| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - GILCHRIST CONSTRUCTION CO. LLC |
- 2 - W. E. MCDONALD & SON, LLC. |
- 3 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 4 - D & J CONSTRUCTION CO., INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
1,500.00 |
1,500.00 |
5,000.00 |
5,000.00 |
3,000.00 |
3,000.00 |
4,000.00 |
4,000.00 |
| 202-02-D |
removal of concrete walks & drives
|
15   |
SQYD |
25.00 |
375.00 |
150.00 |
2,250.00 |
225.00 |
3,375.00 |
30.00 |
450.00 |
| 203-07-A |
borrow (vehicular meas.)(selected soils)
|
11,000   |
CUYD |
12.50 |
137,500.00 |
4.50 |
49,500.00 |
13.00 |
143,000.00 |
20.00 |
220,000.00 |
| 304-05 |
lime treatment (type e)
|
396.90 |
TON |
300.00 |
119,070.00 |
450.00 |
178,605.00 |
385.00 |
152,806.50 |
450.00 |
178,605.00 |
| 308-01-A |
in-place cement treated base course (12" thick)
|
82,058   |
SQYD |
6.00 |
492,348.00 |
8.15 |
668,772.70 |
7.00 |
574,406.00 |
7.50 |
615,435.00 |
| 308-02 |
removal of existing patches
|
600   |
SQYD |
5.00 |
3,000.00 |
10.00 |
6,000.00 |
20.00 |
12,000.00 |
10.00 |
6,000.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
2,811   |
CUYD |
45.00 |
126,495.00 |
20.00 |
56,220.00 |
23.00 |
64,653.00 |
25.00 |
70,275.00 |
| 502-01 |
superpave asphaltic concrete
|
8,828.8 |
TON |
80.50 |
710,718.40 |
89.00 |
785,763.20 |
78.00 |
688,646.40 |
109.00 |
962,339.20 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
200.0 |
TON |
165.00 |
33,000.00 |
200.00 |
40,000.00 |
210.00 |
42,000.00 |
250.00 |
50,000.00 |
| 509-01 |
cold planing asphaltic pavement
|
80,427   |
SQYD |
0.95 |
76,405.65 |
1.50 |
120,640.50 |
1.50 |
120,640.50 |
3.00 |
241,281.00 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 8,241   |
CUYD |
0.10 |
- 824.10 |
0.01 |
- 82.41 |
0.10 |
- 824.10 |
0.10 |
- 824.10 |
| 510-01-B |
pavement patching (12" minimum thickness)
|
50   |
SQYD |
190.00 |
9,500.00 |
175.00 |
8,750.00 |
200.00 |
10,000.00 |
300.00 |
15,000.00 |
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
8   |
LNFT |
300.00 |
2,400.00 |
500.00 |
4,000.00 |
400.00 |
3,200.00 |
500.00 |
4,000.00 |
| 701-15 |
concrete collar
|
1   |
EACH |
1,000.00 |
1,000.00 |
2,000.00 |
2,000.00 |
1,250.00 |
1,250.00 |
2,000.00 |
2,000.00 |
| 711-04 |
geotextile fabric
|
35   |
SQYD |
1.00 |
35.00 |
10.00 |
350.00 |
2.50 |
87.50 |
10.00 |
350.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
12,000.00 |
12,000.00 |
8,900.00 |
8,900.00 |
13,000.00 |
13,000.00 |
15,000.00 |
15,000.00 |
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
20.486 |
MILE |
200.00 |
4,097.20 |
400.00 |
8,194.40 |
130.00 |
2,663.18 |
226.00 |
4,629.84 |
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
17.336 |
MILE |
1.00 |
17.34 |
200.00 |
3,467.20 |
325.00 |
5,634.20 |
250.00 |
4,334.00 |
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
54.524 |
MILE |
1.00 |
54.52 |
250.00 |
13,631.00 |
625.00 |
34,077.50 |
1.00 |
54.52 |
| 716-01-A |
mulch (vegetative)
|
0.3 |
TON |
3,200.00 |
960.00 |
3,000.00 |
900.00 |
3,200.00 |
960.00 |
3,000.00 |
900.00 |
| 717-01 |
seeding
|
5   |
LB |
25.00 |
125.00 |
20.00 |
100.00 |
20.00 |
100.00 |
100.00 |
500.00 |
| 718-01 |
fertilizer
|
100   |
LB |
2.25 |
225.00 |
2.00 |
200.00 |
2.00 |
200.00 |
5.00 |
500.00 |
| 722-01 |
project site laboratory
|
1   |
EACH |
7,000.00 |
7,000.00 |
5,000.00 |
5,000.00 |
4,500.00 |
4,500.00 |
6,000.00 |
6,000.00 |
| 726-01 |
bedding material
|
9.3 |
CUYD |
135.00 |
1,255.50 |
100.00 |
930.00 |
83.00 |
771.90 |
100.00 |
930.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
90,000.00 |
90,000.00 |
45,000.00 |
45,000.00 |
193,000.00 |
193,000.00 |
150,000.00 |
150,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
2   |
EACH |
85.00 |
170.00 |
500.00 |
1,000.00 |
85.00 |
170.00 |
100.00 |
200.00 |
| 731-02 |
reflectorized raised pavement markers
|
901   |
EACH |
5.50 |
4,955.50 |
6.50 |
5,856.50 |
5.00 |
4,505.00 |
8.00 |
7,208.00 |
| 732-01-E |
plastic pavement striping (24" width)
|
20   |
LNFT |
4.40 |
88.00 |
35.00 |
700.00 |
3.25 |
65.00 |
15.00 |
300.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
18.175 |
MILE |
3,000.00 |
54,525.00 |
2,700.00 |
49,072.50 |
2,600.00 |
47,255.00 |
3,200.00 |
58,160.00 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
5.779 |
MILE |
850.00 |
4,912.15 |
1,100.00 |
6,356.90 |
650.00 |
3,756.35 |
1,500.00 |
8,668.50 |
| 735-01 |
mailboxes
|
57   |
EACH |
10.00 |
570.00 |
1.00 |
57.00 |
1.00 |
57.00 |
25.00 |
1,425.00 |
| 735-02 |
mailbox supports (single)
|
54   |
EACH |
120.00 |
6,480.00 |
125.00 |
6,750.00 |
105.00 |
5,670.00 |
125.00 |
6,750.00 |
| 735-03 |
mailbox supports (double)
|
3   |
EACH |
150.00 |
450.00 |
175.00 |
525.00 |
150.00 |
450.00 |
200.00 |
600.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
15,000.00 |
15,000.00 |
8,500.00 |
8,500.00 |
14,500.00 |
14,500.00 |
20,000.00 |
20,000.00 |
| S-001 |
sack concrete headwall
|
3.0 |
CUYD |
500.00 |
1,500.00 |
1,000.00 |
3,000.00 |
400.00 |
1,200.00 |
1,250.00 |
3,750.00 |
| S-002 |
saw cutting
|
500   |
INFT |
3.00 |
1,500.00 |
5.00 |
2,500.00 |
3.00 |
1,500.00 |
1.00 |
500.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,918,408.16 |
|
2,098,409.49 |
|
2,152,275.93 |
|
2,659,320.96 |
|