Lead Project: 858-02-0005
Parish: VERNON
Routes: LA 377
Description: ALLEN PARISH LINE - JCT. LA 10
Type Const: grading, cold planing asphaltic concrete,in-place cement treated base course,superpave
asphaltic concrete pavement and related work
Estimated Construction Cost: $916,828.66
 
RankLicenseBidderConstruction Bid
1 08815 W. E. MCDONALD & SON, LLC. $849,521.63
2 12312 GILCHRIST CONSTRUCTION CO. LLC $972,636.81
3 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $985,463.83
4 34356 PRAIRIE CONTRACTORS INC. $1,090,728.41
 
Item Number Item Description Quantity Unit of Measure - 1 -
W. E. MCDONALD & SON, LLC.
- 2 -
GILCHRIST CONSTRUCTION CO. LLC
- 3 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 4 -
PRAIRIE CONTRACTORS INC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-I removal of concrete cattle gap 1      EACH 2,000.00 2,000.00 1,700.00 1,700.00 1,500.00 1,500.00 3,000.00 3,000.00
203-07-A borrow (vehicular meas.)(selected soils) 1,420      CUYD 10.00 14,200.00 20.00 28,400.00 19.00 26,980.00 15.00 21,300.00
304-05 lime treatment (type e) 92.66   TON 460.00 42,623.60 275.00 25,481.50 450.00 41,697.00 500.00 46,330.00
308-01-A in-place cement treated base course (12" thick) 36,702      SQYD 6.70 245,903.40 7.00 256,914.00 7.25 266,089.50 8.00 293,616.00
308-02 removal of existing patches 200      SQYD 15.00 3,000.00 6.00 1,200.00 30.00 6,000.00 150.00 30,000.00
401-02 aggregate surface course (adjusted vehicular
measurement)
1,330      CUYD 32.00 42,560.00 100.00 133,000.00 88.00 117,040.00 90.00 119,700.00
502-01 superpave asphaltic concrete 3,425.6    TON 95.00 325,432.00 87.00 298,027.20 90.00 308,304.00 95.00 325,432.00
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
439.9    TON 150.00 65,985.00 130.00 57,187.00 160.00 70,384.00 150.00 65,985.00
509-01 cold planing asphaltic pavement 28,054      SQYD 1.25 35,067.50 1.40 39,275.60 1.50 42,081.00 2.00 56,108.00
509-02 contractor retained reclaimed asphaltic pavement - 366      CUYD 0.01 - 3.66 0.10 - 36.60 0.10 - 36.60 0.01 - 3.66
713-01 temporary signs & barricades lump      LUMP 12,500.00 12,500.00 15,000.00 15,000.00 6,750.00 6,750.00 50,000.00 50,000.00
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
5.271  MILE 400.00 2,108.40 230.00 1,212.33 150.00 790.65 400.00 2,108.40
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
4.095  MILE 0.01 0.04 1.00 4.10 325.00 1,330.88 1.00 4.10
713-04-A temporary pavement markings (solid line)(4" width) 4.666  MILE 0.01 0.05 1.00 4.67 625.00 2,916.25 1.00 4.67
716-01-A mulch (vegetative) 2.6    TON 350.00 910.00 550.00 1,430.00 500.00 1,300.00 600.00 1,560.00
717-01 seeding 39      LB 9.00 351.00 15.00 585.00 13.00 507.00 10.00 390.00
718-01 fertilizer 1,300      LB 0.50 650.00 0.80 1,040.00 0.75 975.00 3.00 3,900.00
722-01 project site laboratory 1      EACH 4,000.00 4,000.00 15,000.00 15,000.00 7,000.00 7,000.00 10,000.00 10,000.00
727-01 mobilization lump      LUMP 35,000.00 35,000.00 75,000.00 75,000.00 63,500.00 63,500.00 50,000.00 50,000.00
731-02 reflectorized raised pavement markers 348      EACH 4.50 1,566.00 5.50 1,914.00 5.00 1,740.00 5.00 1,740.00
732-01-E plastic pavement striping (24" width) 12      LNFT 1.00 12.00 3.50 42.00 1.10 13.20 1.00 12.00
732-02-A plastic pavement striping (solid line) (4" width) 2.333  MILE 3,300.00 7,698.90 2,850.00 6,649.05 2,900.00 6,765.70 3,000.00 6,999.00
732-03-A plastic pavement striping (broken line)(4" width) 2.047  MILE 1,200.00 2,456.40 680.00 1,391.96 750.00 1,535.25 700.00 1,432.90
735-01 mailboxes 1      EACH 1.00 1.00 15.00 15.00 1.00 1.00 10.00 10.00
735-02 mailbox supports (single) 1      EACH 500.00 500.00 200.00 200.00 300.00 300.00 1,000.00 1,000.00
740-01 construction layout lump      LUMP 5,000.00 5,000.00 12,000.00 12,000.00 10,000.00 10,000.00 100.00 100.00
                       
 CONTRACTOR TOTAL       849,521.63   972,636.81   985,463.83   1,090,728.41