| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - SPECIALTY CONTRACTORS |
- 2 - GILCHRIST CONSTRUCTION CO. LLC |
- 3 - REGIONAL CONSTRUCTION, LLC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
85,000.00 |
85,000.00 |
150,000.00 |
150,000.00 |
25,000.00 |
25,000.00 |
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
1,000.00 |
1,000.00 |
30,000.00 |
30,000.00 |
25,000.00 |
25,000.00 |
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
4,361.7 |
SQYD |
2.00 |
8,723.40 |
5.00 |
21,808.50 |
8.00 |
34,893.60 |
|
|
| 203-01 |
general excavation
|
10,471   |
CUYD |
2.00 |
20,942.00 |
8.50 |
89,003.50 |
6.00 |
62,826.00 |
|
|
| 203-03 |
embankment
|
10,490   |
CUYD |
5.50 |
57,695.00 |
13.50 |
141,615.00 |
12.00 |
125,880.00 |
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
32   |
EACH |
50.00 |
1,600.00 |
225.00 |
7,200.00 |
100.00 |
3,200.00 |
|
|
| 204-06 |
temporary silt fencing
|
1,580   |
LNFT |
2.00 |
3,160.00 |
1.92 |
3,033.60 |
4.00 |
6,320.00 |
|
|
| 302-02-D |
class ii base course (8 1/2" thick)
|
17,549.8 |
SQYD |
7.40 |
129,868.52 |
12.00 |
210,597.60 |
24.00 |
421,195.20 |
|
|
| 304-05 |
lime treatment (type e)
|
24.88 |
TON |
261.00 |
6,493.68 |
300.00 |
7,464.00 |
350.00 |
8,708.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
8   |
CUYD |
50.00 |
400.00 |
100.00 |
800.00 |
300.00 |
2,400.00 |
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
500.0 |
CUYD |
FREE |
FREE |
40.00 |
20,000.00 |
50.00 |
25,000.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
3,549.4 |
TON |
105.93 |
375,987.94 |
102.00 |
362,038.80 |
115.00 |
408,181.00 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
176.4 |
TON |
153.14 |
27,013.90 |
158.00 |
27,871.20 |
175.00 |
30,870.00 |
|
|
| 701-01-I |
cross drain pipe (24" rcp/pcp)
|
72   |
LNFT |
118.00 |
8,496.00 |
110.00 |
7,920.00 |
200.00 |
14,400.00 |
|
|
| 701-05-G |
side drain pipe (18")
|
32   |
LNFT |
87.00 |
2,784.00 |
80.00 |
2,560.00 |
200.00 |
6,400.00 |
|
|
| 705-02 |
combination mesh & barbed wire fence
|
210   |
LNFT |
8.00 |
1,680.00 |
12.00 |
2,520.00 |
25.00 |
5,250.00 |
|
|
| 708-01 |
right-of-way monument
|
12   |
EACH |
150.00 |
1,800.00 |
300.00 |
3,600.00 |
200.00 |
2,400.00 |
|
|
| 708-02 |
right-of-way monument witness post
|
12   |
EACH |
150.00 |
1,800.00 |
300.00 |
3,600.00 |
200.00 |
2,400.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
16,250.00 |
16,250.00 |
8,500.00 |
8,500.00 |
75,000.00 |
75,000.00 |
|
|
| 713-02-E |
temporary pavement markings (24" width)
|
64   |
LNFT |
1.00 |
64.00 |
1.00 |
64.00 |
3.00 |
192.00 |
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
1.655 |
MILE |
350.00 |
579.25 |
1.00 |
1.66 |
400.00 |
662.00 |
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
6.618 |
MILE |
600.00 |
3,970.80 |
1.00 |
6.62 |
800.00 |
5,294.40 |
|
|
| 716-01-A |
mulch (vegetative)
|
15.0 |
TON |
800.00 |
12,000.00 |
500.00 |
7,500.00 |
3,000.00 |
45,000.00 |
|
|
| 717-01 |
seeding
|
900   |
LB |
8.00 |
7,200.00 |
10.00 |
9,000.00 |
10.00 |
9,000.00 |
|
|
| 718-01 |
fertilizer
|
10,000   |
LB |
0.75 |
7,500.00 |
0.50 |
5,000.00 |
0.80 |
8,000.00 |
|
|
| 720-01-A |
erosion control system, slope protection (type a)
|
13,000   |
SQYD |
2.00 |
26,000.00 |
1.50 |
19,500.00 |
3.00 |
39,000.00 |
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
2,000.00 |
2,000.00 |
50,000.00 |
50,000.00 |
5,000.00 |
5,000.00 |
|
|
| 726-01 |
bedding material
|
27.8 |
CUYD |
100.00 |
2,780.00 |
65.00 |
1,807.00 |
80.00 |
2,224.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
44,300.00 |
44,300.00 |
120,000.00 |
120,000.00 |
75,000.00 |
75,000.00 |
|
|
| 729-16-B |
object marker assembly (type 2)
|
2   |
EACH |
75.00 |
150.00 |
75.00 |
150.00 |
100.00 |
200.00 |
|
|
| 729-19-A |
dead end road installations(type a)
|
1   |
EACH |
2,500.00 |
2,500.00 |
1,500.00 |
1,500.00 |
10,000.00 |
10,000.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
109   |
EACH |
5.00 |
545.00 |
5.00 |
545.00 |
6.00 |
654.00 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
32   |
LNFT |
3.00 |
96.00 |
3.00 |
96.00 |
10.00 |
320.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
3.309 |
MILE |
2,500.00 |
8,272.50 |
2,500.00 |
8,272.50 |
2,700.00 |
8,934.30 |
|
|
| 735-01 |
mailboxes
|
2   |
EACH |
30.00 |
60.00 |
5.00 |
10.00 |
200.00 |
400.00 |
|
|
| 735-02 |
mailbox supports (single)
|
2   |
EACH |
150.00 |
300.00 |
150.00 |
300.00 |
200.00 |
400.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
10,000.00 |
10,000.00 |
24,000.00 |
24,000.00 |
100,000.00 |
100,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
879,011.99 |
|
1,347,884.98 |
|
1,595,604.50 |
|
|
|