| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - GILCHRIST CONSTRUCTION CO. LLC |
- 2 - BARBER BROS. CONTRACTING CO., L.L.C |
- 3 - F.G. SULLIVAN, JR. CONTRACTOR LLC |
- 4 - COASTAL BRIDGE CO., L.L.C. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
18,000.00 |
18,000.00 |
50,000.00 |
50,000.00 |
1,500.00 |
1,500.00 |
75,000.00 |
75,000.00 |
| 202-02-D |
removal of concrete walks & drives
|
1,000   |
SQYD |
10.00 |
10,000.00 |
30.00 |
30,000.00 |
10.00 |
10,000.00 |
25.00 |
25,000.00 |
| 203-07 |
borrow (vehicular measurement)
|
8,472   |
CUYD |
13.75 |
116,490.00 |
5.00 |
42,360.00 |
3.00 |
25,416.00 |
18.00 |
152,496.00 |
| 203-07-A |
borrow (vehicular meas.)(selected soils)
|
2,052   |
CUYD |
14.50 |
29,754.00 |
3.00 |
6,156.00 |
5.00 |
10,260.00 |
25.00 |
51,300.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
20   |
EACH |
220.00 |
4,400.00 |
100.00 |
2,000.00 |
100.00 |
2,000.00 |
150.00 |
3,000.00 |
| 204-06 |
temporary silt fencing
|
9,530   |
LNFT |
1.50 |
14,295.00 |
1.50 |
14,295.00 |
1.50 |
14,295.00 |
2.00 |
19,060.00 |
| 304-01 |
lime
|
52.25 |
TON |
100.00 |
5,225.00 |
180.00 |
9,405.00 |
75.00 |
3,918.75 |
150.00 |
7,837.50 |
| 304-03-D |
lime treatment (type c) (12" thick)
|
1,845   |
SQYD |
5.00 |
9,225.00 |
1.50 |
2,767.50 |
2.00 |
3,690.00 |
5.00 |
9,225.00 |
| 304-05 |
lime treatment (type e)
|
52.31 |
TON |
400.00 |
20,924.00 |
400.00 |
20,924.00 |
250.00 |
13,077.50 |
400.00 |
20,924.00 |
| 308-01-A-01 |
in-place cement treated base course (12" thick) (7%
cement) |
27,257   |
SQYD |
6.25 |
170,356.25 |
7.50 |
204,427.50 |
8.00 |
218,056.00 |
8.00 |
218,056.00 |
| 308-01-A-02 |
in-place cement treated base course (12" thick) (10%
cement) |
46,552   |
SQYD |
8.00 |
372,416.00 |
10.00 |
465,520.00 |
12.00 |
558,624.00 |
10.00 |
465,520.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
3,306   |
CUYD |
20.00 |
66,120.00 |
40.00 |
132,240.00 |
25.00 |
82,650.00 |
90.00 |
297,540.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
130.0 |
CUYD |
50.00 |
6,500.00 |
60.00 |
7,800.00 |
60.00 |
7,800.00 |
75.00 |
9,750.00 |
| 502-01 |
superpave asphaltic concrete
|
20,854.0 |
TON |
94.00 |
1,960,276.00 |
90.00 |
1,876,860.00 |
75.00 |
1,564,050.00 |
90.00 |
1,876,860.00 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
1,830.5 |
TON |
145.00 |
265,422.50 |
100.00 |
183,050.00 |
150.00 |
274,575.00 |
195.00 |
356,947.50 |
| 507-01-A |
asphaltic material (crs-2p emulsion)
|
6,352   |
GAL |
4.00 |
25,408.00 |
4.00 |
25,408.00 |
3.50 |
22,232.00 |
4.00 |
25,408.00 |
| 507-02-C |
aggregate (s3)
|
20,489   |
SQYD |
2.60 |
53,271.40 |
2.75 |
56,344.75 |
2.25 |
46,100.25 |
2.75 |
56,344.75 |
| 509-01 |
cold planing asphaltic pavement
|
44,528   |
SQYD |
1.65 |
73,471.20 |
3.00 |
133,584.00 |
3.50 |
155,848.00 |
2.50 |
111,320.00 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 1,855   |
CUYD |
0.01 |
- 18.55 |
0.00 |
0.00 |
0.01 |
- 18.55 |
0.01 |
- 18.55 |
| 510-01-B |
pavement patching (12" minimum thickness)
|
1,000   |
SQYD |
185.00 |
185,000.00 |
45.00 |
45,000.00 |
40.00 |
40,000.00 |
95.00 |
95,000.00 |
| 701-01-I |
cross drain pipe (24" rcp)
|
248   |
LNFT |
110.00 |
27,280.00 |
140.00 |
34,720.00 |
275.00 |
68,200.00 |
120.00 |
29,760.00 |
| 701-01-M |
cross drain pipe (36" rcp)
|
96   |
LNFT |
140.00 |
13,440.00 |
160.00 |
15,360.00 |
300.00 |
28,800.00 |
185.00 |
17,760.00 |
| 701-01-N |
cross drain pipe (42" rcp)
|
96   |
LNFT |
200.00 |
19,200.00 |
180.00 |
17,280.00 |
320.00 |
30,720.00 |
205.00 |
19,680.00 |
| 701-02-D |
cross drain pipe arch (24" equiv. rcpa)
|
216   |
LNFT |
190.00 |
41,040.00 |
185.00 |
39,960.00 |
275.00 |
59,400.00 |
125.00 |
27,000.00 |
| 701-02-G |
cross drain pipe arch (42" equiv. rcpa)
|
60   |
LNFT |
240.00 |
14,400.00 |
200.00 |
12,000.00 |
325.00 |
19,500.00 |
250.00 |
15,000.00 |
| 701-15 |
concrete collar
|
1   |
EACH |
1,500.00 |
1,500.00 |
1,200.00 |
1,200.00 |
1,200.00 |
1,200.00 |
1,500.00 |
1,500.00 |
| 712-02 |
sacked concrete revetment
|
400   |
SQYD |
80.00 |
32,000.00 |
75.00 |
30,000.00 |
70.00 |
28,000.00 |
85.00 |
34,000.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
15,000.00 |
15,000.00 |
100,000.00 |
100,000.00 |
200,000.00 |
200,000.00 |
25,000.00 |
25,000.00 |
| 713-02-E |
temporary pavement markings (24" width)
|
96   |
LNFT |
1.00 |
96.00 |
1.20 |
115.20 |
0.40 |
38.40 |
2.00 |
192.00 |
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
21.660 |
MILE |
1.00 |
21.66 |
400.00 |
8,664.00 |
600.00 |
12,996.00 |
400.00 |
8,664.00 |
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
12.609 |
MILE |
1.00 |
12.61 |
450.00 |
5,674.05 |
100.00 |
1,260.90 |
400.00 |
5,043.60 |
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
43.761 |
MILE |
450.00 |
19,692.45 |
250.00 |
10,940.25 |
100.00 |
4,376.10 |
900.00 |
39,384.90 |
| 713-05-D |
temporary pavement legends & symbols (rr crossing)
|
2   |
EACH |
30.00 |
60.00 |
30.00 |
60.00 |
15.00 |
30.00 |
500.00 |
1,000.00 |
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
11,000.00 |
11,000.00 |
15,000.00 |
15,000.00 |
10,000.00 |
10,000.00 |
15,000.00 |
15,000.00 |
| 726-01 |
bedding material
|
315.8 |
CUYD |
80.00 |
25,264.00 |
45.00 |
14,211.00 |
0.01 |
3.16 |
105.00 |
33,159.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
110,000.00 |
110,000.00 |
200,000.00 |
200,000.00 |
225,000.00 |
225,000.00 |
475,000.00 |
475,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
80   |
EACH |
45.00 |
3,600.00 |
60.00 |
4,800.00 |
60.00 |
4,800.00 |
75.00 |
6,000.00 |
| 731-02 |
reflectorized raised pavement markers
|
954   |
EACH |
5.00 |
4,770.00 |
6.00 |
5,724.00 |
6.00 |
5,724.00 |
6.00 |
5,724.00 |
| 732-01-E |
plastic pavement striping (24" width)
|
96   |
LNFT |
3.00 |
288.00 |
4.00 |
384.00 |
5.00 |
480.00 |
3.00 |
288.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
29.027 |
MILE |
2,400.00 |
69,664.80 |
2,800.00 |
81,275.60 |
3,000.00 |
87,081.00 |
2,500.00 |
72,567.50 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
4.203 |
MILE |
800.00 |
3,362.40 |
900.00 |
3,782.70 |
900.00 |
3,782.70 |
900.00 |
3,782.70 |
| 732-04-D |
plastic pavement legends and symbols (type d)
|
2   |
EACH |
400.00 |
800.00 |
600.00 |
1,200.00 |
500.00 |
1,000.00 |
750.00 |
1,500.00 |
| 735-01 |
mailboxes
|
137   |
EACH |
5.00 |
685.00 |
2.00 |
274.00 |
5.00 |
685.00 |
1.00 |
137.00 |
| 735-02 |
mailbox supports (single)
|
116   |
EACH |
90.00 |
10,440.00 |
110.00 |
12,760.00 |
125.00 |
14,500.00 |
110.00 |
12,760.00 |
| 735-03 |
mailbox supports (double)
|
6   |
EACH |
120.00 |
720.00 |
140.00 |
840.00 |
150.00 |
900.00 |
150.00 |
900.00 |
| 735-04 |
mailbox supports (multiple)
|
3   |
EACH |
210.00 |
630.00 |
250.00 |
750.00 |
275.00 |
825.00 |
275.00 |
825.00 |
| 739-01 |
hydro-seeding
|
13.13 |
ACRE |
1,000.00 |
13,130.00 |
1,200.00 |
15,756.00 |
1,300.00 |
17,069.00 |
1,300.00 |
17,069.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
20,000.00 |
20,000.00 |
25,000.00 |
25,000.00 |
45,500.00 |
45,500.00 |
250,000.00 |
250,000.00 |
| S-001 |
saw cutting asphaltic concrete patches (12" deep)
|
900   |
LNFT |
5.00 |
4,500.00 |
6.00 |
5,400.00 |
5.00 |
4,500.00 |
8.00 |
7,200.00 |
| S-002 |
saw cutting driveways (6" deep)
|
1,600   |
LNFT |
20.00 |
32,000.00 |
6.50 |
10,400.00 |
10.00 |
16,000.00 |
8.00 |
12,800.00 |
| S-003 |
traffic maintenance superpave asphaltic concrete
|
265.0 |
TON |
150.00 |
39,750.00 |
200.00 |
53,000.00 |
200.00 |
53,000.00 |
150.00 |
39,750.00 |
| S-004 |
surface preparation
|
lump |
LUMP |
12,000.00 |
12,000.00 |
35,000.00 |
35,000.00 |
60,000.00 |
60,000.00 |
25,000.00 |
25,000.00 |
| S-005 |
cleaning existing ditches
|
4,600   |
LNFT |
10.00 |
46,000.00 |
3.00 |
13,800.00 |
6.00 |
27,600.00 |
8.00 |
36,800.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
3,998,882.72 |
|
4,083,472.55 |
|
4,087,045.21 |
|
5,116,816.90 |
|