1,567.50 |
1.65 |
2,351.25 |
0.01 |
14.25 |
1.50 |
2,137.50 |
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
20,000.00 |
20,000.00 |
9,500.00 |
9,500.00 |
5,000.00 |
5,000.00 |
6,000.00 |
6,000.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
125,000.00 |
125,000.00 |
160,000.00 |
160,000.00 |
150,000.00 |
150,000.00 |
190,000.00 |
190,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
4   |
EACH |
60.00 |
240.00 |
55.00 |
220.00 |
150.00 |
600.00 |
60.00 |
240.00 |
| 731-02 |
reflectorized raised pavement markers
|
677   |
EACH |
5.50 |
3,723.50 |
5.00 |
3,385.00 |
4.90 |
3,317.30 |
5.00 |
3,385.00 |
| 732-01-E |
plastic pavement striping (24" width)
|
12   |
LNFT |
4.40 |
52.80 |
3.25 |
39.00 |
3.95 |
47.40 |
3.00 |
36.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
13.421 |
MILE |
2,800.00 |
37,578.80 |
2,600.00 |
34,894.60 |
2,410.00 |
32,344.61 |
3,000.00 |
40,263.00 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
3.550 |
MILE |
800.00 |
2,840.00 |
750.00 |
2,662.50 |
680.00 |
2,414.00 |
700.00 |
2,485.00 |
| 735-01 |
mailboxes
|
38   |
EACH |
1.20 |
45.60 |
1.00 |
38.00 |
1.00 |
38.00 |
1.00 |
38.00 |
| 735-02 |
mailbox supports (single)
|
57   |
EACH |
115.00 |
6,555.00 |
115.00 |
6,555.00 |
125.00 |
7,125.00 |
125.00 |
7,125.00 |
| 735-03 |
mailbox supports (double)
|
1   |
EACH |
150.00 |
150.00 |
135.00 |
135.00 |
175.00 |
175.00 |
200.00 |
200.00 |
| 735-04 |
mailbox supports (multiple)
|
1   |
EACH |
250.00 |
250.00 |
250.00 |
250.00 |
325.00 |
325.00 |
300.00 |
300.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
12,000.00 |
12,000.00 |
14,000.00 |
14,000.00 |
10,000.00 |
10,000.00 |
100.00 |
100.00 |
| S-001 |
cement treatment (10" thick)
|
14,848.5 |
SQYD |
5.50 |
81,666.75 |
6.70 |
99,484.95 |
5.97 |
88,645.55 |
5.50 |
81,666.75 |
| S-002 |
full depth sawcutting of existing portland cement
concrete drives |
992   |
INFT |
2.50 |
2,480.00 |
3.25 |
3,224.00 |
3.00 |
2,976.00 |
3.00 |
2,976.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,895,213.91 |
|
2,918,361.48 |
|
2,943,379.68 |
|
3,011,178.40 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - H & S CONSTRUCTION CO., INC. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks & drives
|
95   |
SQYD |
28.00 |
2,660.00 |
|
|
|
|
|
|
| 203-07 |
borrow (vehicular measurement)
|
710   |
CUYD |
20.00 |
14,200.00 |
|
|
|
|
|
|
| 203-07-A |
borrow (vehicular meas.)(selected soils)
|
653   |
CUYD |
20.00 |
13,060.00 |
|
|
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
39   |
EACH |
250.00 |
9,750.00 |
|
|
|
|
|
|
| 303-01-B |
in-place cement stabilized base course (8 1/2" thick)
|
75,041   |
SQYD |
7.25 |
544,047.25 |
|
|
|
|
|
|
| 303-02 |
removal of existing patches
|
1,596   |
SQYD |
25.00 |
39,900.00 |
|
|
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
2,911   |
CUYD |
60.00 |
174,660.00 |
|
|
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
100.0 |
CUYD |
75.00 |
7,500.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
14,150.5 |
TON |
105.00 |
1,485,802.50 |
|
|
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
1,094.2 |
TON |
135.00 |
147,717.00 |
|
|
|
|
|
|
| 507-01 |
asphaltic material (type e)
|
49,986   |
GAL |
3.60 |
179,949.60 |
|
|
|
|
|
|
| 507-02-B |
aggregate (s2)
|
73,509   |
SQYD |
2.25 |
165,395.25 |
|
|
|
|
|
|
| 507-02-C |
aggregate (s3)
|
73,509   |
SQYD |
1.75 |
128,640.75 |
|
|
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
66,970   |
SQYD |
2.50 |
167,425.00 |
|
|
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 3,278   |
CUYD |
0.01 |
- 32.78 |
|
|
|
|
|
|
| 510-01-B |
pavement patching (12" minimum thickness)
|
54   |
SQYD |
140.00 |
7,560.00 |
|
|
|
|
|
|
| 706-02-A |
concrete drive (4" thick)
|
39.1 |
SQYD |
190.00 |
7,429.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
75,000.00 |
75,000.00 |
|
|
|
|
|
|
| 713-02-E |
temporary pavement markings (24" width)
|
24   |
LNFT |
1.10 |
26.40 |
|
|
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
10.228 |
MILE |
540.00 |
5,523.12 |
|
|
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
7.100 |
MILE |
390.00 |
2,769.00 |
|
|
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
26.841 |
MILE |
700.00 |
18,788.70 |
|
|
|
|
|
|
| 713-06 |
temporary reflectorized raised pavement markers
|
677   |
EACH |
5.90 |
3,994.30 |
|
|
|
|
|
|
| 713-06-A |
temporary reflectorized raised pavement markers (tabs)
|
1,425   |
EACH |
1.95 |
2,778.75 |
|
|
|
|
|
|
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
8,500.00 |
8,500.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
275,000.00 |
275,000.00 |
|
|
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
4   |
EACH |
60.00 |
240.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
677   |
EACH |
5.90 |
3,994.30 |
|
|
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
12   |
LNFT |
4.75 |
57.00 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
13.421 |
MILE |
2,875.00 |
38,585.38 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
3.550 |
MILE |
810.00 |
2,875.50 |
|
|
|
|
|
|
| 735-01 |
mailboxes
|
38   |
EACH |
1.25 |
47.50 |
|
|
|
|
|
|
| 735-02 |
mailbox supports (single)
|
57   |
EACH |
120.00 |
6,840.00 |
|
|
|
|
|
|
| 735-03 |
mailbox supports (double)
|
1   |
EACH |
155.00 |
155.00 |
|
|
|
|
|
|
| 735-04 |
mailbox supports (multiple)
|
1   |
EACH |
270.00 |
270.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
9,500.00 |
9,500.00 |
|
|
|
|
|
|
| S-001 |
cement treatment (10" thick)
|
14,848.5 |
SQYD |
5.00 |
74,242.50 |
|
|
|
|
|
|
| S-002 |
full depth sawcutting of existing portland cement
concrete drives |
992   |
INFT |
1.50 |
1,488.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
3,626,339.02 |
|
|
|
|
|
|
|