Letting of 6/25/2008 LA DOTD Headquarters


READV
go back
Go Back
DBE GOAL FED
Lead Project: 001-09-0068
Parish: OUACHITA
Routes: US 80
Description: CREEK BRIDGE ON US 80
Type Const: grading, cold planing asphaltic pavement, superpave asphaltic concrete overlay,
slab span bridge and related work
Estimated Construction Cost: $954,521.50
 
RankLicenseBidderConstruction Bid
1 34567 JAMES CONSTRUCTION GROUP LLC $1,149,877.31
2 05789 D & J CONSTRUCTION CO., INC. $1,290,506.41
3 09476 KEY CONSTRUCTORS, INC. $1,541,766.55
 
Item Number Item Description Quantity Unit of Measure - 1 -
JAMES CONSTRUCTION GROUP LLC
- 2 -
D & J CONSTRUCTION CO., INC.
- 3 -
KEY CONSTRUCTORS, INC.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 35,000.00 35,000.00 25,000.00 25,000.00 25,000.00 25,000.00    
202-01 removal of structures & obstructions lump      LUMP 8,000.00 8,000.00 10,000.00 10,000.00 10,000.00 10,000.00    
202-02-A-01 removal of bridge (sta. 113+07.02 to sta. 113+66.05;
24'x 59' timber deck & bents with steel i-beams)
1      EACH 30,000.00 30,000.00 30,000.00 30,000.00 8,500.00 8,500.00    
202-02-G removal of surfacing & stabilized base 269.3    SQYD 5.50 1,481.15 25.00 6,732.50 25.00 6,732.50    
202-02-H removal of guard rail 789      LNFT 5.00 3,945.00 10.00 7,890.00 3.50 2,761.50    
203-02 drainage excavation 624      CUYD 10.00 6,240.00 10.00 6,240.00 20.00 12,480.00    
203-06 excavation & embankment lump      LUMP 25,000.00 25,000.00 52,000.00 52,000.00 30,000.00 30,000.00    
204-06 temporary silt fencing 1,761      LNFT 3.50 6,163.50 3.00 5,283.00 5.00 8,805.00    
502-01 superpave asphaltic concrete 2,397.8    TON 150.00 359,670.00 160.00 383,648.00 200.00 479,560.00    
509-01 cold planing asphaltic pavement 358      SQYD 35.00 12,530.00 25.00 8,950.00 50.00 17,900.00    
509-02 contractor retained reclaimed asphaltic pavement - 9      CUYD 0.01 - 0.09 0.01 - 0.09 0.00 0.00    
704-03 blocked out guard rail 400.0    LNFT 20.00 8,000.00 21.00 8,400.00 22.50 9,000.00    
704-08-B guard rail transitions (double thrie beam) 100.0    LNFT 55.00 5,500.00 58.00 5,800.00 60.00 6,000.00    
704-11-A guard rail end treatment (flared) 4      EACH 2,000.00 8,000.00 2,500.00 10,000.00 2,500.00 10,000.00    
708-01 right-of-way monument 8      EACH 200.00 1,600.00 165.00 1,320.00 100.00 800.00    
708-02 right-of-way monument witness post 8      EACH 200.00 1,600.00 165.00 1,320.00 200.00 1,600.00    
711-01-D riprap (55 lb,18" thick) 981      SQYD 62.50 61,312.50 85.00 83,385.00 85.00 83,385.00    
711-04 geotextile fabric 981      SQYD 5.00 4,905.00 5.00 4,905.00 2.50 2,452.50    
713-01 temporary signs & barricades lump      LUMP 23,000.00 23,000.00 50,000.00 50,000.00 15,000.00 15,000.00    
716-01-A mulch (vegetative) 1.94   ACRE 1,150.00 2,231.00 850.00 1,649.00 1,150.00 2,231.00    
717-01 seeding 58      LB 18.00 1,044.00 8.50 493.00 18.00 1,044.00    
718-01 fertilizer 1,940      LB 0.60 1,164.00 0.45 873.00 0.60 1,164.00    
722-01 project site laboratory 1      EACH 3,000.00 3,000.00 10,000.00 10,000.00 10,000.00 10,000.00    
727-01 mobilization lump      LUMP 100,000.00 100,000.00 105,000.00 105,000.00 150,000.00 150,000.00    
729-16-C object marker assembly (type 3) 4      EACH 75.00 300.00 100.00 400.00 80.00 320.00    
731-02 reflectorized raised pavement markers 23      EACH 15.00 345.00 50.00 1,150.00 15.00 345.00    
732-02-A plastic pavement striping (solid line) (4" width) 0.667  MILE 3,500.00 2,334.50 10,000.00 6,670.00 3,500.00 2,334.50    
740-01 construction layout lump      LUMP 20,000.00 20,000.00 17,000.00 17,000.00 25,000.00 25,000.00    
804-01-B precast concrete piles (14") 1,325      LNFT 80.00 106,000.00 70.00 92,750.00 80.00 106,000.00    
804-12 loading permanent piles 1      EACH 1,500.00 1,500.00 1.00 1.00 10,000.00 10,000.00    
805-01-F class a concrete (bents) 41.04   CUYD 850.00 34,884.00 900.00 36,936.00 900.00 36,936.00    
805-03 class aa concrete 158.81   CUYD 700.00 111,167.00 800.00 127,048.00 800.00 127,048.00    
806-02 deformed reinforcing steel (epoxy coated) 34,847      LB 1.25 43,558.75 1.00 34,847.00 1.65 57,497.55    
810-01 concrete railing (barrier) 160.00   LNFT 65.00 10,400.00 100.00 16,000.00 100.00 16,000.00    
813-01 concrete approach slabs 400.00   SQYD 200.00 80,000.00 250.00 100,000.00 270.00 108,000.00    
S-001 sawing and sealing longitudinal joints in asphaltic
concrete overlay
721      LNFT 4.00 2,884.00 3.00 2,163.00 30.00 21,630.00    
S-002 sawing and sealing transverse joints in asphaltic
concrete overlay
865      LNFT 4.00 3,460.00 3.00 2,595.00 30.00 25,950.00    
S-003 sawcuts in asphaltic concrete lifts 9,029      LNFT 2.00 18,058.00 2.00 18,058.00 10.00 90,290.00    
S-004 dynamic message sign unit 2      each 2,800.00 5,600.00 8,000.00 16,000.00 10,000.00 20,000.00    
                       
 CONTRACTOR TOTAL       1,149,877.31   1,290,506.41   1,541,766.55    