| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - MADDEN CONTRACTING CO., INC. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks & drives
|
10   |
SQYD |
20.00 |
200.00 |
|
|
|
|
|
|
| 203-07 |
borrow (vehicular measurement)
|
4,600   |
CUYD |
16.10 |
74,060.00 |
|
|
|
|
|
|
| 203-07-A |
borrow (vehicular meas.)(selected soils)
|
1,040   |
CUYD |
14.00 |
14,560.00 |
|
|
|
|
|
|
| 303-02 |
removal of existing patches
|
300   |
SQYD |
10.00 |
3,000.00 |
|
|
|
|
|
|
| 308-01-A |
in-place cement treated base course (12" thick)
|
61,539   |
SQYD |
8.45 |
520,004.55 |
|
|
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
240   |
CUYD |
1.00 |
240.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
6,479.2 |
TON |
82.90 |
537,125.68 |
|
|
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
300.0 |
TON |
55.00 |
16,500.00 |
|
|
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
17,820   |
SQYD |
2.80 |
49,896.00 |
|
|
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 1,238   |
CUYD |
0.01 |
- 12.38 |
|
|
|
|
|
|
| 701-02-D |
cross drain pipe arch (24" equiv. rcpa)
|
120   |
LNFT |
200.00 |
24,000.00 |
|
|
|
|
|
|
| 701-08 |
relaying pipe
|
4   |
LNFT |
200.00 |
800.00 |
|
|
|
|
|
|
| 702-03-A |
catch basins (cb-01)
|
1   |
EACH |
3,500.00 |
3,500.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
67,500.00 |
67,500.00 |
|
|
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
6.000 |
MILE |
400.00 |
2,400.00 |
|
|
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
1.153 |
MILE |
1.00 |
1.15 |
|
|
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
15.082 |
MILE |
1.00 |
15.08 |
|
|
|
|
|
|
| 713-06-A |
temporary reflectorized raised pavement markers (tabs)
|
1,188   |
EACH |
1.00 |
1,188.00 |
|
|
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
22.9 |
TON |
600.00 |
13,740.00 |
|
|
|
|
|
|
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
2,500.00 |
2,500.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
67,500.00 |
67,500.00 |
|
|
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
1   |
EACH |
85.00 |
85.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
594   |
EACH |
4.50 |
2,673.00 |
|
|
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
22   |
LNFT |
3.00 |
66.00 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
15.082 |
MILE |
2,500.00 |
37,705.00 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.153 |
MILE |
700.00 |
807.10 |
|
|
|
|
|
|
| 739-01 |
hydro-seeding
|
13.09 |
ACRE |
1,200.00 |
15,708.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
17,500.00 |
17,500.00 |
|
|
|
|
|
|
| S-001 |
saw cutting concrete drives
|
26   |
LNFT |
12.00 |
312.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,473,574.18 |
|
|
|
|
|
|
|