Lead Project: 820-29-0003
Parish: EVANGELINE
Routes: LA 1161
Description: JCT. LA 104 - JCT. LA 29
Type Const: cold planing asphaltic concrete, lime treatment, in-place cement stabilized base
course, asphaltic surface treatment, superpave asphaltic concrete overlay and related work.
Estimated Construction Cost: $4,341,099.74
 
RankLicenseBidderConstruction Bid
1 08815 W. E. MCDONALD & SON, LLC. $4,174,260.17
2 12312 GILCHRIST CONSTRUCTION CO. LLC $4,240,019.90
3 34356 PRAIRIE CONTRACTORS INC. $4,436,838.85
4 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $4,908,578.68
5 04089 H & S CONSTRUCTION CO., INC. $4,995,789.74
 
Item Number Item Description Quantity Unit of Measure - 1 -
W. E. MCDONALD & SON, LLC.
- 2 -
GILCHRIST CONSTRUCTION CO. LLC
- 3 -
PRAIRIE CONTRACTORS INC.
- 4 -
DIAMOND B CONSTRUCTION CO., L.L.C.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-D removal of concrete walks & drives 300      SQYD 20.00 6,000.00 16.00 4,800.00 30.00 9,000.00 23.00 6,900.00
203-07 borrow (vehicular measurement) 900      CUYD 12.00 10,800.00 21.00 18,900.00 12.00 10,800.00 23.00 20,700.00
203-07-A borrow (vehicular meas.)(selected soils) 500      CUYD 12.00 6,000.00 21.00 10,500.00 12.00 6,000.00 27.00 13,500.00
204-05-A temporary sediment check dams (hay) 90      EACH 200.00 18,000.00 160.00 14,400.00 250.00 22,500.00 225.00 20,250.00
303-01-B in-place cement stabilized base course (8 1/2" thick) 113,050      SQYD 9.00 1,017,450.00 9.00 1,017,450.00 9.25 1,045,712.50 12.00 1,356,600.00
303-02 removal of existing patches 500      SQYD 15.00 7,500.00 5.00 2,500.00 18.00 9,000.00 25.00 12,500.00
304-05 lime treatment (type e) 250.00   TON 425.00 106,250.00 300.00 75,000.00 450.00 112,500.00 435.00 108,750.00
401-02 aggregate surface course (adjusted vehicular
measurement)
150      CUYD 100.00 15,000.00 120.00 18,000.00 80.00 12,000.00 94.00 14,100.00
502-01 superpave asphaltic concrete 20,798.5    TON 95.00 1,975,857.50 85.00 1,767,872.50 96.00 1,996,656.00 83.25 1,731,475.13
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
890.0    TON 70.00 62,300.00 140.00 124,600.00 70.00 62,300.00 175.00 155,750.00
507-01 asphaltic material 73,470      GAL 2.30 168,981.00 2.50 183,675.00 2.50 183,675.00 2.50 183,675.00
507-02-B aggregate (s2) 108,044      SQYD 1.15 124,250.60 1.30 140,457.20 1.20 129,652.80 1.25 135,055.00
507-02-C aggregate (s3) 108,044      SQYD 0.92 99,400.48 1.00 108,044.00 1.00 108,044.00 1.00 108,044.00
509-01 cold planing asphaltic pavement 84,251      SQYD 0.98 82,565.98 1.00 84,251.00 0.48 40,440.48 2.50 210,627.50
509-02 contractor retained reclaimed asphaltic pavement - 4,388      CUYD 0.01 - 43.88 0.10 - 438.80 0.01 - 43.88 0.10 - 438.80
510-01-C pavement patching (10" minimum thickness) 120      SQYD 150.00 18,000.00 200.00 24,000.00 150.00 18,000.00 135.00 16,200.00
701-05-P-01 side drain pipe (54" cmp)(erosion) 130      LNFT 140.00 18,200.00 175.00 22,750.00 150.00 19,500.00 200.00 26,000.00
701-08 relaying pipe 16      LNFT 180.00 2,880.00 70.00 1,120.00 150.00 2,400.00 200.00 3,200.00
701-15 concrete collar 2      EACH 1,000.00 2,000.00 900.00 1,800.00 600.00 1,200.00 1,300.00 2,600.00
706-02-A concrete drive (4" thick) 15.0    SQYD 200.00 3,000.00 180.00 2,700.00 150.00 2,250.00 100.00 1,500.00
713-01 temporary signs & barricades lump      LUMP 15,000.00 15,000.00 70,000.00 70,000.00 50,000.00 50,000.00 25,000.00 25,000.00
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
14.242  MILE 400.00 5,696.80 200.00 2,848.40 400.00 5,696.80 150.00 2,136.30
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
10.827  MILE 275.00 2,977.43 1.00 10.83 1.00 10.83 300.00 3,248.10
713-04-A temporary pavement markings (solid line)(4" width) 42.365  MILE 495.00 20,970.68 1.00 42.37 1.00 42.37 550.00 23,300.75
713-06-A temporary reflectorized raised pavement markers (tabs) 1,881      EACH 1.50 2,821.50 2.00 3,762.00 2.00 3,762.00 1.75 3,291.75
722-02 project site laboratory (equipped) 1      EACH 6,000.00 6,000.00 25,000.00 25,000.00 6,000.00 6,000.00 17,500.00 17,500.00
727-01 mobilization lump      LUMP 50,000.00 50,000.00 175,000.00 175,000.00 250,000.00 250,000.00 300,000.00 300,000.00
729-16-B object marker assembly (type 2) 52      EACH 60.00 3,120.00 55.00 2,860.00 60.00 3,120.00 55.00 2,860.00
731-02 reflectorized raised pavement markers 941      EACH 4.90 4,610.90 5.50 5,175.50 5.00 4,705.00 5.00 4,705.00
732-02-A plastic pavement striping (solid line) (4" width) 21.183  MILE 2,350.00 49,780.05 2,600.00 55,075.80 2,500.00 52,957.50 2,500.00 52,957.50
732-03-A plastic pavement striping (broken line)(4" width) 5.413  MILE 625.00 3,383.13 700.00 3,789.10 650.00 3,518.45 650.00 3,518.45
735-01 mailboxes 73      EACH 1.00 73.00 10.00 730.00 1.00 73.00 1.00 73.00
735-02 mailbox supports (single) 57      EACH 115.00 6,555.00 110.00 6,270.00 125.00 7,125.00 100.00 5,700.00
735-03 mailbox supports (double) 7      EACH 165.00 1,155.00 135.00 945.00 200.00 1,400.00 125.00 875.00
735-04 mailbox supports (multiple) 1      EACH 325.00 325.00 230.00 230.00 400.00 400.00 225.00 225.00
740-01 construction layout lump      LUMP 10,000.00 10,000.00 30,000.00 30,000.00 1.00 1.00 20,000.00 20,000.00
S-001 cement treatment (12" thick) 40,000.0    SQYD 5.65 226,000.00 5.35 214,000.00 5.90 236,000.00 6.60 264,000.00
S-002 full depth sawcutting of existing portland cement
concrete drives
3,200      INFT 2.00 6,400.00 2.00 6,400.00 1.70 5,440.00 2.25 7,200.00
S-003 selected clearing lump      LUMP 10,000.00 10,000.00 13,000.00 13,000.00 10,000.00 10,000.00 39,500.00 39,500.00
S-004 reshaping ditch lump      LUMP 5,000.00 5,000.00 2,500.00 2,500.00 5,000.00 5,000.00 5,500.00 5,500.00
                       
 CONTRACTOR TOTAL       4,174,260.17   4,240,019.90   4,436,838.85   4,908,578.68
 
Item Number Item Description Quantity Unit of Measure - 5 -
H & S CONSTRUCTION CO., INC.

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-D removal of concrete walks & drives 300      SQYD 15.00 4,500.00            
203-07 borrow (vehicular measurement) 900      CUYD 20.00 18,000.00            
203-07-A borrow (vehicular meas.)(selected soils) 500      CUYD 20.00 10,000.00            
204-05-A temporary sediment check dams (hay) 90      EACH 150.00 13,500.00            
303-01-B in-place cement stabilized base course (8 1/2" thick) 113,050      SQYD 9.50 1,073,975.00            
303-02 removal of existing patches 500      SQYD 25.00 12,500.00            
304-05 lime treatment (type e) 250.00   TON 350.00 87,500.00            
401-02 aggregate surface course (adjusted vehicular
measurement)
150      CUYD 75.00 11,250.00            
502-01 superpave asphaltic concrete 20,798.5    TON 99.75 2,074,650.38            
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
890.0    TON 126.00 112,140.00            
507-01 asphaltic material 73,470      GAL 3.00 220,410.00            
507-02-B aggregate (s2) 108,044      SQYD 1.95 210,685.80            
507-02-C aggregate (s3) 108,044      SQYD 1.75 189,077.00            
509-01 cold planing asphaltic pavement 84,251      SQYD 2.00 168,502.00            
509-02 contractor retained reclaimed asphaltic pavement - 4,388      CUYD 0.01 - 43.88            
510-01-C pavement patching (10" minimum thickness) 120      SQYD 125.00 15,000.00            
701-05-P-01 side drain pipe (54" cmp)(erosion) 130      LNFT 225.00 29,250.00            
701-08 relaying pipe 16      LNFT 180.00 2,880.00            
701-15 concrete collar 2      EACH 750.00 1,500.00            
706-02-A concrete drive (4" thick) 15.0    SQYD 190.00 2,850.00            
713-01 temporary signs & barricades lump      LUMP 50,000.00 50,000.00            
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
14.242  MILE 550.00 7,833.10            
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
10.827  MILE 328.00 3,551.26            
713-04-A temporary pavement markings (solid line)(4" width) 42.365  MILE 589.00 24,952.99            
713-06-A temporary reflectorized raised pavement markers (tabs) 1,881      EACH 2.25 4,232.25            
722-02 project site laboratory (equipped) 1      EACH 6,000.00 6,000.00            
727-01 mobilization lump      LUMP 350,000.00 350,000.00            
729-16-B object marker assembly (type 2) 52      EACH 72.00 3,744.00            
731-02 reflectorized raised pavement markers 941      EACH 5.90 5,551.90            
732-02-A plastic pavement striping (solid line) (4" width) 21.183  MILE 3,000.00 63,549.00            
732-03-A plastic pavement striping (broken line)(4" width) 5.413  MILE 745.00 4,032.69            
735-01 mailboxes 73      EACH 1.25 91.25            
735-02 mailbox supports (single) 57      EACH 137.00 7,809.00            
735-03 mailbox supports (double) 7      EACH 197.00 1,379.00            
735-04 mailbox supports (multiple) 1      EACH 387.00 387.00            
740-01 construction layout lump      LUMP 12,000.00 12,000.00            
S-001 cement treatment (12" thick) 40,000.0    SQYD 4.25 170,000.00            
S-002 full depth sawcutting of existing portland cement
concrete drives
3,200      INFT 1.50 4,800.00            
S-003 selected clearing lump      LUMP 12,000.00 12,000.00            
S-004 reshaping ditch lump      LUMP 5,750.00 5,750.00            
                       
 CONTRACTOR TOTAL       4,995,789.74            