| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - COASTAL BRIDGE CO., L.L.C. |
- 2 - F.G. SULLIVAN, JR. CONTRACTOR LLC |
- 3 - BARRIERE CONSTRUCTION CO., LLC. |
- 4 - BARBER BROS. CONTRACTING CO., L.L.C |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
60,000.00 |
60,000.00 |
77,000.00 |
77,000.00 |
100,000.00 |
100,000.00 |
75,000.00 |
75,000.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
7,500.00 |
7,500.00 |
500.00 |
500.00 |
2,500.00 |
2,500.00 |
15,000.00 |
15,000.00 |
| 202-02-C |
removal of portland cement concrete pavement
|
42   |
SQYD |
15.00 |
630.00 |
17.00 |
714.00 |
47.00 |
1,974.00 |
50.00 |
2,100.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
1,549.2 |
SQYD |
12.00 |
18,590.40 |
11.00 |
17,041.20 |
9.00 |
13,942.80 |
15.00 |
23,238.00 |
| 202-02-I-01 |
removal of wood shed (lt of sta 52+30; 303.5 sq ft)
|
1   |
EACH |
900.00 |
900.00 |
1,000.00 |
1,000.00 |
1,800.00 |
1,800.00 |
1,500.00 |
1,500.00 |
| 202-02-I-02 |
removal of metal shed (lt of sta 52+85; 173.5 sq ft)
|
1   |
EACH |
1,000.00 |
1,000.00 |
1,000.00 |
1,000.00 |
1,800.00 |
1,800.00 |
1,500.00 |
1,500.00 |
| 202-02-J |
removal of steel light pole (lt. of sta. 50+65)
|
1   |
EACH |
1,000.00 |
1,000.00 |
1,000.00 |
1,000.00 |
2,500.00 |
2,500.00 |
2,000.00 |
2,000.00 |
| 202-02-K |
removal of wooden sign (rt. of sta. 50+72)
|
1   |
EACH |
300.00 |
300.00 |
300.00 |
300.00 |
1,500.00 |
1,500.00 |
1,000.00 |
1,000.00 |
| 202-02-L |
removal of fence
|
667   |
LNFT |
2.00 |
1,334.00 |
2.00 |
1,334.00 |
2.15 |
1,434.05 |
5.00 |
3,335.00 |
| 203-05 |
excavation and embankment
|
lump |
LUMP |
50,000.00 |
50,000.00 |
50,000.00 |
50,000.00 |
79,500.00 |
79,500.00 |
50,000.00 |
50,000.00 |
| 204-02 |
temporary hay or straw bales
|
50   |
EACH |
12.00 |
600.00 |
10.00 |
500.00 |
10.00 |
500.00 |
20.00 |
1,000.00 |
| 204-06 |
temporary silt fencing
|
1,775   |
LNFT |
2.00 |
3,550.00 |
2.00 |
3,550.00 |
1.60 |
2,840.00 |
3.00 |
5,325.00 |
| 204-07 |
temporary stone construction entrance
|
2   |
EACH |
1,100.00 |
2,200.00 |
1,100.00 |
2,200.00 |
1,000.00 |
2,000.00 |
3,000.00 |
6,000.00 |
| 302-02-C |
class ii base course (8" thick)
|
3,177.4 |
SQYD |
25.00 |
79,435.00 |
40.00 |
127,096.00 |
30.00 |
95,322.00 |
35.00 |
111,209.00 |
| 304-05 |
lime treatment (type e)
|
18.05 |
TON |
300.00 |
5,415.00 |
350.00 |
6,317.50 |
750.00 |
13,537.50 |
400.00 |
7,220.00 |
| 502-01 |
superpave asphaltic concrete
|
3,181.7 |
TON |
95.00 |
302,261.50 |
60.00 |
190,902.00 |
100.00 |
318,170.00 |
90.00 |
286,353.00 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
121.2 |
TON |
125.00 |
15,150.00 |
60.00 |
7,272.00 |
100.00 |
12,120.00 |
125.00 |
15,150.00 |
| 701-01-G |
cross drain pipe (18" rcp/pcp)
|
40   |
LNFT |
72.00 |
2,880.00 |
100.00 |
4,000.00 |
87.00 |
3,480.00 |
85.00 |
3,400.00 |
| 701-02-D |
cross drain pipe arch (24" equiv. rcpa)
|
72   |
LNFT |
137.00 |
9,864.00 |
170.00 |
12,240.00 |
120.00 |
8,640.00 |
160.00 |
11,520.00 |
| 706-02-C |
concrete drive (6" thick)
|
75.2 |
SQYD |
100.00 |
7,520.00 |
100.00 |
7,520.00 |
119.00 |
8,948.80 |
120.00 |
9,024.00 |
| 708-01 |
right-of-way monument
|
17   |
EACH |
500.00 |
8,500.00 |
300.00 |
5,100.00 |
7.00 |
119.00 |
300.00 |
5,100.00 |
| 708-02 |
right-of-way monument witness post
|
17   |
EACH |
500.00 |
8,500.00 |
300.00 |
5,100.00 |
40.00 |
680.00 |
300.00 |
5,100.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
10,000.00 |
10,000.00 |
37,000.00 |
37,000.00 |
10,000.00 |
10,000.00 |
30,000.00 |
30,000.00 |
| 713-02-E |
temporary pavement markings (24" width)
|
68   |
LNFT |
1.00 |
68.00 |
0.50 |
34.00 |
9.00 |
612.00 |
1.50 |
102.00 |
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
1.500 |
MILE |
850.00 |
1,275.00 |
100.00 |
150.00 |
675.00 |
1,012.50 |
1,000.00 |
1,500.00 |
| 716-01-A |
mulch (vegetative)
|
0.3 |
TON |
3,000.00 |
900.00 |
6,000.00 |
1,800.00 |
7,500.00 |
2,250.00 |
8,000.00 |
2,400.00 |
| 726-01 |
bedding material
|
15.0 |
CUYD |
100.00 |
1,500.00 |
100.00 |
1,500.00 |
105.00 |
1,575.00 |
110.00 |
1,650.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
60,000.00 |
60,000.00 |
90,000.00 |
90,000.00 |
70,000.00 |
70,000.00 |
60,000.00 |
60,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
2   |
EACH |
100.00 |
200.00 |
75.00 |
150.00 |
75.00 |
150.00 |
100.00 |
200.00 |
| 729-19-A |
dead end road installations(type a)
|
1   |
EACH |
5,000.00 |
5,000.00 |
140.00 |
140.00 |
1,400.00 |
1,400.00 |
6,000.00 |
6,000.00 |
| 731-02 |
reflectorized raised pavement markers
|
359   |
EACH |
5.50 |
1,974.50 |
6.00 |
2,154.00 |
5.00 |
1,795.00 |
6.00 |
2,154.00 |
| 732-01-C |
plastic pavement striping (8" width)
|
216   |
LNFT |
1.00 |
216.00 |
1.00 |
216.00 |
0.90 |
194.40 |
1.50 |
324.00 |
| 732-01-E |
plastic pavement striping (24" width)
|
259   |
LNFT |
4.00 |
1,036.00 |
4.00 |
1,036.00 |
2.60 |
673.40 |
5.00 |
1,295.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
0.756 |
MILE |
2,800.00 |
2,116.80 |
3,000.00 |
2,268.00 |
2,200.00 |
1,663.20 |
3,000.00 |
2,268.00 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.061 |
MILE |
900.00 |
54.90 |
800.00 |
48.80 |
750.00 |
45.75 |
1,000.00 |
61.00 |
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
4   |
EACH |
190.00 |
760.00 |
200.00 |
800.00 |
165.00 |
660.00 |
200.00 |
800.00 |
| 732-04-B |
plastic pavement legends & symbols (double arrow)
|
1   |
EACH |
210.00 |
210.00 |
200.00 |
200.00 |
185.00 |
185.00 |
250.00 |
250.00 |
| 732-04-C |
plastic pavement legends & symbols (only)
|
4   |
EACH |
250.00 |
1,000.00 |
250.00 |
1,000.00 |
175.00 |
700.00 |
300.00 |
1,200.00 |
| 735-01 |
mailboxes
|
1   |
EACH |
20.00 |
20.00 |
5.00 |
5.00 |
1.00 |
1.00 |
6.00 |
6.00 |
| 735-02 |
mailbox supports (single)
|
1   |
EACH |
700.00 |
700.00 |
150.00 |
150.00 |
85.00 |
85.00 |
600.00 |
600.00 |
| 739-01 |
hydro-seeding
|
1.17 |
ACRE |
2,000.00 |
2,340.00 |
1,700.00 |
1,989.00 |
1,500.00 |
1,755.00 |
4,000.00 |
4,680.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
15,000.00 |
15,000.00 |
30,000.00 |
30,000.00 |
10,000.00 |
10,000.00 |
28,000.00 |
28,000.00 |
| S-001 |
sawcutting (full depth)
|
2,919.25 |
INFT |
3.00 |
8,757.75 |
5.00 |
14,596.25 |
2.00 |
5,838.50 |
3.00 |
8,757.75 |
| S-002 |
cleaning existing ditches
|
100   |
LNFT |
18.00 |
1,800.00 |
20.00 |
2,000.00 |
25.00 |
2,500.00 |
60.00 |
6,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
702,058.85 |
|
708,923.75 |
|
786,403.90 |
|
799,321.75 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - DIAMOND B CONSTRUCTION CO., L.L.C. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
130,000.00 |
130,000.00 |
|
|
|
|
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
15,000.00 |
15,000.00 |
|
|
|
|
|
|
| 202-02-C |
removal of portland cement concrete pavement
|
42   |
SQYD |
20.00 |
840.00 |
|
|
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
1,549.2 |
SQYD |
7.00 |
10,844.40 |
|
|
|
|
|
|
| 202-02-I-01 |
removal of wood shed (lt of sta 52+30; 303.5 sq ft)
|
1   |
EACH |
4,000.00 |
4,000.00 |
|
|
|
|
|
|
| 202-02-I-02 |
removal of metal shed (lt of sta 52+85; 173.5 sq ft)
|
1   |
EACH |
4,000.00 |
4,000.00 |
|
|
|
|
|
|
| 202-02-J |
removal of steel light pole (lt. of sta. 50+65)
|
1   |
EACH |
700.00 |
700.00 |
|
|
|
|
|
|
| 202-02-K |
removal of wooden sign (rt. of sta. 50+72)
|
1   |
EACH |
700.00 |
700.00 |
|
|
|
|
|
|
| 202-02-L |
removal of fence
|
667   |
LNFT |
15.00 |
10,005.00 |
|
|
|
|
|
|
| 203-05 |
excavation and embankment
|
lump |
LUMP |
150,000.00 |
150,000.00 |
|
|
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
50   |
EACH |
13.00 |
650.00 |
|
|
|
|
|
|
| 204-06 |
temporary silt fencing
|
1,775   |
LNFT |
2.00 |
3,550.00 |
|
|
|
|
|
|
| 204-07 |
temporary stone construction entrance
|
2   |
EACH |
3,000.00 |
6,000.00 |
|
|
|
|
|
|
| 302-02-C |
class ii base course (8" thick)
|
3,177.4 |
SQYD |
75.00 |
238,305.00 |
|
|
|
|
|
|
| 304-05 |
lime treatment (type e)
|
18.05 |
TON |
700.00 |
12,635.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
3,181.7 |
TON |
90.00 |
286,353.00 |
|
|
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
121.2 |
TON |
200.00 |
24,240.00 |
|
|
|
|
|
|
| 701-01-G |
cross drain pipe (18" rcp/pcp)
|
40   |
LNFT |
200.00 |
8,000.00 |
|
|
|
|
|
|
| 701-02-D |
cross drain pipe arch (24" equiv. rcpa)
|
72   |
LNFT |
225.00 |
16,200.00 |
|
|
|
|
|
|
| 706-02-C |
concrete drive (6" thick)
|
75.2 |
SQYD |
125.00 |
9,400.00 |
|
|
|
|
|
|
| 708-01 |
right-of-way monument
|
17   |
EACH |
125.00 |
2,125.00 |
|
|
|
|
|
|
| 708-02 |
right-of-way monument witness post
|
17   |
EACH |
90.00 |
1,530.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
65,000.00 |
65,000.00 |
|
|
|
|
|
|
| 713-02-E |
temporary pavement markings (24" width)
|
68   |
LNFT |
1.00 |
68.00 |
|
|
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
1.500 |
MILE |
1,100.00 |
1,650.00 |
|
|
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
0.3 |
TON |
6,500.00 |
1,950.00 |
|
|
|
|
|
|
| 726-01 |
bedding material
|
15.0 |
CUYD |
175.00 |
2,625.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
110,000.00 |
110,000.00 |
|
|
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
2   |
EACH |
85.00 |
170.00 |
|
|
|
|
|
|
| 729-19-A |
dead end road installations(type a)
|
1   |
EACH |
3,500.00 |
3,500.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
359   |
EACH |
6.25 |
2,243.75 |
|
|
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
216   |
LNFT |
1.00 |
216.00 |
|
|
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
259   |
LNFT |
4.50 |
1,165.50 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
0.756 |
MILE |
3,500.00 |
2,646.00 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.061 |
MILE |
1,000.00 |
61.00 |
|
|
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
4   |
EACH |
220.00 |
880.00 |
|
|
|
|
|
|
| 732-04-B |
plastic pavement legends & symbols (double arrow)
|
1   |
EACH |
2,500.00 |
2,500.00 |
|
|
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
4   |
EACH |
275.00 |
1,100.00 |
|
|
|
|
|
|
| 735-01 |
mailboxes
|
1   |
EACH |
20.00 |
20.00 |
|
|
|
|
|
|
| 735-02 |
mailbox supports (single)
|
1   |
EACH |
200.00 |
200.00 |
|
|
|
|
|
|
| 739-01 |
hydro-seeding
|
1.17 |
ACRE |
1,850.00 |
2,164.50 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
20,000.00 |
20,000.00 |
|
|
|
|
|
|
| S-001 |
sawcutting (full depth)
|
2,919.25 |
INFT |
3.00 |
8,757.75 |
|
|
|
|
|
|
| S-002 |
cleaning existing ditches
|
100   |
LNFT |
25.00 |
2,500.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,164,494.90 |
|
|
|
|
|
|
|