Letting of 6/25/2008 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 063-02-0053
Parish: JEFFERSON
Routes: LA 18, LA 45, LA 560-2
Description: BARATARIA BLVD. (LA 541 - AMES BLVD.)
Type Const: grad, class ii bc, cold planing, superpave acp, pccp, cleaning and resealing existing
joints, full depth patching of pccp and related work
Estimated Construction Cost: $2,342,967.61
 
RankLicenseBidderConstruction Bid
1 24901 HARD ROCK CONSTRUCTION CO. $1,781,589.65
2 38610 THREE C'S PROPERTIES INC $1,805,124.98
3 21982 FORBY CONTRACTING, INC. $2,017,655.30
4 02179 BOH BROS. CONSTRUCTION CO., LLC. $2,141,157.40
5 48896 COMMAND CONSTRUCTION INDUSTRIES LLC $2,192,516.95
 
Item Number Item Description Quantity Unit of Measure - 1 -
HARD ROCK CONSTRUCTION CO.
- 2 -
THREE C'S PROPERTIES INC
- 3 -
FORBY CONTRACTING, INC.
- 4 -
BOH BROS. CONSTRUCTION CO., LLC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-E removal of concrete curbs 2,800.0    LNFT 5.00 14,000.00 1.00 2,800.00 5.00 14,000.00 4.00 11,200.00
202-03-01 relocation of existing reusable signs 10      EACH 50.00 500.00 99.00 990.00 45.00 450.00 50.00 500.00
203-01 general excavation 2,500      CUYD 15.00 37,500.00 15.60 39,000.00 15.00 37,500.00 20.00 50,000.00
203-07 borrow (vehicular measurement) 220      CUYD 0.00 0.00 22.00 4,840.00 25.00 5,500.00 50.00 11,000.00
302-02-F class ii base course (12" thick) 2,310.0    SQYD 33.00 76,230.00 20.00 46,200.00 45.00 103,950.00 35.00 80,850.00
401-02 aggregate surface course (adjusted vehicular
measurement)
75      CUYD 115.00 8,625.00 51.00 3,825.00 100.00 7,500.00 250.00 18,750.00
502-01 superpave asphaltic concrete 1,302.2    TON 113.00 147,148.60 122.85 159,975.27 113.75 148,125.25 140.00 182,308.00
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
194.0    TON 189.00 36,666.00 204.12 39,599.28 189.00 36,666.00 140.00 27,160.00
509-01 cold planing asphaltic pavement 6,705      SQYD 4.55 30,507.75 4.91 32,921.55 4.55 30,507.75 6.00 40,230.00
509-02 contractor retained reclaimed asphaltic pavement - 372      CUYD 15.00 - 5,580.00 14.00 - 5,208.00 15.00 - 5,580.00 5.00 - 1,860.00
510-01-B pavement patching (12" minimum thickness) 50      SQYD 173.00 8,650.00 186.84 9,342.00 173.00 8,650.00 150.00 7,500.00
601-01-K portland cement concrete pavement (10" thick) 2,300.0    SQYD 70.00 161,000.00 78.60 180,780.00 125.00 287,500.00 95.00 218,500.00
602-02-A cleaning and resealing existing longitudinal pavement
joints
60,138      LNFT 1.50 90,207.00 4.00 240,552.00 0.75 45,103.50 1.60 96,220.80
602-02-B cleaning and resealing existing transverse pavement
joints
64,056      LNFT 1.50 96,084.00 4.00 256,224.00 1.50 96,084.00 1.60 102,489.60
602-05-K-01 full depth patching of jointed conc pvmt (10" thick)
(16.0 sq yds & under)
16.0    SQYD 300.00 4,800.00 230.00 3,680.00 250.00 4,000.00 300.00 4,800.00
602-05-K-02 full depth patching of jointed conc pvmt (10" thick)
(16.1-48.0 sq yds)
1,200.0    SQYD 189.00 226,800.00 110.00 132,000.00 185.00 222,000.00 220.00 264,000.00
602-05-K-03 full depth patching of jointed conc pvmt (10" thick)
(48.1 sq yds & over)
2,320.0    SQYD 189.00 438,480.00 110.00 255,200.00 175.00 406,000.00 200.00 464,000.00
702-04-A adjusting manholes 9      EACH 500.00 4,500.00 1,000.00 9,000.00 1,000.00 9,000.00 500.00 4,500.00
702-04-B adjusting catch basins 25      EACH 1,000.00 25,000.00 1,200.00 30,000.00 1,500.00 37,500.00 500.00 12,500.00
707-01 concrete curb 4,840.0    LNFT 7.00 33,880.00 13.50 65,340.00 12.00 58,080.00 8.00 38,720.00
707-04 asphaltic curb 500.0    LNFT 27.30 13,650.00 29.48 14,740.00 27.30 13,650.00 15.00 7,500.00
713-01 temporary signs & barricades lump      LUMP 70,000.00 70,000.00 85,600.00 85,600.00 120,000.00 120,000.00 100,000.00 100,000.00
713-02-C temporary pavement markings (8" width) 1,564      LNFT 0.30 469.20 0.32 500.48 0.30 469.20 0.50 782.00
713-02-E temporary pavement markings (24" width) 1,120      LNFT 0.90 1,008.00 0.97 1,086.40 0.90 1,008.00 1.00 1,120.00
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
6.900  MILE 425.00 2,932.50 216.00 1,490.40 500.00 3,450.00 300.00 2,070.00
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
6.230  MILE 295.00 1,837.85 318.60 1,984.88 295.00 1,837.85 300.00 1,869.00
713-04-A temporary pavement markings (solid line)(4" width) 14.090  MILE 475.00 6,692.75 513.00 7,228.17 475.00 6,692.75 500.00 7,045.00
713-05-A temporary pavement legends and symbols (arrow) 11      EACH 50.00 550.00 54.00 594.00 50.00 550.00 50.00 550.00
713-05-C temporary pavement legends and symbols (only) 8      EACH 75.00 600.00 81.00 648.00 75.00 600.00 50.00 400.00
713-05-D temporary pavement legends and symbols (rr crossing) 2      EACH 200.00 400.00 216.00 432.00 200.00 400.00 150.00 300.00
713-05-E temporary pavement legends and symbols (school
crossing)
3      EACH 200.00 600.00 216.00 648.00 200.00 600.00 150.00 450.00
727-01 mobilization lump      LUMP 128,550.00 128,550.00 31,300.00 31,300.00 180,000.00 180,000.00 210,000.00 210,000.00
729-16-C object marker assembly (type 3) 4      EACH 80.00 320.00 85.00 340.00 80.00 320.00 90.00 360.00
729-19-C dead end road installations(type c) 1      EACH 470.00 470.00 810.00 810.00 470.00 470.00 500.00 500.00
731-02 reflectorized raised pavement markers 2,922      EACH 4.90 14,317.80 5.29 15,457.38 4.90 14,317.80 6.00 17,532.00
732-01-C plastic pavement striping (8" width) 1,564      LNFT 0.85 1,329.40 0.92 1,438.88 0.85 1,329.40 1.00 1,564.00
732-01-E plastic pavement striping (24" width) 596      LNFT 2.95 1,758.20 3.19 1,901.24 2.95 1,758.20 3.00 1,788.00
732-02-A plastic pavement striping (solid line) (4" width) 12.510  MILE 2,590.00 32,400.90 2,797.20 34,992.97 2,590.00 32,400.90 2,900.00 36,279.00
732-03-A plastic pavement striping (broken line)(4" width) 5.930  MILE 590.00 3,498.70 637.20 3,778.60 590.00 3,498.70 600.00 3,558.00
732-04-A plastic pavement legends & symbols (arrow) 11      EACH 165.00 1,815.00 178.20 1,960.20 165.00 1,815.00 180.00 1,980.00
732-04-C plastic pavement legends & symbols (only) 8      EACH 195.00 1,560.00 210.60 1,684.80 195.00 1,560.00 200.00 1,600.00
732-04-D plastic pavement legends & symbols (rr crossing) 2      EACH 400.00 800.00 432.00 864.00 400.00 800.00 400.00 800.00
732-04-E plastic pavement legends & symbols (school crossing) 3      EACH 475.00 1,425.00 513.00 1,539.00 475.00 1,425.00 400.00 1,200.00
732-05 removal of existing markings 5.200  MILE 3,500.00 18,200.00 3,780.00 19,656.00 3,500.00 18,200.00 3,600.00 18,720.00
735-01 mailboxes 1      EACH 1.00 1.00 6.48 6.48 1.00 1.00 2.00 2.00
735-02 mailbox supports (single) 1      EACH 85.00 85.00 162.00 162.00 85.00 85.00 100.00 100.00
736-09 loop detector 500      LNFT 14.00 7,000.00 15.12 7,560.00 14.00 7,000.00 15.00 7,500.00
740-01 construction layout lump      LUMP 17,000.00 17,000.00 35,300.00 35,300.00 25,000.00 25,000.00 50,000.00 50,000.00
741-11 adjusting water valve and meter box 1      EACH 500.00 500.00 1,000.00 1,000.00 500.00 500.00 1,000.00 1,000.00
S-001 full depth sawcut of concrete pavement 1,540      LNFT 8.00 12,320.00 12.00 18,480.00 12.00 18,480.00 13.00 20,020.00
S-002 straightening existing signs 20      ea 50.00 1,000.00 65.00 1,300.00 45.00 900.00 50.00 1,000.00
S-003 cleaning existing ditches 100      LNFT 15.00 1,500.00 25.00 2,500.00 20.00 2,000.00 50.00 5,000.00
S-004 transplanting trees 4      EACH 500.00 2,000.00 270.00 1,080.00 1,000.00 4,000.00 1,300.00 5,200.00
                       
 CONTRACTOR TOTAL       1,781,589.65   1,805,124.98   2,017,655.30   2,141,157.40
 
Item Number Item Description Quantity Unit of Measure - 5 -
COMMAND CONSTRUCTION INDUSTRIES LLC

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-E removal of concrete curbs 2,800.0    LNFT 1.00 2,800.00            
202-03-01 relocation of existing reusable signs 10      EACH 45.00 450.00            
203-01 general excavation 2,500      CUYD 1.00 2,500.00            
203-07 borrow (vehicular measurement) 220      CUYD 30.00 6,600.00            
302-02-F class ii base course (12" thick) 2,310.0    SQYD 40.00 92,400.00            
401-02 aggregate surface course (adjusted vehicular
measurement)
75      CUYD 100.00 7,500.00            
502-01 superpave asphaltic concrete 1,302.2    TON 120.00 156,264.00            
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
194.0    TON 200.00 38,800.00            
509-01 cold planing asphaltic pavement 6,705      SQYD 5.00 33,525.00            
509-02 contractor retained reclaimed asphaltic pavement - 372      CUYD 15.00 - 5,580.00            
510-01-B pavement patching (12" minimum thickness) 50      SQYD 200.00 10,000.00            
601-01-K portland cement concrete pavement (10" thick) 2,300.0    SQYD 70.00 161,000.00            
602-02-A cleaning and resealing existing longitudinal pavement
joints
60,138      LNFT 1.50 90,207.00            
602-02-B cleaning and resealing existing transverse pavement
joints
64,056      LNFT 1.50 96,084.00            
602-05-K-01 full depth patching of jointed conc pvmt (10" thick)
(16.0 sq yds & under)
16.0    SQYD 500.00 8,000.00            
602-05-K-02 full depth patching of jointed conc pvmt (10" thick)
(16.1-48.0 sq yds)
1,200.0    SQYD 190.00 228,000.00            
602-05-K-03 full depth patching of jointed conc pvmt (10" thick)
(48.1 sq yds & over)
2,320.0    SQYD 170.00 394,400.00            
702-04-A adjusting manholes 9      EACH 1,000.00 9,000.00            
702-04-B adjusting catch basins 25      EACH 1,000.00 25,000.00            
707-01 concrete curb 4,840.0    LNFT 15.00 72,600.00            
707-04 asphaltic curb 500.0    LNFT 27.00 13,500.00            
713-01 temporary signs & barricades lump      LUMP 300,000.00 300,000.00            
713-02-C temporary pavement markings (8" width) 1,564      LNFT 0.30 469.20            
713-02-E temporary pavement markings (24" width) 1,120      LNFT 1.00 1,120.00            
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
6.900  MILE 350.00 2,415.00            
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
6.230  MILE 300.00 1,869.00            
713-04-A temporary pavement markings (solid line)(4" width) 14.090  MILE 475.00 6,692.75            
713-05-A temporary pavement legends and symbols (arrow) 11      EACH 50.00 550.00            
713-05-C temporary pavement legends and symbols (only) 8      EACH 75.00 600.00            
713-05-D temporary pavement legends and symbols (rr crossing) 2      EACH 200.00 400.00            
713-05-E temporary pavement legends and symbols (school
crossing)
3      EACH 200.00 600.00            
727-01 mobilization lump      LUMP 200,000.00 200,000.00            
729-16-C object marker assembly (type 3) 4      EACH 100.00 400.00            
729-19-C dead end road installations(type c) 1      EACH 500.00 500.00            
731-02 reflectorized raised pavement markers 2,922      EACH 5.00 14,610.00            
732-01-C plastic pavement striping (8" width) 1,564      LNFT 1.00 1,564.00            
732-01-E plastic pavement striping (24" width) 596      LNFT 3.00 1,788.00            
732-02-A plastic pavement striping (solid line) (4" width) 12.510  MILE 3,000.00 37,530.00            
732-03-A plastic pavement striping (broken line)(4" width) 5.930  MILE 600.00 3,558.00            
732-04-A plastic pavement legends & symbols (arrow) 11      EACH 200.00 2,200.00            
732-04-C plastic pavement legends & symbols (only) 8      EACH 200.00 1,600.00            
732-04-D plastic pavement legends & symbols (rr crossing) 2      EACH 400.00 800.00            
732-04-E plastic pavement legends & symbols (school crossing) 3      EACH 500.00 1,500.00            
732-05 removal of existing markings 5.200  MILE 3,500.00 18,200.00            
735-01 mailboxes 1      EACH 1.00 1.00            
735-02 mailbox supports (single) 1      EACH 100.00 100.00            
736-09 loop detector 500      LNFT 15.00 7,500.00            
740-01 construction layout lump      LUMP 100,000.00 100,000.00            
741-11 adjusting water valve and meter box 1      EACH 400.00 400.00            
S-001 full depth sawcut of concrete pavement 1,540      LNFT 25.00 38,500.00            
S-002 straightening existing signs 20      ea 50.00 1,000.00            
S-003 cleaning existing ditches 100      LNFT 10.00 1,000.00            
S-004 transplanting trees 4      EACH 500.00 2,000.00            
                       
 CONTRACTOR TOTAL       2,192,516.95            