| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - GILCHRIST CONSTRUCTION CO. LLC |
- 2 - JAMES CONSTRUCTION GROUP LLC |
- 3 - SPECIALTY CONTRACTORS |
- 4 - DENTON-JAMES LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
600,000.00 |
600,000.00 |
350,000.00 |
350,000.00 |
1,027,000.00 |
1,027,000.00 |
800,000.00 |
800,000.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
75,000.00 |
75,000.00 |
25,000.00 |
25,000.00 |
15,000.00 |
15,000.00 |
45,000.00 |
45,000.00 |
| 202-02-B-01 |
removal of concrete box culverts (2' x 2')(sta.
3234+47) |
1   |
EACH |
1,000.00 |
1,000.00 |
2,500.00 |
2,500.00 |
1,000.00 |
1,000.00 |
2,000.00 |
2,000.00 |
| 202-02-B-02 |
removal of concrete box culverts (3' x 3')(sta.
3279+37) |
1   |
EACH |
1,000.00 |
1,000.00 |
2,800.00 |
2,800.00 |
1,000.00 |
1,000.00 |
3,000.00 |
3,000.00 |
| 202-02-B-03 |
removal of concrete box culverts (3' x 5')(sta.
3292+37) |
1   |
EACH |
1,000.00 |
1,000.00 |
3,000.00 |
3,000.00 |
1,000.00 |
1,000.00 |
4,000.00 |
4,000.00 |
| 202-02-B-04 |
removal of concrete box culverts (2' x 2')(sta.
3429+65) |
1   |
EACH |
1,000.00 |
1,000.00 |
2,500.00 |
2,500.00 |
1,000.00 |
1,000.00 |
2,000.00 |
2,000.00 |
| 202-02-B-05 |
removal of concrete box culverts (5' x 5')(sta.
3475+55) |
1   |
EACH |
1,000.00 |
1,000.00 |
3,800.00 |
3,800.00 |
2,000.00 |
2,000.00 |
7,000.00 |
7,000.00 |
| 202-02-B-06 |
removal of concrete box culverts (2' x 2')(sta.
3570+09) |
1   |
EACH |
1,000.00 |
1,000.00 |
2,500.00 |
2,500.00 |
1,000.00 |
1,000.00 |
2,000.00 |
2,000.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
34,536.3 |
SQYD |
1.75 |
60,438.53 |
9.00 |
310,826.70 |
4.50 |
155,413.35 |
6.00 |
207,217.80 |
| 202-02-H |
removal of guard rail
|
1,698   |
LNFT |
8.85 |
15,027.30 |
3.00 |
5,094.00 |
3.00 |
5,094.00 |
5.00 |
8,490.00 |
| 202-02-01 |
removal of concrete headwall (2-4' x 4' )(lt. of sta.
3211+87) |
1   |
EACH |
1,000.00 |
1,000.00 |
500.00 |
500.00 |
300.00 |
300.00 |
1,400.00 |
1,400.00 |
| 202-02-02 |
removal of concrete headwall (2-4' x 4' )(rt. of sta.
3211+87) |
1   |
EACH |
1,000.00 |
1,000.00 |
500.00 |
500.00 |
300.00 |
300.00 |
1,400.00 |
1,400.00 |
| 202-02-03 |
removal of concrete headwall (5-8' x 8' )(lt. of sta.
3366+41) |
1   |
EACH |
1,000.00 |
1,000.00 |
1,000.00 |
1,000.00 |
600.00 |
600.00 |
3,000.00 |
3,000.00 |
| 202-02-04 |
removal of concrete headwall (4-6' x 6' )(lt. of sta.
3396+50) |
1   |
EACH |
1,000.00 |
1,000.00 |
800.00 |
800.00 |
500.00 |
500.00 |
2,000.00 |
2,000.00 |
| 202-02-05 |
removal of concrete headwall (3-5' x 5')(lt. of sta.
3411+90) |
1   |
EACH |
1,000.00 |
1,000.00 |
600.00 |
600.00 |
400.00 |
400.00 |
2,000.00 |
2,000.00 |
| 202-02-06 |
removal of concrete headwall (5' x 5' )(lt. of sta.
3464+69) |
1   |
EACH |
1,000.00 |
1,000.00 |
500.00 |
500.00 |
200.00 |
200.00 |
2,000.00 |
2,000.00 |
| 202-02-07 |
removal of concrete headwall (5' x 5' )(rt. of sta.
3464+69) |
1   |
EACH |
1,000.00 |
1,000.00 |
500.00 |
500.00 |
200.00 |
200.00 |
2,000.00 |
2,000.00 |
| 202-02-08 |
removal of concrete headwall (4-5' x 5')(rt. of sta.
3515+42) |
1   |
EACH |
1,000.00 |
1,000.00 |
1,000.00 |
1,000.00 |
500.00 |
500.00 |
2,200.00 |
2,200.00 |
| 202-02-09 |
removal of 1,760 sq. ft. wood frame residence on piers
(rt. of sta. 3224+25)(cont. friable & non-friable asb.) |
1   |
EACH |
1,000.00 |
1,000.00 |
7,850.00 |
7,850.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-10 |
removal of 2,940 sq. ft. wood frame residence on piers
(rt. of sta. 3226+50)(contains non-friable asbestos) |
1   |
EACH |
1,000.00 |
1,000.00 |
5,350.00 |
5,350.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-11 |
removal of 490 sq. ft. wood shed on slab (rt. of sta.
3228+00) |
1   |
EACH |
1,000.00 |
1,000.00 |
1,400.00 |
1,400.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-12 |
removal of 1,860 sq. ft. wood frame residence on piers
(rt. of sta. 3229+00)(contains non-friable asbestos) |
1   |
EACH |
1,000.00 |
1,000.00 |
4,350.00 |
4,350.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-13 |
removal of 1,080 sq. ft. cinder block residence on
slab (rt. of sta. 3230+12) |
1   |
EACH |
1,000.00 |
1,000.00 |
2,500.00 |
2,500.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-14 |
removal of 1,080 sq. ft. cinder block residence on
slab (rt. of sta. 3231+14)(contains non-friable asbestos) |
1   |
EACH |
1,000.00 |
1,000.00 |
2,500.00 |
2,500.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-15 |
removal of 2,600 sq. ft. wood frame residence on piers
(rt. of sta. 3276+25)(contains non-friable asbestos) |
1   |
EACH |
1,000.00 |
1,000.00 |
4,350.00 |
4,350.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-16 |
removal of 212 sq. ft. shed (rt. of sta. 3276+25)
|
1   |
EACH |
500.00 |
500.00 |
400.00 |
400.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-17 |
removal of 1,490 sq. ft. brick veneer residence on
slab (lt. of sta. 3307+50)(contains non-friable asbestos) |
1   |
EACH |
1,000.00 |
1,000.00 |
4,850.00 |
4,850.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-18 |
removal of 1,050 sq. ft. mobile home (lt. of sta.
3308+86) |
1   |
EACH |
1,000.00 |
1,000.00 |
3,000.00 |
3,000.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-19 |
removal of 1,530 sq. ft. wood frame residence (lt. of
sta. 3310+65) |
1   |
EACH |
1,000.00 |
1,000.00 |
3,000.00 |
3,000.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-20 |
removal of 200 sq. ft. metal shed (lt. of sta. 3310+65)
|
1   |
EACH |
1,000.00 |
1,000.00 |
400.00 |
400.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-21 |
removal of 3,240 sq. ft. brick veneer residence on
slab (lt. of sta. 3322+50)(contains non-friable asbestos) |
1   |
EACH |
1,000.00 |
1,000.00 |
5,350.00 |
5,350.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-22 |
removal of 1,100 sq. ft. block residence on slab (lt.
of sta. 3325+28) (contains non-friable asbestos) |
1   |
EACH |
1,000.00 |
1,000.00 |
3,850.00 |
3,850.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-23 |
removal of 1,100 sq. ft. block residence on slab (lt.
of sta. 3326+00) (contains non-friable asbestos) |
1   |
EACH |
1,000.00 |
1,000.00 |
3,850.00 |
3,850.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-24 |
removal of 2,200 sq. ft. brick veneer residence on
slab (lt. of sta. 3327+28)(contains non-friable asbestos) |
1   |
EACH |
1,000.00 |
1,000.00 |
4,850.00 |
4,850.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-25 |
removal of 2,640 sq. ft. brick veneer residence on
slab (lt. of sta. 3328+75)(cont. friable & non-friable asb.) |
1   |
EACH |
1,000.00 |
1,000.00 |
5,350.00 |
5,350.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-26 |
removal of 3,504 sq. ft. concrete slab (lt. of sta.
3332+25)(contains non-friable asbestos) |
1   |
EACH |
500.00 |
500.00 |
1,500.00 |
1,500.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-27 |
removal of 2,090 sq. ft. wood frame residence (lt. of
sta. 3335+80) (contains friable asbestos) |
1   |
EACH |
1,000.00 |
1,000.00 |
8,850.00 |
8,850.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-28 |
removal of 5,050 sq. ft. metal building on slab (lt.
of sta. 3337+50) |
1   |
EACH |
1,000.00 |
1,000.00 |
3,000.00 |
3,000.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-29 |
removal of 660 sq. ft. mobile home (lt. of sta.
3337+60) |
1   |
EACH |
150.00 |
150.00 |
2,500.00 |
2,500.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-30 |
removal of 330 sq. ft. shed (lt. of sta. 3346+90)
|
1   |
EACH |
1,000.00 |
1,000.00 |
400.00 |
400.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 203-01 |
general excavation
|
311,197   |
CUYD |
2.90 |
902,471.30 |
2.00 |
622,394.00 |
1.75 |
544,594.75 |
3.40 |
1,058,069.80 |
| 203-02 |
drainage excavation
|
23,346   |
CUYD |
6.30 |
147,079.80 |
10.00 |
233,460.00 |
4.00 |
93,384.00 |
7.00 |
163,422.00 |
| 203-03 |
embankment
|
600,758   |
CUYD |
6.25 |
3,754,737.50 |
6.50 |
3,904,927.00 |
4.00 |
2,403,032.00 |
6.60 |
3,965,002.80 |
| 204-02 |
temporary hay or straw bales
|
259   |
EACH |
13.00 |
3,367.00 |
30.00 |
7,770.00 |
10.00 |
2,590.00 |
10.00 |
2,590.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
198   |
EACH |
165.00 |
32,670.00 |
350.00 |
69,300.00 |
60.00 |
11,880.00 |
130.00 |
25,740.00 |
| 204-05-B |
temporary sediment check dams (stone)
|
244   |
EACH |
750.00 |
183,000.00 |
400.00 |
97,600.00 |
250.00 |
61,000.00 |
800.00 |
195,200.00 |
| 204-06 |
temporary silt fencing
|
40,000   |
LNFT |
1.30 |
52,000.00 |
4.00 |
160,000.00 |
2.00 |
80,000.00 |
1.70 |
68,000.00 |
| 204-07 |
temporary stone construction entrance
|
10   |
EACH |
3,000.00 |
30,000.00 |
900.00 |
9,000.00 |
2,000.00 |
20,000.00 |
2,500.00 |
25,000.00 |
| 302-02-C-01 |
class ii base course (8" thick)(soil cement)
|
195,143.2 |
SQYD |
8.00 |
1,561,145.60 |
8.00 |
1,561,145.60 |
8.36 |
1,631,397.15 |
8.50 |
1,658,717.20 |
| 302-02-G-01 |
class ii base course (4.75" thick)(stone or recycled
pccp) |
17,770.1 |
SQYD |
8.00 |
142,160.80 |
12.00 |
213,241.20 |
13.10 |
232,788.31 |
14.00 |
248,781.40 |
| 302-02-H-01 |
class ii base course (5.75" thick)(stone or recycled
pccp) |
23,582.3 |
SQYD |
8.50 |
200,449.55 |
13.00 |
306,569.90 |
15.72 |
370,713.76 |
16.00 |
377,316.80 |
| 304-05 |
lime treatment (type e)
|
414.92 |
TON |
290.00 |
120,326.80 |
165.00 |
68,461.80 |
275.00 |
114,103.00 |
400.00 |
165,968.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
599   |
CUYD |
85.00 |
50,915.00 |
55.00 |
32,945.00 |
90.00 |
53,910.00 |
75.00 |
44,925.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
4,000.0 |
CUYD |
45.00 |
180,000.00 |
32.00 |
128,000.00 |
25.00 |
100,000.00 |
60.00 |
240,000.00 |
| 509-01 |
cold planing asphaltic pavement
|
1,659   |
SQYD |
5.00 |
8,295.00 |
3.50 |
5,806.50 |
6.00 |
9,954.00 |
12.00 |
19,908.00 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 92   |
CUYD |
0.10 |
- 9.20 |
1.00 |
- 92.00 |
1.00 |
- 92.00 |
0.01 |
- 0.92 |
| 510-01-C |
pavement patching (14" minimum thickness)
|
2,622   |
SQYD |
100.00 |
262,200.00 |
135.00 |
353,970.00 |
145.00 |
380,190.00 |
130.00 |
340,860.00 |
| 701-01-F |
cross drain pipe (15" rcp/pcp)
|
2,057   |
LNFT |
75.00 |
154,275.00 |
60.00 |
123,420.00 |
45.00 |
92,565.00 |
60.00 |
123,420.00 |
| 701-01-I |
cross drain pipe (24" rcp/pcp)
|
512   |
LNFT |
95.00 |
48,640.00 |
75.00 |
38,400.00 |
50.00 |
25,600.00 |
80.00 |
40,960.00 |
| 701-01-K |
cross drain pipe (30" rcp/pcp)
|
400   |
LNFT |
100.00 |
40,000.00 |
115.00 |
46,000.00 |
80.00 |
32,000.00 |
100.00 |
40,000.00 |
| 701-01-M |
cross drain pipe (36" rcp/pcp)
|
400   |
LNFT |
130.00 |
52,000.00 |
150.00 |
60,000.00 |
106.00 |
42,400.00 |
120.00 |
48,000.00 |
| 701-01-N |
cross drain pipe (42" rcp/pcp)
|
144   |
LNFT |
180.00 |
25,920.00 |
165.00 |
23,760.00 |
150.00 |
21,600.00 |
170.00 |
24,480.00 |
| 701-01-O |
cross drain pipe (48" rcp/pcp)
|
210   |
LNFT |
230.00 |
48,300.00 |
195.00 |
40,950.00 |
180.00 |
37,800.00 |
200.00 |
42,000.00 |
| 701-02-E |
cross drain pipe arch (30" equiv. rcpa)
|
184   |
LNFT |
130.00 |
23,920.00 |
162.00 |
29,808.00 |
100.00 |
18,400.00 |
120.00 |
22,080.00 |
| 701-02-F |
cross drain pipe arch (36" equiv. rcpa)
|
1,152   |
LNFT |
140.00 |
161,280.00 |
150.00 |
172,800.00 |
130.00 |
149,760.00 |
140.00 |
161,280.00 |
| 701-02-G |
cross drain pipe arch (42" equiv. rcpa)
|
104   |
LNFT |
205.00 |
21,320.00 |
200.00 |
20,800.00 |
161.00 |
16,744.00 |
170.00 |
17,680.00 |
| 701-02-H |
cross drain pipe arch (48" equiv. rcpa)
|
864   |
LNFT |
195.00 |
168,480.00 |
159.00 |
137,376.00 |
196.00 |
169,344.00 |
200.00 |
172,800.00 |
| 701-02-I |
cross drain pipe arch (54" equiv. rcpa)
|
208   |
LNFT |
260.00 |
54,080.00 |
214.00 |
44,512.00 |
227.00 |
47,216.00 |
230.00 |
47,840.00 |
| 701-05-G |
side drain pipe (18")
|
2,612   |
LNFT |
30.00 |
78,360.00 |
72.00 |
188,064.00 |
47.00 |
122,764.00 |
45.00 |
117,540.00 |
| 701-05-I |
side drain pipe (24")
|
424   |
LNFT |
43.00 |
18,232.00 |
70.00 |
29,680.00 |
50.00 |
21,200.00 |
58.00 |
24,592.00 |
| 701-05-K |
side drain pipe (30")
|
124   |
LNFT |
71.00 |
8,804.00 |
108.00 |
13,392.00 |
80.00 |
9,920.00 |
70.00 |
8,680.00 |
| 701-05-M |
side drain pipe (36")
|
130   |
LNFT |
80.00 |
10,400.00 |
92.00 |
11,960.00 |
106.00 |
13,780.00 |
100.00 |
13,000.00 |
| 701-05-O |
side drain pipe (48")
|
152   |
LNFT |
120.00 |
18,240.00 |
159.00 |
24,168.00 |
180.00 |
27,360.00 |
140.00 |
21,280.00 |
| 701-05-S |
side drain pipe (72")
|
120   |
LNFT |
300.00 |
36,000.00 |
300.00 |
36,000.00 |
298.00 |
35,760.00 |
220.00 |
26,400.00 |
| 701-10-S |
reinforced concrete pipe (extension)(72")
|
72   |
LNFT |
355.00 |
25,560.00 |
300.00 |
21,600.00 |
426.00 |
30,672.00 |
380.00 |
27,360.00 |
| 702-03-A |
catch basins (cb-01)
|
42   |
EACH |
2,600.00 |
109,200.00 |
2,080.00 |
87,360.00 |
2,500.00 |
105,000.00 |
2,800.00 |
117,600.00 |
| 702-03-B |
catch basins (cb-02)
|
3   |
EACH |
4,600.00 |
13,800.00 |
4,500.00 |
13,500.00 |
3,700.00 |
11,100.00 |
5,000.00 |
15,000.00 |
| 702-08-A |
side drain safety end (type 1)
|
3   |
EACH |
2,400.00 |
7,200.00 |
2,000.00 |
6,000.00 |
1,500.00 |
4,500.00 |
2,500.00 |
7,500.00 |
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
690.0 |
LNFT |
40.00 |
27,600.00 |
34.00 |
23,460.00 |
34.00 |
23,460.00 |
35.00 |
24,150.00 |
| 704-03 |
blocked out guard rail
|
1,475.1 |
LNFT |
25.00 |
36,877.50 |
18.50 |
27,289.35 |
18.50 |
27,289.35 |
19.00 |
28,026.90 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
200.0 |
LNFT |
70.00 |
14,000.00 |
56.00 |
11,200.00 |
56.00 |
11,200.00 |
56.00 |
11,200.00 |
| 704-11-A |
guard rail end treatment (flared)
|
8   |
EACH |
2,500.00 |
20,000.00 |
2,000.00 |
16,000.00 |
2,000.00 |
16,000.00 |
2,000.00 |
16,000.00 |
| 705-01 |
barbed wire fence
|
13,134   |
LNFT |
7.20 |
94,564.80 |
5.40 |
70,923.60 |
7.00 |
91,938.00 |
6.50 |
85,371.00 |
| 705-02 |
combination mesh & barbed wire fence
|
4,297   |
LNFT |
8.25 |
35,450.25 |
6.00 |
25,782.00 |
9.00 |
38,673.00 |
7.50 |
32,227.50 |
| 705-04 |
single swinging driveway gates
|
17   |
EACH |
5.02 |
85.34 |
400.00 |
6,800.00 |
300.00 |
5,100.00 |
500.00 |
8,500.00 |
| 705-06-A |
chain link fence (4-foot height)
|
273   |
LNFT |
20.00 |
5,460.00 |
24.50 |
6,688.50 |
20.00 |
5,460.00 |
20.00 |
5,460.00 |
| 705-06-E |
chain link fence (8-foot height)
|
360   |
LNFT |
35.00 |
12,600.00 |
42.00 |
15,120.00 |
28.00 |
10,080.00 |
34.00 |
12,240.00 |
| 705-07-A |
12-foot single gates for chain line fence (4-foot
height) |
1   |
EACH |
1,000.00 |
1,000.00 |
800.00 |
800.00 |
750.00 |
750.00 |
900.00 |
900.00 |
| 706-03-C |
incidental concrete paving (6" thick)
|
786.4 |
SQYD |
100.00 |
78,640.00 |
110.00 |
86,504.00 |
41.00 |
32,242.40 |
80.00 |
62,912.00 |
| 708-01 |
right-of-way monument
|
92   |
EACH |
285.00 |
26,220.00 |
150.00 |
13,800.00 |
150.00 |
13,800.00 |
200.00 |
18,400.00 |
| 708-02 |
right-of-way monument witness post
|
92   |
EACH |
285.00 |
26,220.00 |
150.00 |
13,800.00 |
125.00 |
11,500.00 |
40.00 |
3,680.00 |
| 711-01-C |
riprap (30 lb, 1.5' thick)
|
4,544   |
SQYD |
55.00 |
249,920.00 |
50.00 |
227,200.00 |
45.00 |
204,480.00 |
60.00 |
272,640.00 |
| 711-01-D |
riprap (55 lb, 1.5' thick)
|
5,754   |
SQYD |
60.00 |
345,240.00 |
50.00 |
287,700.00 |
50.00 |
287,700.00 |
70.00 |
402,780.00 |
| 711-04 |
geotextile fabric
|
10,298   |
SQYD |
2.00 |
20,596.00 |
3.00 |
30,894.00 |
2.50 |
25,745.00 |
2.00 |
20,596.00 |
| 712-02 |
sacked concrete revetment
|
1,280   |
SQYD |
60.00 |
76,800.00 |
71.00 |
90,880.00 |
160.00 |
204,800.00 |
50.00 |
64,000.00 |
| 712-04 |
flexible revetment
|
1,101   |
SQYD |
55.00 |
60,555.00 |
46.00 |
50,646.00 |
80.00 |
88,080.00 |
70.00 |
77,070.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
200,000.00 |
200,000.00 |
100,000.00 |
100,000.00 |
218,000.00 |
218,000.00 |
200,000.00 |
200,000.00 |
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
2.460 |
MILE |
400.00 |
984.00 |
300.00 |
738.00 |
300.00 |
738.00 |
300.00 |
738.00 |
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
3.775 |
MILE |
970.00 |
3,661.75 |
800.00 |
3,020.00 |
600.00 |
2,265.00 |
600.00 |
2,265.00 |
| 714-01 |
slab sodding
|
90,000   |
SQYD |
4.50 |
405,000.00 |
0.25 |
22,500.00 |
3.00 |
270,000.00 |
4.00 |
360,000.00 |
| 715-01 |
topsoil
|
7,500   |
CUYD |
11.40 |
85,500.00 |
21.00 |
157,500.00 |
15.00 |
112,500.00 |
11.00 |
82,500.00 |
| 716-01-A |
mulch (vegetative)
|
15.3 |
TON |
685.00 |
10,480.50 |
550.00 |
8,415.00 |
1,200.00 |
18,360.00 |
600.00 |
9,180.00 |
| 717-01 |
seeding
|
7,920   |
LB |
9.00 |
71,280.00 |
8.50 |
67,320.00 |
10.00 |
79,200.00 |
8.00 |
63,360.00 |
| 718-01 |
fertilizer
|
132,000   |
LB |
0.50 |
66,000.00 |
0.40 |
52,800.00 |
1.00 |
132,000.00 |
0.40 |
52,800.00 |
| 720-01-A |
erosion control system, slope protection (type a)
|
68,362   |
SQYD |
1.50 |
102,543.00 |
1.15 |
78,616.30 |
2.00 |
136,724.00 |
1.30 |
88,870.60 |
| 720-01-B |
erosion control system, slope protection (type b)
|
52,221   |
SQYD |
1.50 |
78,331.50 |
1.15 |
60,054.15 |
2.00 |
104,442.00 |
1.30 |
67,887.30 |
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
75,000.00 |
75,000.00 |
30,000.00 |
30,000.00 |
25,000.00 |
25,000.00 |
30,000.00 |
30,000.00 |
| 725-01 |
temporary detour roads
|
10,264.9 |
SQYD |
60.00 |
615,894.00 |
68.00 |
698,013.20 |
72.43 |
743,486.71 |
70.00 |
718,543.00 |
| 726-01 |
bedding material
|
2,574.0 |
CUYD |
95.00 |
244,530.00 |
70.00 |
180,180.00 |
80.00 |
205,920.00 |
70.00 |
180,180.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
2,400,000.00 |
2,400,000.00 |
2,900,000.00 |
2,900,000.00 |
2,108,000.00 |
2,108,000.00 |
3,500,000.00 |
3,500,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
49   |
EACH |
85.00 |
4,165.00 |
68.00 |
3,332.00 |
68.00 |
3,332.00 |
70.00 |
3,430.00 |
| 729-16-C |
object marker assembly (type 3)
|
38   |
EACH |
90.00 |
3,420.00 |
70.00 |
2,660.00 |
70.00 |
2,660.00 |
75.00 |
2,850.00 |
| 731-01 |
nonreflectorized raised pavement markers
|
308   |
EACH |
13.00 |
4,004.00 |
10.00 |
3,080.00 |
10.00 |
3,080.00 |
10.00 |
3,080.00 |
| 731-02 |
reflectorized raised pavement markers
|
2,376   |
EACH |
6.80 |
16,156.80 |
4.75 |
11,286.00 |
4.75 |
11,286.00 |
5.00 |
11,880.00 |
| 732-01-C |
plastic pavement striping (8" width)
|
3,086   |
LNFT |
5.70 |
17,590.20 |
1.00 |
3,086.00 |
1.00 |
3,086.00 |
1.00 |
3,086.00 |
| 732-01-E |
plastic pavement striping (24" width)
|
90   |
LNFT |
13.65 |
1,228.50 |
3.00 |
270.00 |
3.00 |
270.00 |
3.00 |
270.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
23.134 |
MILE |
2,700.00 |
62,461.80 |
2,500.00 |
57,835.00 |
2,500.00 |
57,835.00 |
2,500.00 |
57,835.00 |
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
13   |
EACH |
340.00 |
4,420.00 |
160.00 |
2,080.00 |
150.00 |
1,950.00 |
150.00 |
1,950.00 |
| 732-04-C |
plastic pavement legends & symbols (only)
|
13   |
EACH |
570.00 |
7,410.00 |
200.00 |
2,600.00 |
200.00 |
2,600.00 |
200.00 |
2,600.00 |
| 732-05 |
removal of existing markings
|
6.110 |
MILE |
3,200.00 |
19,552.00 |
4,600.00 |
28,106.00 |
4,600.00 |
28,106.00 |
4,600.00 |
28,106.00 |
| 735-01 |
mailboxes
|
30   |
EACH |
1.25 |
37.50 |
1.00 |
30.00 |
30.00 |
900.00 |
1.00 |
30.00 |
| 735-02 |
mailbox supports (single)
|
30   |
EACH |
115.00 |
3,450.00 |
100.00 |
3,000.00 |
150.00 |
4,500.00 |
150.00 |
4,500.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
350,000.00 |
350,000.00 |
200,000.00 |
200,000.00 |
640,000.00 |
640,000.00 |
350,000.00 |
350,000.00 |
| 740-02 |
utility oversight and coordination
|
lump |
LUMP |
20,000.00 |
20,000.00 |
20,000.00 |
20,000.00 |
100,000.00 |
100,000.00 |
40,000.00 |
40,000.00 |
| 802-01 |
structural excavation
|
870.6 |
CUYD |
20.00 |
17,412.00 |
17.00 |
14,800.20 |
10.00 |
8,706.00 |
25.00 |
21,765.00 |
| 802-05 |
cofferdams
|
lump |
LUMP |
30,000.00 |
30,000.00 |
100,000.00 |
100,000.00 |
400,000.00 |
400,000.00 |
450,000.00 |
450,000.00 |
| 803-05 |
temporary sheeting
|
lump |
LUMP |
17,000.00 |
17,000.00 |
150,000.00 |
150,000.00 |
20,000.00 |
20,000.00 |
250,000.00 |
250,000.00 |
| 804-01-B |
precast concrete piles (14")
|
1,320   |
LNFT |
52.00 |
68,640.00 |
73.00 |
96,360.00 |
70.00 |
92,400.00 |
80.00 |
105,600.00 |
| 804-01-C |
precast concrete piles (16")
|
1,300   |
LNFT |
62.00 |
80,600.00 |
77.00 |
100,100.00 |
80.00 |
104,000.00 |
90.00 |
117,000.00 |
| 804-01-D |
precast concrete piles (18")
|
1,200   |
LNFT |
65.00 |
78,000.00 |
85.00 |
102,000.00 |
110.00 |
132,000.00 |
110.00 |
132,000.00 |
| 804-01-G |
precast concrete piles (30")
|
4,355   |
LNFT |
145.00 |
631,475.00 |
134.00 |
583,570.00 |
210.00 |
914,550.00 |
170.00 |
740,350.00 |
| 804-05 |
precast concrete test piles
|
3   |
EACH |
30,000.00 |
90,000.00 |
75,000.00 |
225,000.00 |
20,000.00 |
60,000.00 |
30,000.00 |
90,000.00 |
| 804-09 |
loading test piles
|
3   |
EACH |
20,000.00 |
60,000.00 |
5,000.00 |
15,000.00 |
30,000.00 |
90,000.00 |
15,000.00 |
45,000.00 |
| 804-10 |
reloading test piles
|
2   |
EACH |
400.00 |
800.00 |
8,000.00 |
16,000.00 |
3,000.00 |
6,000.00 |
500.00 |
1,000.00 |
| 804-11 |
redriving test piles
|
2   |
EACH |
400.00 |
800.00 |
3,400.00 |
6,800.00 |
6,000.00 |
12,000.00 |
500.00 |
1,000.00 |
| 804-12 |
loading permanent piles
|
2   |
EACH |
1,300.00 |
2,600.00 |
20,000.00 |
40,000.00 |
30,000.00 |
60,000.00 |
1,000.00 |
2,000.00 |
| 804-17 |
dynamic monitoring
|
11   |
EACH |
1,000.00 |
11,000.00 |
2,000.00 |
22,000.00 |
1,500.00 |
16,500.00 |
1,500.00 |
16,500.00 |
| 805-01-A |
class a concrete (pipe headwalls)
|
11.70 |
CUYD |
1,900.00 |
22,230.00 |
1,200.00 |
14,040.00 |
2,400.00 |
28,080.00 |
1,300.00 |
15,210.00 |
| 805-01-B |
class a concrete (box culvert headwalls)
|
134.71 |
CUYD |
1,300.00 |
175,123.00 |
1,420.00 |
191,288.20 |
1,350.00 |
181,858.50 |
1,300.00 |
175,123.00 |
| 805-01-C |
class a concrete (retaining walls)
|
109.64 |
CUYD |
1,300.00 |
142,532.00 |
1,360.00 |
149,110.40 |
1,100.00 |
120,604.00 |
750.00 |
82,230.00 |
| 805-01-D |
class a concrete (footings)
|
100.78 |
CUYD |
575.00 |
57,948.50 |
280.00 |
28,218.40 |
450.00 |
45,351.00 |
420.00 |
42,327.60 |
| 805-01-F |
class a concrete (bents)
|
698.61 |
CUYD |
640.00 |
447,110.40 |
600.00 |
419,166.00 |
850.00 |
593,818.50 |
750.00 |
523,957.50 |
| 805-03 |
class aa concrete
|
1,470.33 |
CUYD |
675.00 |
992,472.75 |
550.00 |
808,681.50 |
650.00 |
955,714.50 |
680.00 |
999,824.40 |
| 805-08-C |
precast-prestressed concrete girders (type iii)
|
5,247.0 |
LNFT |
95.00 |
498,465.00 |
100.00 |
524,700.00 |
120.00 |
629,640.00 |
120.00 |
629,640.00 |
| 805-08-D |
precast-prestressed concrete girders (type iv)
|
2,028.5 |
LNFT |
130.00 |
263,705.00 |
130.00 |
263,705.00 |
140.00 |
283,990.00 |
180.00 |
365,130.00 |
| 805-11 |
strip seal joints
|
313.12 |
LNFT |
165.00 |
51,664.80 |
130.00 |
40,705.60 |
170.00 |
53,230.40 |
200.00 |
62,624.00 |
| 805-12-E |
reinforced concrete box culverts (4'x 4')
|
1,213.0 |
LNFT |
300.00 |
363,900.00 |
235.00 |
285,055.00 |
395.00 |
479,135.00 |
280.00 |
339,640.00 |
| 805-12-I |
reinforced concrete box culverts (5'x 5')
|
1,757.0 |
LNFT |
425.00 |
746,725.00 |
325.00 |
571,025.00 |
510.00 |
896,070.00 |
370.00 |
650,090.00 |
| 805-12-M |
reinforced concrete box culverts (6'x 6')
|
448.0 |
LNFT |
550.00 |
246,400.00 |
415.00 |
185,920.00 |
530.00 |
237,440.00 |
500.00 |
224,000.00 |
| 805-12-S |
reinforced concrete box culverts (8'x 8')
|
575.0 |
LNFT |
740.00 |
425,500.00 |
575.00 |
330,625.00 |
800.00 |
460,000.00 |
680.00 |
391,000.00 |
| 806-01 |
deformed reinforcing steel
|
463,412   |
LB |
1.10 |
509,753.20 |
1.00 |
463,412.00 |
1.35 |
625,606.20 |
1.30 |
602,435.60 |
| 807-08 |
structural metalwork
|
lump |
LUMP |
3,500.00 |
3,500.00 |
12,000.00 |
12,000.00 |
10,000.00 |
10,000.00 |
20,000.00 |
20,000.00 |
| 810-01 |
concrete railing (barrier)
|
2,728.00 |
LNFT |
80.00 |
218,240.00 |
45.00 |
122,760.00 |
70.00 |
190,960.00 |
65.00 |
177,320.00 |
| 813-01 |
concrete approach slabs
|
709.96 |
SQYD |
225.00 |
159,741.00 |
225.00 |
159,741.00 |
270.00 |
191,689.20 |
220.00 |
156,191.20 |
| S-001 |
rumble strips (ground-in)
|
15.5 |
MILE |
600.00 |
9,300.00 |
530.00 |
8,215.00 |
650.00 |
10,075.00 |
700.00 |
10,850.00 |
| S-002 |
removal of transition road from s. p. no. 023-06-0029
|
lump |
LUMP |
5,000.00 |
5,000.00 |
2,000.00 |
2,000.00 |
20,000.00 |
20,000.00 |
20,000.00 |
20,000.00 |
| S-101 |
deck drainage systems
|
lump |
LUMP |
10,000.00 |
10,000.00 |
22,000.00 |
22,000.00 |
10,000.00 |
10,000.00 |
16,000.00 |
16,000.00 |
| S-102 |
retroreflective sheeting panels
|
lump |
LUMP |
800.00 |
800.00 |
1,000.00 |
1,000.00 |
2,000.00 |
2,000.00 |
3,000.00 |
3,000.00 |
| | SUBTOTAL GENERAL |
|
|
|
21,982,803.07 |
|
21,513,927.10 |
|
22,413,416.08 |
|
25,306,624.48 |
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A |
pavement alternates
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A1 |
superpave asphaltic concrete pavement
|
|
|
|
|
|
|
|
|
|
|
| 203-04-A |
nonplastic embankment (stone)
|
3,182   |
CUYD |
115.00 |
365,930.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 302-02-A-01 |
class ii base course (4" thick)(stone or recycled pccp)
|
174,772.8 |
SQYD |
10.00 |
1,747,728.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 302-02-I-01 |
class ii base course (6.5" thick)(stone or recycled
pccp) |
4,719.5 |
SQYD |
21.00 |
99,109.50 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 502-01 |
superpave asphaltic concrete
|
66,982.5 |
TON |
77.00 |
5,157,652.50 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
8,589.5 |
TON |
95.00 |
816,002.50 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
13.894 |
MILE |
900.00 |
12,504.60 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| S-003 |
open graded friction course (low volume traffic
applications) |
264   |
TON |
118.35 |
31,244.40 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| | SUBTOTAL ALT A1 |
|
|
|
8,230,171.50 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A2 |
portland cement concrete pavement
|
|
|
|
|
|
|
|
|
|
|
| 203-04-A |
nonplastic embankment (stone)
|
3,157   |
CUYD |
0.00 |
0.00 |
150.00 |
473,550.00 |
90.00 |
284,130.00 |
80.00 |
252,560.00 |
| 302-02-A-01 |
class ii base course (4" thick)(stone or recycled pccp)
|
170,743.2 |
SQYD |
0.00 |
0.00 |
7.50 |
1,280,574.00 |
14.15 |
2,416,016.28 |
11.00 |
1,878,175.20 |
| 302-02-I-01 |
class ii base course (6.5" thick)(stone or recycled
pccp) |
4,696.0 |
SQYD |
0.00 |
0.00 |
17.00 |
79,832.00 |
17.76 |
83,400.96 |
21.00 |
98,616.00 |
| 502-01 |
superpave asphaltic concrete
|
5,040.4 |
TON |
0.00 |
0.00 |
180.00 |
907,272.00 |
200.00 |
1,008,080.00 |
155.00 |
781,262.00 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
988.4 |
TON |
0.00 |
0.00 |
250.00 |
247,100.00 |
225.00 |
222,390.00 |
190.00 |
187,796.00 |
| 601-01-H |
portland cement concrete pavement (8 1/2" thick)
|
132,506.8 |
SQYD |
0.00 |
0.00 |
40.00 |
5,300,272.00 |
43.00 |
5,697,792.40 |
43.00 |
5,697,792.40 |
| 601-02-H |
portland cement concrete pavement (8 1/2" thick)
(crossovers & turnouts) |
16,400.4 |
SQYD |
0.00 |
0.00 |
60.00 |
984,024.00 |
59.00 |
967,623.60 |
58.00 |
951,223.20 |
| 601-04 |
portland cement concrete pavement coring
|
270   |
EACH |
0.00 |
0.00 |
150.00 |
40,500.00 |
165.00 |
44,550.00 |
120.00 |
32,400.00 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
4.585 |
MILE |
0.00 |
0.00 |
700.00 |
3,209.50 |
700.00 |
3,209.50 |
700.00 |
3,209.50 |
| 732-03-A-01 |
plastic pvmt striping (broken line)(4"width)preformed
marking tape (type v) |
9.309 |
MILE |
0.00 |
0.00 |
3,880.00 |
36,118.92 |
3,960.00 |
36,863.64 |
4,000.00 |
37,236.00 |
| S-004 |
pavement grooving
|
2,403   |
SQYD |
0.00 |
0.00 |
5.40 |
12,976.20 |
10.00 |
24,030.00 |
9.00 |
21,627.00 |
| | SUBTOTAL ALT A2 |
|
|
|
|
|
9,365,428.62 |
|
10,788,086.38 |
|
9,941,897.30 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | ITEM TOTAL (CONSTRUCTION BID) |
|
|
|
30,212,974.57 |
|
30,879,355.72 |
|
33,201,502.46 |
|
35,248,521.78 |
| | NUMBER OF DAYS BID AT $5,000 PER DAY. |
|
|
|
3,125,000.00 |
|
3,625,000.00 |
|
3,000,000.00 |
|
3,625,000.00 |
| | LIFE CYCLE COST |
|
|
|
2,032,700.00 |
|
1,026,200.00 |
|
1,026,200.00 |
|
1,026,200.00 |
| | TOTAL BID |
|
|
|
35,370,674.57 |
|
35,530,555.72 |
|
37,227,702.46 |
|
39,899,721.78 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - AUSTIN BRIDGE & ROAD, LP |
- 6 - DIAMOND B CONSTRUCTION CO., L.L.C. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
1,800,000.00 |
1,800,000.00 |
500,000.00 |
500,000.00 |
|
|
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
275,000.00 |
275,000.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| 202-02-B-01 |
removal of concrete box culverts (2' x 2')(sta.
3234+47) |
1   |
EACH |
3,500.00 |
3,500.00 |
3,000.00 |
3,000.00 |
|
|
|
|
| 202-02-B-02 |
removal of concrete box culverts (3' x 3')(sta.
3279+37) |
1   |
EACH |
4,500.00 |
4,500.00 |
3,000.00 |
3,000.00 |
|
|
|
|
| 202-02-B-03 |
removal of concrete box culverts (3' x 5')(sta.
3292+37) |
1   |
EACH |
4,800.00 |
4,800.00 |
3,000.00 |
3,000.00 |
|
|
|
|
| 202-02-B-04 |
removal of concrete box culverts (2' x 2')(sta.
3429+65) |
1   |
EACH |
3,500.00 |
3,500.00 |
3,000.00 |
3,000.00 |
|
|
|
|
| 202-02-B-05 |
removal of concrete box culverts (5' x 5')(sta.
3475+55) |
1   |
EACH |
5,800.00 |
5,800.00 |
5,000.00 |
5,000.00 |
|
|
|
|
| 202-02-B-06 |
removal of concrete box culverts (2' x 2')(sta.
3570+09) |
1   |
EACH |
3,900.00 |
3,900.00 |
4,000.00 |
4,000.00 |
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
34,536.3 |
SQYD |
4.50 |
155,413.35 |
4.16 |
143,671.01 |
|
|
|
|
| 202-02-H |
removal of guard rail
|
1,698   |
LNFT |
3.50 |
5,943.00 |
7.00 |
11,886.00 |
|
|
|
|
| 202-02-01 |
removal of concrete headwall (2-4' x 4' )(lt. of sta.
3211+87) |
1   |
EACH |
2,200.00 |
2,200.00 |
1,200.00 |
1,200.00 |
|
|
|
|
| 202-02-02 |
removal of concrete headwall (2-4' x 4' )(rt. of sta.
3211+87) |
1   |
EACH |
2,200.00 |
2,200.00 |
1,200.00 |
1,200.00 |
|
|
|
|
| 202-02-03 |
removal of concrete headwall (5-8' x 8' )(lt. of sta.
3366+41) |
1   |
EACH |
5,900.00 |
5,900.00 |
3,000.00 |
3,000.00 |
|
|
|
|
| 202-02-04 |
removal of concrete headwall (4-6' x 6' )(lt. of sta.
3396+50) |
1   |
EACH |
5,800.00 |
5,800.00 |
3,000.00 |
3,000.00 |
|
|
|
|
| 202-02-05 |
removal of concrete headwall (3-5' x 5')(lt. of sta.
3411+90) |
1   |
EACH |
4,600.00 |
4,600.00 |
3,000.00 |
3,000.00 |
|
|
|
|
| 202-02-06 |
removal of concrete headwall (5' x 5' )(lt. of sta.
3464+69) |
1   |
EACH |
2,000.00 |
2,000.00 |
3,000.00 |
3,000.00 |
|
|
|
|
| 202-02-07 |
removal of concrete headwall (5' x 5' )(rt. of sta.
3464+69) |
1   |
EACH |
2,000.00 |
2,000.00 |
3,000.00 |
3,000.00 |
|
|
|
|
| 202-02-08 |
removal of concrete headwall (4-5' x 5')(rt. of sta.
3515+42) |
1   |
EACH |
3,900.00 |
3,900.00 |
3,000.00 |
3,000.00 |
|
|
|
|
| 202-02-09 |
removal of 1,760 sq. ft. wood frame residence on piers
(rt. of sta. 3224+25)(cont. friable & non-friable asb.) |
1   |
EACH |
1,900.00 |
1,900.00 |
3,000.00 |
3,000.00 |
|
|
|
|
| 202-02-10 |
removal of 2,940 sq. ft. wood frame residence on piers
(rt. of sta. 3226+50)(contains non-friable asbestos) |
1   |
EACH |
3,175.20 |
3,175.20 |
3,000.00 |
3,000.00 |
|
|
|
|
| 202-02-11 |
removal of 490 sq. ft. wood shed on slab (rt. of sta.
3228+00) |
1   |
EACH |
529.40 |
529.40 |
3,000.00 |
3,000.00 |
|
|
|
|
| 202-02-12 |
removal of 1,860 sq. ft. wood frame residence on piers
(rt. of sta. 3229+00)(contains non-friable asbestos) |
1   |
EACH |
2,008.80 |
2,008.80 |
3,000.00 |
3,000.00 |
|
|
|
|
| 202-02-13 |
removal of 1,080 sq. ft. cinder block residence on
slab (rt. of sta. 3230+12) |
1   |
EACH |
1,166.40 |
1,166.40 |
3,000.00 |
3,000.00 |
|
|
|
|
| 202-02-14 |
removal of 1,080 sq. ft. cinder block residence on
slab (rt. of sta. 3231+14)(contains non-friable asbestos) |
1   |
EACH |
1,166.40 |
1,166.40 |
3,000.00 |
3,000.00 |
|
|
|
|
| 202-02-15 |
removal of 2,600 sq. ft. wood frame residence on piers
(rt. of sta. 3276+25)(contains non-friable asbestos) |
1   |
EACH |
2,808.00 |
2,808.00 |
3,000.00 |
3,000.00 |
|
|
|
|
| 202-02-16 |
removal of 212 sq. ft. shed (rt. of sta. 3276+25)
|
1   |
EACH |
228.96 |
228.96 |
500.00 |
500.00 |
|
|
|
|
| 202-02-17 |
removal of 1,490 sq. ft. brick veneer residence on
slab (lt. of sta. 3307+50)(contains non-friable asbestos) |
1   |
EACH |
1,609.20 |
1,609.20 |
3,000.00 |
3,000.00 |
|
|
|
|
| 202-02-18 |
removal of 1,050 sq. ft. mobile home (lt. of sta.
3308+86) |
1   |
EACH |
1,134.00 |
1,134.00 |
3,000.00 |
3,000.00 |
|
|
|
|
| 202-02-19 |
removal of 1,530 sq. ft. wood frame residence (lt. of
sta. 3310+65) |
1   |
EACH |
1,652.40 |
1,652.40 |
3,000.00 |
3,000.00 |
|
|
|
|
| 202-02-20 |
removal of 200 sq. ft. metal shed (lt. of sta. 3310+65)
|
1   |
EACH |
216.00 |
216.00 |
500.00 |
500.00 |
|
|
|
|
| 202-02-21 |
removal of 3,240 sq. ft. brick veneer residence on
slab (lt. of sta. 3322+50)(contains non-friable asbestos) |
1   |
EACH |
3,499.20 |
3,499.20 |
3,000.00 |
3,000.00 |
|
|
|
|
| 202-02-22 |
removal of 1,100 sq. ft. block residence on slab (lt.
of sta. 3325+28) (contains non-friable asbestos) |
1   |
EACH |
1,188.00 |
1,188.00 |
3,000.00 |
3,000.00 |
|
|
|
|
| 202-02-23 |
removal of 1,100 sq. ft. block residence on slab (lt.
of sta. 3326+00) (contains non-friable asbestos) |
1   |
EACH |
1,188.00 |
1,188.00 |
2,877.65 |
2,877.65 |
|
|
|
|
| 202-02-24 |
removal of 2,200 sq. ft. brick veneer residence on
slab (lt. of sta. 3327+28)(contains non-friable asbestos) |
1   |
EACH |
2,376.00 |
2,376.00 |
3,000.00 |
3,000.00 |
|
|
|
|
| 202-02-25 |
removal of 2,640 sq. ft. brick veneer residence on
slab (lt. of sta. 3328+75)(cont. friable & non-friable asb.) |
1   |
EACH |
2,851.20 |
2,851.20 |
3,000.00 |
3,000.00 |
|
|
|
|
| 202-02-26 |
removal of 3,504 sq. ft. concrete slab (lt. of sta.
3332+25)(contains non-friable asbestos) |
1   |
EACH |
3,784.32 |
3,784.32 |
3,000.00 |
3,000.00 |
|
|
|
|
| 202-02-27 |
removal of 2,090 sq. ft. wood frame residence (lt. of
sta. 3335+80) (contains friable asbestos) |
1   |
EACH |
2,257.20 |
2,257.20 |
3,000.00 |
3,000.00 |
|
|
|
|
| 202-02-28 |
removal of 5,050 sq. ft. metal building on slab (lt.
of sta. 3337+50) |
1   |
EACH |
5,454.00 |
5,454.00 |
3,000.00 |
3,000.00 |
|
|
|
|
| 202-02-29 |
removal of 660 sq. ft. mobile home (lt. of sta.
3337+60) |
1   |
EACH |
712.80 |
712.80 |
3,000.00 |
3,000.00 |
|
|
|
|
| 202-02-30 |
removal of 330 sq. ft. shed (lt. of sta. 3346+90)
|
1   |
EACH |
356.40 |
356.40 |
500.00 |
500.00 |
|
|
|
|
| 203-01 |
general excavation
|
311,197   |
CUYD |
4.57 |
1,422,170.29 |
4.50 |
1,400,386.50 |
|
|
|
|
| 203-02 |
drainage excavation
|
23,346   |
CUYD |
8.12 |
189,569.52 |
12.00 |
280,152.00 |
|
|
|
|
| 203-03 |
embankment
|
600,758   |
CUYD |
11.17 |
6,710,466.86 |
11.00 |
6,608,338.00 |
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
259   |
EACH |
10.00 |
2,590.00 |
12.00 |
3,108.00 |
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
198   |
EACH |
110.00 |
21,780.00 |
125.00 |
24,750.00 |
|
|
|
|
| 204-05-B |
temporary sediment check dams (stone)
|
244   |
EACH |
325.00 |
79,300.00 |
550.00 |
134,200.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
40,000   |
LNFT |
1.39 |
55,600.00 |
7.00 |
280,000.00 |
|
|
|
|
| 204-07 |
temporary stone construction entrance
|
10   |
EACH |
3,000.00 |
30,000.00 |
1,000.00 |
10,000.00 |
|
|
|
|
| 302-02-C-01 |
class ii base course (8" thick)(soil cement)
|
195,143.2 |
SQYD |
7.71 |
1,504,554.07 |
10.50 |
2,049,003.60 |
|
|
|
|
| 302-02-G-01 |
class ii base course (4.75" thick)(stone or recycled
pccp) |
17,770.1 |
SQYD |
14.00 |
248,781.40 |
15.50 |
275,436.55 |
|
|
|
|
| 302-02-H-01 |
class ii base course (5.75" thick)(stone or recycled
pccp) |
23,582.3 |
SQYD |
14.16 |
333,925.37 |
27.26 |
642,853.50 |
|
|
|
|
| 304-05 |
lime treatment (type e)
|
414.92 |
TON |
100.00 |
41,492.00 |
100.00 |
41,492.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
599   |
CUYD |
110.00 |
65,890.00 |
125.00 |
74,875.00 |
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
4,000.0 |
CUYD |
95.00 |
380,000.00 |
82.00 |
328,000.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
1,659   |
SQYD |
4.00 |
6,636.00 |
17.50 |
29,032.50 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 92   |
CUYD |
1.00 |
- 92.00 |
0.10 |
- 9.20 |
|
|
|
|
| 510-01-C |
pavement patching (14" minimum thickness)
|
2,622   |
SQYD |
70.00 |
183,540.00 |
100.00 |
262,200.00 |
|
|
|
|
| 701-01-F |
cross drain pipe (15" rcp/pcp)
|
2,057   |
LNFT |
55.78 |
114,739.46 |
70.00 |
143,990.00 |
|
|
|
|
| 701-01-I |
cross drain pipe (24" rcp/pcp)
|
512   |
LNFT |
62.88 |
32,194.56 |
90.00 |
46,080.00 |
|
|
|
|
| 701-01-K |
cross drain pipe (30" rcp/pcp)
|
400   |
LNFT |
81.14 |
32,456.00 |
120.00 |
48,000.00 |
|
|
|
|
| 701-01-M |
cross drain pipe (36" rcp/pcp)
|
400   |
LNFT |
116.63 |
46,652.00 |
135.00 |
54,000.00 |
|
|
|
|
| 701-01-N |
cross drain pipe (42" rcp/pcp)
|
144   |
LNFT |
147.06 |
21,176.64 |
160.00 |
23,040.00 |
|
|
|
|
| 701-01-O |
cross drain pipe (48" rcp/pcp)
|
210   |
LNFT |
177.48 |
37,270.80 |
240.00 |
50,400.00 |
|
|
|
|
| 701-02-E |
cross drain pipe arch (30" equiv. rcpa)
|
184   |
LNFT |
96.35 |
17,728.40 |
150.00 |
27,600.00 |
|
|
|
|
| 701-02-F |
cross drain pipe arch (36" equiv. rcpa)
|
1,152   |
LNFT |
136.92 |
157,731.84 |
170.00 |
195,840.00 |
|
|
|
|
| 701-02-G |
cross drain pipe arch (42" equiv. rcpa)
|
104   |
LNFT |
152.13 |
15,821.52 |
220.00 |
22,880.00 |
|
|
|
|
| 701-02-H |
cross drain pipe arch (48" equiv. rcpa)
|
864   |
LNFT |
187.63 |
162,112.32 |
260.00 |
224,640.00 |
|
|
|
|
| 701-02-I |
cross drain pipe arch (54" equiv. rcpa)
|
208   |
LNFT |
223.12 |
46,408.96 |
300.00 |
62,400.00 |
|
|
|
|
| 701-05-G |
side drain pipe (18")
|
2,612   |
LNFT |
55.78 |
145,697.36 |
60.00 |
156,720.00 |
|
|
|
|
| 701-05-I |
side drain pipe (24")
|
424   |
LNFT |
62.88 |
26,661.12 |
70.00 |
29,680.00 |
|
|
|
|
| 701-05-K |
side drain pipe (30")
|
124   |
LNFT |
81.14 |
10,061.36 |
77.00 |
9,548.00 |
|
|
|
|
| 701-05-M |
side drain pipe (36")
|
130   |
LNFT |
116.63 |
15,161.90 |
120.00 |
15,600.00 |
|
|
|
|
| 701-05-O |
side drain pipe (48")
|
152   |
LNFT |
177.48 |
26,976.96 |
200.00 |
30,400.00 |
|
|
|
|
| 701-05-S |
side drain pipe (72")
|
120   |
LNFT |
370.18 |
44,421.60 |
375.00 |
45,000.00 |
|
|
|
|
| 701-10-S |
reinforced concrete pipe (extension)(72")
|
72   |
LNFT |
370.18 |
26,652.96 |
500.00 |
36,000.00 |
|
|
|
|
| 702-03-A |
catch basins (cb-01)
|
42   |
EACH |
2,028.40 |
85,192.80 |
3,750.00 |
157,500.00 |
|
|
|
|
| 702-03-B |
catch basins (cb-02)
|
3   |
EACH |
2,839.76 |
8,519.28 |
4,000.00 |
12,000.00 |
|
|
|
|
| 702-08-A |
side drain safety end (type 1)
|
3   |
EACH |
3,042.60 |
9,127.80 |
2,000.00 |
6,000.00 |
|
|
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
690.0 |
LNFT |
50.00 |
34,500.00 |
35.00 |
24,150.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
1,475.1 |
LNFT |
22.00 |
32,452.20 |
19.50 |
28,764.45 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
200.0 |
LNFT |
56.00 |
11,200.00 |
60.00 |
12,000.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
8   |
EACH |
2,400.00 |
19,200.00 |
2,100.00 |
16,800.00 |
|
|
|
|
| 705-01 |
barbed wire fence
|
13,134   |
LNFT |
5.40 |
70,923.60 |
6.00 |
78,804.00 |
|
|
|
|
| 705-02 |
combination mesh & barbed wire fence
|
4,297   |
LNFT |
6.00 |
25,782.00 |
6.50 |
27,930.50 |
|
|
|
|
| 705-04 |
single swinging driveway gates
|
17   |
EACH |
400.00 |
6,800.00 |
450.00 |
7,650.00 |
|
|
|
|
| 705-06-A |
chain link fence (4-foot height)
|
273   |
LNFT |
24.50 |
6,688.50 |
26.00 |
7,098.00 |
|
|
|
|
| 705-06-E |
chain link fence (8-foot height)
|
360   |
LNFT |
42.00 |
15,120.00 |
45.00 |
16,200.00 |
|
|
|
|
| 705-07-A |
12-foot single gates for chain line fence (4-foot
height) |
1   |
EACH |
800.00 |
800.00 |
850.00 |
850.00 |
|
|
|
|
| 706-03-C |
incidental concrete paving (6" thick)
|
786.4 |
SQYD |
80.00 |
62,912.00 |
110.00 |
86,504.00 |
|
|
|
|
| 708-01 |
right-of-way monument
|
92   |
EACH |
120.00 |
11,040.00 |
175.00 |
16,100.00 |
|
|
|
|
| 708-02 |
right-of-way monument witness post
|
92   |
EACH |
80.00 |
7,360.00 |
155.00 |
14,260.00 |
|
|
|
|
| 711-01-C |
riprap (30 lb, 1.5' thick)
|
4,544   |
SQYD |
70.99 |
322,578.56 |
55.00 |
249,920.00 |
|
|
|
|
| 711-01-D |
riprap (55 lb, 1.5' thick)
|
5,754   |
SQYD |
70.99 |
408,476.46 |
60.00 |
345,240.00 |
|
|
|
|
| 711-04 |
geotextile fabric
|
10,298   |
SQYD |
2.28 |
23,479.44 |
2.50 |
25,745.00 |
|
|
|
|
| 712-02 |
sacked concrete revetment
|
1,280   |
SQYD |
60.00 |
76,800.00 |
160.00 |
204,800.00 |
|
|
|
|
| 712-04 |
flexible revetment
|
1,101   |
SQYD |
50.71 |
55,831.71 |
60.00 |
66,060.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
310,000.00 |
310,000.00 |
200,000.00 |
200,000.00 |
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
2.460 |
MILE |
500.00 |
1,230.00 |
325.00 |
799.50 |
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
3.775 |
MILE |
700.00 |
2,642.50 |
650.00 |
2,453.75 |
|
|
|
|
| 714-01 |
slab sodding
|
90,000   |
SQYD |
4.95 |
445,500.00 |
5.00 |
450,000.00 |
|
|
|
|
| 715-01 |
topsoil
|
7,500   |
CUYD |
15.00 |
112,500.00 |
15.00 |
112,500.00 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
15.3 |
TON |
550.00 |
8,415.00 |
600.00 |
9,180.00 |
|
|
|
|
| 717-01 |
seeding
|
7,920   |
LB |
8.50 |
67,320.00 |
9.00 |
71,280.00 |
|
|
|
|
| 718-01 |
fertilizer
|
132,000   |
LB |
0.39 |
51,480.00 |
0.45 |
59,400.00 |
|
|
|
|
| 720-01-A |
erosion control system, slope protection (type a)
|
68,362   |
SQYD |
1.15 |
78,616.30 |
1.25 |
85,452.50 |
|
|
|
|
| 720-01-B |
erosion control system, slope protection (type b)
|
52,221   |
SQYD |
1.15 |
60,054.15 |
1.25 |
65,276.25 |
|
|
|
|
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
62,012.54 |
62,012.54 |
50,000.00 |
50,000.00 |
|
|
|
|
| 725-01 |
temporary detour roads
|
10,264.9 |
SQYD |
54.61 |
560,566.19 |
70.00 |
718,543.00 |
|
|
|
|
| 726-01 |
bedding material
|
2,574.0 |
CUYD |
79.11 |
203,629.14 |
85.00 |
218,790.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
3,800,000.00 |
3,800,000.00 |
3,065,000.00 |
3,065,000.00 |
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
49   |
EACH |
75.00 |
3,675.00 |
70.00 |
3,430.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
38   |
EACH |
111.00 |
4,218.00 |
75.00 |
2,850.00 |
|
|
|
|
| 731-01 |
nonreflectorized raised pavement markers
|
308   |
EACH |
10.00 |
3,080.00 |
11.00 |
3,388.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
2,376   |
EACH |
4.75 |
11,286.00 |
5.00 |
11,880.00 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
3,086   |
LNFT |
1.00 |
3,086.00 |
1.10 |
3,394.60 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
90   |
LNFT |
3.00 |
270.00 |
3.25 |
292.50 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
23.134 |
MILE |
2,500.00 |
57,835.00 |
2,650.00 |
61,305.10 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
13   |
EACH |
150.00 |
1,950.00 |
175.00 |
2,275.00 |
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
13   |
EACH |
200.00 |
2,600.00 |
220.00 |
2,860.00 |
|
|
|
|
| 732-05 |
removal of existing markings
|
6.110 |
MILE |
4,600.00 |
28,106.00 |
5,000.00 |
30,550.00 |
|
|
|
|
| 735-01 |
mailboxes
|
30   |
EACH |
100.00 |
3,000.00 |
1.10 |
33.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
30   |
EACH |
100.00 |
3,000.00 |
110.00 |
3,300.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
585,102.44 |
585,102.44 |
260,000.00 |
260,000.00 |
|
|
|
|
| 740-02 |
utility oversight and coordination
|
lump |
LUMP |
5,640.60 |
5,640.60 |
30,000.00 |
30,000.00 |
|
|
|
|
| 802-01 |
structural excavation
|
870.6 |
CUYD |
8.62 |
7,504.57 |
12.00 |
10,447.20 |
|
|
|
|
| 802-05 |
cofferdams
|
lump |
LUMP |
66,693.17 |
66,693.17 |
200,000.00 |
200,000.00 |
|
|
|
|
| 803-05 |
temporary sheeting
|
lump |
LUMP |
120,600.00 |
120,600.00 |
107,000.00 |
107,000.00 |
|
|
|
|
| 804-01-B |
precast concrete piles (14")
|
1,320   |
LNFT |
49.08 |
64,785.60 |
57.00 |
75,240.00 |
|
|
|
|
| 804-01-C |
precast concrete piles (16")
|
1,300   |
LNFT |
63.17 |
82,121.00 |
75.00 |
97,500.00 |
|
|
|
|
| 804-01-D |
precast concrete piles (18")
|
1,200   |
LNFT |
74.32 |
89,184.00 |
110.00 |
132,000.00 |
|
|
|
|
| 804-01-G |
precast concrete piles (30")
|
4,355   |
LNFT |
131.83 |
574,119.65 |
215.00 |
936,325.00 |
|
|
|
|
| 804-05 |
precast concrete test piles
|
3   |
EACH |
23,652.77 |
70,958.31 |
20,000.00 |
60,000.00 |
|
|
|
|
| 804-09 |
loading test piles
|
3   |
EACH |
35,480.70 |
106,442.10 |
36,500.00 |
109,500.00 |
|
|
|
|
| 804-10 |
reloading test piles
|
2   |
EACH |
6,333.06 |
12,666.12 |
3,000.00 |
6,000.00 |
|
|
|
|
| 804-11 |
redriving test piles
|
2   |
EACH |
7,744.49 |
15,488.98 |
2,600.00 |
5,200.00 |
|
|
|
|
| 804-12 |
loading permanent piles
|
2   |
EACH |
17,006.72 |
34,013.44 |
8,700.00 |
17,400.00 |
|
|
|
|
| 804-17 |
dynamic monitoring
|
11   |
EACH |
1,639.62 |
18,035.82 |
2,000.00 |
22,000.00 |
|
|
|
|
| 805-01-A |
class a concrete (pipe headwalls)
|
11.70 |
CUYD |
1,521.30 |
17,799.21 |
1,600.00 |
18,720.00 |
|
|
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
134.71 |
CUYD |
1,369.17 |
184,440.89 |
1,600.00 |
215,536.00 |
|
|
|
|
| 805-01-C |
class a concrete (retaining walls)
|
109.64 |
CUYD |
1,716.84 |
188,234.34 |
1,000.00 |
109,640.00 |
|
|
|
|
| 805-01-D |
class a concrete (footings)
|
100.78 |
CUYD |
436.96 |
44,036.83 |
500.00 |
50,390.00 |
|
|
|
|
| 805-01-F |
class a concrete (bents)
|
698.61 |
CUYD |
475.33 |
332,070.29 |
800.00 |
558,888.00 |
|
|
|
|
| 805-03 |
class aa concrete
|
1,470.33 |
CUYD |
650.46 |
956,390.85 |
900.00 |
1,323,297.00 |
|
|
|
|
| 805-08-C |
precast-prestressed concrete girders (type iii)
|
5,247.0 |
LNFT |
92.57 |
485,714.79 |
150.00 |
787,050.00 |
|
|
|
|
| 805-08-D |
precast-prestressed concrete girders (type iv)
|
2,028.5 |
LNFT |
140.68 |
285,369.38 |
250.00 |
507,125.00 |
|
|
|
|
| 805-11 |
strip seal joints
|
313.12 |
LNFT |
160.53 |
50,265.15 |
185.00 |
57,927.20 |
|
|
|
|
| 805-12-E |
reinforced concrete box culverts (4'x 4')
|
1,213.0 |
LNFT |
289.05 |
350,617.65 |
365.00 |
442,745.00 |
|
|
|
|
| 805-12-I |
reinforced concrete box culverts (5'x 5')
|
1,757.0 |
LNFT |
395.54 |
694,963.78 |
465.00 |
817,005.00 |
|
|
|
|
| 805-12-M |
reinforced concrete box culverts (6'x 6')
|
448.0 |
LNFT |
527.38 |
236,266.24 |
565.00 |
253,120.00 |
|
|
|
|
| 805-12-S |
reinforced concrete box culverts (8'x 8')
|
575.0 |
LNFT |
730.22 |
419,876.50 |
700.00 |
402,500.00 |
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
463,412   |
LB |
1.10 |
509,753.20 |
1.25 |
579,265.00 |
|
|
|
|
| 807-08 |
structural metalwork
|
lump |
LUMP |
4,377.37 |
4,377.37 |
8,000.00 |
8,000.00 |
|
|
|
|
| 810-01 |
concrete railing (barrier)
|
2,728.00 |
LNFT |
59.04 |
161,061.12 |
75.00 |
204,600.00 |
|
|
|
|
| 813-01 |
concrete approach slabs
|
709.96 |
SQYD |
188.06 |
133,515.08 |
250.00 |
177,490.00 |
|
|
|
|
| S-001 |
rumble strips (ground-in)
|
15.5 |
MILE |
490.00 |
7,595.00 |
700.00 |
10,850.00 |
|
|
|
|
| S-002 |
removal of transition road from s. p. no. 023-06-0029
|
lump |
LUMP |
25,000.00 |
25,000.00 |
13,000.00 |
13,000.00 |
|
|
|
|
| S-101 |
deck drainage systems
|
lump |
LUMP |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| S-102 |
retroreflective sheeting panels
|
lump |
LUMP |
1,000.00 |
1,000.00 |
550.00 |
550.00 |
|
|
|
|
| | SUBTOTAL GENERAL |
|
|
|
28,720,907.14 |
|
29,695,890.66 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A |
pavement alternates
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A1 |
superpave asphaltic concrete pavement
|
|
|
|
|
|
|
|
|
|
|
| 203-04-A |
nonplastic embankment (stone)
|
3,182   |
CUYD |
0.00 |
0.00 |
132.00 |
420,024.00 |
|
|
|
|
| 302-02-A-01 |
class ii base course (4" thick)(stone or recycled pccp)
|
174,772.8 |
SQYD |
0.00 |
0.00 |
13.71 |
2,396,135.09 |
|
|
|
|
| 302-02-I-01 |
class ii base course (6.5" thick)(stone or recycled
pccp) |
4,719.5 |
SQYD |
0.00 |
0.00 |
30.00 |
141,585.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
66,982.5 |
TON |
0.00 |
0.00 |
100.00 |
6,698,250.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
8,589.5 |
TON |
0.00 |
0.00 |
128.00 |
1,099,456.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
13.894 |
MILE |
0.00 |
0.00 |
750.00 |
10,420.50 |
|
|
|
|
| S-003 |
open graded friction course (low volume traffic
applications) |
264   |
TON |
0.00 |
0.00 |
200.00 |
52,800.00 |
|
|
|
|
| | SUBTOTAL ALT A1 |
|
|
|
|
|
10,818,670.59 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A2 |
portland cement concrete pavement
|
|
|
|
|
|
|
|
|
|
|
| 203-04-A |
nonplastic embankment (stone)
|
3,157   |
CUYD |
71.07 |
224,367.99 |
0.00 |
0.00 |
|
|
|
|
| 302-02-A-01 |
class ii base course (4" thick)(stone or recycled pccp)
|
170,743.2 |
SQYD |
9.03 |
1,541,811.10 |
0.00 |
0.00 |
|
|
|
|
| 302-02-I-01 |
class ii base course (6.5" thick)(stone or recycled
pccp) |
4,696.0 |
SQYD |
16.31 |
76,591.76 |
0.00 |
0.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
5,040.4 |
TON |
183.76 |
926,223.90 |
0.00 |
0.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
988.4 |
TON |
253.81 |
250,865.80 |
0.00 |
0.00 |
|
|
|
|
| 601-01-H |
portland cement concrete pavement (8 1/2" thick)
|
132,506.8 |
SQYD |
48.68 |
6,450,431.02 |
0.00 |
0.00 |
|
|
|
|
| 601-02-H |
portland cement concrete pavement (8 1/2" thick)
(crossovers & turnouts) |
16,400.4 |
SQYD |
59.13 |
969,755.65 |
0.00 |
0.00 |
|
|
|
|
| 601-04 |
portland cement concrete pavement coring
|
270   |
EACH |
107.25 |
28,957.50 |
0.00 |
0.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
4.585 |
MILE |
700.00 |
3,209.50 |
0.00 |
0.00 |
|
|
|
|
| 732-03-A-01 |
plastic pvmt striping (broken line)(4"width)preformed
marking tape (type v) |
9.309 |
MILE |
3,960.00 |
36,863.64 |
0.00 |
0.00 |
|
|
|
|
| S-004 |
pavement grooving
|
2,403   |
SQYD |
5.00 |
12,015.00 |
0.00 |
0.00 |
|
|
|
|
| | SUBTOTAL ALT A2 |
|
|
|
10,521,092.86 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | ITEM TOTAL (CONSTRUCTION BID) |
|
|
|
39,242,000.00 |
|
40,514,561.25 |
|
|
|
|
| | NUMBER OF DAYS BID AT $5,000 PER DAY. |
|
|
|
3,625,000.00 |
|
3,500,000.00 |
|
|
|
|
| | LIFE CYCLE COST |
|
|
|
1,026,200.00 |
|
2,032,700.00 |
|
|
|
|
| | TOTAL BID |
|
|
|
43,893,200.00 |
|
46,047,261.25 |
|
|
|
|
|