| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - MADDEN CONTRACTING CO., INC. |
- 2 - GILCHRIST CONSTRUCTION CO. LLC |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 502-01 |
superpave asphaltic concrete
|
1,627.7 |
TON |
122.31 |
199,083.99 |
153.00 |
249,038.10 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
10.0 |
TON |
122.31 |
1,223.10 |
650.00 |
6,500.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
18,016   |
SQYD |
3.81 |
68,640.96 |
2.50 |
45,040.00 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 517   |
CUYD |
0.01 |
- 5.17 |
0.01 |
- 5.17 |
|
|
|
|
| 510-01-B |
pavement patching (12" minimum thickness)
|
675   |
SQYD |
68.80 |
46,440.00 |
150.00 |
101,250.00 |
|
|
|
|
| 702-04-A |
adjusting manholes
|
2   |
EACH |
1,000.00 |
2,000.00 |
2,200.00 |
4,400.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
35,500.00 |
35,500.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
3.294 |
MILE |
400.00 |
1,317.60 |
1.00 |
3.29 |
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
1.322 |
MILE |
1.00 |
1.32 |
1.00 |
1.32 |
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
3.735 |
MILE |
1.00 |
3.74 |
250.00 |
933.75 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
35,500.00 |
35,500.00 |
60,000.00 |
60,000.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
440   |
EACH |
4.50 |
1,980.00 |
5.00 |
2,200.00 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
675   |
LNFT |
1.00 |
675.00 |
1.00 |
675.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
100   |
LNFT |
3.00 |
300.00 |
4.00 |
400.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
3.735 |
MILE |
2,500.00 |
9,337.50 |
2,500.00 |
9,337.50 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.322 |
MILE |
700.00 |
925.40 |
750.00 |
991.50 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
16   |
EACH |
150.00 |
2,400.00 |
200.00 |
3,200.00 |
|
|
|
|
| 732-04-D |
plastic pavement legends & symbols (rr crossing)
|
2   |
EACH |
400.00 |
800.00 |
250.00 |
500.00 |
|
|
|
|
| 736-09 |
loop detector
|
700   |
LNFT |
18.00 |
12,600.00 |
18.00 |
12,600.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
14,350.00 |
14,350.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 741-11 |
adjusting water valve and meter box
|
5   |
EACH |
750.00 |
3,750.00 |
200.00 |
1,000.00 |
|
|
|
|
| S-001 |
saw cutting
|
18,500   |
INFT |
0.01 |
185.00 |
2.50 |
46,250.00 |
|
|
|
|
| S-002 |
sawcuts in asphaltic concrete lifts
|
11,868   |
LNFT |
1.25 |
14,835.00 |
1.00 |
11,868.00 |
|
|
|
|
| S-003 |
sawing and sealing longitudinal joints in asphaltic
concrete overlay |
3,560   |
LNFT |
1.50 |
5,340.00 |
1.00 |
3,560.00 |
|
|
|
|
| S-004 |
sawing and sealing transverse joints in asphaltic
concrete overlay |
8,308   |
LNFT |
1.75 |
14,539.00 |
1.00 |
8,308.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
471,722.44 |
|
588,051.29 |
|
|
|
|
|