Letting of 6/25/2008 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 052-30-0022
Parish: AVOYELLES
Routes: LA 1
Description: JCT. LA 114 - JCT. LA 107
Type Const: pavement patching, ultra-thin hmac wearing course system, and related work.
Estimated Construction Cost: $1,038,488.11
 
RankLicenseBidderConstruction Bid
1 12312 GILCHRIST CONSTRUCTION CO. LLC $1,026,109.72
2 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $1,069,475.00
3 05789 D & J CONSTRUCTION CO., INC. $1,170,896.34
4 34356 PRAIRIE CONTRACTORS INC. $1,601,676.20
 
Item Number Item Description Quantity Unit of Measure - 1 -
GILCHRIST CONSTRUCTION CO. LLC
- 2 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 3 -
D & J CONSTRUCTION CO., INC.
- 4 -
PRAIRIE CONTRACTORS INC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
510-01-B pavement patching (12" minimum thickness) 185      SQYD 250.00 46,250.00 205.00 37,925.00 175.00 32,375.00 175.00 32,375.00
713-01 temporary signs & barricades lump      LUMP 15,000.00 15,000.00 41,500.00 41,500.00 33,000.00 33,000.00 100,000.00 100,000.00
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
7.319  MILE 250.00 1,829.75 650.00 4,757.35 250.00 1,829.75 500.00 3,659.50
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
6.459  MILE 1.00 6.46 350.00 2,260.65 200.00 1,291.80 1.00 6.46
713-04-A temporary pavement markings (solid line)(4" width) 17.541  MILE 1.00 17.54 650.00 11,401.65 1.00 17.54 1.00 17.54
727-01 mobilization lump      LUMP 50,000.00 50,000.00 100,000.00 100,000.00 45,000.00 45,000.00 100,000.00 100,000.00
731-02 reflectorized raised pavement markers 968      EACH 5.50 5,324.00 5.00 4,840.00 6.00 5,808.00 6.00 5,808.00
732-01-E plastic pavement striping (24" width) 24      LNFT 4.40 105.60 3.25 78.00 25.00 600.00 4.00 96.00
732-02-A plastic pavement striping (solid line) (4" width) 17.541  MILE 2,800.00 49,114.80 4,000.00 70,164.00 3,000.00 52,623.00 3,000.00 52,623.00
732-03-A plastic pavement striping (broken line)(4" width) 6.459  MILE 730.00 4,715.07 650.00 4,198.35 1,000.00 6,459.00 800.00 5,167.20
735-01 mailboxes 19      EACH 10.00 190.00 1.00 19.00 25.00 475.00 1.00 19.00
735-02 mailbox supports (single) 12      EACH 120.00 1,440.00 100.00 1,200.00 125.00 1,500.00 200.00 2,400.00
735-04 mailbox supports (multiple) 2      EACH 250.00 500.00 275.00 550.00 350.00 700.00 400.00 800.00
740-01 construction layout lump      LUMP 12,000.00 12,000.00 10,000.00 10,000.00 15,000.00 15,000.00 100.00 100.00
S-001 saw cutting 4,440      INFT 2.00 8,880.00 0.30 1,332.00 0.85 3,774.00 5.00 22,200.00
S-002 sawcuts in asphaltic concrete lifts 536      LNFT 2.00 1,072.00 4.50 2,412.00 2.00 1,072.00 5.00 2,680.00
S-003 sawing and sealing transverse joints in asphaltic
concrete overlay
536      LNFT 2.00 1,072.00 6.50 3,484.00 5.00 2,680.00 6.00 3,216.00
S-004 ultra-thin hmac wearing course system (0.75 inch thick) 110,479      SQYD 7.50 828,592.50 7.00 773,353.00 8.75 966,691.25 11.50 1,270,508.50
                       
 CONTRACTOR TOTAL       1,026,109.72   1,069,475.00   1,170,896.34   1,601,676.20