| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - JAMES CONSTRUCTION GROUP LLC |
- 2 - D & J CONSTRUCTION CO., INC. |
- 3 - KEY CONSTRUCTORS, INC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
35,000.00 |
35,000.00 |
25,000.00 |
25,000.00 |
25,000.00 |
25,000.00 |
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
8,000.00 |
8,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
|
|
| 202-02-A-01 |
removal of bridge (sta. 113+07.02 to sta. 113+66.05;
24'x 59' timber deck & bents with steel i-beams) |
1   |
EACH |
30,000.00 |
30,000.00 |
30,000.00 |
30,000.00 |
8,500.00 |
8,500.00 |
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
269.3 |
SQYD |
5.50 |
1,481.15 |
25.00 |
6,732.50 |
25.00 |
6,732.50 |
|
|
| 202-02-H |
removal of guard rail
|
789   |
LNFT |
5.00 |
3,945.00 |
10.00 |
7,890.00 |
3.50 |
2,761.50 |
|
|
| 203-02 |
drainage excavation
|
624   |
CUYD |
10.00 |
6,240.00 |
10.00 |
6,240.00 |
20.00 |
12,480.00 |
|
|
| 203-06 |
excavation & embankment
|
lump |
LUMP |
25,000.00 |
25,000.00 |
52,000.00 |
52,000.00 |
30,000.00 |
30,000.00 |
|
|
| 204-06 |
temporary silt fencing
|
1,761   |
LNFT |
3.50 |
6,163.50 |
3.00 |
5,283.00 |
5.00 |
8,805.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
2,397.8 |
TON |
150.00 |
359,670.00 |
160.00 |
383,648.00 |
200.00 |
479,560.00 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
358   |
SQYD |
35.00 |
12,530.00 |
25.00 |
8,950.00 |
50.00 |
17,900.00 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 9   |
CUYD |
0.01 |
- 0.09 |
0.01 |
- 0.09 |
0.00 |
0.00 |
|
|
| 704-03 |
blocked out guard rail
|
400.0 |
LNFT |
20.00 |
8,000.00 |
21.00 |
8,400.00 |
22.50 |
9,000.00 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
55.00 |
5,500.00 |
58.00 |
5,800.00 |
60.00 |
6,000.00 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
2,000.00 |
8,000.00 |
2,500.00 |
10,000.00 |
2,500.00 |
10,000.00 |
|
|
| 708-01 |
right-of-way monument
|
8   |
EACH |
200.00 |
1,600.00 |
165.00 |
1,320.00 |
100.00 |
800.00 |
|
|
| 708-02 |
right-of-way monument witness post
|
8   |
EACH |
200.00 |
1,600.00 |
165.00 |
1,320.00 |
200.00 |
1,600.00 |
|
|
| 711-01-D |
riprap (55 lb,18" thick)
|
981   |
SQYD |
62.50 |
61,312.50 |
85.00 |
83,385.00 |
85.00 |
83,385.00 |
|
|
| 711-04 |
geotextile fabric
|
981   |
SQYD |
5.00 |
4,905.00 |
5.00 |
4,905.00 |
2.50 |
2,452.50 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
23,000.00 |
23,000.00 |
50,000.00 |
50,000.00 |
15,000.00 |
15,000.00 |
|
|
| 716-01-A |
mulch (vegetative)
|
1.94 |
ACRE |
1,150.00 |
2,231.00 |
850.00 |
1,649.00 |
1,150.00 |
2,231.00 |
|
|
| 717-01 |
seeding
|
58   |
LB |
18.00 |
1,044.00 |
8.50 |
493.00 |
18.00 |
1,044.00 |
|
|
| 718-01 |
fertilizer
|
1,940   |
LB |
0.60 |
1,164.00 |
0.45 |
873.00 |
0.60 |
1,164.00 |
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
3,000.00 |
3,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
100,000.00 |
100,000.00 |
105,000.00 |
105,000.00 |
150,000.00 |
150,000.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
75.00 |
300.00 |
100.00 |
400.00 |
80.00 |
320.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
23   |
EACH |
15.00 |
345.00 |
50.00 |
1,150.00 |
15.00 |
345.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
0.667 |
MILE |
3,500.00 |
2,334.50 |
10,000.00 |
6,670.00 |
3,500.00 |
2,334.50 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
20,000.00 |
20,000.00 |
17,000.00 |
17,000.00 |
25,000.00 |
25,000.00 |
|
|
| 804-01-B |
precast concrete piles (14")
|
1,325   |
LNFT |
80.00 |
106,000.00 |
70.00 |
92,750.00 |
80.00 |
106,000.00 |
|
|
| 804-12 |
loading permanent piles
|
1   |
EACH |
1,500.00 |
1,500.00 |
1.00 |
1.00 |
10,000.00 |
10,000.00 |
|
|
| 805-01-F |
class a concrete (bents)
|
41.04 |
CUYD |
850.00 |
34,884.00 |
900.00 |
36,936.00 |
900.00 |
36,936.00 |
|
|
| 805-03 |
class aa concrete
|
158.81 |
CUYD |
700.00 |
111,167.00 |
800.00 |
127,048.00 |
800.00 |
127,048.00 |
|
|
| 806-02 |
deformed reinforcing steel (epoxy coated)
|
34,847   |
LB |
1.25 |
43,558.75 |
1.00 |
34,847.00 |
1.65 |
57,497.55 |
|
|
| 810-01 |
concrete railing (barrier)
|
160.00 |
LNFT |
65.00 |
10,400.00 |
100.00 |
16,000.00 |
100.00 |
16,000.00 |
|
|
| 813-01 |
concrete approach slabs
|
400.00 |
SQYD |
200.00 |
80,000.00 |
250.00 |
100,000.00 |
270.00 |
108,000.00 |
|
|
| S-001 |
sawing and sealing longitudinal joints in asphaltic
concrete overlay |
721   |
LNFT |
4.00 |
2,884.00 |
3.00 |
2,163.00 |
30.00 |
21,630.00 |
|
|
| S-002 |
sawing and sealing transverse joints in asphaltic
concrete overlay |
865   |
LNFT |
4.00 |
3,460.00 |
3.00 |
2,595.00 |
30.00 |
25,950.00 |
|
|
| S-003 |
sawcuts in asphaltic concrete lifts
|
9,029   |
LNFT |
2.00 |
18,058.00 |
2.00 |
18,058.00 |
10.00 |
90,290.00 |
|
|
| S-004 |
dynamic message sign unit
|
2   |
each |
2,800.00 |
5,600.00 |
8,000.00 |
16,000.00 |
10,000.00 |
20,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,149,877.31 |
|
1,290,506.41 |
|
1,541,766.55 |
|
|
|