Lead Project: 807-06-0003
Parish: BIENVILLE
Routes: LA 795
Description: JUNCTION LA 793 - JUNCTION LA 154
Type Const: cold planing, in-place base cement treated base course, superpave asphaltic concrete
overlay, and related work.
Estimated Construction Cost: $1,300,679.75
 
RankLicenseBidderConstruction Bid
1 08584 MADDEN CONTRACTING CO., INC. $1,473,574.18
 
Item Number Item Description Quantity Unit of Measure - 1 -
MADDEN CONTRACTING CO., INC.

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-D removal of concrete walks & drives 10      SQYD 20.00 200.00            
203-07 borrow (vehicular measurement) 4,600      CUYD 16.10 74,060.00            
203-07-A borrow (vehicular meas.)(selected soils) 1,040      CUYD 14.00 14,560.00            
303-02 removal of existing patches 300      SQYD 10.00 3,000.00            
308-01-A in-place cement treated base course (12" thick) 61,539      SQYD 8.45 520,004.55            
401-02 aggregate surface course (adjusted vehicular
measurement)
240      CUYD 1.00 240.00            
502-01 superpave asphaltic concrete 6,479.2    TON 82.90 537,125.68            
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
300.0    TON 55.00 16,500.00            
509-01 cold planing asphaltic pavement 17,820      SQYD 2.80 49,896.00            
509-02 contractor retained reclaimed asphaltic pavement - 1,238      CUYD 0.01 - 12.38            
701-02-D cross drain pipe arch (24" equiv. rcpa) 120      LNFT 200.00 24,000.00            
701-08 relaying pipe 4      LNFT 200.00 800.00            
702-03-A catch basins (cb-01) 1      EACH 3,500.00 3,500.00            
713-01 temporary signs & barricades lump      LUMP 67,500.00 67,500.00            
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
6.000  MILE 400.00 2,400.00            
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
1.153  MILE 1.00 1.15            
713-04-A temporary pavement markings (solid line)(4" width) 15.082  MILE 1.00 15.08            
713-06-A temporary reflectorized raised pavement markers (tabs) 1,188      EACH 1.00 1,188.00            
716-01-A mulch (vegetative) 22.9    TON 600.00 13,740.00            
722-02 project site laboratory (equipped) 1      EACH 2,500.00 2,500.00            
727-01 mobilization lump      LUMP 67,500.00 67,500.00            
729-16-B object marker assembly (type 2) 1      EACH 85.00 85.00            
731-02 reflectorized raised pavement markers 594      EACH 4.50 2,673.00            
732-01-E plastic pavement striping (24" width) 22      LNFT 3.00 66.00            
732-02-A plastic pavement striping (solid line) (4" width) 15.082  MILE 2,500.00 37,705.00            
732-03-A plastic pavement striping (broken line)(4" width) 1.153  MILE 700.00 807.10            
739-01 hydro-seeding 13.09   ACRE 1,200.00 15,708.00            
740-01 construction layout lump      LUMP 17,500.00 17,500.00            
S-001 saw cutting concrete drives 26      LNFT 12.00 312.00            
                       
 CONTRACTOR TOTAL       1,473,574.18            