Letting of 6/25/2008 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 023-05-0028
Parish: WINN
Routes: US 167
Description: WINNFIELD - JCT. LA 1236
Type Const: grading, drainage structures, cold planing asphaltic pavt, lime trmt, class ii bc,
superpave acp (alt. a-1), pccp (alt. a-2), concrete girder bridges and related work.
Estimated Construction Cost: $32,532,431.20
Maximum Number of Days Allowed for Construction: 725
Calculated Daily User Cost: $5,000.00
 
RankLicenseBidderConstruction Bid Bidder's Proposed
Contract Time
Life Cycle
Cost
Total Bid
1 12312 GILCHRIST CONSTRUCTION CO. LLC $30,212,974.57 625 $2,032,700.00 $35,370,674.57
2 34567 JAMES CONSTRUCTION GROUP LLC $30,879,355.72 725 $1,026,200.00 $35,530,555.72
3 33685 SPECIALTY CONTRACTORS $33,201,502.46 600 $1,026,200.00 $37,227,702.46
4 39462 DENTON-JAMES LLC $35,248,521.78 725 $1,026,200.00 $39,899,721.78
5 42076 AUSTIN BRIDGE & ROAD, LP $39,242,000.00 725 $1,026,200.00 $43,893,200.00
6 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $40,514,561.25 700 $2,032,700.00 $46,047,261.25
 
Item Number Item Description Quantity Unit of Measure - 1 -
GILCHRIST CONSTRUCTION CO. LLC
- 2 -
JAMES CONSTRUCTION GROUP LLC
- 3 -
SPECIALTY CONTRACTORS
- 4 -
DENTON-JAMES LLC
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 600,000.00 600,000.00 350,000.00 350,000.00 1,027,000.00 1,027,000.00 800,000.00 800,000.00
202-01 removal of structures & obstructions lump      LUMP 75,000.00 75,000.00 25,000.00 25,000.00 15,000.00 15,000.00 45,000.00 45,000.00
202-02-B-01 removal of concrete box culverts (2' x 2')(sta.
3234+47)
1      EACH 1,000.00 1,000.00 2,500.00 2,500.00 1,000.00 1,000.00 2,000.00 2,000.00
202-02-B-02 removal of concrete box culverts (3' x 3')(sta.
3279+37)
1      EACH 1,000.00 1,000.00 2,800.00 2,800.00 1,000.00 1,000.00 3,000.00 3,000.00
202-02-B-03 removal of concrete box culverts (3' x 5')(sta.
3292+37)
1      EACH 1,000.00 1,000.00 3,000.00 3,000.00 1,000.00 1,000.00 4,000.00 4,000.00
202-02-B-04 removal of concrete box culverts (2' x 2')(sta.
3429+65)
1      EACH 1,000.00 1,000.00 2,500.00 2,500.00 1,000.00 1,000.00 2,000.00 2,000.00
202-02-B-05 removal of concrete box culverts (5' x 5')(sta.
3475+55)
1      EACH 1,000.00 1,000.00 3,800.00 3,800.00 2,000.00 2,000.00 7,000.00 7,000.00
202-02-B-06 removal of concrete box culverts (2' x 2')(sta.
3570+09)
1      EACH 1,000.00 1,000.00 2,500.00 2,500.00 1,000.00 1,000.00 2,000.00 2,000.00
202-02-G removal of surfacing & stabilized base 34,536.3    SQYD 1.75 60,438.53 9.00 310,826.70 4.50 155,413.35 6.00 207,217.80
202-02-H removal of guard rail 1,698      LNFT 8.85 15,027.30 3.00 5,094.00 3.00 5,094.00 5.00 8,490.00
202-02-01 removal of concrete headwall (2-4' x 4' )(lt. of sta.
3211+87)
1      EACH 1,000.00 1,000.00 500.00 500.00 300.00 300.00 1,400.00 1,400.00
202-02-02 removal of concrete headwall (2-4' x 4' )(rt. of sta.
3211+87)
1      EACH 1,000.00 1,000.00 500.00 500.00 300.00 300.00 1,400.00 1,400.00
202-02-03 removal of concrete headwall (5-8' x 8' )(lt. of sta.
3366+41)
1      EACH 1,000.00 1,000.00 1,000.00 1,000.00 600.00 600.00 3,000.00 3,000.00
202-02-04 removal of concrete headwall (4-6' x 6' )(lt. of sta.
3396+50)
1      EACH 1,000.00 1,000.00 800.00 800.00 500.00 500.00 2,000.00 2,000.00
202-02-05 removal of concrete headwall (3-5' x 5')(lt. of sta.
3411+90)
1      EACH 1,000.00 1,000.00 600.00 600.00 400.00 400.00 2,000.00 2,000.00
202-02-06 removal of concrete headwall (5' x 5' )(lt. of sta.
3464+69)
1      EACH 1,000.00 1,000.00 500.00 500.00 200.00 200.00 2,000.00 2,000.00
202-02-07 removal of concrete headwall (5' x 5' )(rt. of sta.
3464+69)
1      EACH 1,000.00 1,000.00 500.00 500.00 200.00 200.00 2,000.00 2,000.00
202-02-08 removal of concrete headwall (4-5' x 5')(rt. of sta.
3515+42)
1      EACH 1,000.00 1,000.00 1,000.00 1,000.00 500.00 500.00 2,200.00 2,200.00
202-02-09 removal of 1,760 sq. ft. wood frame residence on piers
(rt. of sta. 3224+25)(cont. friable & non-friable
asb.)
1      EACH 1,000.00 1,000.00 7,850.00 7,850.00 1.00 1.00 1.00 1.00
202-02-10 removal of 2,940 sq. ft. wood frame residence on piers
(rt. of sta. 3226+50)(contains non-friable
asbestos)
1      EACH 1,000.00 1,000.00 5,350.00 5,350.00 1.00 1.00 1.00 1.00
202-02-11 removal of 490 sq. ft. wood shed on slab (rt. of sta.
3228+00)
1      EACH 1,000.00 1,000.00 1,400.00 1,400.00 1.00 1.00 1.00 1.00
202-02-12 removal of 1,860 sq. ft. wood frame residence on piers
(rt. of sta. 3229+00)(contains non-friable
asbestos)
1      EACH 1,000.00 1,000.00 4,350.00 4,350.00 1.00 1.00 1.00 1.00
202-02-13 removal of 1,080 sq. ft. cinder block residence on
slab (rt. of sta. 3230+12)
1      EACH 1,000.00 1,000.00 2,500.00 2,500.00 1.00 1.00 1.00 1.00
202-02-14 removal of 1,080 sq. ft. cinder block residence on
slab (rt. of sta. 3231+14)(contains non-friable
asbestos)
1      EACH 1,000.00 1,000.00 2,500.00 2,500.00 1.00 1.00 1.00 1.00
202-02-15 removal of 2,600 sq. ft. wood frame residence on piers
(rt. of sta. 3276+25)(contains non-friable
asbestos)
1      EACH 1,000.00 1,000.00 4,350.00 4,350.00 1.00 1.00 1.00 1.00
202-02-16 removal of 212 sq. ft. shed (rt. of sta. 3276+25) 1      EACH 500.00 500.00 400.00 400.00 1.00 1.00 1.00 1.00
202-02-17 removal of 1,490 sq. ft. brick veneer residence on
slab (lt. of sta. 3307+50)(contains non-friable
asbestos)
1      EACH 1,000.00 1,000.00 4,850.00 4,850.00 1.00 1.00 1.00 1.00
202-02-18 removal of 1,050 sq. ft. mobile home (lt. of sta.
3308+86)
1      EACH 1,000.00 1,000.00 3,000.00 3,000.00 1.00 1.00 1.00 1.00
202-02-19 removal of 1,530 sq. ft. wood frame residence (lt. of
sta. 3310+65)
1      EACH 1,000.00 1,000.00 3,000.00 3,000.00 1.00 1.00 1.00 1.00
202-02-20 removal of 200 sq. ft. metal shed (lt. of sta. 3310+65) 1      EACH 1,000.00 1,000.00 400.00 400.00 1.00 1.00 1.00 1.00
202-02-21 removal of 3,240 sq. ft. brick veneer residence on
slab (lt. of sta. 3322+50)(contains non-friable
asbestos)
1      EACH 1,000.00 1,000.00 5,350.00 5,350.00 1.00 1.00 1.00 1.00
202-02-22 removal of 1,100 sq. ft. block residence on slab (lt.
of sta. 3325+28) (contains non-friable asbestos)
1      EACH 1,000.00 1,000.00 3,850.00 3,850.00 1.00 1.00 1.00 1.00
202-02-23 removal of 1,100 sq. ft. block residence on slab (lt.
of sta. 3326+00) (contains non-friable asbestos)
1      EACH 1,000.00 1,000.00 3,850.00 3,850.00 1.00 1.00 1.00 1.00
202-02-24 removal of 2,200 sq. ft. brick veneer residence on
slab (lt. of sta. 3327+28)(contains non-friable
asbestos)
1      EACH 1,000.00 1,000.00 4,850.00 4,850.00 1.00 1.00 1.00 1.00
202-02-25 removal of 2,640 sq. ft. brick veneer residence on
slab (lt. of sta. 3328+75)(cont. friable &
non-friable asb.)
1      EACH 1,000.00 1,000.00 5,350.00 5,350.00 1.00 1.00 1.00 1.00
202-02-26 removal of 3,504 sq. ft. concrete slab (lt. of sta.
3332+25)(contains non-friable asbestos)
1      EACH 500.00 500.00 1,500.00 1,500.00 1.00 1.00 1.00 1.00
202-02-27 removal of 2,090 sq. ft. wood frame residence (lt. of
sta. 3335+80) (contains friable asbestos)
1      EACH 1,000.00 1,000.00 8,850.00 8,850.00 1.00 1.00 1.00 1.00
202-02-28 removal of 5,050 sq. ft. metal building on slab (lt.
of sta. 3337+50)
1      EACH 1,000.00 1,000.00 3,000.00 3,000.00 1.00 1.00 1.00 1.00
202-02-29 removal of 660 sq. ft. mobile home (lt. of sta.
3337+60)
1      EACH 150.00 150.00 2,500.00 2,500.00 1.00 1.00 1.00 1.00
202-02-30 removal of 330 sq. ft. shed (lt. of sta. 3346+90) 1      EACH 1,000.00 1,000.00 400.00 400.00 1.00 1.00 1.00 1.00
203-01 general excavation 311,197      CUYD 2.90 902,471.30 2.00 622,394.00 1.75 544,594.75 3.40 1,058,069.80
203-02 drainage excavation 23,346      CUYD 6.30 147,079.80 10.00 233,460.00 4.00 93,384.00 7.00 163,422.00
203-03 embankment 600,758      CUYD 6.25 3,754,737.50 6.50 3,904,927.00 4.00 2,403,032.00 6.60 3,965,002.80
204-02 temporary hay or straw bales 259      EACH 13.00 3,367.00 30.00 7,770.00 10.00 2,590.00 10.00 2,590.00
204-05-A temporary sediment check dams (hay) 198      EACH 165.00 32,670.00 350.00 69,300.00 60.00 11,880.00 130.00 25,740.00
204-05-B temporary sediment check dams (stone) 244      EACH 750.00 183,000.00 400.00 97,600.00 250.00 61,000.00 800.00 195,200.00
204-06 temporary silt fencing 40,000      LNFT 1.30 52,000.00 4.00 160,000.00 2.00 80,000.00 1.70 68,000.00
204-07 temporary stone construction entrance 10      EACH 3,000.00 30,000.00 900.00 9,000.00 2,000.00 20,000.00 2,500.00 25,000.00
302-02-C-01 class ii base course (8" thick)(soil cement) 195,143.2    SQYD 8.00 1,561,145.60 8.00 1,561,145.60 8.36 1,631,397.15 8.50 1,658,717.20
302-02-G-01 class ii base course (4.75" thick)(stone or recycled
pccp)
17,770.1    SQYD 8.00 142,160.80 12.00 213,241.20 13.10 232,788.31 14.00 248,781.40
302-02-H-01 class ii base course (5.75" thick)(stone or recycled
pccp)
23,582.3    SQYD 8.50 200,449.55 13.00 306,569.90 15.72 370,713.76 16.00 377,316.80
304-05 lime treatment (type e) 414.92   TON 290.00 120,326.80 165.00 68,461.80 275.00 114,103.00 400.00 165,968.00
401-02 aggregate surface course (adjusted vehicular
measurement)
599      CUYD 85.00 50,915.00 55.00 32,945.00 90.00 53,910.00 75.00 44,925.00
402-01 traffic maintenance aggregate (vehicular measurement) 4,000.0    CUYD 45.00 180,000.00 32.00 128,000.00 25.00 100,000.00 60.00 240,000.00
509-01 cold planing asphaltic pavement 1,659      SQYD 5.00 8,295.00 3.50 5,806.50 6.00 9,954.00 12.00 19,908.00
509-02 contractor retained reclaimed asphaltic pavement - 92      CUYD 0.10 - 9.20 1.00 - 92.00 1.00 - 92.00 0.01 - 0.92
510-01-C pavement patching (14" minimum thickness) 2,622      SQYD 100.00 262,200.00 135.00 353,970.00 145.00 380,190.00 130.00 340,860.00
701-01-F cross drain pipe (15" rcp/pcp) 2,057      LNFT 75.00 154,275.00 60.00 123,420.00 45.00 92,565.00 60.00 123,420.00
701-01-I cross drain pipe (24" rcp/pcp) 512      LNFT 95.00 48,640.00 75.00 38,400.00 50.00 25,600.00 80.00 40,960.00
701-01-K cross drain pipe (30" rcp/pcp) 400      LNFT 100.00 40,000.00 115.00 46,000.00 80.00 32,000.00 100.00 40,000.00
701-01-M cross drain pipe (36" rcp/pcp) 400      LNFT 130.00 52,000.00 150.00 60,000.00 106.00 42,400.00 120.00 48,000.00
701-01-N cross drain pipe (42" rcp/pcp) 144      LNFT 180.00 25,920.00 165.00 23,760.00 150.00 21,600.00 170.00 24,480.00
701-01-O cross drain pipe (48" rcp/pcp) 210      LNFT 230.00 48,300.00 195.00 40,950.00 180.00 37,800.00 200.00 42,000.00
701-02-E cross drain pipe arch (30" equiv. rcpa) 184      LNFT 130.00 23,920.00 162.00 29,808.00 100.00 18,400.00 120.00 22,080.00
701-02-F cross drain pipe arch (36" equiv. rcpa) 1,152      LNFT 140.00 161,280.00 150.00 172,800.00 130.00 149,760.00 140.00 161,280.00
701-02-G cross drain pipe arch (42" equiv. rcpa) 104      LNFT 205.00 21,320.00 200.00 20,800.00 161.00 16,744.00 170.00 17,680.00
701-02-H cross drain pipe arch (48" equiv. rcpa) 864      LNFT 195.00 168,480.00 159.00 137,376.00 196.00 169,344.00 200.00 172,800.00
701-02-I cross drain pipe arch (54" equiv. rcpa) 208      LNFT 260.00 54,080.00 214.00 44,512.00 227.00 47,216.00 230.00 47,840.00
701-05-G side drain pipe (18") 2,612      LNFT 30.00 78,360.00 72.00 188,064.00 47.00 122,764.00 45.00 117,540.00
701-05-I side drain pipe (24") 424      LNFT 43.00 18,232.00 70.00 29,680.00 50.00 21,200.00 58.00 24,592.00
701-05-K side drain pipe (30") 124      LNFT 71.00 8,804.00 108.00 13,392.00 80.00 9,920.00 70.00 8,680.00
701-05-M side drain pipe (36") 130      LNFT 80.00 10,400.00 92.00 11,960.00 106.00 13,780.00 100.00 13,000.00
701-05-O side drain pipe (48") 152      LNFT 120.00 18,240.00 159.00 24,168.00 180.00 27,360.00 140.00 21,280.00
701-05-S side drain pipe (72") 120      LNFT 300.00 36,000.00 300.00 36,000.00 298.00 35,760.00 220.00 26,400.00
701-10-S reinforced concrete pipe (extension)(72") 72      LNFT 355.00 25,560.00 300.00 21,600.00 426.00 30,672.00 380.00 27,360.00
702-03-A catch basins (cb-01) 42      EACH 2,600.00 109,200.00 2,080.00 87,360.00 2,500.00 105,000.00 2,800.00 117,600.00
702-03-B catch basins (cb-02) 3      EACH 4,600.00 13,800.00 4,500.00 13,500.00 3,700.00 11,100.00 5,000.00 15,000.00
702-08-A side drain safety end (type 1) 3      EACH 2,400.00 7,200.00 2,000.00 6,000.00 1,500.00 4,500.00 2,500.00 7,500.00
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 690.0    LNFT 40.00 27,600.00 34.00 23,460.00 34.00 23,460.00 35.00 24,150.00
704-03 blocked out guard rail 1,475.1    LNFT 25.00 36,877.50 18.50 27,289.35 18.50 27,289.35 19.00 28,026.90
704-08-B guard rail transitions (double thrie beam) 200.0    LNFT 70.00 14,000.00 56.00 11,200.00 56.00 11,200.00 56.00 11,200.00
704-11-A guard rail end treatment (flared) 8      EACH 2,500.00 20,000.00 2,000.00 16,000.00 2,000.00 16,000.00 2,000.00 16,000.00
705-01 barbed wire fence 13,134      LNFT 7.20 94,564.80 5.40 70,923.60 7.00 91,938.00 6.50 85,371.00
705-02 combination mesh & barbed wire fence 4,297      LNFT 8.25 35,450.25 6.00 25,782.00 9.00 38,673.00 7.50 32,227.50
705-04 single swinging driveway gates 17      EACH 5.02 85.34 400.00 6,800.00 300.00 5,100.00 500.00 8,500.00
705-06-A chain link fence (4-foot height) 273      LNFT 20.00 5,460.00 24.50 6,688.50 20.00 5,460.00 20.00 5,460.00
705-06-E chain link fence (8-foot height) 360      LNFT 35.00 12,600.00 42.00 15,120.00 28.00 10,080.00 34.00 12,240.00
705-07-A 12-foot single gates for chain line fence (4-foot
height)
1      EACH 1,000.00 1,000.00 800.00 800.00 750.00 750.00 900.00 900.00
706-03-C incidental concrete paving (6" thick) 786.4    SQYD 100.00 78,640.00 110.00 86,504.00 41.00 32,242.40 80.00 62,912.00
708-01 right-of-way monument 92      EACH 285.00 26,220.00 150.00 13,800.00 150.00 13,800.00 200.00 18,400.00
708-02 right-of-way monument witness post 92      EACH 285.00 26,220.00 150.00 13,800.00 125.00 11,500.00 40.00 3,680.00
711-01-C riprap (30 lb, 1.5' thick) 4,544      SQYD 55.00 249,920.00 50.00 227,200.00 45.00 204,480.00 60.00 272,640.00
711-01-D riprap (55 lb, 1.5' thick) 5,754      SQYD 60.00 345,240.00 50.00 287,700.00 50.00 287,700.00 70.00 402,780.00
711-04 geotextile fabric 10,298      SQYD 2.00 20,596.00 3.00 30,894.00 2.50 25,745.00 2.00 20,596.00
712-02 sacked concrete revetment 1,280      SQYD 60.00 76,800.00 71.00 90,880.00 160.00 204,800.00 50.00 64,000.00
712-04 flexible revetment 1,101      SQYD 55.00 60,555.00 46.00 50,646.00 80.00 88,080.00 70.00 77,070.00
713-01 temporary signs & barricades lump      LUMP 200,000.00 200,000.00 100,000.00 100,000.00 218,000.00 218,000.00 200,000.00 200,000.00
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
2.460  MILE 400.00 984.00 300.00 738.00 300.00 738.00 300.00 738.00
713-04-A temporary pavement markings (solid line)(4" width) 3.775  MILE 970.00 3,661.75 800.00 3,020.00 600.00 2,265.00 600.00 2,265.00
714-01 slab sodding 90,000      SQYD 4.50 405,000.00 0.25 22,500.00 3.00 270,000.00 4.00 360,000.00
715-01 topsoil 7,500      CUYD 11.40 85,500.00 21.00 157,500.00 15.00 112,500.00 11.00 82,500.00
716-01-A mulch (vegetative) 15.3    TON 685.00 10,480.50 550.00 8,415.00 1,200.00 18,360.00 600.00 9,180.00
717-01 seeding 7,920      LB 9.00 71,280.00 8.50 67,320.00 10.00 79,200.00 8.00 63,360.00
718-01 fertilizer 132,000      LB 0.50 66,000.00 0.40 52,800.00 1.00 132,000.00 0.40 52,800.00
720-01-A erosion control system, slope protection (type a) 68,362      SQYD 1.50 102,543.00 1.15 78,616.30 2.00 136,724.00 1.30 88,870.60
720-01-B erosion control system, slope protection (type b) 52,221      SQYD 1.50 78,331.50 1.15 60,054.15 2.00 104,442.00 1.30 67,887.30
722-02 project site laboratory (equipped) 1      EACH 75,000.00 75,000.00 30,000.00 30,000.00 25,000.00 25,000.00 30,000.00 30,000.00
725-01 temporary detour roads 10,264.9    SQYD 60.00 615,894.00 68.00 698,013.20 72.43 743,486.71 70.00 718,543.00
726-01 bedding material 2,574.0    CUYD 95.00 244,530.00 70.00 180,180.00 80.00 205,920.00 70.00 180,180.00
727-01 mobilization lump      LUMP 2,400,000.00 2,400,000.00 2,900,000.00 2,900,000.00 2,108,000.00 2,108,000.00 3,500,000.00 3,500,000.00
729-16-B object marker assembly (type 2) 49      EACH 85.00 4,165.00 68.00 3,332.00 68.00 3,332.00 70.00 3,430.00
729-16-C object marker assembly (type 3) 38      EACH 90.00 3,420.00 70.00 2,660.00 70.00 2,660.00 75.00 2,850.00
731-01 nonreflectorized raised pavement markers 308      EACH 13.00 4,004.00 10.00 3,080.00 10.00 3,080.00 10.00 3,080.00
731-02 reflectorized raised pavement markers 2,376      EACH 6.80 16,156.80 4.75 11,286.00 4.75 11,286.00 5.00 11,880.00
732-01-C plastic pavement striping (8" width) 3,086      LNFT 5.70 17,590.20 1.00 3,086.00 1.00 3,086.00 1.00 3,086.00
732-01-E plastic pavement striping (24" width) 90      LNFT 13.65 1,228.50 3.00 270.00 3.00 270.00 3.00 270.00
732-02-A plastic pavement striping (solid line) (4" width) 23.134  MILE 2,700.00 62,461.80 2,500.00 57,835.00 2,500.00 57,835.00 2,500.00 57,835.00
732-04-A plastic pavement legends & symbols (arrow) 13      EACH 340.00 4,420.00 160.00 2,080.00 150.00 1,950.00 150.00 1,950.00
732-04-C plastic pavement legends & symbols (only) 13      EACH 570.00 7,410.00 200.00 2,600.00 200.00 2,600.00 200.00 2,600.00
732-05 removal of existing markings 6.110  MILE 3,200.00 19,552.00 4,600.00 28,106.00 4,600.00 28,106.00 4,600.00 28,106.00
735-01 mailboxes 30      EACH 1.25 37.50 1.00 30.00 30.00 900.00 1.00 30.00
735-02 mailbox supports (single) 30      EACH 115.00 3,450.00 100.00 3,000.00 150.00 4,500.00 150.00 4,500.00
740-01 construction layout lump      LUMP 350,000.00 350,000.00 200,000.00 200,000.00 640,000.00 640,000.00 350,000.00 350,000.00
740-02 utility oversight and coordination lump      LUMP 20,000.00 20,000.00 20,000.00 20,000.00 100,000.00 100,000.00 40,000.00 40,000.00
802-01 structural excavation 870.6    CUYD 20.00 17,412.00 17.00 14,800.20 10.00 8,706.00 25.00 21,765.00
802-05 cofferdams lump      LUMP 30,000.00 30,000.00 100,000.00 100,000.00 400,000.00 400,000.00 450,000.00 450,000.00
803-05 temporary sheeting lump      LUMP 17,000.00 17,000.00 150,000.00 150,000.00 20,000.00 20,000.00 250,000.00 250,000.00
804-01-B precast concrete piles (14") 1,320      LNFT 52.00 68,640.00 73.00 96,360.00 70.00 92,400.00 80.00 105,600.00
804-01-C precast concrete piles (16") 1,300      LNFT 62.00 80,600.00 77.00 100,100.00 80.00 104,000.00 90.00 117,000.00
804-01-D precast concrete piles (18") 1,200      LNFT 65.00 78,000.00 85.00 102,000.00 110.00 132,000.00 110.00 132,000.00
804-01-G precast concrete piles (30") 4,355      LNFT 145.00 631,475.00 134.00 583,570.00 210.00 914,550.00 170.00 740,350.00
804-05 precast concrete test piles 3      EACH 30,000.00 90,000.00 75,000.00 225,000.00 20,000.00 60,000.00 30,000.00 90,000.00
804-09 loading test piles 3      EACH 20,000.00 60,000.00 5,000.00 15,000.00 30,000.00 90,000.00 15,000.00 45,000.00
804-10 reloading test piles 2      EACH 400.00 800.00 8,000.00 16,000.00 3,000.00 6,000.00 500.00 1,000.00
804-11 redriving test piles 2      EACH 400.00 800.00 3,400.00 6,800.00 6,000.00 12,000.00 500.00 1,000.00
804-12 loading permanent piles 2      EACH 1,300.00 2,600.00 20,000.00 40,000.00 30,000.00 60,000.00 1,000.00 2,000.00
804-17 dynamic monitoring 11      EACH 1,000.00 11,000.00 2,000.00 22,000.00 1,500.00 16,500.00 1,500.00 16,500.00
805-01-A class a concrete (pipe headwalls) 11.70   CUYD 1,900.00 22,230.00 1,200.00 14,040.00 2,400.00 28,080.00 1,300.00 15,210.00
805-01-B class a concrete (box culvert headwalls) 134.71   CUYD 1,300.00 175,123.00 1,420.00 191,288.20 1,350.00 181,858.50 1,300.00 175,123.00
805-01-C class a concrete (retaining walls) 109.64   CUYD 1,300.00 142,532.00 1,360.00 149,110.40 1,100.00 120,604.00 750.00 82,230.00
805-01-D class a concrete (footings) 100.78   CUYD 575.00 57,948.50 280.00 28,218.40 450.00 45,351.00 420.00 42,327.60
805-01-F class a concrete (bents) 698.61   CUYD 640.00 447,110.40 600.00 419,166.00 850.00 593,818.50 750.00 523,957.50
805-03 class aa concrete 1,470.33   CUYD 675.00 992,472.75 550.00 808,681.50 650.00 955,714.50 680.00 999,824.40
805-08-C precast-prestressed concrete girders (type iii) 5,247.0    LNFT 95.00 498,465.00 100.00 524,700.00 120.00 629,640.00 120.00 629,640.00
805-08-D precast-prestressed concrete girders (type iv) 2,028.5    LNFT 130.00 263,705.00 130.00 263,705.00 140.00 283,990.00 180.00 365,130.00
805-11 strip seal joints 313.12   LNFT 165.00 51,664.80 130.00 40,705.60 170.00 53,230.40 200.00 62,624.00
805-12-E reinforced concrete box culverts (4'x 4') 1,213.0    LNFT 300.00 363,900.00 235.00 285,055.00 395.00 479,135.00 280.00 339,640.00
805-12-I reinforced concrete box culverts (5'x 5') 1,757.0    LNFT 425.00 746,725.00 325.00 571,025.00 510.00 896,070.00 370.00 650,090.00
805-12-M reinforced concrete box culverts (6'x 6') 448.0    LNFT 550.00 246,400.00 415.00 185,920.00 530.00 237,440.00 500.00 224,000.00
805-12-S reinforced concrete box culverts (8'x 8') 575.0    LNFT 740.00 425,500.00 575.00 330,625.00 800.00 460,000.00 680.00 391,000.00
806-01 deformed reinforcing steel 463,412      LB 1.10 509,753.20 1.00 463,412.00 1.35 625,606.20 1.30 602,435.60
807-08 structural metalwork lump      LUMP 3,500.00 3,500.00 12,000.00 12,000.00 10,000.00 10,000.00 20,000.00 20,000.00
810-01 concrete railing (barrier) 2,728.00   LNFT 80.00 218,240.00 45.00 122,760.00 70.00 190,960.00 65.00 177,320.00
813-01 concrete approach slabs 709.96   SQYD 225.00 159,741.00 225.00 159,741.00 270.00 191,689.20 220.00 156,191.20
S-001 rumble strips (ground-in) 15.5    MILE 600.00 9,300.00 530.00 8,215.00 650.00 10,075.00 700.00 10,850.00
S-002 removal of transition road from s. p. no. 023-06-0029 lump      LUMP 5,000.00 5,000.00 2,000.00 2,000.00 20,000.00 20,000.00 20,000.00 20,000.00
S-101 deck drainage systems lump      LUMP 10,000.00 10,000.00 22,000.00 22,000.00 10,000.00 10,000.00 16,000.00 16,000.00
S-102 retroreflective sheeting panels lump      LUMP 800.00 800.00 1,000.00 1,000.00 2,000.00 2,000.00 3,000.00 3,000.00
 SUBTOTAL GENERAL       21,982,803.07   21,513,927.10   22,413,416.08   25,306,624.48
                       
ALTERNATE A pavement alternates                    
                       
ALTERNATE A1 superpave asphaltic concrete pavement                    
203-04-A nonplastic embankment (stone) 3,182      CUYD 115.00 365,930.00 0.00 0.00 0.00 0.00 0.00 0.00
302-02-A-01 class ii base course (4" thick)(stone or recycled pccp) 174,772.8    SQYD 10.00 1,747,728.00 0.00 0.00 0.00 0.00 0.00 0.00
302-02-I-01 class ii base course (6.5" thick)(stone or recycled
pccp)
4,719.5    SQYD 21.00 99,109.50 0.00 0.00 0.00 0.00 0.00 0.00
502-01 superpave asphaltic concrete 66,982.5    TON 77.00 5,157,652.50 0.00 0.00 0.00 0.00 0.00 0.00
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
8,589.5    TON 95.00 816,002.50 0.00 0.00 0.00 0.00 0.00 0.00
732-03-A plastic pavement striping (broken line)(4" width) 13.894  MILE 900.00 12,504.60 0.00 0.00 0.00 0.00 0.00 0.00
S-003 open graded friction course (low volume traffic
applications)
264      TON 118.35 31,244.40 0.00 0.00 0.00 0.00 0.00 0.00
 SUBTOTAL ALT A1       8,230,171.50            
                       
ALTERNATE A2 portland cement concrete pavement                    
203-04-A nonplastic embankment (stone) 3,157      CUYD 0.00 0.00 150.00 473,550.00 90.00 284,130.00 80.00 252,560.00
302-02-A-01 class ii base course (4" thick)(stone or recycled pccp) 170,743.2    SQYD 0.00 0.00 7.50 1,280,574.00 14.15 2,416,016.28 11.00 1,878,175.20
302-02-I-01 class ii base course (6.5" thick)(stone or recycled
pccp)
4,696.0    SQYD 0.00 0.00 17.00 79,832.00 17.76 83,400.96 21.00 98,616.00
502-01 superpave asphaltic concrete 5,040.4    TON 0.00 0.00 180.00 907,272.00 200.00 1,008,080.00 155.00 781,262.00
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
988.4    TON 0.00 0.00 250.00 247,100.00 225.00 222,390.00 190.00 187,796.00
601-01-H portland cement concrete pavement (8 1/2" thick) 132,506.8    SQYD 0.00 0.00 40.00 5,300,272.00 43.00 5,697,792.40 43.00 5,697,792.40
601-02-H portland cement concrete pavement (8 1/2" thick)
(crossovers & turnouts)
16,400.4    SQYD 0.00 0.00 60.00 984,024.00 59.00 967,623.60 58.00 951,223.20
601-04 portland cement concrete pavement coring 270      EACH 0.00 0.00 150.00 40,500.00 165.00 44,550.00 120.00 32,400.00
732-03-A plastic pavement striping (broken line)(4" width) 4.585  MILE 0.00 0.00 700.00 3,209.50 700.00 3,209.50 700.00 3,209.50
732-03-A-01 plastic pvmt striping (broken line)(4"width)preformed
marking tape (type v)
9.309  MILE 0.00 0.00 3,880.00 36,118.92 3,960.00 36,863.64 4,000.00 37,236.00
S-004 pavement grooving 2,403      SQYD 0.00 0.00 5.40 12,976.20 10.00 24,030.00 9.00 21,627.00
 SUBTOTAL ALT A2           9,365,428.62   10,788,086.38   9,941,897.30
                       
 ITEM TOTAL (CONSTRUCTION BID)       30,212,974.57   30,879,355.72   33,201,502.46   35,248,521.78
 NUMBER OF DAYS BID AT $5,000 PER DAY.       3,125,000.00   3,625,000.00   3,000,000.00   3,625,000.00
 LIFE CYCLE COST       2,032,700.00   1,026,200.00   1,026,200.00   1,026,200.00
 TOTAL BID       35,370,674.57   35,530,555.72   37,227,702.46   39,899,721.78
 
Item Number Item Description Quantity Unit of Measure - 5 -
AUSTIN BRIDGE & ROAD, LP
- 6 -
DIAMOND B CONSTRUCTION CO., L.L.C.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 1,800,000.00 1,800,000.00 500,000.00 500,000.00        
202-01 removal of structures & obstructions lump      LUMP 275,000.00 275,000.00 20,000.00 20,000.00        
202-02-B-01 removal of concrete box culverts (2' x 2')(sta.
3234+47)
1      EACH 3,500.00 3,500.00 3,000.00 3,000.00        
202-02-B-02 removal of concrete box culverts (3' x 3')(sta.
3279+37)
1      EACH 4,500.00 4,500.00 3,000.00 3,000.00        
202-02-B-03 removal of concrete box culverts (3' x 5')(sta.
3292+37)
1      EACH 4,800.00 4,800.00 3,000.00 3,000.00        
202-02-B-04 removal of concrete box culverts (2' x 2')(sta.
3429+65)
1      EACH 3,500.00 3,500.00 3,000.00 3,000.00        
202-02-B-05 removal of concrete box culverts (5' x 5')(sta.
3475+55)
1      EACH 5,800.00 5,800.00 5,000.00 5,000.00        
202-02-B-06 removal of concrete box culverts (2' x 2')(sta.
3570+09)
1      EACH 3,900.00 3,900.00 4,000.00 4,000.00        
202-02-G removal of surfacing & stabilized base 34,536.3    SQYD 4.50 155,413.35 4.16 143,671.01        
202-02-H removal of guard rail 1,698      LNFT 3.50 5,943.00 7.00 11,886.00        
202-02-01 removal of concrete headwall (2-4' x 4' )(lt. of sta.
3211+87)
1      EACH 2,200.00 2,200.00 1,200.00 1,200.00        
202-02-02 removal of concrete headwall (2-4' x 4' )(rt. of sta.
3211+87)
1      EACH 2,200.00 2,200.00 1,200.00 1,200.00        
202-02-03 removal of concrete headwall (5-8' x 8' )(lt. of sta.
3366+41)
1      EACH 5,900.00 5,900.00 3,000.00 3,000.00        
202-02-04 removal of concrete headwall (4-6' x 6' )(lt. of sta.
3396+50)
1      EACH 5,800.00 5,800.00 3,000.00 3,000.00        
202-02-05 removal of concrete headwall (3-5' x 5')(lt. of sta.
3411+90)
1      EACH 4,600.00 4,600.00 3,000.00 3,000.00        
202-02-06 removal of concrete headwall (5' x 5' )(lt. of sta.
3464+69)
1      EACH 2,000.00 2,000.00 3,000.00 3,000.00        
202-02-07 removal of concrete headwall (5' x 5' )(rt. of sta.
3464+69)
1      EACH 2,000.00 2,000.00 3,000.00 3,000.00        
202-02-08 removal of concrete headwall (4-5' x 5')(rt. of sta.
3515+42)
1      EACH 3,900.00 3,900.00 3,000.00 3,000.00        
202-02-09 removal of 1,760 sq. ft. wood frame residence on piers
(rt. of sta. 3224+25)(cont. friable & non-friable
asb.)
1      EACH 1,900.00 1,900.00 3,000.00 3,000.00        
202-02-10 removal of 2,940 sq. ft. wood frame residence on piers
(rt. of sta. 3226+50)(contains non-friable
asbestos)
1      EACH 3,175.20 3,175.20 3,000.00 3,000.00        
202-02-11 removal of 490 sq. ft. wood shed on slab (rt. of sta.
3228+00)
1      EACH 529.40 529.40 3,000.00 3,000.00        
202-02-12 removal of 1,860 sq. ft. wood frame residence on piers
(rt. of sta. 3229+00)(contains non-friable
asbestos)
1      EACH 2,008.80 2,008.80 3,000.00 3,000.00        
202-02-13 removal of 1,080 sq. ft. cinder block residence on
slab (rt. of sta. 3230+12)
1      EACH 1,166.40 1,166.40 3,000.00 3,000.00        
202-02-14 removal of 1,080 sq. ft. cinder block residence on
slab (rt. of sta. 3231+14)(contains non-friable
asbestos)
1      EACH 1,166.40 1,166.40 3,000.00 3,000.00        
202-02-15 removal of 2,600 sq. ft. wood frame residence on piers
(rt. of sta. 3276+25)(contains non-friable
asbestos)
1      EACH 2,808.00 2,808.00 3,000.00 3,000.00        
202-02-16 removal of 212 sq. ft. shed (rt. of sta. 3276+25) 1      EACH 228.96 228.96 500.00 500.00        
202-02-17 removal of 1,490 sq. ft. brick veneer residence on
slab (lt. of sta. 3307+50)(contains non-friable
asbestos)
1      EACH 1,609.20 1,609.20 3,000.00 3,000.00        
202-02-18 removal of 1,050 sq. ft. mobile home (lt. of sta.
3308+86)
1      EACH 1,134.00 1,134.00 3,000.00 3,000.00        
202-02-19 removal of 1,530 sq. ft. wood frame residence (lt. of
sta. 3310+65)
1      EACH 1,652.40 1,652.40 3,000.00 3,000.00        
202-02-20 removal of 200 sq. ft. metal shed (lt. of sta. 3310+65) 1      EACH 216.00 216.00 500.00 500.00        
202-02-21 removal of 3,240 sq. ft. brick veneer residence on
slab (lt. of sta. 3322+50)(contains non-friable
asbestos)
1      EACH 3,499.20 3,499.20 3,000.00 3,000.00        
202-02-22 removal of 1,100 sq. ft. block residence on slab (lt.
of sta. 3325+28) (contains non-friable asbestos)
1      EACH 1,188.00 1,188.00 3,000.00 3,000.00        
202-02-23 removal of 1,100 sq. ft. block residence on slab (lt.
of sta. 3326+00) (contains non-friable asbestos)
1      EACH 1,188.00 1,188.00 2,877.65 2,877.65        
202-02-24 removal of 2,200 sq. ft. brick veneer residence on
slab (lt. of sta. 3327+28)(contains non-friable
asbestos)
1      EACH 2,376.00 2,376.00 3,000.00 3,000.00        
202-02-25 removal of 2,640 sq. ft. brick veneer residence on
slab (lt. of sta. 3328+75)(cont. friable &
non-friable asb.)
1      EACH 2,851.20 2,851.20 3,000.00 3,000.00        
202-02-26 removal of 3,504 sq. ft. concrete slab (lt. of sta.
3332+25)(contains non-friable asbestos)
1      EACH 3,784.32 3,784.32 3,000.00 3,000.00        
202-02-27 removal of 2,090 sq. ft. wood frame residence (lt. of
sta. 3335+80) (contains friable asbestos)
1      EACH 2,257.20 2,257.20 3,000.00 3,000.00        
202-02-28 removal of 5,050 sq. ft. metal building on slab (lt.
of sta. 3337+50)
1      EACH 5,454.00 5,454.00 3,000.00 3,000.00        
202-02-29 removal of 660 sq. ft. mobile home (lt. of sta.
3337+60)
1      EACH 712.80 712.80 3,000.00 3,000.00        
202-02-30 removal of 330 sq. ft. shed (lt. of sta. 3346+90) 1      EACH 356.40 356.40 500.00 500.00        
203-01 general excavation 311,197      CUYD 4.57 1,422,170.29 4.50 1,400,386.50        
203-02 drainage excavation 23,346      CUYD 8.12 189,569.52 12.00 280,152.00        
203-03 embankment 600,758      CUYD 11.17 6,710,466.86 11.00 6,608,338.00        
204-02 temporary hay or straw bales 259      EACH 10.00 2,590.00 12.00 3,108.00        
204-05-A temporary sediment check dams (hay) 198      EACH 110.00 21,780.00 125.00 24,750.00        
204-05-B temporary sediment check dams (stone) 244      EACH 325.00 79,300.00 550.00 134,200.00        
204-06 temporary silt fencing 40,000      LNFT 1.39 55,600.00 7.00 280,000.00        
204-07 temporary stone construction entrance 10      EACH 3,000.00 30,000.00 1,000.00 10,000.00        
302-02-C-01 class ii base course (8" thick)(soil cement) 195,143.2    SQYD 7.71 1,504,554.07 10.50 2,049,003.60        
302-02-G-01 class ii base course (4.75" thick)(stone or recycled
pccp)
17,770.1    SQYD 14.00 248,781.40 15.50 275,436.55        
302-02-H-01 class ii base course (5.75" thick)(stone or recycled
pccp)
23,582.3    SQYD 14.16 333,925.37 27.26 642,853.50        
304-05 lime treatment (type e) 414.92   TON 100.00 41,492.00 100.00 41,492.00        
401-02 aggregate surface course (adjusted vehicular
measurement)
599      CUYD 110.00 65,890.00 125.00 74,875.00        
402-01 traffic maintenance aggregate (vehicular measurement) 4,000.0    CUYD 95.00 380,000.00 82.00 328,000.00        
509-01 cold planing asphaltic pavement 1,659      SQYD 4.00 6,636.00 17.50 29,032.50        
509-02 contractor retained reclaimed asphaltic pavement - 92      CUYD 1.00 - 92.00 0.10 - 9.20        
510-01-C pavement patching (14" minimum thickness) 2,622      SQYD 70.00 183,540.00 100.00 262,200.00        
701-01-F cross drain pipe (15" rcp/pcp) 2,057      LNFT 55.78 114,739.46 70.00 143,990.00        
701-01-I cross drain pipe (24" rcp/pcp) 512      LNFT 62.88 32,194.56 90.00 46,080.00        
701-01-K cross drain pipe (30" rcp/pcp) 400      LNFT 81.14 32,456.00 120.00 48,000.00        
701-01-M cross drain pipe (36" rcp/pcp) 400      LNFT 116.63 46,652.00 135.00 54,000.00        
701-01-N cross drain pipe (42" rcp/pcp) 144      LNFT 147.06 21,176.64 160.00 23,040.00        
701-01-O cross drain pipe (48" rcp/pcp) 210      LNFT 177.48 37,270.80 240.00 50,400.00        
701-02-E cross drain pipe arch (30" equiv. rcpa) 184      LNFT 96.35 17,728.40 150.00 27,600.00        
701-02-F cross drain pipe arch (36" equiv. rcpa) 1,152      LNFT 136.92 157,731.84 170.00 195,840.00        
701-02-G cross drain pipe arch (42" equiv. rcpa) 104      LNFT 152.13 15,821.52 220.00 22,880.00        
701-02-H cross drain pipe arch (48" equiv. rcpa) 864      LNFT 187.63 162,112.32 260.00 224,640.00        
701-02-I cross drain pipe arch (54" equiv. rcpa) 208      LNFT 223.12 46,408.96 300.00 62,400.00        
701-05-G side drain pipe (18") 2,612      LNFT 55.78 145,697.36 60.00 156,720.00        
701-05-I side drain pipe (24") 424      LNFT 62.88 26,661.12 70.00 29,680.00        
701-05-K side drain pipe (30") 124      LNFT 81.14 10,061.36 77.00 9,548.00        
701-05-M side drain pipe (36") 130      LNFT 116.63 15,161.90 120.00 15,600.00        
701-05-O side drain pipe (48") 152      LNFT 177.48 26,976.96 200.00 30,400.00        
701-05-S side drain pipe (72") 120      LNFT 370.18 44,421.60 375.00 45,000.00        
701-10-S reinforced concrete pipe (extension)(72") 72      LNFT 370.18 26,652.96 500.00 36,000.00        
702-03-A catch basins (cb-01) 42      EACH 2,028.40 85,192.80 3,750.00 157,500.00        
702-03-B catch basins (cb-02) 3      EACH 2,839.76 8,519.28 4,000.00 12,000.00        
702-08-A side drain safety end (type 1) 3      EACH 3,042.60 9,127.80 2,000.00 6,000.00        
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 690.0    LNFT 50.00 34,500.00 35.00 24,150.00        
704-03 blocked out guard rail 1,475.1    LNFT 22.00 32,452.20 19.50 28,764.45        
704-08-B guard rail transitions (double thrie beam) 200.0    LNFT 56.00 11,200.00 60.00 12,000.00        
704-11-A guard rail end treatment (flared) 8      EACH 2,400.00 19,200.00 2,100.00 16,800.00        
705-01 barbed wire fence 13,134      LNFT 5.40 70,923.60 6.00 78,804.00        
705-02 combination mesh & barbed wire fence 4,297      LNFT 6.00 25,782.00 6.50 27,930.50        
705-04 single swinging driveway gates 17      EACH 400.00 6,800.00 450.00 7,650.00        
705-06-A chain link fence (4-foot height) 273      LNFT 24.50 6,688.50 26.00 7,098.00        
705-06-E chain link fence (8-foot height) 360      LNFT 42.00 15,120.00 45.00 16,200.00        
705-07-A 12-foot single gates for chain line fence (4-foot
height)
1      EACH 800.00 800.00 850.00 850.00        
706-03-C incidental concrete paving (6" thick) 786.4    SQYD 80.00 62,912.00 110.00 86,504.00        
708-01 right-of-way monument 92      EACH 120.00 11,040.00 175.00 16,100.00        
708-02 right-of-way monument witness post 92      EACH 80.00 7,360.00 155.00 14,260.00        
711-01-C riprap (30 lb, 1.5' thick) 4,544      SQYD 70.99 322,578.56 55.00 249,920.00        
711-01-D riprap (55 lb, 1.5' thick) 5,754      SQYD 70.99 408,476.46 60.00 345,240.00        
711-04 geotextile fabric 10,298      SQYD 2.28 23,479.44 2.50 25,745.00        
712-02 sacked concrete revetment 1,280      SQYD 60.00 76,800.00 160.00 204,800.00        
712-04 flexible revetment 1,101      SQYD 50.71 55,831.71 60.00 66,060.00        
713-01 temporary signs & barricades lump      LUMP 310,000.00 310,000.00 200,000.00 200,000.00        
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
2.460  MILE 500.00 1,230.00 325.00 799.50        
713-04-A temporary pavement markings (solid line)(4" width) 3.775  MILE 700.00 2,642.50 650.00 2,453.75        
714-01 slab sodding 90,000      SQYD 4.95 445,500.00 5.00 450,000.00        
715-01 topsoil 7,500      CUYD 15.00 112,500.00 15.00 112,500.00        
716-01-A mulch (vegetative) 15.3    TON 550.00 8,415.00 600.00 9,180.00        
717-01 seeding 7,920      LB 8.50 67,320.00 9.00 71,280.00        
718-01 fertilizer 132,000      LB 0.39 51,480.00 0.45 59,400.00        
720-01-A erosion control system, slope protection (type a) 68,362      SQYD 1.15 78,616.30 1.25 85,452.50        
720-01-B erosion control system, slope protection (type b) 52,221      SQYD 1.15 60,054.15 1.25 65,276.25        
722-02 project site laboratory (equipped) 1      EACH 62,012.54 62,012.54 50,000.00 50,000.00        
725-01 temporary detour roads 10,264.9    SQYD 54.61 560,566.19 70.00 718,543.00        
726-01 bedding material 2,574.0    CUYD 79.11 203,629.14 85.00 218,790.00        
727-01 mobilization lump      LUMP 3,800,000.00 3,800,000.00 3,065,000.00 3,065,000.00        
729-16-B object marker assembly (type 2) 49      EACH 75.00 3,675.00 70.00 3,430.00        
729-16-C object marker assembly (type 3) 38      EACH 111.00 4,218.00 75.00 2,850.00        
731-01 nonreflectorized raised pavement markers 308      EACH 10.00 3,080.00 11.00 3,388.00        
731-02 reflectorized raised pavement markers 2,376      EACH 4.75 11,286.00 5.00 11,880.00        
732-01-C plastic pavement striping (8" width) 3,086      LNFT 1.00 3,086.00 1.10 3,394.60        
732-01-E plastic pavement striping (24" width) 90      LNFT 3.00 270.00 3.25 292.50        
732-02-A plastic pavement striping (solid line) (4" width) 23.134  MILE 2,500.00 57,835.00 2,650.00 61,305.10        
732-04-A plastic pavement legends & symbols (arrow) 13      EACH 150.00 1,950.00 175.00 2,275.00        
732-04-C plastic pavement legends & symbols (only) 13      EACH 200.00 2,600.00 220.00 2,860.00        
732-05 removal of existing markings 6.110  MILE 4,600.00 28,106.00 5,000.00 30,550.00        
735-01 mailboxes 30      EACH 100.00 3,000.00 1.10 33.00        
735-02 mailbox supports (single) 30      EACH 100.00 3,000.00 110.00 3,300.00        
740-01 construction layout lump      LUMP 585,102.44 585,102.44 260,000.00 260,000.00        
740-02 utility oversight and coordination lump      LUMP 5,640.60 5,640.60 30,000.00 30,000.00        
802-01 structural excavation 870.6    CUYD 8.62 7,504.57 12.00 10,447.20        
802-05 cofferdams lump      LUMP 66,693.17 66,693.17 200,000.00 200,000.00        
803-05 temporary sheeting lump      LUMP 120,600.00 120,600.00 107,000.00 107,000.00        
804-01-B precast concrete piles (14") 1,320      LNFT 49.08 64,785.60 57.00 75,240.00        
804-01-C precast concrete piles (16") 1,300      LNFT 63.17 82,121.00 75.00 97,500.00        
804-01-D precast concrete piles (18") 1,200      LNFT 74.32 89,184.00 110.00 132,000.00        
804-01-G precast concrete piles (30") 4,355      LNFT 131.83 574,119.65 215.00 936,325.00        
804-05 precast concrete test piles 3      EACH 23,652.77 70,958.31 20,000.00 60,000.00        
804-09 loading test piles 3      EACH 35,480.70 106,442.10 36,500.00 109,500.00        
804-10 reloading test piles 2      EACH 6,333.06 12,666.12 3,000.00 6,000.00        
804-11 redriving test piles 2      EACH 7,744.49 15,488.98 2,600.00 5,200.00        
804-12 loading permanent piles 2      EACH 17,006.72 34,013.44 8,700.00 17,400.00        
804-17 dynamic monitoring 11      EACH 1,639.62 18,035.82 2,000.00 22,000.00        
805-01-A class a concrete (pipe headwalls) 11.70   CUYD 1,521.30 17,799.21 1,600.00 18,720.00        
805-01-B class a concrete (box culvert headwalls) 134.71   CUYD 1,369.17 184,440.89 1,600.00 215,536.00        
805-01-C class a concrete (retaining walls) 109.64   CUYD 1,716.84 188,234.34 1,000.00 109,640.00        
805-01-D class a concrete (footings) 100.78   CUYD 436.96 44,036.83 500.00 50,390.00        
805-01-F class a concrete (bents) 698.61   CUYD 475.33 332,070.29 800.00 558,888.00        
805-03 class aa concrete 1,470.33   CUYD 650.46 956,390.85 900.00 1,323,297.00        
805-08-C precast-prestressed concrete girders (type iii) 5,247.0    LNFT 92.57 485,714.79 150.00 787,050.00        
805-08-D precast-prestressed concrete girders (type iv) 2,028.5    LNFT 140.68 285,369.38 250.00 507,125.00        
805-11 strip seal joints 313.12   LNFT 160.53 50,265.15 185.00 57,927.20        
805-12-E reinforced concrete box culverts (4'x 4') 1,213.0    LNFT 289.05 350,617.65 365.00 442,745.00        
805-12-I reinforced concrete box culverts (5'x 5') 1,757.0    LNFT 395.54 694,963.78 465.00 817,005.00        
805-12-M reinforced concrete box culverts (6'x 6') 448.0    LNFT 527.38 236,266.24 565.00 253,120.00        
805-12-S reinforced concrete box culverts (8'x 8') 575.0    LNFT 730.22 419,876.50 700.00 402,500.00        
806-01 deformed reinforcing steel 463,412      LB 1.10 509,753.20 1.25 579,265.00        
807-08 structural metalwork lump      LUMP 4,377.37 4,377.37 8,000.00 8,000.00        
810-01 concrete railing (barrier) 2,728.00   LNFT 59.04 161,061.12 75.00 204,600.00        
813-01 concrete approach slabs 709.96   SQYD 188.06 133,515.08 250.00 177,490.00        
S-001 rumble strips (ground-in) 15.5    MILE 490.00 7,595.00 700.00 10,850.00        
S-002 removal of transition road from s. p. no. 023-06-0029 lump      LUMP 25,000.00 25,000.00 13,000.00 13,000.00        
S-101 deck drainage systems lump      LUMP 10,000.00 10,000.00 10,000.00 10,000.00        
S-102 retroreflective sheeting panels lump      LUMP 1,000.00 1,000.00 550.00 550.00        
 SUBTOTAL GENERAL       28,720,907.14   29,695,890.66        
                       
ALTERNATE A pavement alternates                    
                       
ALTERNATE A1 superpave asphaltic concrete pavement                    
203-04-A nonplastic embankment (stone) 3,182      CUYD 0.00 0.00 132.00 420,024.00        
302-02-A-01 class ii base course (4" thick)(stone or recycled pccp) 174,772.8    SQYD 0.00 0.00 13.71 2,396,135.09        
302-02-I-01 class ii base course (6.5" thick)(stone or recycled
pccp)
4,719.5    SQYD 0.00 0.00 30.00 141,585.00        
502-01 superpave asphaltic concrete 66,982.5    TON 0.00 0.00 100.00 6,698,250.00        
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
8,589.5    TON 0.00 0.00 128.00 1,099,456.00        
732-03-A plastic pavement striping (broken line)(4" width) 13.894  MILE 0.00 0.00 750.00 10,420.50        
S-003 open graded friction course (low volume traffic
applications)
264      TON 0.00 0.00 200.00 52,800.00        
 SUBTOTAL ALT A1           10,818,670.59        
                       
ALTERNATE A2 portland cement concrete pavement                    
203-04-A nonplastic embankment (stone) 3,157      CUYD 71.07 224,367.99 0.00 0.00        
302-02-A-01 class ii base course (4" thick)(stone or recycled pccp) 170,743.2    SQYD 9.03 1,541,811.10 0.00 0.00        
302-02-I-01 class ii base course (6.5" thick)(stone or recycled
pccp)
4,696.0    SQYD 16.31 76,591.76 0.00 0.00        
502-01 superpave asphaltic concrete 5,040.4    TON 183.76 926,223.90 0.00 0.00        
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
988.4    TON 253.81 250,865.80 0.00 0.00        
601-01-H portland cement concrete pavement (8 1/2" thick) 132,506.8    SQYD 48.68 6,450,431.02 0.00 0.00        
601-02-H portland cement concrete pavement (8 1/2" thick)
(crossovers & turnouts)
16,400.4    SQYD 59.13 969,755.65 0.00 0.00        
601-04 portland cement concrete pavement coring 270      EACH 107.25 28,957.50 0.00 0.00        
732-03-A plastic pavement striping (broken line)(4" width) 4.585  MILE 700.00 3,209.50 0.00 0.00        
732-03-A-01 plastic pvmt striping (broken line)(4"width)preformed
marking tape (type v)
9.309  MILE 3,960.00 36,863.64 0.00 0.00        
S-004 pavement grooving 2,403      SQYD 5.00 12,015.00 0.00 0.00        
 SUBTOTAL ALT A2       10,521,092.86            
                       
 ITEM TOTAL (CONSTRUCTION BID)       39,242,000.00   40,514,561.25        
 NUMBER OF DAYS BID AT $5,000 PER DAY.       3,625,000.00   3,500,000.00        
 LIFE CYCLE COST       1,026,200.00   2,032,700.00        
 TOTAL BID       43,893,200.00   46,047,261.25        