Letting of 5/28/2008 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 845-18-0011
Parish: ST CHARLES
Routes: LA 3060
Description: BARTON AVE. (US 90 - LA 18)
Type Const: planing asphaltic concrete, pavement patching, superpave asphaltic concrete overlay
and related work
Estimated Construction Cost: $584,568.50
 
RankLicenseBidderConstruction Bid
1 06276 BARRIERE CONSTRUCTION CO., LLC $885,489.40
2 02179 BOH BROS. CONSTRUCTION CO., LLC. $929,469.90
 
Item Number Item Description Quantity Unit of Measure - 1 -
BARRIERE CONSTRUCTION CO., LLC
- 2 -
BOH BROS. CONSTRUCTION CO., LLC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
203-07 borrow (vehicular measurement) 200      CUYD 45.00 9,000.00 35.00 7,000.00        
401-02 aggregate surface course (adjusted vehicular
measurement)
300      CUYD 75.00 22,500.00 100.00 30,000.00        
502-01 superpave asphaltic concrete 2,946.5    TON 95.00 279,917.50 115.00 338,847.50        
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
429.1    TON 175.00 75,092.50 130.00 55,783.00        
509-01 cold planing asphaltic pavement 15,934      SQYD 2.70 43,021.80 2.50 39,835.00        
509-02 contractor retained reclaimed asphaltic pavement - 522      CUYD 1.00 - 522.00 10.00 - 5,220.00        
510-01-B pavement patching (12" minimum thickness) 1,200      SQYD 145.00 174,000.00 110.00 132,000.00        
702-04-A adjusting manholes 6      EACH 270.00 1,620.00 500.00 3,000.00        
702-04-B adjusting catch basins 5      EACH 3,700.00 18,500.00 700.00 3,500.00        
713-01 temporary signs & barricades lump      LUMP 87,000.00 87,000.00 170,000.00 170,000.00        
713-02-E temporary pavement markings (24" width) 100      LNFT 1.12 112.00 1.00 100.00        
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
2.300  MILE 106.00 243.80 10.00 23.00        
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
1.800  MILE 200.00 360.00 20.00 36.00        
713-04-A temporary pavement markings (solid line)(4" width) 6.080  MILE 300.00 1,824.00 30.00 182.40        
713-05-D temporary pavement legends and symbols (rr crossing) 8      EACH 130.00 1,040.00 10.00 80.00        
717-01 seeding 17      LB 38.00 646.00 30.00 510.00        
718-01 fertilizer 560      LB 3.00 1,680.00 1.00 560.00        
727-01 mobilization lump      LUMP 87,000.00 87,000.00 95,000.00 95,000.00        
729-16-C object marker assembly (type 3) 4      EACH 96.00 384.00 100.00 400.00        
729-19-C dead end road installations(type c) 1      EACH 575.00 575.00 500.00 500.00        
731-02 reflectorized raised pavement markers 162      EACH 6.25 1,012.50 5.00 810.00        
732-01-E plastic pavement striping (24" width) 50      LNFT 4.20 210.00 3.50 175.00        
732-02-A plastic pavement striping (solid line) (4" width) 3.040  MILE 3,400.00 10,336.00 3,000.00 9,120.00        
732-03-A plastic pavement striping (broken line)(4" width) 0.900  MILE 925.00 832.50 800.00 720.00        
732-04-D plastic pavement legends & symbols (rr crossing) 4      EACH 510.00 2,040.00 450.00 1,800.00        
735-01 mailboxes 106      EACH 1.30 137.80 1.00 106.00        
735-02 mailbox supports (single) 106      EACH 110.00 11,660.00 100.00 10,600.00        
740-01 construction layout lump      LUMP 38,000.00 38,000.00 15,000.00 15,000.00        
741-11 adjusting water valve and meter box 7      EACH 1,200.00 8,400.00 300.00 2,100.00        
S-001 sawcutting of pavement 16,202      LNFT 0.50 8,101.00 1.00 16,202.00        
S-002 straightening signs lump      LUMP 765.00 765.00 700.00 700.00        
                       
 CONTRACTOR TOTAL       885,489.40   929,469.90        