| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DENTON-JAMES LLC |
- 2 - JAMES CONSTRUCTION GROUP LLC |
- 3 - BARBER BROS. CONTRACTING CO., L.L.C |
- 4 - GILCHRIST CONSTRUCTION CO. LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
700,000.00 |
700,000.00 |
800,000.00 |
800,000.00 |
200,000.00 |
200,000.00 |
800,000.00 |
800,000.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
60,000.00 |
60,000.00 |
120,000.00 |
120,000.00 |
120,000.00 |
120,000.00 |
120,000.00 |
120,000.00 |
| 202-02-A |
removal of bridges(sta.386+63.43;33'x 362'concrete
slab span bridge) |
1   |
EACH |
50,000.00 |
50,000.00 |
200,000.00 |
200,000.00 |
200,000.00 |
200,000.00 |
45,000.00 |
45,000.00 |
| 202-02-B |
removal of concrete box culverts (sta.152+55;5'x 3'x
90') |
1   |
EACH |
8,000.00 |
8,000.00 |
6,000.00 |
6,000.00 |
8,000.00 |
8,000.00 |
8,500.00 |
8,500.00 |
| 202-02-C |
removal of portland cement concrete pavement
|
29,350   |
SQYD |
5.00 |
146,750.00 |
7.00 |
205,450.00 |
20.00 |
587,000.00 |
3.95 |
115,932.50 |
| 202-02-D |
removal of concrete walks & drives
|
4,264   |
SQYD |
10.00 |
42,640.00 |
3.00 |
12,792.00 |
25.00 |
106,600.00 |
6.50 |
27,716.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
123,551.4 |
SQYD |
3.00 |
370,654.20 |
7.50 |
926,635.50 |
3.30 |
407,719.62 |
2.65 |
327,411.21 |
| 202-02-H |
removal of guard rail
|
1,803   |
LNFT |
6.00 |
10,818.00 |
5.00 |
9,015.00 |
5.00 |
9,015.00 |
10.00 |
18,030.00 |
| 202-02-I |
removal of existing traffic signal equipment
|
lump |
LUMP |
4,500.00 |
4,500.00 |
7,000.00 |
7,000.00 |
5,000.00 |
5,000.00 |
5,000.00 |
5,000.00 |
| 203-01 |
general excavation
|
112,620   |
CUYD |
7.00 |
788,340.00 |
5.00 |
563,100.00 |
9.75 |
1,098,045.00 |
4.50 |
506,790.00 |
| 203-02 |
drainage excavation
|
3,960   |
CUYD |
10.00 |
39,600.00 |
12.00 |
47,520.00 |
10.00 |
39,600.00 |
11.00 |
43,560.00 |
| 203-03 |
embankment
|
115,891   |
CUYD |
10.00 |
1,158,910.00 |
10.00 |
1,158,910.00 |
8.50 |
985,073.50 |
10.04 |
1,163,545.64 |
| 204-02 |
temporary hay or straw bales
|
31   |
EACH |
10.00 |
310.00 |
12.00 |
372.00 |
20.00 |
620.00 |
18.00 |
558.00 |
| 204-03 |
temporary slope drains
|
350   |
LNFT |
15.00 |
5,250.00 |
18.00 |
6,300.00 |
6.00 |
2,100.00 |
25.00 |
8,750.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
76   |
EACH |
100.00 |
7,600.00 |
120.00 |
9,120.00 |
125.00 |
9,500.00 |
185.00 |
14,060.00 |
| 204-05-B |
temporary sediment check dams (stone)
|
20   |
EACH |
800.00 |
16,000.00 |
350.00 |
7,000.00 |
700.00 |
14,000.00 |
700.00 |
14,000.00 |
| 204-06 |
temporary silt fencing
|
13,560   |
LNFT |
2.00 |
27,120.00 |
2.50 |
33,900.00 |
2.20 |
29,832.00 |
1.20 |
16,272.00 |
| 302-02-E-01 |
class ii base course (10" thick)(stone or recycled
pccp) or (4" of stone or recycled pccp on 6" of soil cement) |
187,228.4 |
SQYD |
17.00 |
3,182,882.80 |
18.50 |
3,463,725.40 |
19.75 |
3,697,760.90 |
17.00 |
3,182,882.80 |
| 302-02-G-01 |
class ii base course (stone of recycled pccp)(14" avg.
thickness) or (8" stone or recycled pccp on 6" soil cement) |
11,968.1 |
SQYD |
26.00 |
311,170.60 |
35.00 |
418,883.50 |
32.75 |
391,955.28 |
26.50 |
317,154.65 |
| 304-01 |
lime
|
141.76 |
TON |
170.00 |
24,099.20 |
135.00 |
19,137.60 |
175.00 |
24,808.00 |
160.00 |
22,681.60 |
| 304-04-D |
lime treatment (type d) (12" thick)
|
10,000   |
SQYD |
2.50 |
25,000.00 |
2.00 |
20,000.00 |
0.60 |
6,000.00 |
1.65 |
16,500.00 |
| 305-01-B |
subgrade layer (8" thick)
|
198,818   |
SQYD |
6.20 |
1,232,671.60 |
5.50 |
1,093,499.00 |
5.75 |
1,143,203.50 |
5.50 |
1,093,499.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
202   |
CUYD |
75.00 |
15,150.00 |
65.00 |
13,130.00 |
60.00 |
12,120.00 |
70.00 |
14,140.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
5,000.0 |
CUYD |
45.00 |
225,000.00 |
65.00 |
325,000.00 |
40.00 |
200,000.00 |
60.00 |
300,000.00 |
| 509-01 |
cold planing asphaltic pavement
|
34,802   |
SQYD |
1.80 |
62,643.60 |
1.25 |
43,502.50 |
1.50 |
52,203.00 |
2.00 |
69,604.00 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 1,934   |
CUYD |
0.01 |
- 19.34 |
0.01 |
- 19.34 |
0.00 |
0.00 |
0.10 |
- 193.40 |
| 510-01-B |
pavement patching (12" minimum thickness)
|
112   |
SQYD |
130.00 |
14,560.00 |
350.00 |
39,200.00 |
120.00 |
13,440.00 |
175.00 |
19,600.00 |
| 701-01-G |
cross drain pipe (18" rcp/pcp)
|
72   |
LNFT |
70.00 |
5,040.00 |
66.00 |
4,752.00 |
100.00 |
7,200.00 |
100.00 |
7,200.00 |
| 701-01-I |
cross drain pipe (24" rcp/pcp)
|
72   |
LNFT |
85.00 |
6,120.00 |
73.00 |
5,256.00 |
130.00 |
9,360.00 |
120.00 |
8,640.00 |
| 701-01-M |
cross drain pipe (36" rcp/pcp)
|
120   |
LNFT |
100.00 |
12,000.00 |
96.00 |
11,520.00 |
165.00 |
19,800.00 |
130.00 |
15,600.00 |
| 701-01-N |
cross drain pipe (42" rcp/pcp)
|
158   |
LNFT |
140.00 |
22,120.00 |
111.00 |
17,538.00 |
180.00 |
28,440.00 |
180.00 |
28,440.00 |
| 701-03-F |
storm drain pipe (15" rcp/pcp)
|
21,557   |
LNFT |
48.00 |
1,034,736.00 |
61.00 |
1,314,977.00 |
30.00 |
646,710.00 |
34.00 |
732,938.00 |
| 701-03-G |
storm drain pipe (18" rcp/pcp)
|
5,752   |
LNFT |
54.00 |
310,608.00 |
66.00 |
379,632.00 |
35.00 |
201,320.00 |
40.00 |
230,080.00 |
| 701-03-I |
storm drain pipe (24" rcp/pcp)
|
2,823   |
LNFT |
62.00 |
175,026.00 |
76.00 |
214,548.00 |
50.00 |
141,150.00 |
60.00 |
169,380.00 |
| 701-03-K |
storm drain pipe (30" rcp/pcp)
|
1,007   |
LNFT |
78.00 |
78,546.00 |
89.00 |
89,623.00 |
60.00 |
60,420.00 |
90.00 |
90,630.00 |
| 701-03-M |
storm drain pipe (36" rcp/pcp)
|
570   |
LNFT |
96.00 |
54,720.00 |
96.00 |
54,720.00 |
85.00 |
48,450.00 |
110.00 |
62,700.00 |
| 701-03-N |
storm drain pipe (42" rcp/pcp)
|
525   |
LNFT |
120.00 |
63,000.00 |
116.00 |
60,900.00 |
120.00 |
63,000.00 |
130.00 |
68,250.00 |
| 701-03-O |
storm drain pipe (48" rcp/pcp)
|
845   |
LNFT |
140.00 |
118,300.00 |
111.00 |
93,795.00 |
150.00 |
126,750.00 |
150.00 |
126,750.00 |
| 701-03-P |
storm drain pipe (54" rcp/pcp)
|
204   |
LNFT |
190.00 |
38,760.00 |
121.00 |
24,684.00 |
180.00 |
36,720.00 |
200.00 |
40,800.00 |
| 701-03-Q |
storm drain pipe (60" rcp/pcp)
|
185   |
LNFT |
250.00 |
46,250.00 |
127.00 |
23,495.00 |
240.00 |
44,400.00 |
220.00 |
40,700.00 |
| 701-03-S |
storm drain pipe (72" rcp/pcp)
|
453   |
LNFT |
300.00 |
135,900.00 |
155.00 |
70,215.00 |
350.00 |
158,550.00 |
275.00 |
124,575.00 |
| 701-05-G |
side drain pipe (18")
|
221   |
LNFT |
45.00 |
9,945.00 |
35.00 |
7,735.00 |
65.00 |
14,365.00 |
40.00 |
8,840.00 |
| 701-05-G-01 |
side drain pipe (18")(bridge drain)
|
60   |
LNFT |
50.00 |
3,000.00 |
35.00 |
2,100.00 |
120.00 |
7,200.00 |
55.00 |
3,300.00 |
| 701-05-I |
side drain pipe (24")
|
50   |
LNFT |
55.00 |
2,750.00 |
42.00 |
2,100.00 |
75.00 |
3,750.00 |
60.00 |
3,000.00 |
| 701-05-I-01 |
side drain pipe (24")(erosion)
|
50   |
LNFT |
55.00 |
2,750.00 |
75.00 |
3,750.00 |
75.00 |
3,750.00 |
77.00 |
3,850.00 |
| 701-09 |
fabricating pipe fittings
|
5   |
EACH |
1,600.00 |
8,000.00 |
2,200.00 |
11,000.00 |
2,000.00 |
10,000.00 |
600.00 |
3,000.00 |
| 702-02-B |
manholes (r-cb-11)
|
2   |
EACH |
4,000.00 |
8,000.00 |
5,200.00 |
10,400.00 |
5,000.00 |
10,000.00 |
5,000.00 |
10,000.00 |
| 702-02-E |
manholes (r-cb-32 mod)
|
1   |
EACH |
9,000.00 |
9,000.00 |
10,000.00 |
10,000.00 |
18,000.00 |
18,000.00 |
15,000.00 |
15,000.00 |
| 702-02-G |
manholes (r-cb-36)
|
8   |
EACH |
2,000.00 |
16,000.00 |
4,300.00 |
34,400.00 |
3,000.00 |
24,000.00 |
9,500.00 |
76,000.00 |
| 702-03-A |
catch basins (cb-01)
|
85   |
EACH |
2,500.00 |
212,500.00 |
1,100.00 |
93,500.00 |
2,500.00 |
212,500.00 |
2,200.00 |
187,000.00 |
| 702-03-B |
catch basins (cb-02)
|
3   |
EACH |
3,400.00 |
10,200.00 |
1,200.00 |
3,600.00 |
5,000.00 |
15,000.00 |
3,300.00 |
9,900.00 |
| 702-03-C |
catch basins (cb-06)
|
179   |
EACH |
4,200.00 |
751,800.00 |
1,600.00 |
286,400.00 |
3,650.00 |
653,350.00 |
4,400.00 |
787,600.00 |
| 702-03-D |
catch basins (cb-07)
|
99   |
EACH |
4,400.00 |
435,600.00 |
1,800.00 |
178,200.00 |
4,800.00 |
475,200.00 |
5,600.00 |
554,400.00 |
| 702-03-F |
catch basins (cb-08)
|
13   |
EACH |
6,400.00 |
83,200.00 |
2,000.00 |
26,000.00 |
8,000.00 |
104,000.00 |
9,300.00 |
120,900.00 |
| 702-03-H |
catch basins (cb-05)
|
1   |
EACH |
1,600.00 |
1,600.00 |
1,800.00 |
1,800.00 |
1,500.00 |
1,500.00 |
1,400.00 |
1,400.00 |
| 702-04-A |
adjusting manholes
|
2   |
EACH |
1,600.00 |
3,200.00 |
1,100.00 |
2,200.00 |
2,500.00 |
5,000.00 |
1,000.00 |
2,000.00 |
| 702-05-A |
cross drain end treatment (1 barrel, 24"rcp or 30"cmp)
|
1   |
EACH |
6,000.00 |
6,000.00 |
6,000.00 |
6,000.00 |
2,500.00 |
2,500.00 |
3,400.00 |
3,400.00 |
| 703-03 |
perforated pipe underdrains
|
37,920   |
LNFT |
10.00 |
379,200.00 |
8.00 |
303,360.00 |
10.00 |
379,200.00 |
12.00 |
455,040.00 |
| 704-03 |
blocked out guard rail
|
40.0 |
LNFT |
25.00 |
1,000.00 |
25.00 |
1,000.00 |
30.00 |
1,200.00 |
26.50 |
1,060.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
50.0 |
LNFT |
60.00 |
3,000.00 |
60.00 |
3,000.00 |
75.00 |
3,750.00 |
73.00 |
3,650.00 |
| 704-11-A |
guard rail end treatment (flared)
|
2   |
EACH |
2,500.00 |
5,000.00 |
2,500.00 |
5,000.00 |
3,000.00 |
6,000.00 |
2,900.00 |
5,800.00 |
| 706-02-C |
concrete drive (6" thick)
|
7,322.6 |
SQYD |
47.00 |
344,162.20 |
55.00 |
402,743.00 |
60.00 |
439,356.00 |
55.00 |
402,743.00 |
| 708-01 |
right-of-way monument
|
145   |
EACH |
200.00 |
29,000.00 |
200.00 |
29,000.00 |
225.00 |
32,625.00 |
280.00 |
40,600.00 |
| 708-02 |
right-of-way monument witness post
|
35   |
EACH |
40.00 |
1,400.00 |
200.00 |
7,000.00 |
175.00 |
6,125.00 |
280.00 |
9,800.00 |
| 711-01-C |
riprap (30 lb, 10")
|
174   |
SQYD |
90.00 |
15,660.00 |
80.00 |
13,920.00 |
75.00 |
13,050.00 |
55.00 |
9,570.00 |
| 711-01-E |
riprap (130 lb, 24")
|
2,666   |
SQYD |
70.00 |
186,620.00 |
100.00 |
266,600.00 |
75.00 |
199,950.00 |
110.00 |
293,260.00 |
| 711-04 |
geotextile fabric
|
3,085   |
SQYD |
1.80 |
5,553.00 |
2.00 |
6,170.00 |
3.50 |
10,797.50 |
2.30 |
7,095.50 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
400,000.00 |
400,000.00 |
130,000.00 |
130,000.00 |
500,000.00 |
500,000.00 |
275,000.00 |
275,000.00 |
| 713-03-B-01 |
temporary pvmt. markings (broken line)(4" w)(10' l)
(type i removable) |
10.000 |
MILE |
2,700.00 |
27,000.00 |
2,500.00 |
25,000.00 |
3,000.00 |
30,000.00 |
3,000.00 |
30,000.00 |
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
36.916 |
MILE |
480.00 |
17,719.68 |
475.00 |
17,535.10 |
550.00 |
20,303.80 |
530.00 |
19,565.48 |
| 713-08 |
temporary precast concrete barrier (department
furnished) |
28   |
EACH |
500.00 |
14,000.00 |
350.00 |
9,800.00 |
350.00 |
9,800.00 |
470.00 |
13,160.00 |
| 716-01-A |
mulch (vegetative)
|
96.4 |
TON |
350.00 |
33,740.00 |
350.00 |
33,740.00 |
400.00 |
38,560.00 |
335.00 |
32,294.00 |
| 717-01 |
seeding
|
1,242   |
LB |
9.00 |
11,178.00 |
9.00 |
11,178.00 |
10.00 |
12,420.00 |
8.40 |
10,432.80 |
| 718-01 |
fertilizer
|
62,101   |
LB |
0.40 |
24,840.40 |
0.50 |
31,050.50 |
0.50 |
31,050.50 |
0.50 |
31,050.50 |
| 718-02 |
agricultural lime
|
124.2 |
TON |
80.00 |
9,936.00 |
80.00 |
9,936.00 |
90.00 |
11,178.00 |
90.00 |
11,178.00 |
| 719-01-A |
plants (elaeagnus, 3 gallon container full form 24"
min. ht., 18" - 24" spr ead) |
51   |
EACH |
25.00 |
1,275.00 |
25.00 |
1,275.00 |
30.00 |
1,530.00 |
19.50 |
994.50 |
| 719-01-B |
plants (burkii red cedar, 30 gallon container or b/b,
7'-8', 1.5" - 2" cali per, full to ground) |
52   |
EACH |
440.00 |
22,880.00 |
420.00 |
21,840.00 |
500.00 |
26,000.00 |
175.00 |
9,100.00 |
| 719-01-C |
plants (asian jasmine, 4" pot)
|
4,150   |
EACH |
2.30 |
9,545.00 |
2.50 |
10,375.00 |
2.50 |
10,375.00 |
5.00 |
20,750.00 |
| 719-01-D |
plants (parson's juniper, 7 gallon container full form,
10" min. ht., 18" - 24" spread) |
20   |
EACH |
70.00 |
1,400.00 |
70.00 |
1,400.00 |
80.00 |
1,600.00 |
35.67 |
713.40 |
| 719-02 |
top dressing mulch (4" depth)
|
1,040   |
SQYD |
9.00 |
9,360.00 |
9.00 |
9,360.00 |
12.00 |
12,480.00 |
11.15 |
11,596.00 |
| 719-03 |
bed preparation (10" depth)
|
320   |
SQYD |
18.00 |
5,760.00 |
18.00 |
5,760.00 |
24.00 |
7,680.00 |
22.30 |
7,136.00 |
| 719-04 |
landscaping (sow 25 acres of wild flower
seeds:clasping cone flower and cor eopsis tinctoria as directed by project eng. |
lump |
LUMP |
33,000.00 |
33,000.00 |
32,500.00 |
32,500.00 |
38,000.00 |
38,000.00 |
28,000.00 |
28,000.00 |
| 720-01-A |
erosion control system, slope protection (type a)
|
29,098   |
SQYD |
1.10 |
32,007.80 |
1.20 |
34,917.60 |
1.25 |
36,372.50 |
1.40 |
40,737.20 |
| 720-01-A-01 |
erosion control system, slope protection (type a)
(terratex no4 or aprroved equal) |
320   |
SQYD |
2.00 |
640.00 |
2.00 |
640.00 |
2.50 |
800.00 |
2.80 |
896.00 |
| 720-01-B-01 |
erosion control system, slope protection (type b)
anti-wash/geojute or appr oved equal) |
320   |
SQYD |
3.50 |
1,120.00 |
3.50 |
1,120.00 |
4.00 |
1,280.00 |
3.90 |
1,248.00 |
| 720-01-C |
erosion control system, flexible channel liner (type c)
|
1,622   |
SQYD |
1.40 |
2,270.80 |
1.50 |
2,433.00 |
1.60 |
2,595.20 |
1.65 |
2,676.30 |
| 720-01-D |
erosion control system, flexible channel liner (type d)
|
13,058   |
SQYD |
1.50 |
19,587.00 |
1.50 |
19,587.00 |
1.70 |
22,198.60 |
1.85 |
24,157.30 |
| 720-01-E |
erosion control system, flexible channel liner (type e)
|
200   |
SQYD |
3.00 |
600.00 |
3.00 |
600.00 |
3.30 |
660.00 |
5.60 |
1,120.00 |
| 720-01-F |
erosion control system, flexible channel liner (type f)
|
880   |
SQYD |
3.50 |
3,080.00 |
3.50 |
3,080.00 |
4.00 |
3,520.00 |
5.60 |
4,928.00 |
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
30,000.00 |
30,000.00 |
25,000.00 |
25,000.00 |
50,000.00 |
50,000.00 |
60,000.00 |
60,000.00 |
| 725-01 |
temporary detour roads
|
3,620.0 |
SQYD |
65.00 |
235,300.00 |
80.00 |
289,600.00 |
72.00 |
260,640.00 |
85.00 |
307,700.00 |
| 726-01 |
bedding material
|
4,461.9 |
CUYD |
65.00 |
290,023.50 |
60.00 |
267,714.00 |
1.00 |
4,461.90 |
97.00 |
432,804.30 |
| 727-01 |
mobilization
|
lump |
LUMP |
2,900,000.00 |
2,900,000.00 |
2,750,000.00 |
2,750,000.00 |
1,450,000.00 |
1,450,000.00 |
2,800,000.00 |
2,800,000.00 |
| 729-01 |
sign (type a)
|
20.0 |
SQFT |
50.00 |
1,000.00 |
70.00 |
1,400.00 |
35.00 |
700.00 |
32.00 |
640.00 |
| 729-06 |
sign (overhead mounted)
|
20.0 |
SQFT |
50.00 |
1,000.00 |
70.00 |
1,400.00 |
40.00 |
800.00 |
38.00 |
760.00 |
| 729-16-B |
object marker assembly (type 2)
|
5   |
EACH |
60.00 |
300.00 |
60.00 |
300.00 |
70.00 |
350.00 |
55.00 |
275.00 |
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
75.00 |
300.00 |
75.00 |
300.00 |
85.00 |
340.00 |
84.00 |
336.00 |
| 730-08-A |
electrical service point (existing power pole)
|
1   |
EACH |
1,200.00 |
1,200.00 |
1,500.00 |
1,500.00 |
1,500.00 |
1,500.00 |
1,200.00 |
1,200.00 |
| 731-02 |
reflectorized raised pavement markers
|
1,870   |
EACH |
5.00 |
9,350.00 |
5.00 |
9,350.00 |
5.50 |
10,285.00 |
5.50 |
10,285.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
21.200 |
MILE |
2,200.00 |
46,640.00 |
2,200.00 |
46,640.00 |
2,500.00 |
53,000.00 |
2,400.00 |
50,880.00 |
| 732-02-C |
plastic pavement striping (solid line) (8" width)
|
0.164 |
MILE |
4,400.00 |
721.60 |
4,400.00 |
721.60 |
5,000.00 |
820.00 |
4,800.00 |
787.20 |
| 732-02-E |
plastic pavement striping (solid line) (24" width)
|
0.303 |
MILE |
14,000.00 |
4,242.00 |
14,000.00 |
4,242.00 |
16,000.00 |
4,848.00 |
15,500.00 |
4,696.50 |
| 735-01 |
mailboxes
|
10   |
EACH |
1.00 |
10.00 |
1.00 |
10.00 |
2.00 |
20.00 |
1.10 |
11.00 |
| 735-02 |
mailbox supports (single)
|
10   |
EACH |
150.00 |
1,500.00 |
100.00 |
1,000.00 |
125.00 |
1,250.00 |
115.00 |
1,150.00 |
| 736-01 |
trenching and backfilling
|
394   |
LNFT |
3.50 |
1,379.00 |
4.00 |
1,576.00 |
4.00 |
1,576.00 |
3.95 |
1,556.30 |
| 736-03-A |
jacked or bored conduit (3" schedule 80)
|
284   |
LNFT |
24.00 |
6,816.00 |
25.00 |
7,100.00 |
30.00 |
8,520.00 |
26.00 |
7,384.00 |
| 736-04-B |
signal support (30'steel strain pole)
|
4   |
EACH |
10,000.00 |
40,000.00 |
7,000.00 |
28,000.00 |
11,000.00 |
44,000.00 |
10,000.00 |
40,000.00 |
| 736-05-B |
signal heads (3-section, 12" led lenses, r,y,g)
|
5   |
EACH |
800.00 |
4,000.00 |
1,200.00 |
6,000.00 |
900.00 |
4,500.00 |
850.00 |
4,250.00 |
| 736-05-C |
signal heads (5-section, 12" led lenses,
r,lt.y,y,lt.g,g) |
1   |
EACH |
1,200.00 |
1,200.00 |
1,900.00 |
1,900.00 |
1,500.00 |
1,500.00 |
1,200.00 |
1,200.00 |
| 736-05-D |
signal heads (5-section, 12" led lenses,
r,y,rt.y,g,rt.g) |
1   |
EACH |
1,200.00 |
1,200.00 |
1,900.00 |
1,900.00 |
1,500.00 |
1,500.00 |
1,200.00 |
1,200.00 |
| 736-08-A |
signal controller (nema,ts-2,type 2;type 3 pole
mounted cabinet) |
1   |
EACH |
16,000.00 |
16,000.00 |
15,000.00 |
15,000.00 |
18,000.00 |
18,000.00 |
17,000.00 |
17,000.00 |
| 736-09 |
loop detector
|
135   |
LNFT |
10.00 |
1,350.00 |
12.00 |
1,620.00 |
12.00 |
1,620.00 |
10.50 |
1,417.50 |
| 736-10-A |
underground junction box (type d)
|
2   |
EACH |
350.00 |
700.00 |
290.00 |
580.00 |
400.00 |
800.00 |
380.00 |
760.00 |
| 736-10-B |
underground junction box (type e)
|
2   |
EACH |
370.00 |
740.00 |
420.00 |
840.00 |
450.00 |
900.00 |
415.00 |
830.00 |
| 736-10-C |
underground junction box (type f)
|
2   |
EACH |
500.00 |
1,000.00 |
480.00 |
960.00 |
600.00 |
1,200.00 |
550.00 |
1,100.00 |
| 736-11-A |
conduit (1/2" pvc, schedule 80)
|
35   |
LNFT |
4.50 |
157.50 |
2.00 |
70.00 |
6.00 |
210.00 |
5.00 |
175.00 |
| 736-11-B |
conduit (1" pvc, schedule 80)
|
284   |
LNFT |
2.80 |
795.20 |
2.25 |
639.00 |
4.00 |
1,136.00 |
3.00 |
852.00 |
| 736-11-C |
conduit (2" pvc, schedule 80)
|
75   |
LNFT |
4.00 |
300.00 |
2.50 |
187.50 |
5.00 |
375.00 |
4.46 |
334.50 |
| 736-12-A |
conductor (2c loop lead-in, 14awg, 19x27 class c
stranding, imsa 50-2) |
525   |
LNFT |
1.40 |
735.00 |
1.75 |
918.75 |
1.60 |
840.00 |
1.50 |
787.50 |
| 736-12-B |
conductor (3c power, 6 awg, concentric)
|
75   |
LNFT |
5.50 |
412.50 |
4.25 |
318.75 |
6.50 |
487.50 |
6.20 |
465.00 |
| 736-12-C |
conductor (6c signal, 14 awg, stranded)
|
180   |
LNFT |
3.50 |
630.00 |
2.00 |
360.00 |
4.00 |
720.00 |
3.90 |
702.00 |
| 736-12-D |
conductor (10c signal, 14 awg, stranded)
|
505   |
LNFT |
4.50 |
2,272.50 |
3.00 |
1,515.00 |
5.50 |
2,777.50 |
5.00 |
2,525.00 |
| 739-01 |
hydro-seeding
|
10.00 |
ACRE |
1,100.00 |
11,000.00 |
1,000.00 |
10,000.00 |
1,500.00 |
15,000.00 |
1,000.00 |
10,000.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
250,000.00 |
250,000.00 |
390,000.00 |
390,000.00 |
300,000.00 |
300,000.00 |
300,000.00 |
300,000.00 |
| 741-09 |
adjusting water house connections
|
8   |
EACH |
1,000.00 |
8,000.00 |
1,300.00 |
10,400.00 |
1,200.00 |
9,600.00 |
400.00 |
3,200.00 |
| 742-01-A |
sanitary sewer pipe (4")
|
13   |
LNFT |
70.00 |
910.00 |
50.00 |
650.00 |
150.00 |
1,950.00 |
11.20 |
145.60 |
| 742-01-A-01 |
sanitary sewer pipe (4")(ductile iron)
|
24   |
LNFT |
90.00 |
2,160.00 |
5.00 |
120.00 |
150.00 |
3,600.00 |
28.00 |
672.00 |
| 742-01-B |
sanitary sewer pipe (8")
|
2,770   |
LNFT |
42.00 |
116,340.00 |
36.00 |
99,720.00 |
25.00 |
69,250.00 |
16.50 |
45,705.00 |
| 742-02 |
adjusting sanitary sewer house connections
|
8   |
EACH |
800.00 |
6,400.00 |
1,200.00 |
9,600.00 |
1,200.00 |
9,600.00 |
400.00 |
3,200.00 |
| 803-03 |
steel sheet pile wall
|
1,386   |
SQFT |
55.00 |
76,230.00 |
30.00 |
41,580.00 |
55.00 |
76,230.00 |
35.00 |
48,510.00 |
| 804-01-F |
precast concrete piles (24")
|
6,630   |
LNFT |
110.00 |
729,300.00 |
100.00 |
663,000.00 |
100.00 |
663,000.00 |
100.00 |
663,000.00 |
| 804-12 |
loading permanent piles
|
1   |
EACH |
1,000.00 |
1,000.00 |
2,500.00 |
2,500.00 |
8,000.00 |
8,000.00 |
9,700.00 |
9,700.00 |
| 805-01-A |
class a concrete (pipe headwalls)
|
36.22 |
CUYD |
1,500.00 |
54,330.00 |
1,500.00 |
54,330.00 |
1,500.00 |
54,330.00 |
1,500.00 |
54,330.00 |
| 805-01-B |
class a concrete (box culvert headwalls)
|
13.12 |
CUYD |
1,500.00 |
19,680.00 |
1,750.00 |
22,960.00 |
1,500.00 |
19,680.00 |
1,500.00 |
19,680.00 |
| 805-01-F |
class a concrete (bents)
|
232.03 |
CUYD |
900.00 |
208,827.00 |
850.00 |
197,225.50 |
800.00 |
185,624.00 |
925.00 |
214,627.75 |
| 805-03 |
class aa concrete
|
952.60 |
CUYD |
700.00 |
666,820.00 |
600.00 |
571,560.00 |
780.00 |
743,028.00 |
815.00 |
776,369.00 |
| 805-08-C |
precast-prestressed concrete girders (type iii)
|
4,165.0 |
LNFT |
98.00 |
408,170.00 |
110.00 |
458,150.00 |
125.00 |
520,625.00 |
97.00 |
404,005.00 |
| 805-12-G |
reinforced concrete box culverts (6'x 4')
|
42.0 |
LNFT |
800.00 |
33,600.00 |
1,000.00 |
42,000.00 |
500.00 |
21,000.00 |
735.00 |
30,870.00 |
| 806-01 |
deformed reinforcing steel
|
342,312   |
LB |
1.40 |
479,236.80 |
1.00 |
342,312.00 |
1.60 |
547,699.20 |
1.15 |
393,658.80 |
| 807-08 |
structural metalwork
|
lump |
LUMP |
4,000.00 |
4,000.00 |
12,000.00 |
12,000.00 |
25,000.00 |
25,000.00 |
12,000.00 |
12,000.00 |
| 810-01 |
concrete railing (barrier)
|
843.00 |
LNFT |
65.00 |
54,795.00 |
50.00 |
42,150.00 |
80.00 |
67,440.00 |
70.00 |
59,010.00 |
| 813-01 |
concrete approach slabs
|
929.88 |
SQYD |
200.00 |
185,976.00 |
230.00 |
213,872.40 |
500.00 |
464,940.00 |
430.00 |
399,848.40 |
| S-001 |
temporary construction entrances
|
4   |
EACH |
2,500.00 |
10,000.00 |
4,000.00 |
16,000.00 |
5,000.00 |
20,000.00 |
2,000.00 |
8,000.00 |
| S-002 |
video detection system
|
1   |
EACH |
4,000.00 |
4,000.00 |
4,400.00 |
4,400.00 |
4,500.00 |
4,500.00 |
4,500.00 |
4,500.00 |
| S-003 |
video detector device and connection
|
2   |
EACH |
6,500.00 |
13,000.00 |
6,400.00 |
12,800.00 |
7,000.00 |
14,000.00 |
7,000.00 |
14,000.00 |
| S-005 |
saw cutting (1" depth)
|
642   |
LNFT |
8.00 |
5,136.00 |
4.00 |
2,568.00 |
3.50 |
2,247.00 |
7.50 |
4,815.00 |
| S-101 |
temporary guard rail
|
62.5 |
LNFT |
20.00 |
1,250.00 |
20.00 |
1,250.00 |
25.00 |
1,562.50 |
65.00 |
4,062.50 |
| S-102 |
temporary guard rail end treatment(flared)
|
1   |
EACH |
2,500.00 |
2,500.00 |
2,500.00 |
2,500.00 |
3,000.00 |
3,000.00 |
2,000.00 |
2,000.00 |
| S-103 |
impact attennuators (construction zone)
|
2   |
EACH |
20,000.00 |
40,000.00 |
17,000.00 |
34,000.00 |
20,000.00 |
40,000.00 |
21,000.00 |
42,000.00 |
| | SUBTOTAL GENERAL |
|
|
|
20,839,792.14 |
|
20,771,243.86 |
|
20,247,020.50 |
|
20,894,591.83 |
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A |
pavement alternates
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A1 |
superpave asphaltic concrete pavement
|
|
|
|
|
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
92,576.9 |
TON |
0.00 |
0.00 |
0.00 |
0.00 |
88.00 |
8,146,767.20 |
0.00 |
0.00 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
3,409.7 |
TON |
0.00 |
0.00 |
0.00 |
0.00 |
100.00 |
340,970.00 |
0.00 |
0.00 |
| 707-03 |
combination concrete curb & gutter
|
41,395.3 |
LNFT |
0.00 |
0.00 |
0.00 |
0.00 |
22.00 |
910,696.60 |
0.00 |
0.00 |
| 732-03-A |
plastic pavement striping (broken line) (4" width)
|
10.600 |
MILE |
0.00 |
0.00 |
0.00 |
0.00 |
600.00 |
6,360.00 |
0.00 |
0.00 |
| S-004 |
rumble strips (ground-in)
|
3.4 |
MILE |
0.00 |
0.00 |
0.00 |
0.00 |
1,500.00 |
5,100.00 |
0.00 |
0.00 |
| | SUBTOTAL ALT A1 |
|
|
|
|
|
|
|
9,409,893.80 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A2 |
portland cement concrete pavement
|
|
|
|
|
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
9,690.6 |
TON |
110.00 |
1,065,966.00 |
95.00 |
920,607.00 |
0.00 |
0.00 |
115.00 |
1,114,419.00 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
94.4 |
TON |
170.00 |
16,048.00 |
155.00 |
14,632.00 |
0.00 |
0.00 |
175.00 |
16,520.00 |
| 601-01-I |
portland cement concrete pavement (9" thick)
|
175,256.0 |
SQYD |
40.00 |
7,010,240.00 |
41.00 |
7,185,496.00 |
0.00 |
0.00 |
45.00 |
7,886,520.00 |
| 601-02-I |
portland cement concrete pavement (9" thick)
(crossovers & turnouts) |
6,698.6 |
SQYD |
52.00 |
348,327.20 |
62.00 |
415,313.20 |
0.00 |
0.00 |
72.00 |
482,299.20 |
| 601-04 |
portland cement concrete pavement coring
|
227   |
EACH |
120.00 |
27,240.00 |
115.00 |
26,105.00 |
0.00 |
0.00 |
130.00 |
29,510.00 |
| 707-01 |
concrete curb
|
41,395.3 |
LNFT |
3.00 |
124,185.90 |
5.00 |
206,976.50 |
0.00 |
0.00 |
2.40 |
99,348.72 |
| 732-03-A-01 |
plastic pavement striping (broken line) (4" width)
(preformed marking tape - type v) |
10.600 |
MILE |
3,500.00 |
37,100.00 |
3,500.00 |
37,100.00 |
0.00 |
0.00 |
3,800.00 |
40,280.00 |
| S-004 |
rumble strips (ground -in)
|
0.800 |
MILE |
2,000.00 |
1,600.00 |
1,000.00 |
800.00 |
0.00 |
0.00 |
1,100.00 |
880.00 |
| | SUBTOTAL ALT A2 |
|
|
|
8,630,707.10 |
|
8,807,029.70 |
|
|
|
9,669,776.92 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | ITEM TOTAL (CONSTRUCTION BID) |
|
|
|
29,470,499.24 |
|
29,578,273.56 |
|
29,656,914.30 |
|
30,564,368.75 |
| | NUMBER OF DAYS BID AT $1,000 PER DAY. |
|
|
|
790,000.00 |
|
790,000.00 |
|
690,000.00 |
|
750,000.00 |
| | LIFE CYCLE COST |
|
|
|
590,700.00 |
|
590,700.00 |
|
2,140,500.00 |
|
590,700.00 |
| | TOTAL BID |
|
|
|
30,851,199.24 |
|
30,958,973.56 |
|
32,487,414.30 |
|
31,905,068.75 |
|