| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - W. E. MCDONALD & SON, LLC. |
- 2 - GILCHRIST CONSTRUCTION CO. LLC |
- 3 - PRAIRIE CONTRACTORS INC. |
- 4 - DIAMOND B CONSTRUCTION CO., L.L.C. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks & drives
|
300   |
SQYD |
20.00 |
6,000.00 |
16.00 |
4,800.00 |
30.00 |
9,000.00 |
23.00 |
6,900.00 |
| 203-07 |
borrow (vehicular measurement)
|
900   |
CUYD |
12.00 |
10,800.00 |
21.00 |
18,900.00 |
12.00 |
10,800.00 |
23.00 |
20,700.00 |
| 203-07-A |
borrow (vehicular meas.)(selected soils)
|
500   |
CUYD |
12.00 |
6,000.00 |
21.00 |
10,500.00 |
12.00 |
6,000.00 |
27.00 |
13,500.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
90   |
EACH |
200.00 |
18,000.00 |
160.00 |
14,400.00 |
250.00 |
22,500.00 |
225.00 |
20,250.00 |
| 303-01-B |
in-place cement stabilized base course (8 1/2" thick)
|
113,050   |
SQYD |
9.00 |
1,017,450.00 |
9.00 |
1,017,450.00 |
9.25 |
1,045,712.50 |
12.00 |
1,356,600.00 |
| 303-02 |
removal of existing patches
|
500   |
SQYD |
15.00 |
7,500.00 |
5.00 |
2,500.00 |
18.00 |
9,000.00 |
25.00 |
12,500.00 |
| 304-05 |
lime treatment (type e)
|
250.00 |
TON |
425.00 |
106,250.00 |
300.00 |
75,000.00 |
450.00 |
112,500.00 |
435.00 |
108,750.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
150   |
CUYD |
100.00 |
15,000.00 |
120.00 |
18,000.00 |
80.00 |
12,000.00 |
94.00 |
14,100.00 |
| 502-01 |
superpave asphaltic concrete
|
20,798.5 |
TON |
95.00 |
1,975,857.50 |
85.00 |
1,767,872.50 |
96.00 |
1,996,656.00 |
83.25 |
1,731,475.13 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
890.0 |
TON |
70.00 |
62,300.00 |
140.00 |
124,600.00 |
70.00 |
62,300.00 |
175.00 |
155,750.00 |
| 507-01 |
asphaltic material
|
73,470   |
GAL |
2.30 |
168,981.00 |
2.50 |
183,675.00 |
2.50 |
183,675.00 |
2.50 |
183,675.00 |
| 507-02-B |
aggregate (s2)
|
108,044   |
SQYD |
1.15 |
124,250.60 |
1.30 |
140,457.20 |
1.20 |
129,652.80 |
1.25 |
135,055.00 |
| 507-02-C |
aggregate (s3)
|
108,044   |
SQYD |
0.92 |
99,400.48 |
1.00 |
108,044.00 |
1.00 |
108,044.00 |
1.00 |
108,044.00 |
| 509-01 |
cold planing asphaltic pavement
|
84,251   |
SQYD |
0.98 |
82,565.98 |
1.00 |
84,251.00 |
0.48 |
40,440.48 |
2.50 |
210,627.50 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 4,388   |
CUYD |
0.01 |
- 43.88 |
0.10 |
- 438.80 |
0.01 |
- 43.88 |
0.10 |
- 438.80 |
| 510-01-C |
pavement patching (10" minimum thickness)
|
120   |
SQYD |
150.00 |
18,000.00 |
200.00 |
24,000.00 |
150.00 |
18,000.00 |
135.00 |
16,200.00 |
| 701-05-P-01 |
side drain pipe (54" cmp)(erosion)
|
130   |
LNFT |
140.00 |
18,200.00 |
175.00 |
22,750.00 |
150.00 |
19,500.00 |
200.00 |
26,000.00 |
| 701-08 |
relaying pipe
|
16   |
LNFT |
180.00 |
2,880.00 |
70.00 |
1,120.00 |
150.00 |
2,400.00 |
200.00 |
3,200.00 |
| 701-15 |
concrete collar
|
2   |
EACH |
1,000.00 |
2,000.00 |
900.00 |
1,800.00 |
600.00 |
1,200.00 |
1,300.00 |
2,600.00 |
| 706-02-A |
concrete drive (4" thick)
|
15.0 |
SQYD |
200.00 |
3,000.00 |
180.00 |
2,700.00 |
150.00 |
2,250.00 |
100.00 |
1,500.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
15,000.00 |
15,000.00 |
70,000.00 |
70,000.00 |
50,000.00 |
50,000.00 |
25,000.00 |
25,000.00 |
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
14.242 |
MILE |
400.00 |
5,696.80 |
200.00 |
2,848.40 |
400.00 |
5,696.80 |
150.00 |
2,136.30 |
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
10.827 |
MILE |
275.00 |
2,977.43 |
1.00 |
10.83 |
1.00 |
10.83 |
300.00 |
3,248.10 |
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
42.365 |
MILE |
495.00 |
20,970.68 |
1.00 |
42.37 |
1.00 |
42.37 |
550.00 |
23,300.75 |
| 713-06-A |
temporary reflectorized raised pavement markers (tabs)
|
1,881   |
EACH |
1.50 |
2,821.50 |
2.00 |
3,762.00 |
2.00 |
3,762.00 |
1.75 |
3,291.75 |
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
6,000.00 |
6,000.00 |
25,000.00 |
25,000.00 |
6,000.00 |
6,000.00 |
17,500.00 |
17,500.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
50,000.00 |
50,000.00 |
175,000.00 |
175,000.00 |
250,000.00 |
250,000.00 |
300,000.00 |
300,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
52   |
EACH |
60.00 |
3,120.00 |
55.00 |
2,860.00 |
60.00 |
3,120.00 |
55.00 |
2,860.00 |
| 731-02 |
reflectorized raised pavement markers
|
941   |
EACH |
4.90 |
4,610.90 |
5.50 |
5,175.50 |
5.00 |
4,705.00 |
5.00 |
4,705.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
21.183 |
MILE |
2,350.00 |
49,780.05 |
2,600.00 |
55,075.80 |
2,500.00 |
52,957.50 |
2,500.00 |
52,957.50 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
5.413 |
MILE |
625.00 |
3,383.13 |
700.00 |
3,789.10 |
650.00 |
3,518.45 |
650.00 |
3,518.45 |
| 735-01 |
mailboxes
|
73   |
EACH |
1.00 |
73.00 |
10.00 |
730.00 |
1.00 |
73.00 |
1.00 |
73.00 |
| 735-02 |
mailbox supports (single)
|
57   |
EACH |
115.00 |
6,555.00 |
110.00 |
6,270.00 |
125.00 |
7,125.00 |
100.00 |
5,700.00 |
| 735-03 |
mailbox supports (double)
|
7   |
EACH |
165.00 |
1,155.00 |
135.00 |
945.00 |
200.00 |
1,400.00 |
125.00 |
875.00 |
| 735-04 |
mailbox supports (multiple)
|
1   |
EACH |
325.00 |
325.00 |
230.00 |
230.00 |
400.00 |
400.00 |
225.00 |
225.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
10,000.00 |
10,000.00 |
30,000.00 |
30,000.00 |
1.00 |
1.00 |
20,000.00 |
20,000.00 |
| S-001 |
cement treatment (12" thick)
|
40,000.0 |
SQYD |
5.65 |
226,000.00 |
5.35 |
214,000.00 |
5.90 |
236,000.00 |
6.60 |
264,000.00 |
| S-002 |
full depth sawcutting of existing portland cement
concrete drives |
3,200   |
INFT |
2.00 |
6,400.00 |
2.00 |
6,400.00 |
1.70 |
5,440.00 |
2.25 |
7,200.00 |
| S-003 |
selected clearing
|
lump |
LUMP |
10,000.00 |
10,000.00 |
13,000.00 |
13,000.00 |
10,000.00 |
10,000.00 |
39,500.00 |
39,500.00 |
| S-004 |
reshaping ditch
|
lump |
LUMP |
5,000.00 |
5,000.00 |
2,500.00 |
2,500.00 |
5,000.00 |
5,000.00 |
5,500.00 |
5,500.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
4,174,260.17 |
|
4,240,019.90 |
|
4,436,838.85 |
|
4,908,578.68 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - H & S CONSTRUCTION CO., INC. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks & drives
|
300   |
SQYD |
15.00 |
4,500.00 |
|
|
|
|
|
|
| 203-07 |
borrow (vehicular measurement)
|
900   |
CUYD |
20.00 |
18,000.00 |
|
|
|
|
|
|
| 203-07-A |
borrow (vehicular meas.)(selected soils)
|
500   |
CUYD |
20.00 |
10,000.00 |
|
|
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
90   |
EACH |
150.00 |
13,500.00 |
|
|
|
|
|
|
| 303-01-B |
in-place cement stabilized base course (8 1/2" thick)
|
113,050   |
SQYD |
9.50 |
1,073,975.00 |
|
|
|
|
|
|
| 303-02 |
removal of existing patches
|
500   |
SQYD |
25.00 |
12,500.00 |
|
|
|
|
|
|
| 304-05 |
lime treatment (type e)
|
250.00 |
TON |
350.00 |
87,500.00 |
|
|
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
150   |
CUYD |
75.00 |
11,250.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
20,798.5 |
TON |
99.75 |
2,074,650.38 |
|
|
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
890.0 |
TON |
126.00 |
112,140.00 |
|
|
|
|
|
|
| 507-01 |
asphaltic material
|
73,470   |
GAL |
3.00 |
220,410.00 |
|
|
|
|
|
|
| 507-02-B |
aggregate (s2)
|
108,044   |
SQYD |
1.95 |
210,685.80 |
|
|
|
|
|
|
| 507-02-C |
aggregate (s3)
|
108,044   |
SQYD |
1.75 |
189,077.00 |
|
|
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
84,251   |
SQYD |
2.00 |
168,502.00 |
|
|
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 4,388   |
CUYD |
0.01 |
- 43.88 |
|
|
|
|
|
|
| 510-01-C |
pavement patching (10" minimum thickness)
|
120   |
SQYD |
125.00 |
15,000.00 |
|
|
|
|
|
|
| 701-05-P-01 |
side drain pipe (54" cmp)(erosion)
|
130   |
LNFT |
225.00 |
29,250.00 |
|
|
|
|
|
|
| 701-08 |
relaying pipe
|
16   |
LNFT |
180.00 |
2,880.00 |
|
|
|
|
|
|
| 701-15 |
concrete collar
|
2   |
EACH |
750.00 |
1,500.00 |
|
|
|
|
|
|
| 706-02-A |
concrete drive (4" thick)
|
15.0 |
SQYD |
190.00 |
2,850.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
50,000.00 |
50,000.00 |
|
|
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
14.242 |
MILE |
550.00 |
7,833.10 |
|
|
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
10.827 |
MILE |
328.00 |
3,551.26 |
|
|
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
42.365 |
MILE |
589.00 |
24,952.99 |
|
|
|
|
|
|
| 713-06-A |
temporary reflectorized raised pavement markers (tabs)
|
1,881   |
EACH |
2.25 |
4,232.25 |
|
|
|
|
|
|
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
6,000.00 |
6,000.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
350,000.00 |
350,000.00 |
|
|
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
52   |
EACH |
72.00 |
3,744.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
941   |
EACH |
5.90 |
5,551.90 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
21.183 |
MILE |
3,000.00 |
63,549.00 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
5.413 |
MILE |
745.00 |
4,032.69 |
|
|
|
|
|
|
| 735-01 |
mailboxes
|
73   |
EACH |
1.25 |
91.25 |
|
|
|
|
|
|
| 735-02 |
mailbox supports (single)
|
57   |
EACH |
137.00 |
7,809.00 |
|
|
|
|
|
|
| 735-03 |
mailbox supports (double)
|
7   |
EACH |
197.00 |
1,379.00 |
|
|
|
|
|
|
| 735-04 |
mailbox supports (multiple)
|
1   |
EACH |
387.00 |
387.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
12,000.00 |
12,000.00 |
|
|
|
|
|
|
| S-001 |
cement treatment (12" thick)
|
40,000.0 |
SQYD |
4.25 |
170,000.00 |
|
|
|
|
|
|
| S-002 |
full depth sawcutting of existing portland cement
concrete drives |
3,200   |
INFT |
1.50 |
4,800.00 |
|
|
|
|
|
|
| S-003 |
selected clearing
|
lump |
LUMP |
12,000.00 |
12,000.00 |
|
|
|
|
|
|
| S-004 |
reshaping ditch
|
lump |
LUMP |
5,750.00 |
5,750.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
4,995,789.74 |
|
|
|
|
|
|
|