| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - AMERICAN CONTRACTING & SERVICES,INC |
- 2 - GULF STATES CONSTRUCTORS, L.L.C. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 602-05-E-01 |
full depth patching of jointed concrete pavement(7"
thick)(16 sq yds and un der) |
144.0 |
SQYD |
300.00 |
43,200.00 |
375.00 |
54,000.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
27,000.00 |
27,000.00 |
37,500.00 |
37,500.00 |
|
|
|
|
| 713-04-A-01 |
temporary pvmt. markings (solid line)(4" w)(type i
removable) |
0.606 |
MILE |
9,500.00 |
5,757.00 |
15,000.00 |
9,090.00 |
|
|
|
|
| 713-07 |
temporary precast concrete barrier (contractor
furnished) |
52   |
EACH |
1,100.00 |
57,200.00 |
921.20 |
47,902.40 |
|
|
|
|
| 713-10 |
temporary precast concrete barrier movement
|
52   |
EACH |
100.00 |
5,200.00 |
187.50 |
9,750.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
59,390.22 |
59,390.22 |
176,076.20 |
176,076.20 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
10   |
EACH |
100.00 |
1,000.00 |
125.00 |
1,250.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
0.182 |
MILE |
10,000.00 |
1,820.00 |
12,500.00 |
2,275.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.091 |
MILE |
5,000.00 |
455.00 |
6,250.00 |
568.75 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
8,000.00 |
8,000.00 |
25,000.00 |
25,000.00 |
|
|
|
|
| S-101 |
hydro-demolition (2 inches thick)
|
1,440.0 |
SQYD |
125.00 |
180,000.00 |
103.75 |
149,400.00 |
|
|
|
|
| S-102 |
thin bonded latex modified concrete overlay (2" thick)
|
1,440.0 |
SQYD |
130.00 |
187,200.00 |
152.50 |
219,600.00 |
|
|
|
|
| S-103 |
dynamic message sign unit
|
1   |
EACH |
6,500.00 |
6,500.00 |
22,500.00 |
22,500.00 |
|
|
|
|
| S-104 |
impact attenuators (construction zone)(department
furnished) |
1   |
EACH |
3,500.00 |
3,500.00 |
3,750.00 |
3,750.00 |
|
|
|
|
| S-105 |
sawcut in portland cement concrete (1.5 inch depth)
|
1,920   |
LNFT |
4.00 |
7,680.00 |
5.00 |
9,600.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
593,902.22 |
|
768,262.35 |
|
|
|
|
|