Letting of 6/25/2008 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 077-02-0017
Parish: ASCENSION
Routes: LA 621, LA 73, I-10
Description: LA 621/LA 73 AT I-10 INTERSECTION IMPROVEMENTS
Type Const: grading, drainage structures, cold planing asphaltic concrete, class ii base course,
superpave asphaltic concrete pavement, traffic signalization and related work.
Estimated Construction Cost: $2,328,293.50
 
RankLicenseBidderConstruction Bid
1 25088 RCS CONTRACTORS, INC. $2,443,821.12
 
Item Number Item Description Quantity Unit of Measure - 1 -
RCS CONTRACTORS, INC.

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 20,000.00 20,000.00            
202-02-C removal of portland cement concrete pavement 515      SQYD 15.00 7,725.00            
202-02-E removal of concrete curbs 701.0    LNFT 5.00 3,505.00            
202-02-G removal of surfacing & stabilized base 2,124.2    SQYD 7.00 14,869.40            
202-02-01 removal of existing traffic signal equipment & related
items
lump      LUMP 4,812.00 4,812.00            
203-01 general excavation 2,497      CUYD 7.50 18,727.50            
203-03 embankment 1,499      CUYD 25.00 37,475.00            
302-02-D class ii base course (8 1/2" thick) 8,599.0    SQYD 37.50 322,462.50            
502-01 superpave asphaltic concrete 1,989.5    TON 145.00 288,477.50            
509-01 cold planing asphaltic pavement 6,745      SQYD 5.50 37,097.50            
510-01 pavement patching 180      SQYD 165.00 29,700.00            
601-01-I portland cement concrete pavement (9" thick) 5,602.7    SQYD 85.00 476,229.50            
602-02 cleaning and resealing existing longitudinal and
transverse pavement joints
762      LNFT 2.00 1,524.00            
602-03 cleaning and sealing cracks 1,750      LNFT 3.50 6,125.00            
602-05-I-01 full depth patching of jointed conc pvmt (9" thick)
(16.0 sq yds & under)
229.0    SQYD 175.00 40,075.00            
602-05-I-02 full depth patching of jointed conc pvmt (9" thick)
(16.1 - 48.0 sq yds)
459.1    SQYD 169.00 77,587.90            
602-05-I-03 full depth patching of jointed conc pvmt (9" thick)
(48.1 sq yds & over)
164.7    SQYD 165.00 27,175.50            
701-01-H cross drain pipe (21" cmp) 60      LNFT 120.00 7,200.00            
701-03-F storm drain pipe (15" rcp/pcp) 8      LNFT 80.00 640.00            
701-03-G storm drain pipe (18" rcp/pcp) 201      LNFT 79.00 15,879.00            
701-03-I storm drain pipe (24" rcp/pcp) 1,116      LNFT 89.00 99,324.00            
701-03-K storm drain pipe (30" rcp/pcp) 16      LNFT 115.00 1,840.00            
701-03-O storm drain pipe (48" rcp/pcp) 14      LNFT 200.00 2,800.00            
701-09 fabricating pipe fittings 6      EACH 3,700.00 22,200.00            
701-12-I corrugated metal pipe (extension)(24") 12      LNFT 80.00 960.00            
701-15 concrete collar (collar - 01) 13      EACH 1,000.00 13,000.00            
702-03-A catch basins (cb-01) 8      EACH 2,250.00 18,000.00            
702-03-B catch basins (cb-02) 1      EACH 4,500.00 4,500.00            
702-03-C catch basins (cb-06) 1      EACH 4,700.00 4,700.00            
702-05-A cross drain end treatment (type 1 ) 4      EACH 2,900.00 11,600.00            
702-06-A side drain end treatment (type 1 ) 2      EACH 2,700.00 5,400.00            
706-02-C concrete drive (6" thick) 264.0    SQYD 70.00 18,480.00            
706-03-B incidental concrete paving (5" thick) 30.0    SQYD 60.00 1,800.00            
707-01 concrete curb 441.7    LNFT 15.00 6,625.50            
707-03 combination concrete curb & gutter 1,600.0    LNFT 25.00 40,000.00            
713-01 temporary signs & barricades lump      LUMP 31,000.00 31,000.00            
713-02-A temporary pavement markings (4" width) 136      LNFT 11.00 1,496.00            
717-01 seeding 58      LB 10.00 580.00            
718-01 fertilizer 1,650      LB 0.60 990.00            
722-01 project site laboratory 1      EACH 10,000.00 10,000.00            
726-01 bedding material 150.0    CUYD 90.00 13,500.00            
727-01 mobilization lump      LUMP 155,244.00 155,244.00            
729-01 sign (type a) 246.4    SQFT 44.00 10,841.60            
731-02 reflectorized raised pavement markers 185      EACH 5.40 999.00            
732-01-C plastic pavement striping (8" width) 1,030      LNFT 0.66 679.80            
732-01-D plastic pavement striping (12" width) 60      LNFT 1.00 60.00            
732-01-E plastic pavement striping (24" width) 1,030      LNFT 2.50 2,575.00            
732-02-A plastic pavement striping (solid line) (4" width) 2.783  MILE 2,035.00 5,663.41            
732-03-A plastic pavement striping (broken line)(4" width) 1.193  MILE 684.00 816.01            
732-04-A plastic pavement legends & symbols (arrow) 17      EACH 200.00 3,400.00            
732-04-B plastic pavement legends & symbols (double arrow) 5      EACH 215.00 1,075.00            
732-04-C plastic pavement legends & symbols (only) 6      EACH 215.00 1,290.00            
736-01 trenching and backfilling 3,650      LNFT 4.13 15,074.50            
736-03 jacked or bored conduit (3" hdpe) 1,000      LNFT 21.35 21,350.00            
736-04-B signal support (35' mast arm pole) 3      EACH 10,000.00 30,000.00            
736-04-C signal support (40' mast arm pole) 2      EACH 11,000.00 22,000.00            
736-04-D signal support (50' mast arm pole) 2      EACH 13,000.00 26,000.00            
736-04-E signal support (45' mast arm pole) 1      EACH 12,000.00 12,000.00            
736-04-F signal support (25' mast arm pole) 2      EACH 9,000.00 18,000.00            
736-04-G signal support (double mast arms 50' and 50'pole) 2      EACH 18,000.00 36,000.00            
736-05-B signal heads (3-section, 12" lens)(r,y,g) 24      EACH 867.50 20,820.00            
736-05-C signal heads (5-section, 12" lens, r, lt.y, y, lt.g, g) 5      EACH 1,362.50 6,812.50            
736-05-D signal heads (4-section, 12" lens, r, y, lt.g, g) 2      EACH 1,250.00 2,500.00            
736-05-E signal heads (3-section, 12" lens, r, lt.y, lt.g) 3      EACH 800.00 2,400.00            
736-05-F signal heads (5-section, 12" lens, r, y, rt.y, g, rt.g) 1      EACH 1,362.50 1,362.50            
736-06 signal service 4      EACH 881.25 3,525.00            
736-08 signal controller 3      EACH 25,312.50 75,937.50            
736-09 loop detector 680      LNFT 11.00 7,480.00            
736-10-A underground junction box(type d) 14      EACH 377.50 5,285.00            
736-10-B underground junction box(type f) 23      EACH 377.50 8,682.50            
736-10-C underground junction box(type h) 3      EACH 900.00 2,700.00            
736-10-D underground junction box(type j) 3      EACH 1,200.00 3,600.00            
736-11-A conduit (1" hdpe) 2,304      LNFT 3.50 8,064.00            
736-11-B conduit (2" hdpe) 195      LNFT 4.30 838.50            
736-11-C conduit (3" hdpe) 1,920      LNFT 6.45 12,384.00            
736-11-D conduit (4" hdpe) 10      LNFT 9.00 90.00            
736-12-A conductor (2c loop lead-in, 14 awg, 19x27 class c) 2,850      LNFT 1.50 4,275.00            
736-12-B conductor (3c signal, 14awg, stranded) 870      LNFT 1.40 1,218.00            
736-12-C conductor (6c, signal, 14 awg, stranded) 2,592      LNFT 2.00 5,184.00            
736-12-D conductor (10c, signal, 14 awg, stranded) 6,415      LNFT 2.50 16,037.50            
740-01 construction layout lump      LUMP 15,000.00 15,000.00            
S-001 full-depth sawcut pavement 205      LNFT 10.00 2,050.00            
S-002 paved gutter drains 6      EACH 2,750.00 16,500.00            
S-003 video detection system 4      EACH 4,350.00 17,400.00            
S-004 video detector device and connection 12      EACH 7,262.00 87,144.00            
S-005 conductor, fiber optic signal interconnect trunk line
cable (36 sm)
1,400      LNFT 5.10 7,140.00            
S-006 fiber optic drop cable, 12 fiber, (single mode) 30      LNFT 8.00 240.00            
                       
 CONTRACTOR TOTAL       2,443,821.12            