Lead Project: 833-11-0001
Parish: MADISON
Routes: LA 577-S
Description: LA 577 - END OF CONTROL SECTION
Type Const: grading, drainage struct, cold planing asphaltic concrete, in-place cement treated
base course, superpave asphaltic concrete overlay.
Estimated Construction Cost: $1,917,732.73
 
RankLicenseBidderConstruction Bid
1 05789 D & J CONSTRUCTION CO., INC. $1,942,096.02
2 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $2,160,118.61
 
Item Number Item Description Quantity Unit of Measure - 1 -
D & J CONSTRUCTION CO., INC.
- 2 -
DIAMOND B CONSTRUCTION CO., L.L.C.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 5,000.00 5,000.00 3,000.00 3,000.00        
203-07 borrow (vehicular measurement) 100      CUYD 50.00 5,000.00 40.00 4,000.00        
203-07-A borrow (vehicular meas.)(selected soils) 2,840      CUYD 10.00 28,400.00 16.00 45,440.00        
308-01-A in-place cement treated base course (12" thick) 74,748      SQYD 9.00 672,732.00 12.00 896,976.00        
308-01-B in-place cement treated base course (14" thick) 7,667      SQYD 12.00 92,004.00 14.00 107,338.00        
308-02 removal of existing patches 100      SQYD 20.00 2,000.00 14.00 1,400.00        
401-02 aggregate surface course (adjusted vehicular
measurement)
850      CUYD 30.00 25,500.00 25.00 21,250.00        
402-01 traffic maintenance aggregate (vehicular measurement) 710.0    CUYD 10.00 7,100.00 48.00 34,080.00        
502-01 superpave asphaltic concrete 5,901.4    TON 110.00 649,154.00 96.00 566,534.40        
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
299.9    TON 110.00 32,989.00 175.00 52,482.50        
509-01 cold planing asphaltic pavement 32,557      SQYD 1.50 48,835.50 2.00 65,114.00        
509-02 contractor retained reclaimed asphaltic pavement - 1,359      CUYD 0.01 - 13.59 0.10 - 135.90        
701-01-M cross drain pipe (36" rcp/pcp) 44      LNFT 150.00 6,600.00 165.00 7,260.00        
701-01-N cross drain pipe (42" rcp/pcp) 96      LNFT 200.00 19,200.00 180.00 17,280.00        
701-01-O cross drain pipe (48" rcp/pcp) 90      LNFT 250.00 22,500.00 195.00 17,550.00        
713-01 temporary signs & barricades lump      LUMP 68,000.00 68,000.00 35,000.00 35,000.00        
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
8.154  MILE 225.00 1,834.65 150.00 1,223.10        
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
3.753  MILE 300.00 1,125.90 320.00 1,200.96        
713-04-A temporary pavement markings (solid line)(4" width) 27.558  MILE 1.00 27.56 650.00 17,912.70        
716-01-A mulch (vegetative) 4.0    TON 750.00 3,000.00 650.00 2,600.00        
717-01 seeding 178      LB 11.00 1,958.00 11.00 1,958.00        
718-01 fertilizer 3,954      LB 0.60 2,372.40 0.65 2,570.10        
726-01 bedding material 131.6    CUYD 90.00 11,844.00 110.00 14,476.00        
727-01 mobilization lump      LUMP 146,000.00 146,000.00 150,000.00 150,000.00        
729-16-B object marker assembly (type 2) 10      EACH 100.00 1,000.00 110.00 1,100.00        
731-02 reflectorized raised pavement markers 359      EACH 8.00 2,872.00 5.00 1,795.00        
732-02-A plastic pavement striping (solid line) (4" width) 9.186  MILE 3,600.00 33,069.60 2,750.00 25,261.50        
732-03-A plastic pavement striping (broken line)(4" width) 1.251  MILE 3,000.00 3,753.00 750.00 938.25        
735-01 mailboxes 14      EACH 2.00 28.00 1.00 14.00        
735-02 mailbox supports (single) 14      EACH 140.00 1,960.00 125.00 1,750.00        
740-01 construction layout lump      LUMP 16,000.00 16,000.00 10,000.00 10,000.00        
S-001 tree trimming lump      LUMP 25,000.00 25,000.00 43,000.00 43,000.00        
S-002 cleaning existing ditches 750      LNFT 7.00 5,250.00 13.00 9,750.00        
                       
 CONTRACTOR TOTAL       1,942,096.02   2,160,118.61        