| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - JAMES CONSTRUCTION GROUP LLC |
- 2 - GILCHRIST CONSTRUCTION CO. LLC |
- 3 - AUSTIN BRIDGE & ROAD, LP |
- 4 - HILL BROTHERS CONSTRUCTION CO., INC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
1,000,000.00 |
1,000,000.00 |
180,000.00 |
180,000.00 |
805,433.00 |
805,433.00 |
500,000.00 |
500,000.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
lump |
30,000.00 |
30,000.00 |
10,500.00 |
10,500.00 |
105,000.00 |
105,000.00 |
20,000.00 |
20,000.00 |
| 202-02-A-01 |
removal of bridge (sta. 10+283.16, 7.6m x 139.6m
timber trestle bridge) |
1   |
ea |
50,000.00 |
50,000.00 |
25,000.00 |
25,000.00 |
30,000.00 |
30,000.00 |
125,000.00 |
125,000.00 |
| 202-02-B |
removal of concrete box culverts (sta. 8+782.00; 10 m
x 2 m x 1.22 m) |
1   |
ea |
4,500.00 |
4,500.00 |
5,000.00 |
5,000.00 |
3,000.00 |
3,000.00 |
5,000.00 |
5,000.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
18,142.8 |
sq m |
4.70 |
85,271.16 |
4.50 |
81,642.60 |
5.00 |
90,714.00 |
5.50 |
99,785.40 |
| 202-02-H |
removal of guard rail
|
636   |
ln m |
12.50 |
7,950.00 |
20.00 |
12,720.00 |
56.00 |
35,616.00 |
12.75 |
8,109.00 |
| 202-02-01 |
removal of sign 4 ft x 4 ft
|
1   |
ea |
100.00 |
100.00 |
1.00 |
1.00 |
100.00 |
100.00 |
110.00 |
110.00 |
| 202-02-02 |
removal of metal sign 3 ft x 6 ft
|
1   |
ea |
50.00 |
50.00 |
1.00 |
1.00 |
100.00 |
100.00 |
110.00 |
110.00 |
| 202-02-03 |
removal of wood frame commercial building 30 ft x
45 ft |
1   |
ea |
4,500.00 |
4,500.00 |
1.00 |
1.00 |
3,300.00 |
3,300.00 |
3,600.00 |
3,600.00 |
| 202-02-04 |
removal of wood frame sign 8 ft x 8 ft
|
1   |
ea |
100.00 |
100.00 |
1.00 |
1.00 |
100.00 |
100.00 |
110.00 |
110.00 |
| 202-02-05 |
removal of brick veneer residence 30 ft x 60 ft
|
1   |
ea |
4,500.00 |
4,500.00 |
1.00 |
1.00 |
5,500.00 |
5,500.00 |
6,100.00 |
6,100.00 |
| 202-02-06 |
removal of wood frame shed 20 ft x 30 ft
|
1   |
ea |
1,500.00 |
1,500.00 |
1.00 |
1.00 |
1,500.00 |
1,500.00 |
1,650.00 |
1,650.00 |
| 203-01 |
general excavation
|
16,416   |
cu m |
4.25 |
69,768.00 |
7.40 |
121,478.40 |
3.00 |
49,248.00 |
3.00 |
49,248.00 |
| 203-02 |
drainage excavation
|
1,050   |
cu m |
18.00 |
18,900.00 |
15.00 |
15,750.00 |
7.85 |
8,242.50 |
8.75 |
9,187.50 |
| 203-04 |
embankment
|
41,772   |
cu m |
17.00 |
710,124.00 |
16.00 |
668,352.00 |
10.00 |
417,720.00 |
9.25 |
386,391.00 |
| 204-02 |
temporary hay or straw bales
|
40   |
ea |
25.00 |
1,000.00 |
17.00 |
680.00 |
20.00 |
800.00 |
22.00 |
880.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
6   |
ea |
220.00 |
1,320.00 |
300.00 |
1,800.00 |
200.00 |
1,200.00 |
220.00 |
1,320.00 |
| 204-06 |
temporary silt fencing
|
100   |
ln m |
18.00 |
1,800.00 |
15.00 |
1,500.00 |
15.00 |
1,500.00 |
17.00 |
1,700.00 |
| 302-02-B |
class ii base course (220 mm thick)
|
9,241.4 |
sq m |
31.00 |
286,483.40 |
28.00 |
258,759.20 |
35.00 |
323,449.00 |
40.00 |
369,656.00 |
| 304-01 |
lime
|
54.47 |
Mg |
210.00 |
11,438.70 |
220.00 |
11,983.40 |
193.00 |
10,512.71 |
215.00 |
11,711.05 |
| 304-04-D |
lime treatment (type d) (300 mm thick)
|
7,198   |
sq m |
2.00 |
14,396.00 |
1.50 |
10,797.00 |
3.00 |
21,594.00 |
3.50 |
25,193.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
3,200.0 |
cu m |
16.00 |
51,200.00 |
20.00 |
64,000.00 |
5.00 |
16,000.00 |
1.10 |
3,520.00 |
| 502-01 |
superpave asphaltic concrete
|
2,020.6 |
Mg |
133.00 |
268,739.80 |
130.00 |
262,678.00 |
132.26 |
267,244.56 |
145.00 |
292,987.00 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
675.4 |
Mg |
167.00 |
112,791.80 |
180.00 |
121,572.00 |
166.88 |
112,710.75 |
185.00 |
124,949.00 |
| 701-01-Q |
cross drain pipe (1500 mm rcp/pcp)
|
22.0 |
ln m |
845.00 |
18,590.00 |
1,500.00 |
33,000.00 |
1,600.00 |
35,200.00 |
1,775.00 |
39,050.00 |
| 701-05-F |
side drain pipe (375 mm)
|
7.0 |
ln m |
200.00 |
1,400.00 |
420.00 |
2,940.00 |
252.00 |
1,764.00 |
280.00 |
1,960.00 |
| 701-05-G |
side drain pipe (450 mm)
|
26.0 |
ln m |
225.00 |
5,850.00 |
340.00 |
8,840.00 |
260.00 |
6,760.00 |
290.00 |
7,540.00 |
| 701-05-M |
side drain pipe (900 mm)
|
56.0 |
ln m |
365.00 |
20,440.00 |
460.00 |
25,760.00 |
541.00 |
30,296.00 |
600.00 |
33,600.00 |
| 702-03-A |
catch basins (cb-01)
|
2   |
ea |
3,000.00 |
6,000.00 |
3,000.00 |
6,000.00 |
3,500.00 |
7,000.00 |
3,900.00 |
7,800.00 |
| 704-03 |
blocked out guard rail
|
150.50 |
ln m |
75.00 |
11,287.50 |
110.00 |
16,555.00 |
74.96 |
11,281.48 |
85.00 |
12,792.50 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
30.48 |
ln m |
202.00 |
6,156.96 |
275.00 |
8,382.00 |
201.77 |
6,149.95 |
225.00 |
6,858.00 |
| 704-11-A |
guard rail end treatment (flared)
|
3   |
ea |
2,168.00 |
6,504.00 |
4,000.00 |
12,000.00 |
2,168.00 |
6,504.00 |
2,400.00 |
7,200.00 |
| 705-01 |
barbed wire fence
|
376   |
ln m |
17.00 |
6,392.00 |
20.00 |
7,520.00 |
17.00 |
6,392.00 |
19.00 |
7,144.00 |
| 708-01 |
right-of-way monument
|
29   |
ea |
185.00 |
5,365.00 |
350.00 |
10,150.00 |
120.00 |
3,480.00 |
100.00 |
2,900.00 |
| 708-02 |
right-of-way monument witness post
|
29   |
ea |
60.00 |
1,740.00 |
350.00 |
10,150.00 |
120.00 |
3,480.00 |
38.00 |
1,102.00 |
| 712-03 |
stone revetment
|
265   |
sq m |
85.00 |
22,525.00 |
90.00 |
23,850.00 |
60.00 |
15,900.00 |
65.00 |
17,225.00 |
| 713-01 |
temporary signs & barricades
|
lump |
lump |
50,000.00 |
50,000.00 |
200,000.00 |
200,000.00 |
100,000.00 |
100,000.00 |
15,000.00 |
15,000.00 |
| 713-03-A |
temporary pavement markings (broken line)(100 mm width)
(1.2 m length) |
0.050 |
km |
1,000.00 |
50.00 |
4,000.00 |
200.00 |
200.00 |
10.00 |
225.00 |
11.25 |
| 713-03-B |
temporary pavement markings (broken line)(100mm width)
(3.0m length) |
0.050 |
km |
185.00 |
9.25 |
475.00 |
23.75 |
185.00 |
9.25 |
205.00 |
10.25 |
| 713-04-A |
temporary pavement markings (solid line)(100 mm width)
|
0.400 |
km |
370.00 |
148.00 |
3,200.00 |
1,280.00 |
370.00 |
148.00 |
410.00 |
164.00 |
| 717-01 |
seeding
|
119   |
kg |
22.00 |
2,618.00 |
30.00 |
3,570.00 |
22.00 |
2,618.00 |
25.00 |
2,975.00 |
| 718-01 |
fertilizer
|
4,442   |
kg |
1.10 |
4,886.20 |
1.50 |
6,663.00 |
1.10 |
4,886.20 |
1.25 |
5,552.50 |
| 720-01-A |
erosion control system, slope protection (type a)
|
867   |
sq m |
1.90 |
1,647.30 |
2.25 |
1,950.75 |
1.90 |
1,647.30 |
2.10 |
1,820.70 |
| 722-01 |
project site laboratory
|
1   |
ea |
30,000.00 |
30,000.00 |
80,000.00 |
80,000.00 |
20,000.00 |
20,000.00 |
35,000.00 |
35,000.00 |
| 725-03 |
low profile runaround
|
1   |
ea |
65,000.00 |
65,000.00 |
250,000.00 |
250,000.00 |
130,000.00 |
130,000.00 |
125,000.00 |
125,000.00 |
| 726-01 |
bedding material
|
25.6 |
cu m |
90.00 |
2,304.00 |
130.00 |
3,328.00 |
105.00 |
2,688.00 |
115.00 |
2,944.00 |
| 727-01 |
mobilization
|
lump |
lump |
1,550,000.00 |
1,550,000.00 |
1,600,000.00 |
1,600,000.00 |
1,660,000.00 |
1,660,000.00 |
1,500,000.00 |
1,500,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
4   |
ea |
75.00 |
300.00 |
120.00 |
480.00 |
75.00 |
300.00 |
85.00 |
340.00 |
| 731-02 |
reflectorized raised pavement markers
|
1,162   |
ea |
4.50 |
5,229.00 |
6.50 |
7,553.00 |
4.50 |
5,229.00 |
5.00 |
5,810.00 |
| 732-02-A |
plastic pavement striping (solid line)(100 mm width)
|
9.302 |
km |
1,543.00 |
14,352.99 |
1,800.00 |
16,743.60 |
1,543.00 |
14,352.99 |
1,700.00 |
15,813.40 |
| 732-02-D |
plastic pavement striping (solid line)(300 mm width)
|
0.416 |
km |
9,777.00 |
4,067.23 |
5,900.00 |
2,454.40 |
9,777.00 |
4,067.23 |
11,000.00 |
4,576.00 |
| 732-03-A |
plastic pavement striping (broken line)(100 mm width)
|
0.096 |
km |
600.00 |
57.60 |
540.00 |
51.84 |
600.00 |
57.60 |
665.00 |
63.84 |
| 740-01 |
construction layout
|
lump |
lump |
300,000.00 |
300,000.00 |
150,000.00 |
150,000.00 |
500,000.00 |
500,000.00 |
275,000.00 |
275,000.00 |
| 804-01-B |
precast concrete piles (350 mm)
|
41.6 |
ln m |
157.00 |
6,531.20 |
340.00 |
14,144.00 |
315.00 |
13,104.00 |
200.00 |
8,320.00 |
| 804-01-C |
precast concrete piles (400 mm)
|
358.4 |
ln m |
186.00 |
66,662.40 |
235.00 |
84,224.00 |
230.00 |
82,432.00 |
225.00 |
80,640.00 |
| 804-01-F |
precast concrete piles (600 mm)
|
7,187.4 |
ln m |
260.00 |
1,868,724.00 |
380.00 |
2,731,212.00 |
265.00 |
1,904,661.00 |
350.00 |
2,515,590.00 |
| 804-05 |
precast concrete test piles
|
4   |
ea |
60,000.00 |
240,000.00 |
65,000.00 |
260,000.00 |
25,000.00 |
100,000.00 |
15,000.00 |
60,000.00 |
| 804-09 |
loading test piles
|
4   |
ea |
2,000.00 |
8,000.00 |
25,000.00 |
100,000.00 |
30,000.00 |
120,000.00 |
8,400.00 |
33,600.00 |
| 804-12 |
loading permanent piles
|
2   |
ea |
20,000.00 |
40,000.00 |
5,000.00 |
10,000.00 |
18,500.00 |
37,000.00 |
6,000.00 |
12,000.00 |
| 804-17 |
dynamic monitoring
|
68   |
ea |
800.00 |
54,400.00 |
500.00 |
34,000.00 |
1,500.00 |
102,000.00 |
3,400.00 |
231,200.00 |
| 805-01-B |
class a concrete (box culvert headwalls)
|
45.28 |
cu m |
1,100.00 |
49,808.00 |
1,800.00 |
81,504.00 |
1,500.00 |
67,920.00 |
2,000.00 |
90,560.00 |
| 805-01-F |
class a concrete (bents)
|
606.55 |
cu m |
1,070.00 |
649,008.50 |
900.00 |
545,895.00 |
1,100.00 |
667,205.00 |
1,500.00 |
909,825.00 |
| 805-04 |
class aa(m) concrete
|
3,276.00 |
cu m |
1,020.00 |
3,341,520.00 |
1,050.00 |
3,439,800.00 |
1,200.00 |
3,931,200.00 |
1,200.00 |
3,931,200.00 |
| 805-08-C |
precast-prestressed concrete girders (type iii)
|
5,716.80 |
ln m |
270.00 |
1,543,536.00 |
260.00 |
1,486,368.00 |
400.00 |
2,286,720.00 |
370.00 |
2,115,216.00 |
| 805-11 |
strip seal joints
|
190.00 |
ln m |
450.00 |
85,500.00 |
450.00 |
85,500.00 |
800.00 |
152,000.00 |
625.00 |
118,750.00 |
| 805-12-X |
reinforced concrete box culverts (3000 mm x 3000 mm)
|
28.40 |
ln m |
3,700.00 |
105,080.00 |
4,500.00 |
127,800.00 |
5,628.00 |
159,835.20 |
6,500.00 |
184,600.00 |
| 806-01 |
deformed reinforcing steel
|
459,304   |
kg |
2.90 |
1,331,981.60 |
2.75 |
1,263,086.00 |
2.12 |
973,724.48 |
3.20 |
1,469,772.80 |
| 807-08 |
structural metalwork
|
lump |
lump |
280,000.00 |
280,000.00 |
300,000.00 |
300,000.00 |
300,000.00 |
300,000.00 |
350,000.00 |
350,000.00 |
| 810-01 |
concrete railing (barrier)
|
2,901.94 |
ln m |
160.00 |
464,310.40 |
245.00 |
710,975.30 |
145.44 |
422,058.15 |
230.00 |
667,446.20 |
| 813-01 |
concrete approach slabs
|
240.00 |
sq m |
270.00 |
64,800.00 |
450.00 |
108,000.00 |
400.00 |
96,000.00 |
235.00 |
56,400.00 |
| S-101 |
dynamic analysis
|
68   |
ea |
1,000.00 |
68,000.00 |
2,000.00 |
136,000.00 |
500.00 |
34,000.00 |
2,500.00 |
170,000.00 |
| S-102 |
stainless steel deformed reinforcing steel
|
16,704   |
kg |
20.25 |
338,256.00 |
25.00 |
417,600.00 |
15.00 |
250,560.00 |
16.00 |
267,264.00 |
| S-103 |
continuous deck control joint
|
581.15 |
ln m |
25.00 |
14,528.75 |
30.00 |
17,434.50 |
13.00 |
7,554.95 |
45.00 |
26,151.75 |
| S-104 |
special anchor section
|
1   |
ea |
1,220.00 |
1,220.00 |
1,700.00 |
1,700.00 |
1,220.00 |
1,220.00 |
1,350.00 |
1,350.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
15,501,219.74 |
|
16,298,906.74 |
|
16,600,000.30 |
|
17,481,455.14 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - GUINN BROTHERS, LLC. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
1,650,000.00 |
1,650,000.00 |
|
|
|
|
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
lump |
50,000.00 |
50,000.00 |
|
|
|
|
|
|
| 202-02-A-01 |
removal of bridge (sta. 10+283.16, 7.6m x 139.6m
timber trestle bridge) |
1   |
ea |
250,000.00 |
250,000.00 |
|
|
|
|
|
|
| 202-02-B |
removal of concrete box culverts (sta. 8+782.00; 10 m
x 2 m x 1.22 m) |
1   |
ea |
35,000.00 |
35,000.00 |
|
|
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
18,142.8 |
sq m |
6.00 |
108,856.80 |
|
|
|
|
|
|
| 202-02-H |
removal of guard rail
|
636   |
ln m |
6.00 |
3,816.00 |
|
|
|
|
|
|
| 202-02-01 |
removal of sign 4 ft x 4 ft
|
1   |
ea |
200.00 |
200.00 |
|
|
|
|
|
|
| 202-02-02 |
removal of metal sign 3 ft x 6 ft
|
1   |
ea |
100.00 |
100.00 |
|
|
|
|
|
|
| 202-02-03 |
removal of wood frame commercial building 30 ft x
45 ft |
1   |
ea |
10,000.00 |
10,000.00 |
|
|
|
|
|
|
| 202-02-04 |
removal of wood frame sign 8 ft x 8 ft
|
1   |
ea |
200.00 |
200.00 |
|
|
|
|
|
|
| 202-02-05 |
removal of brick veneer residence 30 ft x 60 ft
|
1   |
ea |
10,000.00 |
10,000.00 |
|
|
|
|
|
|
| 202-02-06 |
removal of wood frame shed 20 ft x 30 ft
|
1   |
ea |
3,000.00 |
3,000.00 |
|
|
|
|
|
|
| 203-01 |
general excavation
|
16,416   |
cu m |
12.50 |
205,200.00 |
|
|
|
|
|
|
| 203-02 |
drainage excavation
|
1,050   |
cu m |
13.00 |
13,650.00 |
|
|
|
|
|
|
| 203-04 |
embankment
|
41,772   |
cu m |
25.00 |
1,044,300.00 |
|
|
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
40   |
ea |
10.00 |
400.00 |
|
|
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
6   |
ea |
100.00 |
600.00 |
|
|
|
|
|
|
| 204-06 |
temporary silt fencing
|
100   |
ln m |
15.00 |
1,500.00 |
|
|
|
|
|
|
| 302-02-B |
class ii base course (220 mm thick)
|
9,241.4 |
sq m |
45.00 |
415,863.00 |
|
|
|
|
|
|
| 304-01 |
lime
|
54.47 |
Mg |
350.00 |
19,064.50 |
|
|
|
|
|
|
| 304-04-D |
lime treatment (type d) (300 mm thick)
|
7,198   |
sq m |
4.00 |
28,792.00 |
|
|
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
3,200.0 |
cu m |
55.00 |
176,000.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
2,020.6 |
Mg |
165.00 |
333,399.00 |
|
|
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
675.4 |
Mg |
210.00 |
141,834.00 |
|
|
|
|
|
|
| 701-01-Q |
cross drain pipe (1500 mm rcp/pcp)
|
22.0 |
ln m |
1,265.00 |
27,830.00 |
|
|
|
|
|
|
| 701-05-F |
side drain pipe (375 mm)
|
7.0 |
ln m |
156.00 |
1,092.00 |
|
|
|
|
|
|
| 701-05-G |
side drain pipe (450 mm)
|
26.0 |
ln m |
200.00 |
5,200.00 |
|
|
|
|
|
|
| 701-05-M |
side drain pipe (900 mm)
|
56.0 |
ln m |
542.00 |
30,352.00 |
|
|
|
|
|
|
| 702-03-A |
catch basins (cb-01)
|
2   |
ea |
5,000.00 |
10,000.00 |
|
|
|
|
|
|
| 704-03 |
blocked out guard rail
|
150.50 |
ln m |
85.00 |
12,792.50 |
|
|
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
30.48 |
ln m |
250.00 |
7,620.00 |
|
|
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
3   |
ea |
2,750.00 |
8,250.00 |
|
|
|
|
|
|
| 705-01 |
barbed wire fence
|
376   |
ln m |
20.00 |
7,520.00 |
|
|
|
|
|
|
| 708-01 |
right-of-way monument
|
29   |
ea |
200.00 |
5,800.00 |
|
|
|
|
|
|
| 708-02 |
right-of-way monument witness post
|
29   |
ea |
100.00 |
2,900.00 |
|
|
|
|
|
|
| 712-03 |
stone revetment
|
265   |
sq m |
100.00 |
26,500.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
lump |
100,000.00 |
100,000.00 |
|
|
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(100 mm width)
(1.2 m length) |
0.050 |
km |
2,000.00 |
100.00 |
|
|
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(100mm width)
(3.0m length) |
0.050 |
km |
2,000.00 |
100.00 |
|
|
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(100 mm width)
|
0.400 |
km |
3,500.00 |
1,400.00 |
|
|
|
|
|
|
| 717-01 |
seeding
|
119   |
kg |
45.00 |
5,355.00 |
|
|
|
|
|
|
| 718-01 |
fertilizer
|
4,442   |
kg |
2.00 |
8,884.00 |
|
|
|
|
|
|
| 720-01-A |
erosion control system, slope protection (type a)
|
867   |
sq m |
5.00 |
4,335.00 |
|
|
|
|
|
|
| 722-01 |
project site laboratory
|
1   |
ea |
20,000.00 |
20,000.00 |
|
|
|
|
|
|
| 725-03 |
low profile runaround
|
1   |
ea |
50,000.00 |
50,000.00 |
|
|
|
|
|
|
| 726-01 |
bedding material
|
25.6 |
cu m |
130.00 |
3,328.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
lump |
1,750,000.00 |
1,750,000.00 |
|
|
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
ea |
100.00 |
400.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
1,162   |
ea |
6.00 |
6,972.00 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line)(100 mm width)
|
9.302 |
km |
2,000.00 |
18,604.00 |
|
|
|
|
|
|
| 732-02-D |
plastic pavement striping (solid line)(300 mm width)
|
0.416 |
km |
5,800.00 |
2,412.80 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(100 mm width)
|
0.096 |
km |
1,000.00 |
96.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
lump |
335,000.00 |
335,000.00 |
|
|
|
|
|
|
| 804-01-B |
precast concrete piles (350 mm)
|
41.6 |
ln m |
258.66 |
10,760.26 |
|
|
|
|
|
|
| 804-01-C |
precast concrete piles (400 mm)
|
358.4 |
ln m |
258.00 |
92,467.20 |
|
|
|
|
|
|
| 804-01-F |
precast concrete piles (600 mm)
|
7,187.4 |
ln m |
586.00 |
4,211,816.40 |
|
|
|
|
|
|
| 804-05 |
precast concrete test piles
|
4   |
ea |
75,000.00 |
300,000.00 |
|
|
|
|
|
|
| 804-09 |
loading test piles
|
4   |
ea |
1.00 |
4.00 |
|
|
|
|
|
|
| 804-12 |
loading permanent piles
|
2   |
ea |
1.00 |
2.00 |
|
|
|
|
|
|
| 804-17 |
dynamic monitoring
|
68   |
ea |
2,500.00 |
170,000.00 |
|
|
|
|
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
45.28 |
cu m |
1,500.00 |
67,920.00 |
|
|
|
|
|
|
| 805-01-F |
class a concrete (bents)
|
606.55 |
cu m |
1,350.00 |
818,842.50 |
|
|
|
|
|
|
| 805-04 |
class aa(m) concrete
|
3,276.00 |
cu m |
1,050.00 |
3,439,800.00 |
|
|
|
|
|
|
| 805-08-C |
precast-prestressed concrete girders (type iii)
|
5,716.80 |
ln m |
548.00 |
3,132,806.40 |
|
|
|
|
|
|
| 805-11 |
strip seal joints
|
190.00 |
ln m |
435.00 |
82,650.00 |
|
|
|
|
|
|
| 805-12-X |
reinforced concrete box culverts (3000 mm x 3000 mm)
|
28.40 |
ln m |
4,500.00 |
127,800.00 |
|
|
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
459,304   |
kg |
3.45 |
1,584,598.80 |
|
|
|
|
|
|
| 807-08 |
structural metalwork
|
lump |
lump |
300,000.00 |
300,000.00 |
|
|
|
|
|
|
| 810-01 |
concrete railing (barrier)
|
2,901.94 |
ln m |
175.00 |
507,839.50 |
|
|
|
|
|
|
| 813-01 |
concrete approach slabs
|
240.00 |
sq m |
350.00 |
84,000.00 |
|
|
|
|
|
|
| S-101 |
dynamic analysis
|
68   |
ea |
1,200.00 |
81,600.00 |
|
|
|
|
|
|
| S-102 |
stainless steel deformed reinforcing steel
|
16,704   |
kg |
22.40 |
374,169.60 |
|
|
|
|
|
|
| S-103 |
continuous deck control joint
|
581.15 |
ln m |
27.80 |
16,155.97 |
|
|
|
|
|
|
| S-104 |
special anchor section
|
1   |
ea |
1,500.00 |
1,500.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|