Lead Project: 150-02-0014
Parish: SABINE
Routes: LA 476
Description: JCT. LA 191 - JCT. LA 6
Type Const: grading, drain struct, cold planing asphaltic concrete, lime treatment, in-place
cement stabilized base course, superpave asphaltic concrete pavement, and related work.
Estimated Construction Cost: $2,258,795.06
 
RankLicenseBidderConstruction Bid
1 12312 GILCHRIST CONSTRUCTION CO. LLC $1,967,706.24
2 02268 SOIL STABILIZERS, INC. $2,404,325.66
3 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $2,506,272.85
 
Item Number Item Description Quantity Unit of Measure - 1 -
GILCHRIST CONSTRUCTION CO. LLC
- 2 -
SOIL STABILIZERS, INC.
- 3 -
DIAMOND B CONSTRUCTION CO., L.L.C.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 15,000.00 15,000.00 35,000.00 35,000.00 30,000.00 30,000.00    
202-01 removal of structures & obstructions lump      LUMP 7,500.00 7,500.00 10,000.00 10,000.00 1,600.00 1,600.00    
202-02-D removal of concrete walks & drives 34      SQYD 8.00 272.00 25.00 850.00 37.00 1,258.00    
202-02-H removal of guard rail 113      LNFT 15.00 1,695.00 20.00 2,260.00 13.00 1,469.00    
203-07 borrow (vehicular measurement) 320      CUYD 17.00 5,440.00 20.00 6,400.00 25.00 8,000.00    
203-07-A borrow (vehicular meas.)(selected soils) 85      CUYD 40.00 3,400.00 25.00 2,125.00 25.00 2,125.00    
303-01-B in-place cement stabilized base course (8 1/2" thick) 53,665      SQYD 6.50 348,822.50 9.00 482,985.00 10.50 563,482.50    
303-02 removal of existing patches 150      SQYD 11.00 1,650.00 20.00 3,000.00 23.82 3,573.00    
304-05 lime treatment (type e) 119.73   TON 400.00 47,892.00 300.00 35,919.00 350.00 41,905.50    
401-02 aggregate surface course (adjusted vehicular
measurement)
2,722      CUYD 45.00 122,490.00 35.00 95,270.00 25.00 68,050.00    
502-01 superpave asphaltic concrete 10,327.7    TON 100.00 1,032,770.00 110.00 1,136,047.00 113.00 1,167,030.10    
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
795.8    TON 155.00 123,349.00 175.00 139,265.00 178.00 141,652.40    
509-01 cold planing asphaltic pavement 56,987      SQYD 0.10 5,698.70 1.71 97,447.77 1.65 94,028.55    
509-02 contractor retained reclaimed asphaltic pavement - 2,931      CUYD 0.01 - 29.31 0.01 - 29.31 0.10 - 293.10    
701-01-I cross drain pipe (24" rcp/pcp) 32      LNFT 250.00 8,000.00 125.00 4,000.00 110.00 3,520.00    
701-01-K cross drain pipe (30" rcp/pcp) 72      LNFT 325.00 23,400.00 145.00 10,440.00 130.00 9,360.00    
701-01-N cross drain pipe (42" rcp/pcp) 144      LNFT 300.00 43,200.00 210.00 30,240.00 200.00 28,800.00    
701-05-I side drain pipe (24") 48      LNFT 150.00 7,200.00 100.00 4,800.00 110.00 5,280.00    
701-05-N side drain pipe (42") 80      LNFT 170.00 13,600.00 175.00 14,000.00 220.00 17,600.00    
701-08 relaying pipe 8      LNFT 200.00 1,600.00 200.00 1,600.00 220.00 1,760.00    
701-15 concrete collar 9      EACH 1,000.00 9,000.00 900.00 8,100.00 2,000.00 18,000.00    
704-11-A guard rail end treatment (flared) 3      EACH 2,300.00 6,900.00 3,500.00 10,500.00 2,500.00 7,500.00    
712-04 flexible revetment 60      SQYD 90.00 5,400.00 100.00 6,000.00 85.00 5,100.00    
713-01 temporary signs & barricades lump      LUMP 7,500.00 7,500.00 60,000.00 60,000.00 13,000.00 13,000.00    
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
14.035  MILE 50.00 701.75 300.00 4,210.50 150.00 2,105.25    
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
5.782  MILE 50.00 289.10 250.00 1,445.50 300.00 1,734.60    
713-04-A temporary pavement markings (solid line)(4" width) 31.214  MILE 250.00 7,803.50 300.00 9,364.20 500.00 15,607.00    
716-01-A mulch (vegetative) 1.0    TON 1,000.00 1,000.00 1,000.00 1,000.00 1,100.00 1,100.00    
717-01 seeding 15      LB 20.00 300.00 40.00 600.00 22.00 330.00    
718-01 fertilizer 500      LB 2.00 1,000.00 3.00 1,500.00 3.00 1,500.00    
722-01 project site laboratory 1      EACH 5,500.00 5,500.00 5,000.00 5,000.00 45,000.00 45,000.00    
726-01 bedding material 100.0    CUYD 72.00 7,200.00 100.00 10,000.00 165.00 16,500.00    
727-01 mobilization lump      LUMP 55,000.00 55,000.00 65,000.00 65,000.00 115,000.00 115,000.00    
729-16-B object marker assembly (type 2) 13      EACH 75.00 975.00 100.00 1,300.00 85.00 1,105.00    
731-02 reflectorized raised pavement markers 618      EACH 5.00 3,090.00 8.00 4,944.00 5.00 3,090.00    
732-01-E plastic pavement striping (24" width) 15      LNFT 3.00 45.00 50.00 750.00 3.50 52.50    
732-02-A plastic pavement striping (solid line) (4" width) 10.405  MILE 2,000.00 20,810.00 2,900.00 30,174.50 2,200.00 22,891.00    
732-03-A plastic pavement striping (broken line)(4" width) 1.927  MILE 600.00 1,156.20 1,500.00 2,890.50 650.00 1,252.55    
735-01 mailboxes 47      EACH 5.00 235.00 1.00 47.00 1.00 47.00    
735-02 mailbox supports (single) 45      EACH 110.00 4,950.00 120.00 5,400.00 125.00 5,625.00    
735-03 mailbox supports (double) 2      EACH 150.00 300.00 200.00 400.00 160.00 320.00    
740-01 construction layout lump      LUMP 7,500.00 7,500.00 50,000.00 50,000.00 20,000.00 20,000.00    
S-001 cleaning existing ditches 600      LNFT 10.00 6,000.00 10.00 6,000.00 30.00 18,000.00    
S-002 saw cutting 808      INFT 2.60 2,100.80 10.00 8,080.00 1.50 1,212.00    
                       
 CONTRACTOR TOTAL       1,967,706.24   2,404,325.66   2,506,272.85    