Letting of 6/25/2008 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 019-04-0037
Parish: W FELICIANA
Routes: US 61
Description: ST. FRANCISVILLE - BAINS
Type Const: grading, drain struct, class ii bc, subgrade layer, lime trmt, (alt. a1-superpave
acp; alt.a2-pccp), concrete slab span bridge, and related work.
Estimated Construction Cost: $31,874,712.28
Maximum Number of Days Allowed for Construction: 790
Calculated Daily User Cost: $1,000.00
 
RankLicenseBidderConstruction Bid Bidder's Proposed
Contract Time
Life Cycle
Cost
Total Bid
1 39462 DENTON-JAMES LLC $29,470,499.24 790 $590,700.00 $30,851,199.24
2 34567 JAMES CONSTRUCTION GROUP LLC $29,578,273.56 790 $590,700.00 $30,958,973.56
3 00046 BARBER BROS. CONTRACTING CO., L.L.C $29,656,914.30 690 $2,140,500.00 $32,487,414.30
4 12312 GILCHRIST CONSTRUCTION CO. LLC $30,564,368.75 750 $590,700.00 $31,905,068.75
 
Item Number Item Description Quantity Unit of Measure - 1 -
DENTON-JAMES LLC
- 2 -
JAMES CONSTRUCTION GROUP LLC
- 3 -
BARBER BROS. CONTRACTING CO., L.L.C
- 4 -
GILCHRIST CONSTRUCTION CO. LLC
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 700,000.00 700,000.00 800,000.00 800,000.00 200,000.00 200,000.00 800,000.00 800,000.00
202-01 removal of structures & obstructions lump      LUMP 60,000.00 60,000.00 120,000.00 120,000.00 120,000.00 120,000.00 120,000.00 120,000.00
202-02-A removal of bridges(sta.386+63.43;33'x 362'concrete
slab span bridge)
1      EACH 50,000.00 50,000.00 200,000.00 200,000.00 200,000.00 200,000.00 45,000.00 45,000.00
202-02-B removal of concrete box culverts (sta.152+55;5'x 3'x
90')
1      EACH 8,000.00 8,000.00 6,000.00 6,000.00 8,000.00 8,000.00 8,500.00 8,500.00
202-02-C removal of portland cement concrete pavement 29,350      SQYD 5.00 146,750.00 7.00 205,450.00 20.00 587,000.00 3.95 115,932.50
202-02-D removal of concrete walks & drives 4,264      SQYD 10.00 42,640.00 3.00 12,792.00 25.00 106,600.00 6.50 27,716.00
202-02-G removal of surfacing & stabilized base 123,551.4    SQYD 3.00 370,654.20 7.50 926,635.50 3.30 407,719.62 2.65 327,411.21
202-02-H removal of guard rail 1,803      LNFT 6.00 10,818.00 5.00 9,015.00 5.00 9,015.00 10.00 18,030.00
202-02-I removal of existing traffic signal equipment lump      LUMP 4,500.00 4,500.00 7,000.00 7,000.00 5,000.00 5,000.00 5,000.00 5,000.00
203-01 general excavation 112,620      CUYD 7.00 788,340.00 5.00 563,100.00 9.75 1,098,045.00 4.50 506,790.00
203-02 drainage excavation 3,960      CUYD 10.00 39,600.00 12.00 47,520.00 10.00 39,600.00 11.00 43,560.00
203-03 embankment 115,891      CUYD 10.00 1,158,910.00 10.00 1,158,910.00 8.50 985,073.50 10.04 1,163,545.64
204-02 temporary hay or straw bales 31      EACH 10.00 310.00 12.00 372.00 20.00 620.00 18.00 558.00
204-03 temporary slope drains 350      LNFT 15.00 5,250.00 18.00 6,300.00 6.00 2,100.00 25.00 8,750.00
204-05-A temporary sediment check dams (hay) 76      EACH 100.00 7,600.00 120.00 9,120.00 125.00 9,500.00 185.00 14,060.00
204-05-B temporary sediment check dams (stone) 20      EACH 800.00 16,000.00 350.00 7,000.00 700.00 14,000.00 700.00 14,000.00
204-06 temporary silt fencing 13,560      LNFT 2.00 27,120.00 2.50 33,900.00 2.20 29,832.00 1.20 16,272.00
302-02-E-01 class ii base course (10" thick)(stone or recycled
pccp) or (4" of stone or recycled pccp on 6" of
soil cement)
187,228.4    SQYD 17.00 3,182,882.80 18.50 3,463,725.40 19.75 3,697,760.90 17.00 3,182,882.80
302-02-G-01 class ii base course (stone of recycled pccp)(14" avg.
thickness) or (8" stone or recycled pccp on 6"
soil cement)
11,968.1    SQYD 26.00 311,170.60 35.00 418,883.50 32.75 391,955.28 26.50 317,154.65
304-01 lime 141.76   TON 170.00 24,099.20 135.00 19,137.60 175.00 24,808.00 160.00 22,681.60
304-04-D lime treatment (type d) (12" thick) 10,000      SQYD 2.50 25,000.00 2.00 20,000.00 0.60 6,000.00 1.65 16,500.00
305-01-B subgrade layer (8" thick) 198,818      SQYD 6.20 1,232,671.60 5.50 1,093,499.00 5.75 1,143,203.50 5.50 1,093,499.00
401-02 aggregate surface course (adjusted vehicular
measurement)
202      CUYD 75.00 15,150.00 65.00 13,130.00 60.00 12,120.00 70.00 14,140.00
402-01 traffic maintenance aggregate (vehicular measurement) 5,000.0    CUYD 45.00 225,000.00 65.00 325,000.00 40.00 200,000.00 60.00 300,000.00
509-01 cold planing asphaltic pavement 34,802      SQYD 1.80 62,643.60 1.25 43,502.50 1.50 52,203.00 2.00 69,604.00
509-02 contractor retained reclaimed asphaltic pavement - 1,934      CUYD 0.01 - 19.34 0.01 - 19.34 0.00 0.00 0.10 - 193.40
510-01-B pavement patching (12" minimum thickness) 112      SQYD 130.00 14,560.00 350.00 39,200.00 120.00 13,440.00 175.00 19,600.00
701-01-G cross drain pipe (18" rcp/pcp) 72      LNFT 70.00 5,040.00 66.00 4,752.00 100.00 7,200.00 100.00 7,200.00
701-01-I cross drain pipe (24" rcp/pcp) 72      LNFT 85.00 6,120.00 73.00 5,256.00 130.00 9,360.00 120.00 8,640.00
701-01-M cross drain pipe (36" rcp/pcp) 120      LNFT 100.00 12,000.00 96.00 11,520.00 165.00 19,800.00 130.00 15,600.00
701-01-N cross drain pipe (42" rcp/pcp) 158      LNFT 140.00 22,120.00 111.00 17,538.00 180.00 28,440.00 180.00 28,440.00
701-03-F storm drain pipe (15" rcp/pcp) 21,557      LNFT 48.00 1,034,736.00 61.00 1,314,977.00 30.00 646,710.00 34.00 732,938.00
701-03-G storm drain pipe (18" rcp/pcp) 5,752      LNFT 54.00 310,608.00 66.00 379,632.00 35.00 201,320.00 40.00 230,080.00
701-03-I storm drain pipe (24" rcp/pcp) 2,823      LNFT 62.00 175,026.00 76.00 214,548.00 50.00 141,150.00 60.00 169,380.00
701-03-K storm drain pipe (30" rcp/pcp) 1,007      LNFT 78.00 78,546.00 89.00 89,623.00 60.00 60,420.00 90.00 90,630.00
701-03-M storm drain pipe (36" rcp/pcp) 570      LNFT 96.00 54,720.00 96.00 54,720.00 85.00 48,450.00 110.00 62,700.00
701-03-N storm drain pipe (42" rcp/pcp) 525      LNFT 120.00 63,000.00 116.00 60,900.00 120.00 63,000.00 130.00 68,250.00
701-03-O storm drain pipe (48" rcp/pcp) 845      LNFT 140.00 118,300.00 111.00 93,795.00 150.00 126,750.00 150.00 126,750.00
701-03-P storm drain pipe (54" rcp/pcp) 204      LNFT 190.00 38,760.00 121.00 24,684.00 180.00 36,720.00 200.00 40,800.00
701-03-Q storm drain pipe (60" rcp/pcp) 185      LNFT 250.00 46,250.00 127.00 23,495.00 240.00 44,400.00 220.00 40,700.00
701-03-S storm drain pipe (72" rcp/pcp) 453      LNFT 300.00 135,900.00 155.00 70,215.00 350.00 158,550.00 275.00 124,575.00
701-05-G side drain pipe (18") 221      LNFT 45.00 9,945.00 35.00 7,735.00 65.00 14,365.00 40.00 8,840.00
701-05-G-01 side drain pipe (18")(bridge drain) 60      LNFT 50.00 3,000.00 35.00 2,100.00 120.00 7,200.00 55.00 3,300.00
701-05-I side drain pipe (24") 50      LNFT 55.00 2,750.00 42.00 2,100.00 75.00 3,750.00 60.00 3,000.00
701-05-I-01 side drain pipe (24")(erosion) 50      LNFT 55.00 2,750.00 75.00 3,750.00 75.00 3,750.00 77.00 3,850.00
701-09 fabricating pipe fittings 5      EACH 1,600.00 8,000.00 2,200.00 11,000.00 2,000.00 10,000.00 600.00 3,000.00
702-02-B manholes (r-cb-11) 2      EACH 4,000.00 8,000.00 5,200.00 10,400.00 5,000.00 10,000.00 5,000.00 10,000.00
702-02-E manholes (r-cb-32 mod) 1      EACH 9,000.00 9,000.00 10,000.00 10,000.00 18,000.00 18,000.00 15,000.00 15,000.00
702-02-G manholes (r-cb-36) 8      EACH 2,000.00 16,000.00 4,300.00 34,400.00 3,000.00 24,000.00 9,500.00 76,000.00
702-03-A catch basins (cb-01) 85      EACH 2,500.00 212,500.00 1,100.00 93,500.00 2,500.00 212,500.00 2,200.00 187,000.00
702-03-B catch basins (cb-02) 3      EACH 3,400.00 10,200.00 1,200.00 3,600.00 5,000.00 15,000.00 3,300.00 9,900.00
702-03-C catch basins (cb-06) 179      EACH 4,200.00 751,800.00 1,600.00 286,400.00 3,650.00 653,350.00 4,400.00 787,600.00
702-03-D catch basins (cb-07) 99      EACH 4,400.00 435,600.00 1,800.00 178,200.00 4,800.00 475,200.00 5,600.00 554,400.00
702-03-F catch basins (cb-08) 13      EACH 6,400.00 83,200.00 2,000.00 26,000.00 8,000.00 104,000.00 9,300.00 120,900.00
702-03-H catch basins (cb-05) 1      EACH 1,600.00 1,600.00 1,800.00 1,800.00 1,500.00 1,500.00 1,400.00 1,400.00
702-04-A adjusting manholes 2      EACH 1,600.00 3,200.00 1,100.00 2,200.00 2,500.00 5,000.00 1,000.00 2,000.00
702-05-A cross drain end treatment (1 barrel, 24"rcp or 30"cmp) 1      EACH 6,000.00 6,000.00 6,000.00 6,000.00 2,500.00 2,500.00 3,400.00 3,400.00
703-03 perforated pipe underdrains 37,920      LNFT 10.00 379,200.00 8.00 303,360.00 10.00 379,200.00 12.00 455,040.00
704-03 blocked out guard rail 40.0    LNFT 25.00 1,000.00 25.00 1,000.00 30.00 1,200.00 26.50 1,060.00
704-08-B guard rail transitions (double thrie beam) 50.0    LNFT 60.00 3,000.00 60.00 3,000.00 75.00 3,750.00 73.00 3,650.00
704-11-A guard rail end treatment (flared) 2      EACH 2,500.00 5,000.00 2,500.00 5,000.00 3,000.00 6,000.00 2,900.00 5,800.00
706-02-C concrete drive (6" thick) 7,322.6    SQYD 47.00 344,162.20 55.00 402,743.00 60.00 439,356.00 55.00 402,743.00
708-01 right-of-way monument 145      EACH 200.00 29,000.00 200.00 29,000.00 225.00 32,625.00 280.00 40,600.00
708-02 right-of-way monument witness post 35      EACH 40.00 1,400.00 200.00 7,000.00 175.00 6,125.00 280.00 9,800.00
711-01-C riprap (30 lb, 10") 174      SQYD 90.00 15,660.00 80.00 13,920.00 75.00 13,050.00 55.00 9,570.00
711-01-E riprap (130 lb, 24") 2,666      SQYD 70.00 186,620.00 100.00 266,600.00 75.00 199,950.00 110.00 293,260.00
711-04 geotextile fabric 3,085      SQYD 1.80 5,553.00 2.00 6,170.00 3.50 10,797.50 2.30 7,095.50
713-01 temporary signs & barricades lump      LUMP 400,000.00 400,000.00 130,000.00 130,000.00 500,000.00 500,000.00 275,000.00 275,000.00
713-03-B-01 temporary pvmt. markings (broken line)(4" w)(10' l)
(type i removable)
10.000  MILE 2,700.00 27,000.00 2,500.00 25,000.00 3,000.00 30,000.00 3,000.00 30,000.00
713-04-A temporary pavement markings (solid line)(4" width) 36.916  MILE 480.00 17,719.68 475.00 17,535.10 550.00 20,303.80 530.00 19,565.48
713-08 temporary precast concrete barrier (department
furnished)
28      EACH 500.00 14,000.00 350.00 9,800.00 350.00 9,800.00 470.00 13,160.00
716-01-A mulch (vegetative) 96.4    TON 350.00 33,740.00 350.00 33,740.00 400.00 38,560.00 335.00 32,294.00
717-01 seeding 1,242      LB 9.00 11,178.00 9.00 11,178.00 10.00 12,420.00 8.40 10,432.80
718-01 fertilizer 62,101      LB 0.40 24,840.40 0.50 31,050.50 0.50 31,050.50 0.50 31,050.50
718-02 agricultural lime 124.2    TON 80.00 9,936.00 80.00 9,936.00 90.00 11,178.00 90.00 11,178.00
719-01-A plants (elaeagnus, 3 gallon container full form 24"
min. ht., 18" - 24" spr ead)
51      EACH 25.00 1,275.00 25.00 1,275.00 30.00 1,530.00 19.50 994.50
719-01-B plants (burkii red cedar, 30 gallon container or b/b,
7'-8', 1.5" - 2" cali per, full to ground)
52      EACH 440.00 22,880.00 420.00 21,840.00 500.00 26,000.00 175.00 9,100.00
719-01-C plants (asian jasmine, 4" pot) 4,150      EACH 2.30 9,545.00 2.50 10,375.00 2.50 10,375.00 5.00 20,750.00
719-01-D plants (parson's juniper, 7 gallon container full form,
10" min. ht., 18" - 24" spread)
20      EACH 70.00 1,400.00 70.00 1,400.00 80.00 1,600.00 35.67 713.40
719-02 top dressing mulch (4" depth) 1,040      SQYD 9.00 9,360.00 9.00 9,360.00 12.00 12,480.00 11.15 11,596.00
719-03 bed preparation (10" depth) 320      SQYD 18.00 5,760.00 18.00 5,760.00 24.00 7,680.00 22.30 7,136.00
719-04 landscaping (sow 25 acres of wild flower
seeds:clasping cone flower and cor eopsis
tinctoria as directed by project eng.
lump      LUMP 33,000.00 33,000.00 32,500.00 32,500.00 38,000.00 38,000.00 28,000.00 28,000.00
720-01-A erosion control system, slope protection (type a) 29,098      SQYD 1.10 32,007.80 1.20 34,917.60 1.25 36,372.50 1.40 40,737.20
720-01-A-01 erosion control system, slope protection (type a)
(terratex no4 or aprroved equal)
320      SQYD 2.00 640.00 2.00 640.00 2.50 800.00 2.80 896.00
720-01-B-01 erosion control system, slope protection (type b)
anti-wash/geojute or appr oved equal)
320      SQYD 3.50 1,120.00 3.50 1,120.00 4.00 1,280.00 3.90 1,248.00
720-01-C erosion control system, flexible channel liner (type c) 1,622      SQYD 1.40 2,270.80 1.50 2,433.00 1.60 2,595.20 1.65 2,676.30
720-01-D erosion control system, flexible channel liner (type d) 13,058      SQYD 1.50 19,587.00 1.50 19,587.00 1.70 22,198.60 1.85 24,157.30
720-01-E erosion control system, flexible channel liner (type e) 200      SQYD 3.00 600.00 3.00 600.00 3.30 660.00 5.60 1,120.00
720-01-F erosion control system, flexible channel liner (type f) 880      SQYD 3.50 3,080.00 3.50 3,080.00 4.00 3,520.00 5.60 4,928.00
722-02 project site laboratory (equipped) 1      EACH 30,000.00 30,000.00 25,000.00 25,000.00 50,000.00 50,000.00 60,000.00 60,000.00
725-01 temporary detour roads 3,620.0    SQYD 65.00 235,300.00 80.00 289,600.00 72.00 260,640.00 85.00 307,700.00
726-01 bedding material 4,461.9    CUYD 65.00 290,023.50 60.00 267,714.00 1.00 4,461.90 97.00 432,804.30
727-01 mobilization lump      LUMP 2,900,000.00 2,900,000.00 2,750,000.00 2,750,000.00 1,450,000.00 1,450,000.00 2,800,000.00 2,800,000.00
729-01 sign (type a) 20.0    SQFT 50.00 1,000.00 70.00 1,400.00 35.00 700.00 32.00 640.00
729-06 sign (overhead mounted) 20.0    SQFT 50.00 1,000.00 70.00 1,400.00 40.00 800.00 38.00 760.00
729-16-B object marker assembly (type 2) 5      EACH 60.00 300.00 60.00 300.00 70.00 350.00 55.00 275.00
729-16-C object marker assembly (type 3) 4      EACH 75.00 300.00 75.00 300.00 85.00 340.00 84.00 336.00
730-08-A electrical service point (existing power pole) 1      EACH 1,200.00 1,200.00 1,500.00 1,500.00 1,500.00 1,500.00 1,200.00 1,200.00
731-02 reflectorized raised pavement markers 1,870      EACH 5.00 9,350.00 5.00 9,350.00 5.50 10,285.00 5.50 10,285.00
732-02-A plastic pavement striping (solid line) (4" width) 21.200  MILE 2,200.00 46,640.00 2,200.00 46,640.00 2,500.00 53,000.00 2,400.00 50,880.00
732-02-C plastic pavement striping (solid line) (8" width) 0.164  MILE 4,400.00 721.60 4,400.00 721.60 5,000.00 820.00 4,800.00 787.20
732-02-E plastic pavement striping (solid line) (24" width) 0.303  MILE 14,000.00 4,242.00 14,000.00 4,242.00 16,000.00 4,848.00 15,500.00 4,696.50
735-01 mailboxes 10      EACH 1.00 10.00 1.00 10.00 2.00 20.00 1.10 11.00
735-02 mailbox supports (single) 10      EACH 150.00 1,500.00 100.00 1,000.00 125.00 1,250.00 115.00 1,150.00
736-01 trenching and backfilling 394      LNFT 3.50 1,379.00 4.00 1,576.00 4.00 1,576.00 3.95 1,556.30
736-03-A jacked or bored conduit (3" schedule 80) 284      LNFT 24.00 6,816.00 25.00 7,100.00 30.00 8,520.00 26.00 7,384.00
736-04-B signal support (30'steel strain pole) 4      EACH 10,000.00 40,000.00 7,000.00 28,000.00 11,000.00 44,000.00 10,000.00 40,000.00
736-05-B signal heads (3-section, 12" led lenses, r,y,g) 5      EACH 800.00 4,000.00 1,200.00 6,000.00 900.00 4,500.00 850.00 4,250.00
736-05-C signal heads (5-section, 12" led lenses,
r,lt.y,y,lt.g,g)
1      EACH 1,200.00 1,200.00 1,900.00 1,900.00 1,500.00 1,500.00 1,200.00 1,200.00
736-05-D signal heads (5-section, 12" led lenses,
r,y,rt.y,g,rt.g)
1      EACH 1,200.00 1,200.00 1,900.00 1,900.00 1,500.00 1,500.00 1,200.00 1,200.00
736-08-A signal controller (nema,ts-2,type 2;type 3 pole
mounted cabinet)
1      EACH 16,000.00 16,000.00 15,000.00 15,000.00 18,000.00 18,000.00 17,000.00 17,000.00
736-09 loop detector 135      LNFT 10.00 1,350.00 12.00 1,620.00 12.00 1,620.00 10.50 1,417.50
736-10-A underground junction box (type d) 2      EACH 350.00 700.00 290.00 580.00 400.00 800.00 380.00 760.00
736-10-B underground junction box (type e) 2      EACH 370.00 740.00 420.00 840.00 450.00 900.00 415.00 830.00
736-10-C underground junction box (type f) 2      EACH 500.00 1,000.00 480.00 960.00 600.00 1,200.00 550.00 1,100.00
736-11-A conduit (1/2" pvc, schedule 80) 35      LNFT 4.50 157.50 2.00 70.00 6.00 210.00 5.00 175.00
736-11-B conduit (1" pvc, schedule 80) 284      LNFT 2.80 795.20 2.25 639.00 4.00 1,136.00 3.00 852.00
736-11-C conduit (2" pvc, schedule 80) 75      LNFT 4.00 300.00 2.50 187.50 5.00 375.00 4.46 334.50
736-12-A conductor (2c loop lead-in, 14awg, 19x27 class c
stranding, imsa 50-2)
525      LNFT 1.40 735.00 1.75 918.75 1.60 840.00 1.50 787.50
736-12-B conductor (3c power, 6 awg, concentric) 75      LNFT 5.50 412.50 4.25 318.75 6.50 487.50 6.20 465.00
736-12-C conductor (6c signal, 14 awg, stranded) 180      LNFT 3.50 630.00 2.00 360.00 4.00 720.00 3.90 702.00
736-12-D conductor (10c signal, 14 awg, stranded) 505      LNFT 4.50 2,272.50 3.00 1,515.00 5.50 2,777.50 5.00 2,525.00
739-01 hydro-seeding 10.00   ACRE 1,100.00 11,000.00 1,000.00 10,000.00 1,500.00 15,000.00 1,000.00 10,000.00
740-01 construction layout lump      LUMP 250,000.00 250,000.00 390,000.00 390,000.00 300,000.00 300,000.00 300,000.00 300,000.00
741-09 adjusting water house connections 8      EACH 1,000.00 8,000.00 1,300.00 10,400.00 1,200.00 9,600.00 400.00 3,200.00
742-01-A sanitary sewer pipe (4") 13      LNFT 70.00 910.00 50.00 650.00 150.00 1,950.00 11.20 145.60
742-01-A-01 sanitary sewer pipe (4")(ductile iron) 24      LNFT 90.00 2,160.00 5.00 120.00 150.00 3,600.00 28.00 672.00
742-01-B sanitary sewer pipe (8") 2,770      LNFT 42.00 116,340.00 36.00 99,720.00 25.00 69,250.00 16.50 45,705.00
742-02 adjusting sanitary sewer house connections 8      EACH 800.00 6,400.00 1,200.00 9,600.00 1,200.00 9,600.00 400.00 3,200.00
803-03 steel sheet pile wall 1,386      SQFT 55.00 76,230.00 30.00 41,580.00 55.00 76,230.00 35.00 48,510.00
804-01-F precast concrete piles (24") 6,630      LNFT 110.00 729,300.00 100.00 663,000.00 100.00 663,000.00 100.00 663,000.00
804-12 loading permanent piles 1      EACH 1,000.00 1,000.00 2,500.00 2,500.00 8,000.00 8,000.00 9,700.00 9,700.00
805-01-A class a concrete (pipe headwalls) 36.22   CUYD 1,500.00 54,330.00 1,500.00 54,330.00 1,500.00 54,330.00 1,500.00 54,330.00
805-01-B class a concrete (box culvert headwalls) 13.12   CUYD 1,500.00 19,680.00 1,750.00 22,960.00 1,500.00 19,680.00 1,500.00 19,680.00
805-01-F class a concrete (bents) 232.03   CUYD 900.00 208,827.00 850.00 197,225.50 800.00 185,624.00 925.00 214,627.75
805-03 class aa concrete 952.60   CUYD 700.00 666,820.00 600.00 571,560.00 780.00 743,028.00 815.00 776,369.00
805-08-C precast-prestressed concrete girders (type iii) 4,165.0    LNFT 98.00 408,170.00 110.00 458,150.00 125.00 520,625.00 97.00 404,005.00
805-12-G reinforced concrete box culverts (6'x 4') 42.0    LNFT 800.00 33,600.00 1,000.00 42,000.00 500.00 21,000.00 735.00 30,870.00
806-01 deformed reinforcing steel 342,312      LB 1.40 479,236.80 1.00 342,312.00 1.60 547,699.20 1.15 393,658.80
807-08 structural metalwork lump      LUMP 4,000.00 4,000.00 12,000.00 12,000.00 25,000.00 25,000.00 12,000.00 12,000.00
810-01 concrete railing (barrier) 843.00   LNFT 65.00 54,795.00 50.00 42,150.00 80.00 67,440.00 70.00 59,010.00
813-01 concrete approach slabs 929.88   SQYD 200.00 185,976.00 230.00 213,872.40 500.00 464,940.00 430.00 399,848.40
S-001 temporary construction entrances 4      EACH 2,500.00 10,000.00 4,000.00 16,000.00 5,000.00 20,000.00 2,000.00 8,000.00
S-002 video detection system 1      EACH 4,000.00 4,000.00 4,400.00 4,400.00 4,500.00 4,500.00 4,500.00 4,500.00
S-003 video detector device and connection 2      EACH 6,500.00 13,000.00 6,400.00 12,800.00 7,000.00 14,000.00 7,000.00 14,000.00
S-005 saw cutting (1" depth) 642      LNFT 8.00 5,136.00 4.00 2,568.00 3.50 2,247.00 7.50 4,815.00
S-101 temporary guard rail 62.5    LNFT 20.00 1,250.00 20.00 1,250.00 25.00 1,562.50 65.00 4,062.50
S-102 temporary guard rail end treatment(flared) 1      EACH 2,500.00 2,500.00 2,500.00 2,500.00 3,000.00 3,000.00 2,000.00 2,000.00
S-103 impact attennuators (construction zone) 2      EACH 20,000.00 40,000.00 17,000.00 34,000.00 20,000.00 40,000.00 21,000.00 42,000.00
 SUBTOTAL GENERAL       20,839,792.14   20,771,243.86   20,247,020.50   20,894,591.83
                       
ALTERNATE A pavement alternates                    
                       
ALTERNATE A1 superpave asphaltic concrete pavement                    
502-01 superpave asphaltic concrete 92,576.9    TON 0.00 0.00 0.00 0.00 88.00 8,146,767.20 0.00 0.00
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
3,409.7    TON 0.00 0.00 0.00 0.00 100.00 340,970.00 0.00 0.00
707-03 combination concrete curb & gutter 41,395.3    LNFT 0.00 0.00 0.00 0.00 22.00 910,696.60 0.00 0.00
732-03-A plastic pavement striping (broken line) (4" width) 10.600  MILE 0.00 0.00 0.00 0.00 600.00 6,360.00 0.00 0.00
S-004 rumble strips (ground-in) 3.4    MILE 0.00 0.00 0.00 0.00 1,500.00 5,100.00 0.00 0.00
 SUBTOTAL ALT A1               9,409,893.80    
                       
ALTERNATE A2 portland cement concrete pavement                    
502-01 superpave asphaltic concrete 9,690.6    TON 110.00 1,065,966.00 95.00 920,607.00 0.00 0.00 115.00 1,114,419.00
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
94.4    TON 170.00 16,048.00 155.00 14,632.00 0.00 0.00 175.00 16,520.00
601-01-I portland cement concrete pavement (9" thick) 175,256.0    SQYD 40.00 7,010,240.00 41.00 7,185,496.00 0.00 0.00 45.00 7,886,520.00
601-02-I portland cement concrete pavement (9" thick)
(crossovers & turnouts)
6,698.6    SQYD 52.00 348,327.20 62.00 415,313.20 0.00 0.00 72.00 482,299.20
601-04 portland cement concrete pavement coring 227      EACH 120.00 27,240.00 115.00 26,105.00 0.00 0.00 130.00 29,510.00
707-01 concrete curb 41,395.3    LNFT 3.00 124,185.90 5.00 206,976.50 0.00 0.00 2.40 99,348.72
732-03-A-01 plastic pavement striping (broken line) (4" width)
(preformed marking tape - type v)
10.600  MILE 3,500.00 37,100.00 3,500.00 37,100.00 0.00 0.00 3,800.00 40,280.00
S-004 rumble strips (ground -in) 0.800  MILE 2,000.00 1,600.00 1,000.00 800.00 0.00 0.00 1,100.00 880.00
 SUBTOTAL ALT A2       8,630,707.10   8,807,029.70       9,669,776.92
                       
 ITEM TOTAL (CONSTRUCTION BID)       29,470,499.24   29,578,273.56   29,656,914.30   30,564,368.75
 NUMBER OF DAYS BID AT $1,000 PER DAY.       790,000.00   790,000.00   690,000.00   750,000.00
 LIFE CYCLE COST       590,700.00   590,700.00   2,140,500.00   590,700.00
 TOTAL BID       30,851,199.24   30,958,973.56   32,487,414.30   31,905,068.75