| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - D & J CONSTRUCTION CO., INC. |
- 2 - DIAMOND B CONSTRUCTION CO., L.L.C. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
5,000.00 |
5,000.00 |
3,000.00 |
3,000.00 |
|
|
|
|
| 203-07 |
borrow (vehicular measurement)
|
100   |
CUYD |
50.00 |
5,000.00 |
40.00 |
4,000.00 |
|
|
|
|
| 203-07-A |
borrow (vehicular meas.)(selected soils)
|
2,840   |
CUYD |
10.00 |
28,400.00 |
16.00 |
45,440.00 |
|
|
|
|
| 308-01-A |
in-place cement treated base course (12" thick)
|
74,748   |
SQYD |
9.00 |
672,732.00 |
12.00 |
896,976.00 |
|
|
|
|
| 308-01-B |
in-place cement treated base course (14" thick)
|
7,667   |
SQYD |
12.00 |
92,004.00 |
14.00 |
107,338.00 |
|
|
|
|
| 308-02 |
removal of existing patches
|
100   |
SQYD |
20.00 |
2,000.00 |
14.00 |
1,400.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
850   |
CUYD |
30.00 |
25,500.00 |
25.00 |
21,250.00 |
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
710.0 |
CUYD |
10.00 |
7,100.00 |
48.00 |
34,080.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
5,901.4 |
TON |
110.00 |
649,154.00 |
96.00 |
566,534.40 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
299.9 |
TON |
110.00 |
32,989.00 |
175.00 |
52,482.50 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
32,557   |
SQYD |
1.50 |
48,835.50 |
2.00 |
65,114.00 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 1,359   |
CUYD |
0.01 |
- 13.59 |
0.10 |
- 135.90 |
|
|
|
|
| 701-01-M |
cross drain pipe (36" rcp/pcp)
|
44   |
LNFT |
150.00 |
6,600.00 |
165.00 |
7,260.00 |
|
|
|
|
| 701-01-N |
cross drain pipe (42" rcp/pcp)
|
96   |
LNFT |
200.00 |
19,200.00 |
180.00 |
17,280.00 |
|
|
|
|
| 701-01-O |
cross drain pipe (48" rcp/pcp)
|
90   |
LNFT |
250.00 |
22,500.00 |
195.00 |
17,550.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
68,000.00 |
68,000.00 |
35,000.00 |
35,000.00 |
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
8.154 |
MILE |
225.00 |
1,834.65 |
150.00 |
1,223.10 |
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
3.753 |
MILE |
300.00 |
1,125.90 |
320.00 |
1,200.96 |
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
27.558 |
MILE |
1.00 |
27.56 |
650.00 |
17,912.70 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
4.0 |
TON |
750.00 |
3,000.00 |
650.00 |
2,600.00 |
|
|
|
|
| 717-01 |
seeding
|
178   |
LB |
11.00 |
1,958.00 |
11.00 |
1,958.00 |
|
|
|
|
| 718-01 |
fertilizer
|
3,954   |
LB |
0.60 |
2,372.40 |
0.65 |
2,570.10 |
|
|
|
|
| 726-01 |
bedding material
|
131.6 |
CUYD |
90.00 |
11,844.00 |
110.00 |
14,476.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
146,000.00 |
146,000.00 |
150,000.00 |
150,000.00 |
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
10   |
EACH |
100.00 |
1,000.00 |
110.00 |
1,100.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
359   |
EACH |
8.00 |
2,872.00 |
5.00 |
1,795.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
9.186 |
MILE |
3,600.00 |
33,069.60 |
2,750.00 |
25,261.50 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.251 |
MILE |
3,000.00 |
3,753.00 |
750.00 |
938.25 |
|
|
|
|
| 735-01 |
mailboxes
|
14   |
EACH |
2.00 |
28.00 |
1.00 |
14.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
14   |
EACH |
140.00 |
1,960.00 |
125.00 |
1,750.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
16,000.00 |
16,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| S-001 |
tree trimming
|
lump |
LUMP |
25,000.00 |
25,000.00 |
43,000.00 |
43,000.00 |
|
|
|
|
| S-002 |
cleaning existing ditches
|
750   |
LNFT |
7.00 |
5,250.00 |
13.00 |
9,750.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,942,096.02 |
|
2,160,118.61 |
|
|
|
|
|